Loading...
HomeMy WebLinkAbout20090725 Ver 1_Certification of Completion_20130422L I T T L E J O H N E N G I N E E R I N G A S S O C I A T E S ENGINEERING PLANNING LANDSCAPE ARCHITECTURE LAND SURVEYING 1935 TWENTY - FIRST AVENUE SOUTH • NASHVILLE, TENNESSEE 37212 P H O N E 61 5 - 3 8 5 - 4 1 44 • FAX 6 1 5 - 3 8 5 - 4 0 2 0 • W W W L E A I N C. C O M TRANSMITTAL To: 401 Oversight / Express Permitting Unit Date: 17- Apr -13 North Carolina Division of Water Quality Job No.: 26012 1650 Mail Service Center Project: Camp Lejeune Raleigh, NC 27699 -1650 Regarding: New River Officer Housing - Certificate of Completion We are sending: Ox Attached Under Separate Cover Copy of Letter Via: Pick Up Drawings Originals /Reproducibles E] Change Order 0 Courier Computer Disk EJSpecifications F] Other i APR 2 2 2013 "R ^ U/1L N [X ] Express /Overnight Mail We are sending: 0 For Approval 0 For Your Use Q For Your Record For Review & Comment As Requested E-1 For Bids Due Remarks: DWQ Project No.: 09 - 0725 Copies to: File Signed: Derek Baalbergen n Certification of Completion DWQ Project No.: OQ D'7' County: Applicant: M o. D *Ge Com Project Name: Now RIVER ©F F l "t, Nw e/n/G _ -At Ax O/YV /"O' Date of Issuance of Wetland Permit: _ Ave. vs T 9 _ 'Zoo Q Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWQ by the applicant; the applicant's authorized agent, or the project engineer. It Is not necessary to send certificates from all of these. Applicant's Certification I, ' hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Agnature: Date: Agent's Cert ykation I, hereby state that, to the best of my abilities, due care and diligence was used in the.observation..of.the construction such that.the.constructioti . wP . observed.to be bpiit..within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, "Me5pJA6 .T.-MArlS , as a duly registered Professional (i.e., Engineer, in the State of North Carolina, having been authorized to observe (periodically, -weeld l -tie) the construction of the project, for the Permittee hereby state that to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date ARR222013 wrt -WA