Loading...
HomeMy WebLinkAbout20200362 Ver 2_401 Request Attachment_20210727 „.STATE w” t R gqtlµµxt STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J.ERIC BOYETTE GOVERNOR SECRETARY July 27,2021 U.S. Army Corps of Engineers Regulatory Field Office 151 Patton Avenue,Room 208 Asheville,North Carolina 28801 ATTN: Ms. Lori Beckwith NCDOT Coordinator Subject: Request for Modification to Section 404 Individual Permit and 401 Water Quality Certification for the proposed Rutherfordton Bypass,US 221 south of US 74 Business to North of SR 1366(Roper Loop Road),Federal Aid Project No. STBG-0024(083),Division 13, TIP Nos. R-2233BB &BA. Debit$570 from WBS 34400.1.S5. Reference: Section 404 Individual Permit,Action ID: SAW-2008-02857,issued December 4,2020 401 Water Quality Certification,NCDWR Project No.20200362,issued June 10,2020 Dear Madam: The purpose of the request for modification of the above project is a change in project section boundaries between R-2233BB and R-2233BA which will result in significant cost savings in fill material.The designs of Project R-2233BB are being extended 1,335 LF onto project R-2233BA to take advantage of over 400,000 cubic yards of earthwork in the BA section(that currently does not let to construction until 2027) that otherwise would have been wasted. R-2233BB is a borrow fill (fill needed) project and R-2233BA is a waste (excess material) project - this extension would allow for a more balanced fill budget for R-2233BB and the reduction of tax dollar expenditure with an estimated savings of$1.4 million. Grading will be the primary construction activity occurring in the extension. This action will not violate NCDOT's compliance with any Section 106 commitments nor impact any cultural resources sites. In addition,the extension will not affect any residential or business relocations. This section boundary shift does not result in additional impacts for the overall project. However, it does shift Permit Sites 15 and 16 from the BA section, and places them in the BB section to be included with current construction activities. As such,they have been re-numbered to Sites 19 and 20 to match the BB site number scheme. Revised permit drawings have been provided to include these new sites, as well as revised preliminary permit drawings for R-2233BA which now no longer include BA Sites 15 and 16, though a phased permit modification for that section will not be pursued until it reaches final design. Mailing Address: Telephone:(919)707-6000 Location: NC DEPARTMENT OF TRANSPORTATION Customer Service: 1-877-368-4968 1000 BIRCH RIDGE DRIVE ENVIRONMENT ANALYSIS UNIT RALEIGH NC 27610 1598 MAIL SERVICE CENTER Websit¢:www.ncdot.gov W.nCdOt.gOV RALEIGH NC 27699-1598 Permit Stream Name/ Status/ Perm. Bank Temp. ACOE DWR Site NRTR ID Class Channel Stabili Channel Required Required Impacts Description Impacts zation Impacts Mitigation Mitigation UT to Stonecutter Perennial Stream SP will be relocated into a 105( 8' RCBC with 19 Creek/SP C 879 -- 30 879 879 impacts from roadway fill to the original streambed. Permanent Permit NRTR NC WAM Classification Wetland Fill in Excavation Mechanized Hand Impact Description Site Site Size Wetlands in Wetlands Clearing Clearing 20 WB Bottomland Hardwood Forest <0.01 -- <0.01 -- -- Roadway fill This modification increases the permanent stream impacts in R-2233BB from 4,736 lf to 5,615 lf. The preliminary stream impacts in R-2233BA reduced from 5,413 lf to 4,5341f. There will be no Utility impacts in the extension for R-2233BB. Mitigation has already been secured for R-2233BB and R-2233BA from NCDMS. Since there are no new impacts in the extension,no new mitigation will be requested for this modification. R-2233BB &BA Individual Phased Permit Application Modification July 2021 Page 2 of 3 Thank you for your assistance with this project. If you have any questions or need additional information, please contact Jeff Hemphill at jhemphill(a,ncdot.gov or (919) 219-8581. A copy of this application and distribution list will also be posted on the NCDOT website at: https://xfer.services.ncdot.gov/pdea/PeirApps/. Sincerely, Philip S. Harris,P.E., C.P.M. nit Environmental Analysis U Head cc: NCDOT Permit Application Standard Distribution List. R-2233BB &BA Individual Phased Permit Application Modification July 2021 Page 3 of 3 Highway hwa North Carolina Department of Transportation gStorrnWatF-Y. Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version(Version 2.07;Released October 2016) FOR NCDOT PROJECTS WBS Element: 34400.1.S5 TIP No.: R-2233BB County(ies): Rutherford Page 1 of 4 General Project Information WBS Element: 34400.1.S5 TIP Number: R-2233BB Project Type: New Location Date: 5/27/2021 NCDOT Contact: Matthew York,PE Hydraulics Unit Contractor/Designer: Steven Bondor,PE Dewberry Engineers Inc Address: NCDOT Hydraulics Unit Address: Dewberry Engineers Inc. 1020 Birch Ridge Road 2610 Wycliff Road,Suite 410 Raleigh,NC 27610 Raleigh,NC 27607 Phone: 919-707-6765 Phone: 919-636-6334 Email: mivork(cjncdot.gov Email: sbondor(a�degwberry.com City/Town: Rutherfordton County(ies): Rutherford River Basin(s): Broad CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length(lin.miles or feet): 5.01 miles Surrounding Land Use: Residential,light industrial,rural undeveloped Proposed Project Existing Site Project Built-Upon Area(ac.) 139(proposed pavement) ac. 60.0 ac. Typical Cross Section Description: The R-2233BB project is new alignment approximately 5 miles long and includes two Two lane shoulder section along existing alignment that will be widened. interchanges. Typical section is four lane divided highway with 46'grass median,paved shoulders and median ditches. Annual Avg Daily Traffic(veh/hr/day): Design/Future: 13,300/14,500 Year: 2020/2040 Existing: 7000 Year: 2016 General Project Narrative: Roadway runoff flows to grass shouders in fill sections and is collected in median and grass side ditches in cut sections to pipe systems.Pipe systems include riprap pads or (Description of Minimization of Water energy dissipator basins at outfalls.Two locations include dry detention ponds to reduce post construction runoff to the preconstruction discharge.Ditches include riprap lining Quality Impacts) where sheat stress exceeds allowable for grass. Waterbody Information Surface Water Body(1): Cleghorn Creek Trib 11 NCDWR Stream Index No.: n/a Primary Classification: Class C NCDWR Surface Water Classification for Water Body - Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) WBS Element: 34400.1.S5 TIP No.: R-2233BB County(ies): Rutherford Page 2 of 4 Additional Waterbody Information Surface Water Body(2): Cleghorn Creek Trib 12 NCDWR Stream Index No.: NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: _ NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) ati ,a, 1-ljghwav North Carolina Department of Transportation Stoetinvater Highway Stormwater Program STORMWATER MANAGEMENT PLAN 0Ik4) � (Version 2.07;Released October 2016) FOR NCDOT PROJECTS WBS Element: 34400.1.S5 TIP No.: R-2233BB County(ies): Rutherford Page 2 of 4 Additional Waterbody Information Surface Water Body(2): Cleghorn Creek Trib 12 NCDWR Stream Index No.: n/a NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Surface Water Body(3): Cleghorn Creek _ NCDWR Stream Index No.: 9-26-(0.5) NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: _Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Surface Water Body(4): Hollands Creek NCDWR Stream Index No.: 9-41-13-7-(1) NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply V(WS-V) Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) l \ See Sheet 9A For Index of Sheets — — sTwTR T TR PRa,RCT RPPEREN E No SHEET 2 See Sheet 18 For Conventional Symbols STA Tl OF NORTH CAROLINA PERMIT DRAWING NO SHEETS C. / 1 SHEET 1 OF 37 N.C. R-2233BB i END STATE _ - DI VISION OF HIGHWAYS sT�'Ie PROl.N0. P.6PRW.NO. DR9CRIPTIO PROJECT R-2233BB � �, _AI i 34400.1.55 PE ` 34400.2.5 RiW M 34400.2.7 RN/ L. W m 34400.3.4 CONST. �, � _NI at - . ,), R UTHERFORD COUNTY N Albat - r LOCATION: US 221 SOUTH OF US 74 BUSINESS (CHARLOTTE ROAD) TO NORTH OF SR 1366 (ROPER LOOP ROAD) Nq i D 8 • • TYPE OF WORK: GRADING,DRAINAGE,PAVING,RETAININ 2p'' ANDSTRUCTURES Ca) ...,a.��. -IIpr4114111&. Okrill, � iimi'_` BE IN STATE ,; ' WETLAND AND SURFACE WATER IMPACTS PERMIT W ,--k 4 2 R— �I O VICINITY MAP SITE 16 SITE 13 04.4 SITE 20 1' 1 SITE 19 SITE 1 L -SITE 5 SITE 11 riniq 840t%��`&P 25 TO M__-_ As---`" �� aril* SITE 6 l � , is `` V 31 — � 1 \� ! al SITE 9 SITE 10 -.,. '� ,��� �� 511-Ii---,--_______Iy : _____,....410_ ,.... .1Ip latiglikw,r4p ril 1 ...111111W ).__ , - a-----" VA-- \ vl6 4-1 441d - SITE 15 32 SITE 17 `i- j%�� • 26 _ OWNS SITE 4 --� END TIP PROJECT R-2233BB SITE 7 SITE 14 —L3— POT Sta. 1004+00.00 ON END TIP PROJECT R-2233BA SITE 8 MBEGIN TIP PROJECT R-2233BB V BEGIN CONSTRUCTION REVISED SIGNAL O —L3— POT Sta. 731+35.44 PROPOSED SIGNAL SITE 18 V THIS IS A CONTROLLED—ACCESS PROJECT WITH ACCESS DOCUMENT NOT CONSIDERED FINAL BEING LIMITED TO INTERCHANGES. UNLESS ALL SIGNATURES COMPLETED THIS IS A PARTIAL CONTROLLED—ACCESS PROJECT WITH E' • ACCESS BEING LIMITED TO POINTS AS SHOWN ON THE PLANS. NCDOT CONTACT: NATHAN ADIMA, P.E. V GRAPHIC SCALES DESIGN DATA PROJECT LENGTH PLANS PREPARED FOR NCDOT BY: HYDRAULICS ENGINEER SUIT WYCLIFF ROAD ADT 2020 = 13300 LENGTH ROADWAY TIP PROJECT R-2233BB = 5.140 MILES , �:'� RALEIGHSUITE 0NC 27607 50 25 0 50 100 VP Dewberry PHONE:919.881.9939 �10I�T I 'I',_ ADT 2040 = 14500 ��! NC COA No.F-0929 ®� LENGTH STRUCTURE TIP PROJECT R-2233BB= 0.026 MILES 14 PLANS K = 9 TAT TOTAL LENGTH TIP PROJECT R-2233BB = 5.166 MILES 2018 STANDARD SPECIFICATIONS �4 1�%, % P.E. 50 25 0 50 100 T = 90 % RIGHT OF WAY DATE: DENNIS J.MORY, P.E. SIGNATURE: Z N �'�"� STRUCTURE LENGTH BASED ON —L3— NB STATIONING. g PROJECT ENGINEER ROADWAY DESIGN vilillilli V = 70 MPH DULY 28, 2017 PROFILE (HORIZONTAL) 5% 4% ENGINEER TTST DUAL ���� @®* FUNC CLASS = LETTING DATE: BRYAN LAMBETH,P.E. °P TRX0 r=il€ 10 5 0 10 20 i,I„� ARTERIAL DECEMBER 21,2021 PROJECT DESIGN ENGINEER srg- `� PROFILE (VERTICAL) REGIONAL TIER P.E. Q rc J` J\ SIGNATURE: /\ JJ 6 2' BOPO PROJECT REFERENCE NO. SHEET NO. Dewberry a c�\\o z 96 nccon rvo.F Daze R-2233B6 4 Ia PM S SHEET NO. PERMIT DRAWING ROADWAY DESIGN HYDRAULICS SHEET 5A OF 37 ENGINEER ENGINEER J/ff! SUR AT WATERTS IN ��0000// DENOTES EXCAVATION IN SITE 20 ELEVBMA e4 9L SITE 19 �s�// DENOTES TEMPORARY 356'LEFT /�° IMPACTS IN SURFACE WATER DOCUMENT NOT CONSIDERED FINAL BM UNLESS ALL SIGNATURES COMPLETED WB 2 HASLOPECHANGE Is../ 5``��k 50 0\0 O ` J.W.LSO9GAN 8 BASE DITCH SP 33 O OB BpEPGLI o"" SEE DETAIL 37 p CN ,1 P,26 SY DALLAS JERRY OWNBY h. -I o Mp.S V� S \�1� : MARY ELLEN OWNB EIF CHANNEL CHANGE .^u��,,,, NAD 63 fD V ; 456 PG III,TRAC TWO �' _ �� 'DE � GEORCOO AND& `l-_�_ �• . ...�„_ r � .. � � __ j,`\I LATERAL BASE�1'ITCHO ^"' REMOVE 60"PIPE SEE DETAIL 38 � . � SEE DETAIL 2 ^?, P. urAir, n _ ,, PDE LOUISE A.,.LLANG ��� -L3- POT 743+46 4= �. $ann�� ��I>� .,( ` �sr E a WIC DRL3 POta.743+ 6.24=-a . s "^ PD / OB 860.PG I16.P0"ON OF TRACT FIVE SEE DETAIL E DITCH S O i°Sfl4 E \1,1`� ; ;a 37. 744 75.00 : �r/�f , '� -_ Ns HTR »` �.. 0... 8 �' ,' , !'9k\` `rS Q.L� :- fI "� HORTON-AMERICAN PROPERTIES.LLC y G N \\ C \\,' ;.' ' L- SE 1 w - e�i2�. (y \� 3b - r 2'LATERAL BASITCH DB 745,PG 622 O T' \\, \\JJ TERU G -- ?2`\ '"S� aA O7C8VA. SEE DETAIL 35 RIP RAP ENERGY `\• Fs ' ©©©Ve15 ., e `E ' _ -` !.' DISSIPET RIL BASIN 3'LATERAL SEEBASE DETAIL 36 ,'\ \\ l3\x ,\\ LEE VA' ER O'\ o. \0. _ SEE DETAIL 1 \��1 /\ DB 488,PG 68 "`''G err` o C _ --- A. sG e - Q�� �� FILL EXISTING4 F \ .• - _ (`a CHANNEL TO .. __ .� �np�� . � OTCB .,,iL€. '_II _,A-,�-'� x /A —-- OhA ; \\ 4a``l�� . EL.973.0 \`. 'PS V41'� � � __ -...°__w JB ' H =� Try �,. :, c 0 ''(qti 9 Oa rlut. CEORGE E.HOLLAND 8 ��\\ ./y� /61�� ,'. - _ 8 LOUISE A.HOLLAND ,, �I -- 36 - DB 860,PG K.TRACT SIX "\ ,/�Ij---I- CP III _ef --" •�-y ,-__ - _ - ----_ ,; . \ �' •TCB OTC O..l> `� TOE PROTECTION /Ij 4-r ►►0g -E- ------- CL.ii-RH'RAP P _ ,\I'I iOt �4�i; 0 d' t C 4 i O/Or ��� � SEE DETAIL 34 ,rrIIP rA.� - - ------ ----- EST.7 GYe \ _ I /r O C` \ , rI _- , EST.227SY GFD - 41 1;2 S{,;0 `�.9,�00 \ JB NdM I; HTR `1''�G \1 TOE PROTECTION z2o q3 ,/,,„-_, + `L'"` ,\ssB04 *4I�� J I; ",�°^' \ \\ SEE DETAIL 24\ � QQ LL,, 4� j EDGE OF FUTURE SHOULDER _� _ ; I__ IIa\ �''' GRADING ONLY // FUTURE LANES / o SL-i5a FUTRE BRI B �\ �1 Ln GRADING ONLY m t d HTR -"� ' F M FUTURE LANES \ _ - I i � e CO -lc '�y- I `T'44 —L3— 8r �qo(;,5'3— r TV A� PROP.CABLE �GI f` EL :Ch y, i tsL-r_ _N 5'54'08.7 1'Y \ HTR HTR --_—r_�i _i_ _Y,S GUIDERAIL \ � / v 117 d-153 �4 {I- le‘ 1 GRADING ONLY FUTURE I LN�S R FUTURE BRIDGE i \ PR LU FUTURE LANES GRADING ONLY �a > _� -- w EDGE OF FUTURE SHOULDER £ '` Y25REV PC '''\\� i',:, t ., P �f' i Sta.30+3L35 5 F ceD -L3- POT Sta.731+35.44 � 2 sEFTIc Q ae �'� �. y�10 O REPAIR FIELD �h ( \ -TOE PROD ION END TIP PROJECT R-22338A a ,1�fi �� ---__ * O SEE DETAIL zaPe _ BEGIN TIP PROJECT R-2233BB O` O 0 \ `,, vi . \ \ ; 0 5� V e� HORTON-AMEERICAN PROPERTIES,LLC - - . / F- F \ a`t \� ` GEORGE E.HOLLAND 8 �/ F� D 745 PG HTR HTR F- b \ QC �` OB 860.PG LOUISE 6,SPORTION OF DYRACT FIVE OR•I" \ O. \I" I �� O GEORCE E.HOLLAND 8 - . ` HTR LINE „ I I SEPTIC TA O �-\ LOUISE A.HOLLAND \, sip `p 9 Q Q /_ /� �� DB 860.PG n6,TRACT SIX 4, . �F f Ilt �\ �— -� / r 11 I zr� F v��. 4� ® E- =sEPnc ANK .� BY95-37I1 I ---- 30"RCP III - `r \i ` ,' is 3N""CONC -CHANNEL CHANGE a- 0 w to, €e _ -/rad grbb q �.• R?s SEE DETAIL 38 �.� 2 UCM, I\ ��I �l rx �. a :.:....,.. .Y. i rrrl/r11711/11/r r/11 r lr\i", >�\: ,FGoN cxlsrlNc aiW RUF A�nHc PROPERTY un-E I~Z/) W X ISMTLVUS Q .....a. _ 'nOl YY fiiwo�� rrrruraiirrrrrrrr r \ \ ��� \ rrr" p o III -Y25REV- PT JB� , rlrrr �♦�r\;a .n� �� 9 EIF rVy..piwb4i /Ry;� 1 :ice ftp sw .Fr i -'2L Eris r' a.W ' I Sta.3+88.43 TOE PROTECTION �: �R�Ii +a 6 c 3'LATERAL DITCH EE DETAIL 34 •��+,' '� Orr '� „ aiG IIIII: ISEE DETAIL 33 !NG WW �� ,, '-Rr IN110GONHW < 1 `.� 2GI1n ET ��- 0�►^\ /♦ .1 \ \ 52'C04, -_ kW. or\EXISTING ROW; L9NG-PROFFTY 1IO o.o �' 5 NA ��� i 11xx48 wDrRnl�\sq5. \\ 3 TONS IP RAR\ I•F'o. R FgsF \\ i. OUTLET PROT FILL EXISTING CHANNEL s �Fh \\ 70 S.Y GEO7EXTILE OTCBro EL.935.0 F�FqA O \�\a END CONSTRUCTION q,, e \\� 5 TONS CL 8 RIP RAP �q8m1 \ -Y74- POC Sto.pfB_ F*, \\ OUTLET PRDFE�3�J`J2 \Fr \ ^ 14 S.Y GEOTEXTILE \\ � HE -Y74- PC Sta.10+3293 \ \\�\ ,n n r M7L z s MTL� L\Lgdpr s cMF IN —RETAINQAOY¢a�`O c� \\ _ — =r 4�5_is._s— _——�a�� —— ,_ — _�v 5 rc R \� BEGIN CONSTRUCTION MTLL- _��___ _ sv _ _ m �GPI� -Y74- POT Sta.10+00,00 t_ __ .o - \\ �� — F u�d O __ S t- =0 O—� _au., -'f'✓ '✓o t3'C.5` 9��-t-J'�95'g.. -�l/ 6'CON 2G1-A`V z4°CLAP , T74-AI=PRox,IB CO -..r ��� _�� �E� �41dDPE`-•I 6 CON C -- m s�� i,i G___ -}",. REMOVE +/ b OF \• RCN / i// --HD.-- ' ii- ,-- \ us 74-A 6YF 30 esT EXIST.24"CMP � 24`C NHS 3 it I_ oC \\ - iiii_ rmmi v s \ i -- 04 :I�mr5 Jo.e'C� - --- _________________US rr r � - r--T- -r-- ------r— - cb a u O - y �// ii/ C}tJ'© / _ �- ———+ — e \\\ ,"'1`?,-,•-2rr-,-r'-`, �,-! r^Lr'?trr ,-,,,,,, ,,. 1 ——z-— 00, tiLW� // /� {GCS° �ii —�® __—r—yw-= os \\ .. .. .. a ii /� - \\ -Y25REV- POT Sta.33+72.53- oLL y " _v -.<�%/ // // -� - KeR `�s \\ SEE SHEET 33 FOR L3 PROFILE \!�y ;; /� SP oa 6 // �� y �F, \�\ -Y74- POC Sta.17+22.67 SEE SHEET 85 FOR-Y25REV-PROFILE Lo A6 � / N '" N ,,e, \O„ SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS p6'/ nc con rvo.F Daze PROJECT REFERENCE NO. SHEET NO. Lm- I. a \�,' �99 C. :' Dewberry R-2233BB 4 /� �� \?9no� \ op>��Po9\\�`lol\\,5, '• \\( \` \\o'er • 2W SHEET NO. C g39)5 D loll)OZ 1013 )4 O)a[0» \ \ 1040 \ ROADWAY DESIGN HYDRAULICS 0 �> PERMIT DRAWING RR) a 993 "9s o°s z\�p2z� ozs a \\ ENGINEER ENGINEER SHEET 56 OF 37 �965 g9a) S 9g, 98S 286�8999�\D' n3' Opa 3 1006 1428 >\ 0je\19 )0ZO u+ °•)S 3. 59 966 D9.9 9) 9 9gJ 984 1420 10g 0\ \ 10 96p bb 9J6 80 981 > \ \ / 95 95J 9612 963 964 9a5 JQ 97J , DJ 9 /> 'OHO\ \6,. / / SURFAACE WA ERTS IN 960� ` \ 95 >Po �� 1009 O \ /lllJ/ 95a 95g 3 9>S\ \.9 `9q 992 99q 99>\ \\� \\i ,gyp\ O O'1y / --`9so 951 9J°��� ° \ 100L- \ o> \° �f//// DENOTES EXCAVATION 955 IN WETLAND -411----- ---7.: 9 5 996_ E , DENOTES TEMPORARY ii - ,�8g 94]9a9 955 95> }`�� ��R �q` 9 E- S I �\I° // IMPACTS IN SURFACE WATER g 39 9 950 951 y, am • <\ DOCUMENT NOT CONSIDERED FINAL \ a UNLESS ALL SIGNATURES COMPLETED T \'''''''''' 93 �� D SP a > \CO! 12°13 1014 / /._ 1055 q. 93 0 J. vv3 93d .. 38 4.\ D 6 a \ N` \�e� n� �° S���� 33 oo O >� _ i 9 9 S \ to b' 9zs 9�p �- \w �s\ \`° \ s •� • \ a � / SCN S��P 26k5 o y � a JE R�Q{Y � �' <y 9;g ` s \ \ NAD �\�5 t S �V, 1 I y 1:11;1•\;:iiii"4:, --..,. ._77.01Ts0E-____EE (per ., 0 1 v :Y? `7wtO H o f VA V • ..� tom-��� _y.� "•°' E' Ip.q w i��ti ! pp. �. .x \_ \s z `D. �n.'' 11 \ 'S,-,,,,..------a'-,,. ._--o ,,�s66 "f _ l yI�� I% a �0� J'��� ':8 ' �'- i fl01Es<,� -I(a A �� �,v���� •a g�j 3 B_�., F �., A [4 _ , :�� , - a.i;yr.1{+r. - -9Y�sq d..._ ra , AC�p,A' 1 so _-I_ a 01 __ 6�- �__- A \V `- .9 o... o .Y /" io t0 • �N aYk P \Ris(qa '"La ♦ \ �s> \\ lbw \ a SEE DET L ..95•96 - 471,37 N 1 • �ULVlL \ ��b n$ . ti,' ♦b _ '�' 3 iATE O,9.�C' a \r o` .. P d. _ �.' \� > '2.:�5 566 X�' �y�X966_i T A`�\...\ O,e t 1 - tD-- �/ 0� .,. \ tkg.�� /gyp/' �• '� _ D O0;7'�. j \ `J lid r I9)6 �'\n ?! n \` \-4 % `• \` _ '3)�8e - HORTON-AMERICAN PROPEflTIES,LLC y L F. N F \1ps6 ��� � �� 5.�r tta . V� '\\ `� \ n ] 2 U,ARIAL BASE. D8746.PD622r \ p3 g/a� 1e?22S\' �� 9b \\\ \\�OTCB' �w L� \P'• ._J4 SEE DETAIL s, I 9a6 �• RIP RAP ENERGY ,U? "11 `s �\ \ I) DISSIPATOR BASIN3'LATERAL BASE DITCH \ C ) / i 1. F�i;to \ . \� \ SEE DETAIL 1 SEE DETAIL 36 \ \1�, . ,,. 1L6 �, � � D92v� *\` �s1m� ., �`6. /1�- /A �� I _ � '`�� °j sv• + ='t �j�'%y' •Mz \ Pi\ �\ ° 'u �: 9 r A.��B$•+ w Rai � 6 I < ', a� s, ��� q, �., e \ .Q> � � rcn'hi 37i'r _ - -- � ;.eea_ \*�Pe n6r - . k,,4 , p \ \s 9 i Z.,. .c m ,f - - -- ------ a_- O<b_� r . _ xe�aEeSp 3^_moo"_ w y, \ TO c- ,;fig ` .. - 9a'TCC.�RH'-R 1POs'/' - : \\S' 3k-� '• s °� ••4 ----- EST.7 TONS' r-G1kro - +, 9 _-- i,, EST.22 SY GFD �A �•a.� \\\ P ° ZI, '�\:;\ Dn\ 6 �.b" JB wMF� I; la°� OEPROTECI - Try-- Ln \ s rra ., � \ i; \ O +�'j� na,� y6-\�I J 491. SEE DETAIL 241. '.P i{ �p + •a6 > sty @11 N 9 /i 996 �_-� v ''• •s�\ v -At,‘,t e �a V� - ����� %�;� 2GIF�� , �j��sbs6 �It `� EDGE OFF FUTURE SHOUL ER hi _ L. 11 VA A� ,• s o F ,�.._: i 996 B`5 --FUT RE BRI R t. 1 y Al� 11 tq n . Da + Iltnloa le r - _ --- �er, - rl 4 � I e fzRADING ONLY ��d - -- - - - - fUTURE LANES q L96 . GRADING ONLYItit; = __,... Tr., ., _ 1 996 �i a;` i b \� v'-. _ __ ,may " - i �� rf�gq.� F\ J) 18 _ C; - ( ,' to -L & ORL3 im.- a.-4\MINIIMIENIIIIIIIIMEM,,, I - Fs .asa 6• D c 54'0:.9"W rillll - HTR 1r li TU DERAILE In N ° 7�GI .- i / :'4 ill_ FUTURE FUTURE BRIDGE I� v s PR - w r i a / ' r GRADING • ONLY - --- _ GRADING ONLY u' ` x - Z Pq �'� w FUTURE LANES a / - I� �4 �� _y - -_- ve <:A'sue_, 2GIFG N � >_- r EDGE OF FUTURE SHOULDER ) - f �`/ J 5 h REV PC .p'is,', q_:=1/q/ 0,7°-\ ,_;,;\It. END TIP PROJECT R 22 9 e e Sta.30 L3 POT Sta 73/+35 44 \ \ ��• c a 35 \.\ \ �•40 u w' I -: \ \ 995-�RE AP la FIELD ,/ \ `\\ 1 h f"'�1 (�\ + /TOE PRdTECTION D kN, 338rhe �' * sEE DErAl�rasb Q Z BEGIN TIP PROJECT R-2233Da. `Cfb c5 ,'s,1•°p. � �� •\:�®, i,A E, HORTON-AMERICAN PROPER Q C ---�- -- - `~11' 1\ \ O `sP T, C. °.�*,.\\ir. ` \.G 0 C Y II �\ DB 745.P -:R r*' 1 �. i 3 • F... �. 994 _ O GEOH OLLAND �\ \ �g \•' ® • .: � - _ ' / O uuuasuuuc4Tell Q Art F Lm �.NOLLAND \ 4 \..: :c4\�T ?� n D� ii.4\'�•, `\: L� .N_ .� LI �g_ ��. I�♦ 1 ^, DB 860,P 116. RA T SI. i' �sob� ��` 35/ D ��J _- Tlc aNl< BYq S-3F\I ,/�I T ,' 3 E - >$.. _.q. •aal�ya'. . ,�\�.. Q 1, " : .. R. �.. , ��'['t, 77-..../. ..----0 -99 -- >66� -+. O = D II •i I ,.-�•,- - 994/ a • 4I / es Q� rs i�9 �� n •firx ►� ISMTLeusI ,0i, I .. .. \�p IDaaaii�iS.Asene r4� Cgr L.;�..N \+:i:* ��Eg e4 r6a` 'rl 14�•1 D el \ ,.,�7-" 'IB w/M aasCaa. y�kd\>'. - • -'4. \ \\ Du` del \ 1 .; t /� a \ -. -___-_ f r,.. I al 4 a a\ \ \ ?s o v__ y.. r.a +_\ ��y I // \zsa -- - _ - - �i: e er6 a'�.`a:g,2�as.- _ /Ss .� \`\ \�\, 9 -`�- s. •;.:fx� o' 1 ,- a •• 4e �\ \` \�f°,.: ,L• s D, :S2to5.R3E V PT• - al eS� - ..__� _ TOE PROTECTIO 6 \ `"y.`. 6. � v� ��9 �� -tea sae r •,ems--y�Yt _ NI _ /+88.43`.: \\ >56 ssb�� 'I!c I�ITEFI-- EE DETAIL 34 \os����p� ��r� �: ':L,. Ny'-i11 `Y . 6 AIL 3 z4o .�+ . �� r 1flB966s _sc L115-,p.4) \ ` \ 6 b `- � k ,' Le56 -�' r. _ �\R NI � dab\. Y . l96 096 996�Z9.5=`6\\O ,,,\\ by5h •'\A\' t� . 656 -/ �r. 96 g96 r �fON' .-0\E%ISTIN,uy•._41 r:. as air S96 D9 .\ 5�/ -- ♦•t ' y L 096 ` OL6- ' ;� �. . �X'�-. C96 yb 596 l96\\\\\\`% '� I((l�. - �., :• Y[t[. r4. 696 l. ��. Y 2 '4 .� ) 48"WI RAIL :_ -�_ ''d,. `i" OTCB, END CONSTRUCTION � ���� FILL E%ISTING CHANNEL '.-.. - s Svc •�� =- R 96 1 e ota/ TO EL 935.0 Pr�- u. sT _� a4' y °ppr \. ! ®' t •�--�s >° 7:::::‘,...7"....,:s..61.5.7 ' c�. _ _ • d:a�Kr.� i ' 11 -Y74- POC,' to.17+8' _z�b. �rCb �� \ Q\ D_ eu '.1+--.,rr.� ,.___,64upTuTf . �. / eb°` ea d /�0-6 -Y74- PC Sta.10+32.93 l % = =u •47. =_ _ __ `° =- -` -_L`\--- ' rs= m_R � _!6�/ LL S ��- L66 �-_ TC 866 oN ��� BEGIN CONSTRUCTION - _m Eool i / 7 -Y74 poT Sto 10+0,0.00 L_ `,, 99T 996- o _`i d 1 � _i. -o _ - .� - i�? - -.c' �.�J --ti`-' { �7- --2GI-.4 n995 99, [ 99> UI op �7,06 Og6 6�� .- - J \\ 5 \_ r '��_ / - -�=� -- ' _ fJ ... a. .. tea`-"�1 za"yc- C '- dD CC 4 m '-_r0` °6. -066 B�- ,O°3 \O°a '• s + * iP �=ate. +xa _ y_.�.:,., _ i''- • .w ...... �°c' *FtF - -- m 500I i.6.6, 6a LL66 �/� / / _- 995 RtMUVE +/-�"'• - �N 466E66a ' ij/// r - T __ _ ___-_ ___ (V / / / `��\\ 9 U5 Tq_�6: 995 -9. \ L66 g6666 NO" 100� //Oo _//� �- .7 _ - - \\ _ • r N NT \�gbb MI ° i�� 'a p AF''*f -4* 5.}.` w. \p00 �. :ST .x.Cn' _ _ N DIC yam_ ,4 .� _ ,�{j� EXIST 24 CMP o i� cool /% _ ia•:. -'ry}':�- :•s:;..�_a Sx-r.._v.. �_ 0 �/�y m.�, _Loo\ ��i �/ op\�/ / _ wool ;�_%� ��� 927!•.._�~e'P - 'F '- -9T SEE SHEET 33 FOR-L3-PROFILE r s 9F �\\ -Y74-i'OC Sto-17+22.67 SEE SHEET 85 FOR-Y25REV-PROFILE Ag Ste' /SPN '• _,-,T,ALfl e�,Fi\.- „°'\ \\ SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS IT PROJECT REFERENCE NO. SHEET NO. T v R-2233BB in PERMIT DRAWING RO DWAY DE ENGINEERSIGN HYDRAULIC ENGINEERS SHEET 5C OF 37 SITE 1 • SP 100 e 100_ CENTERLINE 'A-L3-735+;9 NOTE: 1 @ 10'X B'RCBCEL._ BACKFILL KITH NATIVE MATERIAL.NATIVE MATERIAL PROPOSED GRADESSKERADWE POI5, DEG 1005.1 CONSISTS OF MATERIAL THAT IS EXCAVATED FROM THE STREAM BED AT TN: PROJECT SITE DURING 1000 f .02_NO• . L __ CIRVERT -ONSTRUCTION_ NATIVE .AERIAL IS SUBJECT TO APPROVAL BY THE ENGINEER AND // -L3-GRADE IINE MAY BE SUBJECT TO PERMIT CONDITIONS. / POINT -DRL3- 2:1 NORMAL GRADING ON Y 980 2 2:1 NORMAL PROP 100 YR 9:6.7 /. PROP 50 YR I I - 935.3 I I 960 L —TOP OF BANK RT .t`/ TOi OF BANK LT/ `EXIST ROADWAY EXISTING GRADE— N I EMBANKMENT ALONG GL �JWSELI7M .1(4G119) 940 —TOP OF BANK RT / TOP OF BANK LT _- - ` 920 _ / a cSP STREAM BED —EXIST 5 X 5 RCBC n _- -- -- '--- �� INV.=931.• CHANNEL CHANGE �� 1 @ 10', 8'RCBC -- CA.EL= 922.2 CHANNEL CHANGE— —36"CSP SLOPE= 3.07% INV.=916.5 900 0 5 10 I PRO!.REFERENCE NO. SHEET NO. ■ . ■TTI R-2233BB X-4B 260 250 240 230 220 2 0 200 190 180 170 160 150 140 170 110 100 90 E10 70 60 r 50 40 30 20 10 0 1D 20 30 40 I PERMIT DRAWIN=+ SHEET 5D OF 37 - 1111 I _II 11 1010 1010 1000 1000 GRADING ONLY GR 0.020 0.020 j 996.10 990 990 980 % 980 j 970 / 970 / 960 / - - WETLAND 733+50.00 950 / EX. EL. 961.38 950 940 940 930 r I r ' 930. -I r-I---r /.- '3• 920 920 N''m 910 910 T -L3- N.0 260 250 240 230 220 2 0 200 190 180 I 170 160 150 140 1:10 120 1'0 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site JD Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. ID (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 SN L3 778+97 TO 779+40 LT ROADWAY FILL <0.01 <0.01 43 34 1 SN Y2 22+05 LT 48"Pipe <0.01 <0.01 24 14 4 SL L3 797+64 TO 798+03 LT CHANNEL REALIGNMENT 0.01 <0.01 96 18 4 SL/SM L3 797+66 10'X 7'RCBC 0.09 766 4 SL L 797+63 TO 798+0 RT CHANNEL REALIGNMENT <0.01 43 4 SL L3 797+63 TO 797+70 RT V DITCH <0.01 <0.01 10 7 5 SK L3 814+76 LT TO 814+87 LT BANK STABILIZATION <0.01 <0.01 10 17 5 SK L3 814+76 LT TO 815+43 RT ROADWAY FILL/30"CSP 0.02 112 5 SJ L3 815+11 TO 815+46LT ROADWAY FILL <0.01 <0.01 28 21 6 SI L3 828+19 TO 828+28 LT BANK STABILIZATION <0.01 <0.01 11 9 6 SI L3 830+00 8'X 6'RCBC 0.06 670 6 SI L3 832+25 TO 832+56 RT CL.II RIPRAP ON BANKS <0.01 <0.01 34 18 7 SH L3 831+35 TO 836+42 RT ROADWAY FILL 0.11 832 8 SG RPD 22+04 RT TO 18+22 LT ROADWAY FILL 0.05 445 8 WA RPD 17+38 TO 22+04 LT ROADWAY FILL 0.11 8 SG RPD 18+26 TO 18+08 LT 36"PIPE <0.01 32 8 SG RPD 18+08 TO 17+76 LT CL.II RIPRAP ON BANKS <0.01 <0.01 25 20 9 SF L3 864+92 LT BANK STABILIZATION <0.01 <0.01 14 8 9 SF L3 866+00 54"RCP-V 0.01 140 RIIP RAP ENERGY DISSIPATOR BASIN/CL.I RIP 9 SF L3 867+00 TO 867+28 RT RAP IN CHANNEL <0.01 <0.01 55 7 10 SE L3 875+24 LT FLOODPLAIN BENCH 0.01 <0.01 72 19 10 SE L3 874+42 3-10'X 10'RCBC 0.05 217 10 SE L3 874+16 RT FLOODPLAIN BENCH 0.01 45 REMOVAL OF EXISTING 10 SE L3 873+90 RT CULVERT 0.01 51 11 SB L3 968+69 TO 968+88 LT BANK STABILIZATION <0.01 <0.01 10 27 11 SB L3 968+64 36"STEEL PIPE <0.01 151 13 SO Y2 15+24 RT CL.II RIPRAP 0.02 <0.01 35 19 14 SG Y6 10+23 RT BANK STABILIZATION <0.01 <0.01 10 24 15 SC Y11 22+50 LT BANK STABILIZATION <0.01 <0.01 22 14 15 SC Y11 22+80 42"CSP 0.05 506 15 SC Y11 19+88 RT LATERAL V DITCH <0.01 <0.01 14 19 RIP RAP ENEGY DISSIPATOR/CL.B RIPRAP 16 SD Y8 17+18 LT LINING CHANNEL <0.01 <0.01 52 10 16 SD Y8 18+04 60"PIPE <0.01 38 16 SD Y10 15+63 RT LATERAL V DITCH <0.01 <0.01 18 12 17 SO Y2 33+41 TO 34+50 RT ROADWAY FILL 0.01 143 18 N/A Y6 32+02 TO 32+09 LT BANK STABILIZATION <0.01 <0.01 13 12 19 SP L3 733+34 LT TO 736+81 RT 10'X 8'RCBC 0.14 605 19 SP L3 731+47 TO 732+16 LT CHANNEL REALIGNMENT 0.02 92 19 SP L3 732+16 TO 732+71 LT ROADWAY FILL 0.01 60 19 SP L3 732+71 TO 733+34 LT CHANNEL REALIGNMENT 0.02 76 19 SP L3 731+22 TO 731+47 LT CHANNEL REALIGNMENT <0.01 12.0 19 SP L3 736+81 TO 737+26 RT CHANNEL REALIGNMENT 0.01 46 19 SP L3 737+26 TO 737+36 RT CHANNEL REALIGNMENT <0.01 18.0 20 WB L3 733+46 LT TO 733+80 LT CHANNEL REALIGNMENT <0.01 TOTALS*: 0.11 <0.01 0.77 0.06 5615 411 0 "Rounded totals are sum of actual impacts NOTES: Site 4 SUSM is comprised of both the main jurisdictional stream and a trib to the left of the main stem. NC DEPARTMENT OF TRANSPORTATION Site 7 begin on sheet 16 of 37. The stream is completely covered by roadway. The drainage that would have gone to the stream is being picked up in the proposed lateral V ditch to the right of L3. DIVISION OF HIGHWAYS Site 17 is a small area between piped streams that has been covered up by the roadway. 6/25/2021 Site 2,3,and 12 have been removed due to those sites not being jurisdictional. RUTHERFORD Site 18 was not in the original JD file,therefore it never received a JD ID. During the 4C meeting,it was agreed upon to keep the impact site. R-2233BB Revised win 09 09 SHEET 37 OF 37 Hi hWa North Carolina Department of Transportation gStorn r vate1':: Highway Stormwater Program ::410. STORMWATER MANAGEMENT PLAN (Version 2.07;Released October 2016) FOR NCDOT PROJECTS WBS Element: 34400.1.S5 TIP No.: R-2233BA County(ies): Rutherford Page 1 of 4 General Project Information WBS Element: 34400.1.S5 TIP Number: R-2233BA Project Type: New Location Date: 6/14/2021 NCDOT Contact: Michelle Berry,PE Hydraulics Unit Contractor/Designer: Steven Bondor,PE Dewberry Engineers Inc Address: NCDOT Hydraulics Unit Address: Dewberry Engineers Inc. 1000 Birch Ridge Road 2610 Wycliff Road,Suite 410 Raleigh,NC 27610 Raleigh,NC 27607 Phone: 919-707-6719 Phone: 919-636-6334 Email: mgberry(8 ncdot.gov Email: sbondor(cildewberry.com City/Town: Rutherfordton County(ies): Rutherford River Basin(s): Broad CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length(lin.miles or feet): 3.8 miles Surrounding Land Use: Residential,light industrial,rural undeveloped Proposed Project Existing Site Project Built-Upon Area(ac.) 40(proposed pavement) ac. 12.0 ac. Typical Cross Section Description: The R-2233BA project is new alignment approximately 3.8 miles long and includes one Existing alignment to be widened includes four lane divided and two lane shoulder interchange. Typical section is four lane divided highway with grass median,paved sections.Existing Y lines crossing the project corridor are shoulder sections. shoulders,and median ditches. Annual Avg Daily Traffic(veh/hr/day): Design/Future: 10,400/12,900 Year:2022/2040 Existing: 7000 Year: 2016 General Project Narrative: Roadway runoff flows to grass shouders in fill sections and is collected in median and grass side ditches in cut sections to pipe systems.Pipe systems include riprap pads at (Description of Minimization of Water outfalls.Two locations include dry detention ponds to reduce post construction runoff to the preconstruction discharge.Ditches include riprap lining where shear stress exceeds Quality Impacts) allowable for grass. The project inlcudes four box culverts and one bridge that cross jurisdictional streams.Pipe systems were minimized in length and riprap ditches were utilized to maximum extent possible t oavoide direct discharge from pipe systems.Fill slopes 2:1 used to minimize wetland impact. Waterbody Information Surface Water Body(1): LONG BRANCH NCDWR Stream Index No.: 9-37-1 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) ati a 1-ljghwav North Carolina Department of Transportation inv Stoetater Highway Stormwater Program i STORMWATER MANAGEMENT PLAN \ (Version 2.07;Released October 2016) FOR NCDOT PROJECTS WBS Element: 34400.1.S5 TIP No.: R-2233BA County(ies): Rutherford Page 2 of 4 Additional Waterbody Information Surface Water Body(2): Cleghorn Creek NCDWR Stream Index No.: 9-26-(0.5) NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Surface Water Body(3): STONECUTTER CREEK _ NCDWR Stream Index No.: N/A NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: _Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Surface Water Body(4): STONECUTTER CREEK NCDWR Stream Index No.: 9-26-1 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) I-IlghWav North Carolina Department of Transportation !rM'` '' ` Stornrwater la y/1 Highway Stormwater Program ,, STORMWATER MANAGEMENT PLAN (Version 2.07;Released October 2016) FOR NCDOT PROJECTS WBS Element: TIP No.: R-2233BA County(ies): Rutherford Page 3 of 4 Preformed Scour Holes and Energy Dissipators Station & Coordinates Drainage Pipe/Structure BMP Sheet (Road and Non Road Surface Energy Dissipator Area Conveyance Dimensions Q10 V10 Associated w/ No. Projects) Water Body Type Riprap Type (ac) Structure (in) (cfs) (fps) Buffer Rules? L3 555+70 RT (1)UT to 5 LONG Riprap Energy Class I 9.7 Ditch 3' BASE LAT DITCH 28.0 2.2 No 35.312211/-81.925566 BRANCH Dissipator Basin L3 688+50 LT 14 (4)STONECU Riprap Energy Class I 9.0 Pipe 30" RCP 23.0 2.0 No 35.3411112/-81.945020 TTER CREEK Dissipator Basin L3 688+50 LT 15 (4)STONECU Riprap Energy Class I 10.4 Pipe 30" RCP 36.0 2.4 No 35.345175/-81.944245 TTER CREEK Dissipator Basin Additional Comments Refer to the NCDOT Best Management Practices Toolbox(2014), NCDOT Standards, the Federal Highway Administration(FHWA) Hydraulic Engineering Circular No. 14(HEC-14),Third Edition, Hydraulic Design of Energy Dissipators for Culverts and Channels(July 2006), as applicable,for design guidance and criteria. 1 lighw<lV North Carolina Department of Transportation t / 4a Stt)Ytllv1'�11C'Y Highway Stormwater Program 41 T^ STORM WATER MANAGEMENT PLAN (Version 2.07;Released October 2016) FOR NCDOT PROJECTS WBS Element: 34400.1.S5 TIP No.: R-2233BA County(ies): Rutherford Page 4 of 4 Other Best Management Practices New Built-Upon Precipitation Depth Station&Coordinates Surface Drainage Area Area Volume Treated Treated over NBUA BMP Associated Sheet No. (Road and Non Road Projects) Water Body BMP Type (ac) (ac) (ac-ft) (in) w/Buffer Rules? 10 L 622+35 RT (2)UT to Dry Detention Basin 12.5 3.6 0.3 1.05 No 35.323142/-81.942072 Cleghorn Creek 12 SR1 17+80 RT (3)UT to Dry Detention Basin 8.7 1.8 0.17 1.19 No 35.335175/-81.944949 STONECUTTE Additional Comments See Sheet 1A For Index of Sheets i r T� ��Y q NEE See Sheet 1 B For Conventional Symbols STATE OF IN O V'.T 11 JL C A I''O L I I �' d il PERMIT D RAW I N G STATE SPATE PROJECT REFERENCE NO. NO SHEETS ����►�- '� — DIVISION OF HIGHWAYS SHEET 1 OF 26STA N.C. PRW.NO R-2233BA P DESCRIPTION 34 00 .S5 Zik a 34400.2.S5 RNJ & UTIL �, E:-:0 ND STATE -� Ar. R UTHERFORD COUNTY PROJECT R-2233B _`� NI 2L-41111"- N O LOCATION: RUTHERFORDTON BYPASS FROM US 74 BYPASS I RL IFVI TO US 221 SOUTH OF US 74 BUSINESS (CHARLOTTE ROAD) 1:4 * • 14 ' 1 14 ' f kNt TYPE OF WORK: GRADING,DRAINAGE,PAVING �1 AND STRUCTURES V BEGIN ATE J O PROJECT R-2233BA . - �rLirall — CAMw� PRELIMINARY WETLAND AND SURFACE WATER PERMIT DRAWINGS Q VICINITY MAP SITE 4 SX SITE 7 WD SITE 8 SV Hqo �j �� SITE 9 SU B HA 20,, Plaml SITE 3 WF SITE 11 ST \ nl*"I‘c& ry 70 Eili SITE 2 SY J9 41p O O N ti Viol x< `•- w 1 F. 1 hal* NIP N 1..'-';. 41 _11„0. 1..‘ 1 404....4.901114711. \ 1WlpWht ///t4ii r ,,0s��\� ' 4il1a wWt,,"i'Pr4,.'AA llpr I/ , . '0 R(---- pROTpN N SITE 10 END TIP PROJECT R-2233AB ?=, 16 -L- POT Sta. 565+95.27 BK(8.3'RT)= a SITE 6 SW ° MI BEGIN TIP PROJECT R-2233BA SITE 1 SZ SITE 12 SS o, -L3- POT Sta. 543+00.00 AH " SITE 5 WE o`' �,� �, A PORTION OF THIS PROJECT IS FULL CONTROLLED-ACCESS WITH ,G -L3- POT Sta. 731+35.44 ACCESS BEING LIMITED TO INTERCHANGES. SITE 13 SXJ INCOMPLETE PLANS END TIP PROJECT R-2233BA DO Nor IMB FOR I✓• �+a+ A PORTION OF THIS PROJECT IS PARTIAL CONTROLLED-ACCESS WITH SITE 14 SXI BEGIN TIP PROJECT R-2233BB DOCUMENT NOT CONSIDERED FINAL ACCESS BEING LIMITED TO POINTS AS SHOWN ON THE PLANS. UNLESS ALL SIGNATURES COMPLETED CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. �' • `A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE TOWN OF SPINDALE. NCDOT CONTACT: NATHAN ADIMA, P.E. V GRAPHIC SCALES DESIGN DATA PROJECT LENGTH PLANS PREPARED FOR NCDOT BY: HYDRAULICS ENGINEER 2610 WYCLIFF ROAD ADT 2022 = 10400 LENGTH ROADWAY TIP PROJECT R-2233BA = 3.616 MILES RALEIGH,SUITE 410 NC 27607 50 25 0 50 100lib, Dewberry PHONE:919.881.9939 ®i ADT 2040 = 12900 NC COA No.F-0929 ®F C " " ,__ LENGTH STRUCTURE TIP PROJECT R-2233BA = 0.205 MILES �� 4 K = 8 % 2018 STANDARD SPECIFICATIONSIR TOTAL LENGTH TIP PROJECT R-2233BA = 3.821 MILES ®o PLANS % P.E. • 50 25 0 50 100 D = 55 * SIGNATURE: 0 ', T 7 % STRUCTURE LENGTH BASED ON -L3- NB STATIONING. RIGHT OF WAY DATE: DENNIS J.MORY, P.E. I. at 1 1 1 1 1__ V = 70 MPH DECEMBER 18. 2020 PROJECT ENGINEER ROADWAY DESIGN PROFILE (HORIZONTAL) * UST 2% DUAL 5% ENGINEER m��*A ®@,e O10 5 0 10 20 FUNC CLASS = LETTING DATE: BRYAN LAMBETH, P.E. ®R 8wae►9 o" V i i i i i__ ARTERIAL JUNE 21,2022 PROJECT DESIGN ENGINEER s3 PROFILE (VERTICAL) REGIONAL TIER P.E. Sop SIGNATURE: DewberrySURE PROJECT REFERENCE NO. SHEET NO. L. vC I / 100'T I 0' 100' i rvc can Ne ma, R-2233BA 5 it • • • • • RW SHEET NO. I / • • eel ROADWAY DESIGN HYDRAULICS I / 1•i100 PERMIT DRAWING ENGINEER ENGINEER 1 / / SHEET 2 O F 2 6 INCOMPLETE PLANS / TM NOT USE FOR Rite ACQUISITION I / A' 'V / q0 I ' 83 4'-6 BASE,1s1-2L1 SIDES - • 4'-6'BANK HEIGHT I 0.5'FLOW,GRAVEL BOTTOM I BARE SOIL SIDES ' DOCUMENT NOT CONSIDERED FINAL / ACTIVE EROSION / -L3- POC Sto.563+91J6= i / UNLESS ALL SIGNATURES COMPLETED 3 -DRW3- POT Sto.10+00.00 ,L\f,i DENOTES IMPACTS IN WRDAREi R // WXR� � / pB 344 PG 434 i -DRW5- POT Sto.10+00.00 if �yy ;//f371fA // URFACEWATERl"' `�' DENOTESTEMPORARYI IMPACTS IN SURFACE WATEF to -DRW4- P0C Sto.10+00.00 / O + ' . In Ln BEGIN CONSTRUCTION �" l CONSTRUCTION / BA�G N CONS UC ON / ; I v -DRW4- PC Sto.10+50.00 1 hi .1 MAX NA IRCK N -DRW4- • a. I DB 464 PG 45E. u'1 Sto.10+75.00 : II _° I } I I„ SEPTIC - Ln -DRW4- PRC to.11+26.72 1 "� / ��OIRECTIOPIAL ONLY TANK I� : ,o m a R41N LIN O O 1 - '�11� POT 4 SIo.II f85. O SEPTIC REPA• ARC I_ F tn -ORW4- PT Sta 1+8757 1!11I . i lm .. �• a.t I I 0 T OW FROM POND p;1"19i5/ eirtiV I r. EXISTING R/w '1. I ilk" - .�u EXISTING R/N � qi )1tEm. iII'60'WWv --E%ISTING,fI/W 1i1"1X� X - ���� N�� .L�1J.0'E �+ RT 9 p RETAIN DITCH RETAIN DITCH S" \ -�•- 4' / • ^I'�� O O AND RIPRAP / \ �� :� W triii, III O la, p. __ \ \ b _� 233AB BL-101 ci O / RETAIN RIPRAP R .A O 0,,_ ,AP DITCH___ ----.... o � DITCH 1^' �i I \� 'R P RIP-- 7I OATURI A .. //7 "0 3:: ira C _5 C_ i 7'C� HW q•PV /\ -s��11f� co �� L T�T --y I--' �\, �- Ip• , c WIN_, --. Dar 'I ir,�- c_ .. . Lf1 s_ C s�/ f"�_ ` 4•' `-'t-FSS-- 6�STL--lf�� %I T G RAY L� •�.. in MTLL _ T _ __ -�rss� -T PR IAAn�F1--- _ '�r� U5 27J .� a ti � 91.0'LT 91.29' T -F V) �� - - �_ TO RUTHERFOROTON - _ 1. •d � EXISTING P/N '�_ P' M. __ -t 13 �� -_M ..-• r_l� !I r 8' 'VC(DATURI - F55- "IOWl.Liiirt I 1 WW mom i - y�AYi1E - - 1 .-.- -_ aT .I •O Ji _Asgssommoom --T _ 1 --Tc EMP- _ - MTL II F- 8 -- _ - E1 F- �4 --5 W -? \ --- W W - - 6'STL - { W �� _�/_ ... ...-- - RIM II! ! 1` In _�M:.MIL�IGirr ... - T r O s` _F`\-'7.e., RIP RAP Om .. Y .ISSIPATOR BASING 0'TYPETL-3 W W .. CAT-1 a �\ �Y� 27 GFp O F- }+" �4r= - SEE DETAIL 1 SHEET 20.2 - _ - rtai �, e\ 4�' " I"',,D[� _ %ISTWG R rGI �_�0 7,. -r-"<+�+. - 11 RIPRAP PAD F- -F- oIA - ii $111 ir 1 i �Iia EST.10 TONS z ,RJR-..�faZ.�- '� „4� EST.27 SY GFD - -- -- __ ,A, twiny i.: U RK WALLS/ �J Am. F r t; __-- r II1 , �z iiiii \/ em _ _ � HH.11 rQc ..* - � ■ 3 LAT B• :r���� IRIS .lt ,}l I G LAT 2'BASE DITC ' ` J - �P L`� EST.233 TONS t�E N SE[5F2F8NOL A I PUE ate' J, ,_ EST.419 SY GFO■ ,2 r I� W e EST.108 TONS I I 3'LAT BASE DITCH O i ,, , a m A�' t I EST.197 SY GFD 1 Q/ SEE DETAIL C +46.65 PU - •a q PUE •4 PUE /, _7 I 1� EST.154 TONS XT, CH NNEL CHANGE �� .. ^J © / / EST.218 SY GFD 135.13'RT oW r `"`-I SEE RETAIL B II LAT V DITCH -- / TDE I- /� '7 TDE i • ""I SEE p�rAIL E LINE m - BASE.0.8'FLOW29.•- ._T IL B S 4'6 O TDE 2:1 SIDES.GR J j �App� BRUSH / H SIDES STABLE eat {+� REYM D. T TONS a.b: RT O I `Lip a Fib DE +46.07/ _ SEVERAL LOCH i t b / p Eby 6' i2D +8.74' 141.85'RT SITE 1 s -_. 128.74'RT BANK UNDERCUT ppA1N LtE 44,5,4 • • +09.80 +46.94 TDE 13.5 R 180.00' $ 108.73 RT 1 158.56'RT -TDE +09.314'RT O TDE + 7.0� a 1� 118.9 t:+ CROW FAMLr TRUST -L3- Ste.560+00.0048.77'RT ' POC SZ }� I 5 °B B5O PR -DRW4- • POT 5to.12+37 e .•aO `W 1,a, / I I TE,A '�f.1 s1 a,R.Nrid•:t.* s rnN `. 0 C!) n STANK..''` -DRW3-BYRD CROVE POT o ••85 DB in PG 134 JNI .16 CL 11 RIP RAP EXCAVATION = 20 CY rti �`, D SIIIlSTRUiS WITH GEOTEXTILE ITYP.) CLASS II RIP RAP= 13 TONS CL� tt+' •A,(/M•V( CL II RIP RAP GEOTEXTILE= 20 SY {`� ,(`'� D t� WITH GEOTEXTILE /1 `W y� CI 1 I ON BENCH DETAIL A DETAIL C - DETAIL D LATERAL BASE DITCH LATERAL BASE DITCH O4'j ��� LATERAL BASE DITCH - -4-2) Not toS<ple INorroSrolel EXISTING �� 46- ERMING INoftoScale) DETAIL E _ 6 b GRADE Imo, ,�� GRADE • LATERAL'V'DITCH 16,37• lorol I+- NFilloturol I-.- LP , N turol I Not Ip Swle) 5 1- Slope Groun� l,.dt Fill Ground 1"ht. Fill d d D Slope OUTLET,T AT CULVERT d D Slope OUTLET.TRANSITION TO 1 HII f GEOTEXTILE GEOTFATIIE I' •I EXISTING CHANNEL AT END GEOTEMILE Groun 1'lEt. Slope D Min.D=1.5 Ft. Min.D=1.5 H. Min.D=1.5 Ft. '7 p Moe.d=1.0 H. Max.d=To Ft. Max.d=1.0 Ft. Min.D=1.5 H. SEE SHEET 26 FOR-L3-PROFILE I when a ie< e.G' a=z.o H. wl,ee B I:< 4D' 8=3.0 H. CHANNEL CHANGE DETAIL B •wnee e i, e.o- a=3.a Ft. b=5.o Ft_ SEE SHEET 51 FOR-DRW3-PROFILE N Li; Type of Liner= CL I Rip-Rap 6=5.0 Ft. iof Liner= CL II Ri-Ra b=5.0 Ft_ (LOOKING DOWNSTREAM) b=5.0 N. Type p p Type of Liner= CL Rip-Rap SEE SHEET 52 FOR-DRW4-PROFILE FROM L3 STA.553+50 RT TO 554+60 RT FROM L3 STA.554+60 RT TO 555+60 RT FROM L3 STA.561+30 RT TO 563+50 RT FROM DRW3 STA.10+80 LT TO 11+50 LT SEE SHEET 52 FOR-DRWS-PROFILE S � SFE SHFFT 7B-2 FOR INTERSECTION DETAILS X nl 1 N/+rn1 i;; -,.. PROJECT REFERENCE NO. SHEET NO. v,P: Dewberry $ �100' 0' 100' f.... Eii"„He roezB R-2233BA 5 ; av LL \ \\\ \ ........1.1.11 ■ . ■ ■ eei`� R/W SHEET NO. \\1 'j -� 1 ROADWAY DESIGN HYDRAULICS / I:100 ENGINEER ENGINEER 1 PERMIT DRAWING - INCOMPLETE PLANS 1 SHEET 3 OF 26 f 1M NOT USE FOR R/W ACOWBITION N 1 /(4j ,' // ti r / - qI / p�` J r 4' BASE.1:1 2:1 SIDES // /4' BANK IGHT`°" ,5'FLASE :AVEL B TOM ��y1 �' r.✓ .ARE SO)L SIDES _ DOCUMENT NOT CONSIDERED FINAL '< ' 11 ACTIVE ROSION / o -L3- POC Sto.563+9/J6- z UNLESS ALL SIGNATURES COMPLETED 0°0 /E -DRW3- POT Sto.10+00.00 3� j� r � '{"y/.� 1DENOTES IMPACTS IN i -ORW5- POT Sto.10+0000 4" J w SURFACEWATERi �/ m/ E + j, , ¢' % 1 13 `rs or DENOTES TEMPORARY / 7 - # "` 1 ////� IMPACTS IN SURFACE WATEF L S•/ _, • 4 -•' Sta./0+00.00 \ lCONSTRUCTIONO ! i ,,,0 / }v1 1 r. - BEGIN / 2 r• is 1 ' �� i. STRUTic r, I to.l re ' / 4 t, / 7 1 oe, +se/ to r0' 5 D 5AO t w :,,/j/.• . -D- - PRC Sto.l/+ ,r2 I�I�l �� IL3- 'f t DI: �'�" - ��, -y►4.0 0� -D- r �u�• a �I eci Y- ; -DRW4- PT Sto.l/ 8757 g- • l I. I t 41, � w g V� k/W C ti o r ' I 5 p f '+ate e 1,IN.. X 1 F o viz :11,0)iiiiitildriiiiii-1:_',0Lifilsioni os-O � � RfTA1N' `� I �''� Jr t Or ,./aa; aR„a W // �.\�sC: \ / 3AB BL-�01 n ��RETa(NO� . '`. �, ,, Emm. RAP fir+a DITCH. c,g/ q ■ 1+ ���Ej�. _._ A \ -� � C WW-F55��$ 4 PV EATi U?��YRUT P-f7��,i'�}mil °l�L�T � LC) -.-me 'a.- • .,r �S - • - - elT i+- ATEril e D.o t Q �.-. -rt o - -_ AA• -1 --� US?21 -9r 7�- Q r i _ N F� - - F RDTO F- �- T - T'RUTRER D _ y g r� . 'A / - '�' 7 .- ='pC' -1711 .s1nv Cil Ati ,,LBy• -IP .p 1 11 M' T Y - a : wimpri y_3^ � � �.. ` .'EE •� .. ,r r,• �� _ EXrsnNG R% CAT-1 GI-�A).• ih,.` _ L • 1 1 _� 995 tT-R'' PAD.. �S_+. `� '.^P U �::. -e i:.�����::..*•r LTONS F I - '��'� U la 1 V.:V. . Q I ® i� 7`_SY. • F I. --F\ II • .wS'-5�+1h .-••.:may ®1%s@ \\ NNNtt1�q� 11.'• 1 f � _ q 1' �}��. J �� /� @'moo® � �� '�:J � i0� <. �` a - ES.233 ONS 11 ,1N1ar��••k, ; 11 Irt f S-.,.:: 1 %� I ,�'°_ PUE as 6i ''� Es.ary GFD� m `, i�EIST. R. -FL, \ I 3• .T BASE DITCH O _ r1tsT • S GF C1 m 'r// r \ SEE •TAIL C 1 r --+4 E27 PU I D' , PUE- - a '\` , ft 1 •I�WWYLLL L C ANr-E 'iit E1 \ t EST15 TON 135.13 RT - Lit 1 LTG [[HN, ��LJ_ EST.218YFDTD !� � =zI 5EE•'AILI.�NC1 / / E TDE o BASE.0 8'FLOWz9.014141 i lDES TD2:1 41DES.GRAV 113 rT- r�� 'a I, BRUSH SIOES STABLE sE D. O 1 T � iti TONS 46.6%'RT+••.07 A I 1 D EVERAL 40C s �� ZD I ' S sl 141.8•' � NOERCUT v +49�4 �g y%. 'PGT R - K U/- aDS i _ N 00_ / I AIN SITE R128.74'R l T m 13 6 T +46.4 2 65 R �p9:Bo r � E I 0 y 58.56 RT T D \ E • 108.73'RT. i \ \ T' +09.T TOE 8 785 N m � Y pqN FAMILY 1 -L3- P C to.5•0+00.0C, 1'4148__ DB'850 PO 55 \\ ., 7� -DRW4- POT Sr l +37... �+` ..:a.,aa+ 1�0�.8• 9' 'p0 .p `mam \l/\/\ ) ))'''''' ))) �� / ' 1�• `*ht►'% ;** rqq5 / 1 I .1 ',6)= _, r AY e,.,,D ,.,, (-DRW3- POT Stogy 85,5p 7.( % - . v. De Ire w I ! \ -� qq" / EXCAVATION = 20 CY �)1 � E DCp STRUCTtO/ nJ^ WI II RIP RAPCUSS.II RIP RAP= 13 TONS 'if" �a - - /��'.`(I`WITH GEOTE%TIIE 1T1'P-) GEOTEXTILE- ]0 SY . I /14 \ 15 StQ tt+60 CL II RIP RAF ( f _a' WITH GEOTEXTILE y __ ON BENCH f ••r ( ' ___- e5 . -,„___,--_____, / . DETAIL A / � DETAIL C � � DETAIL D LATERAL BASE DITCH LATERAL BASE DITCH - LATERAL BASE DITCH ( /,6' Not to Scale EXISTING �I *� \-\.._ INor to Scale) S G � TXISTING INot to Scale) DETAIL E b b GRADE Imo, ILA,, GRADE LATERAL'V'DITCH 16.37' N I r i► \ 1 Not to Sealel 5 19.4. I. HII Natural I�- Fill �• �� urol _ -.-- Fill 6'E \\ Groan 1rH. Group. 1",ft G�ound 1",Ft. \ d p Slope d D Slope 10 WIDTH AT CULVERT d D Slope 3 �^/ C� - .L� " OUTLET.TRANSITION TO I ^- Fill I \N GEOTE%TILE et GEOTEATILE I' I EXISTING CHANNEL.AT END GEOTEXT LE Group 1",H. Slope Min.D=1.5 Ft. Min.D=1.5 H. Min.D=1.5 Ft. '7 p Max.d=1.0 H. Max.d=1.0 H. Max.a=1.0 H. SEE SHEET 26 FOR-L3-PROFILE Min..0 Ft H. E •When B iz< 6.0' 8=2.0 H. When B is< 6.0' 8=3.0 H. CHANNEL CHANGE DETAIL B •when a�. s.o' B=3.a H. b=s.o Ft- SEE SHEET 51 FOR-DRW3-PROFILE N < Type of Liner= CL Rip-Rap 6=5.0 H. iof Liner= CL II Rip-Rap b=5.0 Ft (LOOKING DOWNSTREAM) 6=5.0 Ft. Type p p Type of Liner= CL I Rip-Rap SEE SHEET 52 FOR-DRW4-PROFILE FROM L3 STA.553+50 RT TO 554+60 RT FROM L3 STA.554+60 RT TO 555+60 RT FROM L3 STA.561+30 RT TO 563+50 RT FROM DRW3 STA.10+80 LT TO 11+50 LT SEE SHEET 52 FOR-DRWS-PROFILE Sow SEE SHEET 2B-2 FOR INTERSECTION DETAILS PROJECT REFERENCE NO. SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PERMIT DRA IN SITE 1 SZ SHEET 4 O 26 , 150 100 50 CL 50 100 150 CENTERLINE ST-.-L3- 56.+17 EXTEND 2 @ X 6'RC3C GRADE POINT : . = 991.6 SKEW - 88 I ECREES - 990 PROP 100 YR. = 971.8 GRADE TOP OF BANK RT — — PROP 50 YR POINT 2:1 qga TOP OF SANK LT. \ \ , \ I NWSEL \ \ • N 966.9 \ EXISTING GRADE ' . • I (do 9) \ AT C'L \%. I' 1 r • • • 970 _ POND NORMAL FLOW \—_ -- --- _ —} -- — �_ K.. LT.• .m. , ,i, l OUTLET CHANNEL — — — — EXISTING INV ————_ EL.=966.1 960 . EXISTING INV 'ED CHANNEL CHANGE EL.=965.8 EXTEND 2 @ 5' X 6' RCBC CA_ EL. = 964.8' 1 -- o�° w� s'Acip o- 6.. I ROOD. FERENCE NO. SHEET NO. I Dewberry NC gi Ln 1 ,r�,1 -um pS Faoa a R-2233BA _7 2 0 I �'"I I Sg��,F,d !VW SHEET NO. Q r old'III © •0'■ ■ ■ PERMIT DRAWING RO DWAY ENGINEER HYDRAULICS ENGINEERS I 1 • SHEET 5 OF 26 `� � �� n �t© �-9O INCOMPLETE NOT USE PLANS SMON �0 I Im o I ,n, CQ� DENOTES IMPACTS IN • I +29.00 I t4 ��/�/ SURFACE WATER 438'LT m A I I m ' ''Qiit /// \\ 3 E .off E \%�397LLT Ok DENOTES TEMPORARY // / IMPACTS IN SURFACE WATER � * \I p/7'BEGIN CONSTRUCTION /y/j'� DE NOTES FILL IN �� \ / o +15.00 , -DRWI- POT St0.lO+OOAO - / • ` _____...\ III �N m/ / a DETAIL C <"\ . �/ \\ \ DOCUMENT NOT CONSIDERED FINAL /0RIRPAP PAD AT 1UR1501CTIONAL STREAM ��, "�b \\ _ UNLESS ALL SIGNATURES COMPLETED k IHmro s�I.l s •;.y \\ \+31.54 ia( IT ; ✓ ' �2•c 328.09'LTjil \ i / rrem.e \ .S/ - \ ti - / .0 02 I / �' Jy►, \\ \V / + i \\ /� Geo.ex.ile 1 o \\3Ser+ Imo/ /` Exist Channel D= Pipe Di°. /,,' \ \\ Is I O1 ,1--. 4•STEEL __ Type of Liner= CL II Rip-Rap \\\\ i \T/.h �1 / °° 20� / qar/--k -_c --- - FROM STA.L3 584+64 RT f\ THE TAKEN COLPANP /�ii\��' _I fl � � ' - �salL��' �I-/ OB 405.PG 633 / - ,� + LATERAL V DITCH('/ // /,a \ / SEE DETAIL B , �0.11�C� m ////e. �/ EST.58 TONS �'• �, & r'/-keifr / I) / . \ - / EST.104 SY GFD „ \ C�� y - 1ti IP�' /% / 1516 111 J..i, IE YtE 11 _ 2 / i'1. 1 1 BE 37 07FENCE 04.75'LT i- T OBT 405NO3! SITE 3 WF STEEE /, /0., / j/ nl X --X 72'CHLXB 35BWX�'I•/ TOE PROTECTION "�'•" y �62 / /�/ I ., f/ 11 \ EST.797TAslLT ii.r.:eiPttIctiliOaTtILOEEI.CT,x1REgki:FilitEl Ti I m O EST.327 SYGFD LATERAL V DI/ Dl, -L3- POC Sta.577+0037=P`�y� ///` I � TIE TRAIEN COIPANY TOE PROTECTIONSEEDETAILB/ � /162.03107.92'lT I DI 73.06 -IRW/- POT StO.I4+`�J4 OB 4pl.PG 6!! SEE DETAIL A ,� EST.39 TONS _END FENCE = �',in +67.04EST.124 TONSEST.70SYGF.�{� �y /G/ a : 129.12'L7 EST.151 SY GFD ���w�.4.9 n411( O�/ i�/ / - .L , c OW ,i. „watt 1Y�62 FT ,F✓ .I. '' " f +tiS / ul AA IJ ' ' Y • Lw■■R■.■■■Iry ■ i i,ih A- - 15"go- .1 c - `� •!In! IDiT1/III I I Ir//IIIi'B�i'cRl.■. •1 N1� _ ►/ - r't Ar'r• 1 n: m 0 2cl — `— — C pr •pi e C.X. Q .03 I — — — _ F _ — p•rp•Nr �� Q0 n3 �� 15""RCP-III I CAT-12GI „. i I�`* - 1 \\ __z_-" -"-"•........._____- ....7„ -41 a-iI.l"a ! _ lk imviirr- v _ sic` ..... GREU TYPE TLC O \ -444 t".", \ l ...-----r". , c, ....:--.---t ak / BEG.FENCE - \ e� \ \N IN 1"' ►I - ---F---- ---, V r,- . # 4 \ --- �99,4 RT +27.51 \I ��y \ 4_ \\ /\ TOpv° , `\ NC. m p \47.99'R� Iy 7:�\\`�9\I� CTS"v°' :.� �3q, y �� Ii; •,,y\ �,� / „ -Y/0- POT Sto.201b0.00 OA— —1 1-,* \��4\ \ v O ►J i /ri a1.. .fir � +� ,.yi!a ► la ro t /t I �yA / �; ,, 11 L 70E PR• ECTION , if F �lAr'Sr�lyirYti d b\/// t '/ ,-,9� 4 �: TIE TRIED �JLPANY EST.3SEE 4� ' 4 SD OEPROTE 10 0'Ssma351fF?'i y \ AIL A �1^e E:.'/ Y ,e\ \ \ . . TO �r o.e•o// / �q ` \ -�• ` EST.85 SY GF��/ ,% mo04 s ��\\ \ i I T E 2 SY TA`^i I \ `/ / "©O / `' �s\'`� _ a� STEVE H.NNTLEY 10 // Q \ @i\,. T Rt0i71o4�9 pRAY gg CROIE h \ /O,aC // \�x� \\ �rBsr\\;+,._..6).(ssC 0 Ifir TR1CT' K OB IlEfi"G 1!4 9��/ I� n��0 _ y//•L3 �'0/P\\\\ S �r\�Uq ExIsrING cHAIµEL SKE icM CO 4.1 ,p// \\ ��-\\\ /-'/ �. /SS t:5 \�\A'\\\\ \\\ •• B°V4RIE5�'3 F}, SILTY 00iiDM ^ \,, \ o L:5 w ,(Ili �t- 7 Fi, , ;•;\- ,2 titi 1\ 1 / _ /9 / �\\\\ \ .- f------- le. • �4"°4/ \s• /� �YIO- POT SIO.25+OOA0 s� Q 9R �\ \� Ip .`,__ I \ o \ v S \ \ - i i SEa __ •, / aD © a \ & ti N /0 i // // I1� • ^i Cm // \ \\ \ E+stryE GE °'ry 7 d iH4i n e I / A N R G.NC /F i ss \\ �.• O ^�/ JUSTICE L.BtICxANAN • // D.B.WO.PW TTi V1• n2Al �/'•. / `k\\ T° \ 300 i, • SEWNR 4CC N. / / 011 IOM PC cee of 4epT,c In o // , m 1 q y0 �/ 00 ss I\ ''1D A Rl?yE,\ q 0(E ESS.. Er•V //\ ti/ \ter\\ \\F°gaT \\\`rs Nam 0 autos, \c\ - s �\ e a SEE SHEET 28 FOR-L3-PROFILE N / / ' �"�°mac„„ � , SEE SHEET 51 FOR-DRW1-PROFILE Sae: SEE SHEET 2B-2 FOR INTERSECTION DETAIL J ROOD 6.. I PROJECT REFERENCE NO. SHEET NO. I o, 100' 0' Dewberry y la m� I / y-9� ■ ■ . R-2233BA 7 rg �S0 �E RN SHEET NO. ti '� O• ROADWAY DESIGN HYDRAULICS � m � � �� I':100' PERMIT D�W I N G ENGINEER ENGINEER " I / \i/-9,6\\ SHEET 6 OF 26 INCOMPLETE PLANS t Im • � I �, a /, ! DO NOT USE FOR RAW ACOUSOTION Ai 29.0! In2 • r( {+� DENOTES IMPACTS IN Pg 14 ,I� 38'L °o �II Np I I \60 y ij //�/ SURFACE WATER `. m \ + �' / '1 DENOTES TEMPORARY � \ /� - ✓ i 4%//� IMPACTS IN SURFACE (14 �� \ retail E L .`BEGIN CONSTRUCTION ///) DENOTES FILL IN ' -^" _� �`. WETLAND , i V/ ) 15:Oo .,.A. -ORWI- POT Sta.IO+DODO _ \ ;-3 , �� l , A\ f DOCUMENT NOT CONSIDERED FINAL \ IIIP: �` / DETAIL C I 1\ \\ ^' tO / / 1 l�� 1 .,,,,,,::::\ 1,�+- V UNLESS ALL SIGNATURES COMPLETED ^� \ ( \ / RIRPAP PAD ATI NoRroS scnlellONAI STREAM / /' j,� ,�, ���'!►l�/c,W �\ Wilt, 3.8.19`L 1,l Q h Exist Channel D= Pipe Dlo. / / ` 6 /' oo/ k�j a I//i//" 1035 � \ \ 'W(•( ' / // l y - 4• EEL G_ - __ Type of Liner= CL II Rip-Rap I .,.�\'�\r 1 ;. / o o /G _ - -I i - FROM STA.L3 584+64 RT 11 \ \ N.'. \•*,kk *49 ) ) i i / l / yATERAL V b1TCH - v`� ��i., I l V 1055 \ � jl- \ SEE DELAIL B � //, �� EST.58 TONS- \ v��� & � ei� �� ` a �� q" f5T..-04(5Y,GFD�. ���, d� • BEGI E _ \ \ • T "'w 0 °, , , , ,x +3 O i17 XS� - SITE 3 WF •` , •y �' �O� 4T YE„se 11.(14T'. •: /. =RL A X� TO' CT , . \\ \\\\ S1 �„- �� %/4 / , DI t `L3- POC 5ta.577+0037= f 71 l \ \ \ 11 \��, s FD LATERAL v .ITCH �� / ! T TAME it TOE L.PROEC ION`\ \ SE a A e = /<63.0 107.•r'lT 73.06 405. EE ETA A F 67 P F= CE t .01 �in 912'LT 4* ST.1,4 •NS a � yqe� D �+ /'/ a_ - l}J 129.12'LT ST.1.1 S GFD ..._ 9 All \'\ J3 n O. .O lT -� ,: ..> iiii Fi 's 1'`�s s CS '49 —— of gT - la ►tAV-••••••••1,--li 0 .44-,' ����tw������ / � �� �lealif -� ett, lit )11 ei r:' '''''' — -1-,� �• / I :RCP_01 DI c .•a R 1 rFl r ft N..t'yp N tv s tt yzt�'1 j 9 �� m 0 f� 2GI I My to ttt / rn ` 03 q \ W /— P �t�t t9t / I!. -a y ..4-, m III ; r /` M-71 — T RCp_II\ _ 1 ��\ I i it 1 .� w !tea I B: ,tiv __,,-, „ to 111111111"'''r5 Vite:61 ' MENMM=MMIIIMMIKIIIIIINIMIIVIIICTOOrA irt--4.r.„ iti-4, ,\ _ .�. .`_ST c C 1045 d_ I Joss GREU PE TL-3 \.�r �1 0 Mill T,. IN ,, ,- - ) 11 Y BEG FENCE ' `1 ��� \N �4`, 1 �, TAr if I lt �.\r441011gli I 99.49'RT I-275� :•? - r �:,��. • �' �--"Fr \%.� ' m •+� �` \ ? �J� m \\\ \ 747.99'RT 2 a \ \ 'i F \ .. r.i '94 -YID- POT S10.20+DODO lc yo ►:ry •4, , 1,!, A 4*9,L.,t•R TpE / -ryR. - //// S9I r.EIPR.�cro ► aiu s 9ii� .uiluttW ,,� S. \% 7.34 iI -' I j ��.:p^,`*' ''s �� / / / �I OE T o ) I �'i�o ? E . "`9`s'��w - \�`\ o / © .� '`C ,� �V � ��T.E ll .\ EST 1rp 5 04 ... \ Z C/ ! a. 10 \ \ E 45 S F \ : ;� �,, : ; SITE 2 SY ��'�>� ,z .. _ �' / �.. „ @4m 7� �,_ �� os\��\� TDE—Jv ST6 aMNri_Ex`I ,. o i�� a:�- �� \��'_"' 44. -. - �� \ 1� • psi -1• SIT\ ( 0 1�:.., / 2 \ OBI 0_.�. %. / - Dry° \'•%sue -:., / ExISi I/f m ' ♦♦ f TCH �-\ • PRIES H \\ : / it '®9© \\ �` na— e:vPRIEs?z PT sun Bono. 43 \)sil ' ..•,, -.-_._______, ) i ..,2 ___-/ 01 ..- \* wSi,. ‘, {{ n 1/4\ yr \\ /,4„:,7v-- 4pB6\ // YIO POT Sto.25 OO.00 a• �T \ �_. ' \ LL _ 1. t A, ° c ti —i/a� © , / y / ��� fi RID la ,�' i,l J ; 0 \ ti,!,117 // / r 1111k \ if A 7 4„ ,.‘ \v1/4 . , ci. ' '' \_1 __ , t. 'F ' : NO. 90 e / \ qF o \// /' �f,ay� / ,V' � I :/9;?g ♦ 30!PG 1098 R Sfa V 4V .\ \� \ x \'S' �0 P N. /' F �CCE r r t• r fP4jR T,C N N .a l �,00 \ ` S V \T R, \�Ht.I s, _-R \ \ S $gym / �/ / b �, 01121412 -,\\\ F_s \�04, ,,. . IA, o ` SEE SHEET 28 FOR-L3-PROFILE SaN r "' °- E ! SEE SHEET 51 FOR-DRW1-PROFILE Sow SEE SHEET 2B-2 FOR INTERSECTION DETAIL r ., _ _ _ _ _ _ _ _ _ I (I)._ 5 10 J.REFERENCE NO. SHEET NO >J �1 N a I I PRO R-2233BA I X-19 1`0 140 1:0 120 1"0 100 90 80 TO 60 50 40 310 20 10 0 10 20 30 40 50 60 70 I aq 1 90 IQO 110 120 130 140 150 J_ J J_ J J ! J PERMIT DRAWING 1 = i i1 11 III 11 i.1 I SHEET 7 OF 26 I 1 F 1 r - 1 - I I I I II 11 1 I 11 I 1 1 1 I 1 1 1 I I I 1 1 1, 1 I 11 1 I I I 1, 1 1 11-- -11 1 I _ I I I--I-1 _ 11 1 - --1 1I I I - -- I T I I -- 11 11 J H 1 1 1 11a— il—I I 1 I- I 1 HH 1 II I Hj - ;- -1 '11 1 - �- ,_ 1 = = --J_ __ 1I I ' 1 1 II 1 1- I - 1 i 1 1 i 11 1--1 -1 1 1 1 1 1 1 I -'1 1 1�I 1 1- 1 1- _ _ _ _ _ _ _ _ _ _ _ - I .�_ �� -�� �� F L 1 , 1, , , , , ,, , 11 .rr r1, 11 ,, , „ , 11 , 1,„ ,, -, , , , i Fri ri -li ,1 , , _, , , , , ., ,, , , , , 1 1 -111111 Jr affilli, L. . ... 0.050 . 1... ' 0 O50 5.266:1 6.1 non 1nAQ 105/.26 - __ - --_ . - 2.; 050 105Q j:: r _1r Dan J„ 1040 WETLAND oan.. ... ... _ _ '0311 1Q8.50 — -- _ 020 — _ .021a —L3— .. 585+00.00 Joio EX. EL. 1020.86 1010 0.050 -3 0.050 5.235:1 6,1 I_ 1QI1Q 060 ...„...--c_J • lO5d.45 .. . I 11 1 050 1 11 HI 11 105Q 11 1-i it 1 oan ! — H 1 loan 1 1 WETLAND • 10 kl I I lnan 07n - --- - - - -- -- - _ - - - -1020 aL F� I1 IUF _ —L3— -- - _ _ I h 1 1 1 1 584+50.00 1010 EX. EL. 1020.26 1n1n 111 I i � a _u ��� —L3- 1 �. FI T _1. 110 14,0 1.0 110 10 100 90 00 TO 60 50 40 310 20 10 0 10 20 30 40 50 60 70 1 80 90 100 10 110 1.0 12 0 150 L . o. Q. Dewberry PROJECT REFERENCE NO. SHEET NO. T I00' 0' I00' iiiii Dewberry ea oonu MUFF R-2233BA 9 ol \ R'W SHEET NO. ROADWAY DESIGN HYDRAULICS";100 ENGINEER ENGINEER / INCOMPLETE PLANS X \i, DO NOT USE FOR E ACOUISITTON Z19 II No a� FRINGES.IWNTI OLIYER / / a LOOM T�0.PB4FMIM Cf, im REF.ELL 200.PH.395 II X SITE 5 PERMIT DRAWING DOCUMENT NOT CONSIDERED FINAL NN UNLESS ALL SIGNATURES COMPLETED as SHEET 8 OF 26 73 f _ _ \'VE X n -, �^ k \TOF f:� FIxA r9j.�, ' o%/ofGYj \ / ,. J$ \ SEE DgfAIL DSE DITCH �Tf 6/,j,c 'c�_� rG.'; SS E5T.7 4 TONS g.s \,.._�Sf + EST.IIAI SY GPO �—S Q ^ a _� LATERAL BASE DITCH \_ _-\ T \��R + �u� -11114kivy__ "� �� SEE DETAIL D EST 734�'� \ V' TOE f � ,A,'^ - 41 - EST.1344 TSY ONGFD 5643' / p W \� n _�_��``vv 17057'LT / Ati Jy N gp�y.6 14 '��! �,Lrc�_r` — `-!►��.s`��\�5 ��44\.�` E—E 0eA yA L .2 BRACE PUIyAN a Og. \• `� `` �n c e^� 1 ' wRTxEL SMNI w ..; �e2s0°'. \\, tl + I -. ft.'� -.T. OB M B G 714 /' \, toe DB B21 Pc 23.E, -T a. / \\� x -1b_ ` �� OB 2i5�P�0 63B BRACE PUTYIN l F + /SB �,� QL/,,�,,(�!��� �'� ft HA EL SIM W TRENY / `Ll=�►f►.�v�\ .�,.� love. -F OB eh PG 23.EXFMIT A / - X ,,,�.F alyli ' ����, 1111111111111.11111111111111111117mmumemmummoiew3 4•S. / 0• 'k1 ?�```I n �" h. fir 'o ,a iiiir .0,,,,- n /ci �e� , �.a - .9$Xz5 W Q Ng." =---_,-__ -_!!,A Nor - . i --, _______ ° N 2B4.40. / / �.ti. X Oi - FS-A GREU TYPE —_ _ F q\ `�� � \,``/ e ' -t, =-=-^mc,J����::\ i l / ................................... /����K���,.ice\`�J i�ii�""� � � � _ O 0 N q9•°�; w� �`\a +� �� 4"RCP-III...„„ mce....... � `_` 36.p. \ �\ ` I!/ s / _ 1I + \ . . \ r e\ 1O l f1 09 /,,F W 4'LATERAL BASE DITCH f0 TO teitiria.,..ATiimrivir:sz........dryt �%A_�,l'Ile \ `\. +\+y. 2GI A1711 42. "AA��Vv �49A /1 TL• EST4FE TONS\ ‘16.4F-AiGi.--4—.--21,...1941,47,4-11.......„ (� X 4 _ /_ �►�� , �� X •P c!(.Qo E5T.373 SY GFD 1S / EXISTING CHANNEL SKETCH!, �� `� t1jj���' ^ 4a O W,B6�./ ; 1. Lf4( Tl I.NKLOMZ /Pi �X / + p FF .4. . \` \ ��� `,^ t` /$'pRINN ®IRyAl�4Tl p a TRACY L.RAFLORITZ / .I. / 0.3 FTT.FLS GRAVEL,COBBLE �✓ \\\� `� �` �� pla yEg DB Xo3 Pc 7e7 I 1 / S„ + o-vaatEs -FT. SOME UNDERCUT \`, ` I�`; J p5 I I + BANKS STABLE TDE 1 R�'.`� H=vAH1EB 6 T. TDE 6, I / ( s.�\ f Sa°� 1 / TOE= \ `!"� ` iRipq SPRINKLENaripAr,o�'`^ II I + \+\+S�j \\� �/✓9,f 21 8'LATERAL BASE DITCH E FeNi`'q,1,Rp(< R/ I 1X + / Z� "573 SEE DETAILC �� i s \ �f oEST.1852TON$P( _$$ / I I f;A / \ EST.2896 SY GFD �56�•�Olp o X F is.64 IUD // /0 ^^ 3dOH.ZI / / + f + Cy / / �® i i \+ // \+\a / / -RPC- Sc Sto.12+DOA0 Luasr ww HEAD& / .RR. \+ + s. -RPC- CS Sto.10+00.00= ai / SPR NK EN� / // 4, + /+ -L3- POC Sto.6/1+94.03 1 ' / / / / / \ +\�+ / f97A0'RTt / l — / H / / / / i IRlRlIC4i qq� O / I I +S' + SPRINKLENR I/ �g / 1 1 / o9,,.Sa/ / 11 . FXS 11►ETTE XEIDv�/ T� I I VZ OB GE PG 220 as /// DENOTES FILL IN WETLAND 8 IRR`Ip4TI /// DENOTES IMPACTS IN SURFACE WATER 4RNK�E� DENOTES TEMPORARY //////. IMPACTS IN SURFACE WATER E La 0 �m a SEE SHEET 30 FOR-L3-PROFILE §'mm. SEE SHEET 42 FOR-RPB-PROFILE SEE SHEET 43 FOR-RPC-PROFILE 2610 MUFF o� Dewberr PROJECT REFERENCE NO. SHEET NO. — �� �\ \100' 0' IGO' rva oon u.:roe'se° R-2233BA 9 •'.'i- \ 4---,n �r \ .......... 1 ■ ■ ■ ■ y WW SHEET NO. _ \ ROADWAY DESIGN HYDRAULICS _ - ";100' I m ENGINEER ENGINEER -� \ "z"'z \ INCOMPLETE PLANS -J m \'\. \ \ ay.� \� rt DO NOT USE FOR RBW ACOUISIT70N w 1• i1' YER ''.... \\ \ . / 46- IR �n ©'°�� ��� � PERMIT DRAWING °-' SI T E 5 \ . O DOCUMENT NOT CONSIDERED FINAL � m SHEET 9 OF 26 �0�m /-� _/ i�—� '�,, �� UNLESS ALL SIGNATURES COMPLETED sac / w.. ; °5 ` L - -' --- °� ,a re r T ONE s/.. ,— \\ g_ J /" �.� / _ W E P ���� �� Ra J � ° �� \ �\ �'sE DITCH v. °s CTj 6/jtgo '')/ , i "SST p7oi . / M - r � ESi lEt4 Sr FD l /°30 ° �, -.. : _ I �� ' i >< A� .1., � LATERAL BASE Dt i 8 ._ ^ ` lib �i�!� pat - EE DETAIL / �o� �@'L 1i `rb' �•. \ V -=.i ST.1 44 SY GF 3 I�/j ., _ pe !!!!mil►\ s ���t� � � ty?!..l....:S.:71 la,.,,..7KIN4ix.IN.s..3020:: .xj:.:14„..:714rI:‘,. 77:.....7,:o_.._.,....„...i...avox:‘: ir ..... .,. 4: .e.,:it, I( e) , - ,,,,„- .....-:-Aftiumm...frtz4iik.,...,..- ,„,,,. 41/4,... -,. v 44111114101111111 .- 4041‘ '-, ,v_ „JAW N, 1\11,41i. i. .._ .._ 4‘,141,14,, 10,0 �— ..i �• s,-R ;'ca `ate �, _ '` ` `� __ kimuitior Ate`" �� � � illt 1 a. F " s �— �� O� 40k- • S_ O S1I'CtllOxNIIIIIIIII am ` h aim, ` ® - � � W_4 L _ --- `O O _— // �/ 1110 allidillim,... ..., 3 be+Ai \ -�'/ �� a-�.. J. = v wf� t- j \FS-A GREY T•1PE - _ � / �\�� 0, A 4 / 42-q1.9140 c ' '..' 24"RCP-III. -v / -. -`� ���,_m\�� , v� � \ 36.0�0.. F N.v.„............. \ /� cpantax. w ��� ,\ .•;�1 / ' it I+ V r �Ye'Via II o�rq®.�®I�� .' O tP�y` �� n �',' 4'LATERAL BA DITCH __���i--'� 1 f �� ItAI� I �"! 1 ��.' .. , SEE It: , 1 . \,� drp���•'r���I �, 1 ♦ F%i ° '� ��'ie:�t gut = \� \ + • , BER' DITCH E ' •� \�, :�_\ SEE DE L E \ fi — / _A,N. - .., EST.206. o S \.� - S I T ` -"'A � � , ` ��" ) ` ��`�®1a \ .SST 373 SY . D 18 / k.EXIG G CHAN'NEL SKET J• L • lvH 0 IR• 47rjpN ��, .••I ,iV�q -, �. �� ii � `� r yw�1'�_ •�. ,SRR."l e� `I� � [}1 L i1--,.../ "! e.3 FT.FL O SI1ME'N.ERCUT BB E ` �j� SX IAFIT \, .�r� + vaRlEs . ` + �VPRIES 56 . BANKS/US P:E / �' T. ` . 1 kV/4i ©a,.Ile 4--- �o TDE �J j �4111.' iY a° �,, } OE ww F i 4 T.y. n, Na/ t/',J I � \ + ,r, 8'.LPITEI�AL.BA' DITCH f 7/' ,�gl. cy �, •' � \_ K�" o -, \ ,013' / �.1 �, n'S". \�/'' LE�<, 4\/ / /\/ `/ I//]� / / + �,., mwl _R CS Sfa.lO+OOAO= - SC 5►,. 2+000ii ... , ., ,.., s , / v gl / 1��„o,—� -L POC SA1 611+94,0/ /° / s m s, (97.00'RTl ma s..) �' / / I o- \ A i',' 'Y \ \ n' k ,3 \1 DENOTE$FILL IN a _ � � //� WETLAND ie O�h �z DENOTES IMPACTS IN \ j/ SURFACE WATER ,A \ \ DENOTES TEMPORARY �� ) ..�)) )) _ :;, �//// IMPACTS IN SURFACE WATER /7.,6,;/ -- r \ \ SEE SHEET 30 FOR-L3-PROFILE o � \ „tip-�� D am \ \ ° SEE SHEET 42 FOR-RPB-PROFILE l "� SEE SHEET 43 FOR-RAC-PROFILE -' 0 5 10 PROJ.REFERENCE NO. SHEET NO. 1_111T7I R-2233BA X-34 260 250 240 230 220 210 200 190 iaor 17011 1 fb01II 150 T 0 y0 4t� Ir 30 20 1] n 11 20 30 0 PERMIT DRAWING II_ 111 I AIL 1- SHEET 10 OF 26 I 11 11 11 11 ' it11 11 11 1111: 1 i 0 0E0 -�� 0.080 1030 6:1 4.784 �� -� 1 1 - 1028.77 / 1020-----________ / 1020 1010 -----_-____- 1010 \ l 1000 j 1000 1000.233 ----_ _ 990 990 -- —L3- 608+50.00 980 EX. EL. 989.37 980 o.080 — �— 1030 ��l 4�84:1 0.080 ' 1 1 WETLAND 1029.27 1020 /= ' 1020 it 1010 __ -------__ j = 1010 fit I r` 'F= —___ / } 1000 -'___ / tti, i 1 1 1000 1 1 �_ 990 1- ----------------_ - — 608+00.00 1 EX. EL. 995.47 a -L3- 11. 260 250 240 230 220 210 200 190 180 r 170 11,0 1°,0 140 1;,0 1.0 10 100 90 80 70 60 50 40 30 20 13 0 Tp 20 30 40 now nev.-n'°..mn..is,io:o-r„�a"onsno,ai.is_,wem.rue w+W I /__`—____ / Q n. woa.r,.,u«<.'wo I 'o \� r Tes,,,,, 1 ------.-, ,2 ,0":? r-----.4. x .� roes :1,./^:c4, rAJ � : t % % r: / -,. PERMIT DRAWING $/ / \a; a � �s �ilikok �/, / y SHEET 11 OF 26 �UUI T�IS 0 cy \,., m_. �. �1 �3���./ems/ * 4�� �� ) r�1�Nv7 40, \"--' ,,, ,,,,_ ‘‘ ..B :+ ,,,, ,,,./ .>,,,,,,--,,, i --.•,,, ,,,,,.,4,,- ,044, „ , ,,,,,,,,,,,..c. -- -- 0.Y __ /�� \�\.j / f air / / m o.,„ ik.: aC / - t ° —_—_—_ /�, '�•-roe .� .; / ... J B ... ,,. 41 � \°- a r �i./. I (\ ( o 17, dr: .,... of / astray:. _ .. . .• y.f �/ a` 1' /_ 1 ! `�.t* ire+, ,ji I o .w. 1 ) e\ J n ice. miliniew ,•+ II r _ . .U� t ems_ 0 I II. �. _/___�S `u—_raw.. ,,/ ,` 1't p �,, oo ....� ✓° �) �� �1til �1 '� °ram ` I. �. '1 �!! ��a ti I -©A� h h//� �` �'1� "� FYI ^ B VW ite MIMI /� inn ff / ;, o :/(.i �!Q .4' �/ °'0 i/ adialiiV� =ems i f T ter—r- R }i s r,.a = ✓--"'�`_•' _, • m __ i 0 m® nr f - .w / 0 0 0p 0 �� i p � `.: „ �o w,� ; 'G7i.6,o r�i1 i p p —�—� - --ram �.. ,//(1/ I i 1/4,.. �� q r. 0 �i C. / �i lrar,F! ruE — �o,' ro \ 0 M !g 0 i sF . ..or e14 ' j/ !/ IOW �.. i��-'C I • / p r� y ;, aid.,A— ;v., / ��/ .,�E ® p SITE 4 SX �6N �� ai . liti ‘ \ 6 ;6 © © / Y ,toed%/�J�440P-0.►\ ' ../ 414111 / / / 4 .... ,\ SITE 6 SW ��° ."17� a " ....%. �� r: � / ta:,, o _ �� �. J N� �'L �� At* ' -\ # a ~� .sue % / • 1 II "\'`` tea\ Z; .•i/ \'�f� r� ;.: ,, v ewe HE� 777��/ \ ` % /.r "'SES 'r�.� il f ` � ;/ ^W c aifi t r /`©* + r, Taft `��.............. //�V/ t su s E�s:=o",e ii 111 No �� - IGRAQPHIC SCALE ...ED w. f n I1 ii 1c :j<„.n, : gym. PLANS k r _ =- ll tiq . ,, . 1,14 1114114;) 47 r : '•- ......--*/ ftw , ° ; �� °Z / - if. PERMIT DRAWING C.\ JL114 1. \ ��: i ,..v., • Ti ///1 i ri ii its . . ... �. SHEET 12 OF 26 � (ir-:) ::\''' Sc f O / ( /wa ®�=' :4. � jilip 43 /'''' 144 0...it% g °3` ;%/ii iv) I, I .i �l ( , ., jam/ �� f/ /., �ty. yM r ff L,_44 _ .. \\\\,t\i , ti P".• ...-,/ /i.,- (lip _..--- , t ,,,:.,, r,..„1,1,,,,,,r;, r ;'mak! -, � . ► '67- `ems !1/ / . , / ,-i'-).7-7,4 „T, 1 .mot J t / rn r I r / II p -pg t!1►. ill. ''''\--N, \ AL, 0 \:),,,_,--:-'-,,, :::______Z'rii ,,,_ ( 1 , /4 1.44r ,, NAEL-Wft.s, .. . 7- .1, ,,,,,j0.4„,,, "; -- II , e; S"..,. .4,, ° r d V 4-•a J e.d� �II , , ' �6 L� B i-PWTitrifi i''' / , — �: / _ -1 �. : ft ~ ter„.._--------- ,\-_,--, ._,.. or- ...... -- --- 7 /f / / 7,t ♦ AiTtO in _r.,-_--- -,,__-7- .,::: , , . I ea f / -. 1 7/ A / -. ----... --- T ' ,JA • -ow' / .,, i \\ Lc,,1_,14.. ,,. ' /I / ---, ./-, --- ..,---- 1 ---Nik ,, \ ) 1 , 1 ,, ,,,,,,, _0 i(if ...___ T.°r. AIM / ./.....*,ivoi.swAi , ___, w, '-'-' '' N — --"--— /•; # A -•• '-, '.'7 -- '..*Z"-....--- °,' ...': / , \ // \ 6 v E.I.i" .• ' ...,....e.ro-.......'r."%- ' . f'//01 - �,, I� ��� - .� ��imj�.�. wild/` 6, . �9�If �4._ ino_ Rio 4,4 a rl •„ ''''- ut* ;I* , �/ / _ I -<, �F AI, k flm 4� is , I,( '.�t� - — T _.�� ...rem- '� �'_- - i W' u� Illil P : .i H� + ���� (��� (I�I I��� \v „B'f � / ,• i _CO Q# _�e'- ^ -sue_ 414 y j _;---', ,,,--- Jr _ of .„------ ..„--,.. ....--- ,, -___ ,, , ,:. litii, i q .l" .� - -:,.,, ` \ 111 1; �� ,— , �/ SITE 4 SX _ e7 ► ; , - - ,/,/ p,...-., , ----- - ...... ..:-....-,.- , _____ ___, ____ �iyf /f'file,e tl E ,,,,r --.... .. . 6,7 y - i r, y li coil ,- •::::::::::::::r j, ,,,,,, i,..4.4440‘.... :. -- iv"( (-, ) 3.1, SITE 6 SW � �>, . .� e, _....,.,,,x,,,1 6,6_:...,::/ -__ •.--- -:// , i;�' dry_ _ - ` �. •� a /� \ �� OPTS war.477 N`� It 07 p Ei ._ 'Iry / i , 0,>° c o SHFP',Y�'® ° "iFFA j St 5...,.- __ / . ,e,mo" sna,v wx mrvc.swno onau € y STq 36 .„� 4�0 Op / '1l m"o.. EE SHEET 22-I FOR GRAPHIC SCALE ig �11111Mi J "�«so «m. PLANS — . - PROJECT REFERENCE NO. SHEET NO. E RMI DRAWING ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER HEET 13 OF 26 SITE 6 SW 200 100 CL 100 200 I CENTERLINE S-A. -L3- 617+72 NCTE: RPB 8' x 8' RCBC BACKFILL ITH NATIVE MATERIAL. NATIVE MATERIAL = MATERIAL MINI EL. 1022.87 CONSISTS OF I�MTE AL THAT IS EXCAVATED FROM = THE STRE• BED AT THE PROJECT SITE DURING 4 SKEW 105 DEGREES _ RPC CU_VERT SONSTRUCTION. NATIVE MATERIAL IS 1020 SUBJECT TIP APPROVAL BY THE ENGINEER AND MAY BE S BJECT TO PERMIT CONDITIOIN S. GRADE PO NT 2.1:1.0 2.2:1.0 2:1 NORMAL 2:1 NORMAL 1000 PROP 100 YR = 965.0 : YR961.2 P 50 964.8 _ 980 (4/2/19) TOP OF BANK RT TOP OF BANK LT TOP OF BANK LT TOP OF BANK RT EXISTING GRADE - 960 - --- N ••�- - -------- - - -- - - � �� � STREAM BED 8X8' RCBC L CHANNEL REIALIGNMENT CL EL. = 954.5 940 I S_OPE = 2.14% Nye OK� JL Rom, D. / / yet"1, PROJECT REFERENCE NO. SHEET NO. Dewberry DETAIL A DETAIL B v / /k 100' 0' 100' oin R-2233BA 11 N / / / LATERAL BASE DITCH RIRPAP PAD AT JURISDICTIONAL STREAM •� 'j WW SHEET NO. / //. INot to Scale) INotto Scale) W PERMIT D RAW I N G ROADWAY DESIGN HYDRAULICS b ENGINEER / / round Flu Gram z:/ � .. .. o ENGINEER GEGTTaF _'° SHEET 14 OF 26 INCOMPLETE PLANS - /' Min.D= 1.5 H. Georenda a Dia. DO NOT USE FOR R/W ACOVIBITION Max.d= 1.5 Ft, Exist Channel 1 'l..-. 'When B is< 6.0' a= 5.0 Ft. y //,�/ DENOTES IMPACTS IN Type of Liner= CL I Rip-Rap 6= .0 Ft. Type of Liner- CL II Rip-Rap / SURFACE WATER FROM L3 STA.640+90 LT TO 643+95 LT FROM STA.L3 645+00 LT %fie///� DENOTES TEMPORARY _ rCN FROM STA.L3 649+60 LT /�' / IMPACTS IN SURFACE WATER H ���� BA FT.R011 DENOTES FILL IN WETLAND sae.TRAVEL. DOCUMENT NOT CONSIDERED FINAL SITE 8 SY YMIES b3 FT. COBBLE,ISOLATED ! óNOT e.vMIES 6-e FT. BOIAOEfL BEOPOEx T.VARIES 2.3 TT. TLAOGE CAROL HYATT � FLOW.INTERMITTENT Nqp 8'-3� • • OB NE PG 609 \ 1 ''' ''\ RIPRAP ON BANKS ONLY -/C) j�E \ SEE DETAIL B EST 1•IP At1;J55 EXISTING[ SxE rCN SITE 7 W D TOE ROTECTION EST, r S GfiD \ �� 10E p SEE .ETAIL C fg Y EST..70 TONS NO FLOM EST.. 9 SY GFD - OW4 -'',•(Q�— Mr BED u smo.GRavEL. \`Q "' ► 8.VARIES 2-4 FT. COBBLE IPRAP ON BANKS LATERAL BASE DITCH L' . — `� V.VARIES 3; NLY SEE DETAIL B @� EST.SEE DETAIL299 A - �TA1 . 30"RCP 4104�A4/. JB uvMH \ 'J •✓ \; EST.546 SY GFD 1 /"OT O SITE 10 ��� ���ir[J AA�•,r�rryrr• -e`er, JB wMH \ \. CL y //� .-- _ SASB �• \F RIP RAP Or TOE PROTECTION•' ` OW ♦ - SEE DETAIL C ./ �OTCB '� vv'MEE. / o ,�E " EST.270 TONS '' ..� r F_.../ ;I , \ ",�\ _ / A� J/MH !r EST. 5Y GFF / _fj / ExiSTI��L i \ 5 S , ..�` JB WMH ' ' /;;��w la" Q _ -.LIRE STA rgFLow �1=/ 6, , ` .7 �b 145.00'LT d v BED Or o=VARIES 02.0.5 FT. i ° -L3- PC Spa.644+6922 _ s,j r� A IC ED T,VARIES VARIES 3 0 FT FT. . E' r :. '•,'Y'',,,,0 BANKS.,,/,rr _ ,-;- .4x_ . OO n \• ----- j. `( Nw ORY ° -T RBECI. •rl�,rr,I,���C — — F EST EST 2305Y • _ lI 2GI •. -` I C --_ c 15- v� � Lf) 2GI GREU TYPE TL-3 O �� RCP-III _ 2GI S INIIME Fz • . •—IL' F7m� �1 N IM J A°� ad __ ma-ice■►'• �1 t IYJll� P s� r� � ,_ • w I \ IW D111 1 ',,' lik —I 1 2GI TOE PROTECTION IL C15 O • 70 �• `.�w 2GI EST.64 TONS ���;JdrrrrprUr7r�rgrr0/rr7rrrrr..r EST.459ASY0 GF,r — / RCP-III4F `— CV _ TOE PROTECTION p. —�, rpWruoura uruuuuuuruuuurur n ua 2�I `x� a EST.125 GFD SY �BA��1�A yr/r -rr ■ *I r/IrAAfI "}l av-_ V O f ''''e'''BtL}i ♦ .:. r4�rl,,,,,, I' � „, Reiss e:-.• �y A���� J • TT �� y�i�� ���� r r w rr w r r r, n�rr+rr��' •j �� ildi + DISEE D 8��.���0•, SEEE DETOAILCD ION • �,NI If EIP 66 441 ✓ T 47 TONS \ ��i O AA�AB'�G + TOE PROTECTION C - \ ANGEL RENEE CPR O MR��I II A"••�j�i�:A. SEE DETA D SITE 9 SU B�9 PG BM m ��E.E t; CIA EST.113 T• �f�I 232 SY GFD .r�/j 4Tj �" / "" t ExISTINL C ,.L. l_ I�,F -/ T MM1fiC HYATT _ \ SEPTIC DRAIN E W F , - ~� 609 REPAIR FIELD LINE:ii1T L'/' -'---04•E NO FLOW /� _ 50).91 ,par BED DRY,SAfp:n•AYEL. -= - TOE PROTECTION I FT. 0 SOf4E COBBL INOR \ / SEE DETAIL C �' e= MIES 12 FT. BONG EROSION EST.225 TONS T. Fi EIEt05 ra EST.216 SY GFD ,� / eIFL EXISTING EL SKETCH _ IA_ LLL jj� • J FLO EIP F.. .' .. . \ E`. /� \ 3 / 0=VARIES 0.5-2 Fi, STABLE AEG Ae .4 irk a,VARIES 3-4 FT, SANO.CJIAVEL 36 ^ / b rc YAHIES 5-7 Fr, PXGAL J.CILBRETH&.As \ l`x �a Od 505.PG.671 . -.\ \ QC 32 r .'"-.............., '' \• JOSEPII;R.JpES REVOCABLE TRUS / D' '94R P.G.Bsx TRACT ONEI • \\\ '-.' / d DETAIL C DETAIL D DETAIL E DETAIL G DETAIL F l TOE PROTECTION TOE PROTECTION TOE PROTECTION SPECIAL CUT DITCH BERM DITCH \ I Nol to Scale) 1 Not to Scolel Nab la Scale) )Not to Smle r7 I (Nolte Scale) We / / Q�CCO �� Q\�of Q�lac Natural h'�Ne< Slope a a E lig Nawral ,y.-CEKB \;\S\°va Natural •'L.\r°;\S\oQe G•oond b 'L.\�°;\S\oQe Gaun d z:/ D Po N N 5.0 ... 5.0 COO Gmaad b Q Ground b CO. F� 1� )b I I d I d s GeoeextXe \fhb \ Ghx., d=1.0 FT d=1.0 FT d=1.0 FT v Min.D=1.5 Ft. ) 3.5q. • / b=3.0 FT r- Gearextlle b=3.0 FT Geotextile 75 b=3.0 FT Georaxrile m Type of Liner=CL IRip-Rap MAx.d=1.5 Ft. tG a'YC 93,)), E Type of Line CL II Riprop Type of Liner= CL I Riprop Type of Liner= CL B Riprop n FROM L3 STA.652+20 RT TO 653+00 RT p � 1 Geotenile \ o FROM L3 STA.641+00 RT TO 643+00 RT FROM L3 STA.643+75 RT TO 646+25 RT FROM L3 STA.646+25 RT TO 647+25 RT Min.0=1 H. FROM L3 STA.649+00 RT TO 651+15 RT FROM L3 STA.646+25 RT TO 647+25 RT FROM L3 STA.647+50 RT TO 649+00 RT N O� / \ Max.d=1 H. L 1/ FROM L3 STA.644+00 LT TO 645+00 LT FROM L3 STA.647+50 RT TO 649+00 RT \\` Type of Liner= CL Rip-Rap . - FROM L3 STA.649+60 LT TO 652+00 LT -j \ ; S ] .• \ \ ltij (] I FROM -L3-STA.653+00 TO STA.654+50 RT FROM -L3-STA.654+50 TO STA.656+50 RT SEE SHEET 33 FOR-L3-PROFILE ..F IT 2610 WYCLIFF ROAD Dewberry PROJECT REFERENCE NO. SHEET NO. / / i .-" © J In 1 .. t it rvccanaa_27607 R-22335A U C ��'�� � —ta,� � �. A Y r A 100' , 0' wW SHEET No. / /�j//� N .RCH '/ f R�R ,AD AT IURISDT I_bNAy$j \L. ' � •• k N°t° eon �-� --' w_ir'4y/}• PERMIT DRAWING ROADWAY DESIGN HYDRAULICS LO �/ - �� , ENir ! 115 " lig6// A. -<0,lle - —�7. DO NOT USE FOR R/W ACQUISITION (tI ilw' M d= 15 FI, _✓ Ex tCh°np� // DENOTES IMPACTS IN � _ OaS Rap %// ,i0 Ft uner� CL p-Ra ,r �+ i SURFACE WATER (((---�—� L3"S • 640 , - 4 / ✓ FR. 645+�'t 1 y�/ / _"�' ` // k ^J ,r / FR• �/ ,/ _ •• 5T• 3 649+i0. LJ N if( /...;,/ Le K7/97 ��/I DENOTES TEMPORARY /l � T Y ���/, IMPACTS IN SURFACE WATER -_�_ � I" �� - J I ��,� - 7/7/7/. DENOTES FILL IN /� ///," / WETLAND 8 _.- - _77 / v F/ i+ , //� — 'S I T E S'I / / / / /i ,- / // . , _ .T� i�, . �_ \ UNLESS ALL SIGNATURES COMPLETED rr- = s ' ,...7_77/ ab ``9`5 BANKS LY 1;�� • _ �.. ` \*.. I , , / (\l, 44 bt--------..------........„..2 SITE 7 WD �, Y \ f / �eb roe d� \ v � I Lp,TERPL„ - , .a ,��iP. .� / � �F �� �-_ _ ��..., aY,.� \��\\y� � k ,,/,/,, ,,,, . ,),/ / � — °�FE DETP --EST.299 / - JIi H, e� c-- 00" \: /7 _ r - _.... EST 46 ' T�/ .. • �� 7R' - \\ - - sQti JN 01....07177,,, TfCTIGNSITE 1 411PAINNi --" )11'4 / ' i :'/ '''''ILI.i-- / -- �- F t.JW / ` SST-7:_,...____=:>'7,571.5„1....t..._t‘....,f.!.!71, / '�•{ , / �� ��� �` "per /// �� s ,—,m,_�� oRt IIII ' v _ j= i o� -L3 PC Sfo _ .� o` �)\,r , - e�•m��' o r _ '/ ���„��-' EST. . TON 11 /cti i�� . - c 1 , ,..„ _ ,,.„ ___ ,,, „.,‘ -, ' —, ,-___.-F ...--- ----_- C EST' sY. `'))/ i,. , , „ ,,,, _ ., ilk ���� 'Aid A ri I J IRCP-III:GI GREU TYPE TL-' r• As Terri (11:71 iliNisiiimmi ,. , Iii!' 71 iDYYi/iii r \ r'\ s 1 �i\'\VA\\�\\\\\ I VI\0 /� ( ar, /.:-.......,_. _. s ��� _ —os. mommitimximmisti ---•.• z A ` ` 2, \ TOE PROTE• _ ��• �1 %%/ / / T E PROTTECTIO\ E.E ,q .� lb... /// � � \ ��_ '� S DETA L D � ',. � �/�{RiiiR./RI®AR.•i:RRi(ICE+rRtlClw IIL7!yiRt?-..�\\ _ ti ': .�A.. 1 / � ~, „ \\ II , „' I � , -- \ / / \ ES 64TO 5 �1 ip.R44lRY' RR R3RR/rY"••R'R3 !bR L'::7RG •� ( � ii e___, N ,111 § lir ! /, /066 _ EST.145 G SY , ".:��_.I _���a�'R g�\V®.Y 1R.` i i7j':r11..F' /� -__.— - � :C p -��� �1�� J�� it V' // / " ��`�'° � } F - !•S 'slat �._ ;v QIt v6 l� �� / 0�� C,�/ �r�T _V.,� v / , R�r4y9.4YRy.G�FriRjaRq`_ ❑. • ! _ �6 se� 7EITT. OF l l / e m ,/ �t�®P �1• - ���� \:.. s r 1 U ITCH), �•�'.,® RlP RA�F 4ijjfJ(u1i! Jllhi t,c.r. ®� �1,4 R _ .. _a �/ - E "::: T.' AONS I' � ./ - T 7 SYONE 143 1�GFD Et - / �/ lux,,,,,,::::::43: -E`b:_L � I I I \\/y '�� I .•9�� �J � P•2� \ ,, LL / N�'I/�l/pN ^ 6 ��9 v ey/ a:A` �\ , a�� �N</..;,,,, ,,,:�,..y���� / . §......::ITE SU � � -� _ , �9��94R F :+� �Y I V t75`48'04• - N � �. 7 / �Q\�� \ I1SIR FIELDORAIN5: ,:_______:(,,/ . _ ,. ...,,,,,i,, ,,,, ,,rv:. ,, ,,,,,,,, �� e t. ,��/� ��� ��� s � I •07.91• E ,.., - � :' 'IffIR � .r d° ea,�\�► �� _ 1 I ._ . , ,,i,,,,,,„. „:„... . . _ill FR ' '''" t\y: /14 -""111111111111111f,---/ ' ,<,/, /' ____------ 17116 b_.,_;,/,,,., (://(11 1.1 /� plj: :PA. roman. \ sa� g a+' �m,� _ _ — ; - Q -o •z° m --- , i5171), , _ m / D. AIL •I : .� � m d T• PROTECTI•• r•1ivrr.++ s , C,�`.p ' - F W' \J men Sefl1 III Q Natural I \\.' N oral. .I\ \S\ape N al .1 \S\O(A / •I..: ] /r' ` y / _ Gtound 1 /f •' G ound� b F G u ,/ b /s / uo d Lr I��. - 1 ¢ i II / d 1.0 ' r�y d=.0 FT - ,�d d 1 0 FT i.AM/d / .ik. ` .5 Ff N'r r N/6b,T. � ;ejogor // 5 3 FT - b- .0 FT Geotextile -3.0 FT -- • °vexiil. rr" 79\S9- 111 T�pa_ofTiner L IJJYY 5 FI. m / d p f L ¢r N R prep p f L ner- R p p Typ of Liner- CL S R pr°p .02+a 0 R 6.3 .0 R "e Georen le —'/ FROM L3 SIA 6¢7 Ob 'T O ROM L3 5 643+75 RT TO 646+25 RT FROM L3 A.646+25 RT O 647+25 RT I Min D-1 Ft. �` II/ FROM L3 ST 6149t+QO 'T T RT',,FROM L3 A 646+ 5 RT TO 647+25 RT FROM L3 •TA.647+50 RT TO 649+00 RT / N Cr. J 6 C u Max.d=1 F1. � FROM L3 A 644+00.L' 6 0 :'FROM/ • STA.647+50 RT TO 649+00 RT C C. / 2 •I ype of er- CL I Rtp-Rap ccnn,, _� FROM C3 TA.649+60 -f \ �i / 4y ��_ p // /1/\/��• V A'' FROM -L3-STA.653+00 TO STA.654+50 RT _� ((( FROM -L3-STA.654+50 TO STA.656+50 RT SEE SHEET 33 FOR-L3-PROFILE 0 5 10 PROJ.REFERENCE NO. SHEET NO. ICIA [Id R 2233BA X 63A 40 30 20 10 0 10 20 30 40 50 60 7D 80 90 100 up 130 140-- I150 160 170 160 150_ 200 2 0 260 230 2%0 250 260 _ _ PERMIT DRAWING kkl - SHEET 16 OF 26 j 1-1 k C • CFI -k k, -1_ Ik II r— If, _, , 1, , , , It _, , , , , , ,_, 1 , , , , , , , ,-_-= , , , , , , , 1 ,_ T 1 _ 1 002o 0020 _ 1- 1040 1040 1030 1030 11 1090 102A j I I 1 1010 1010 r=kl kk b� I I ;I I kk r �k' 1000 1000 -.\ 990 III 990 WETLAND 980 ` 980 =1-� f 1 I 970 r _i 970 III I 960 -IL [_—� k- I I L 960 - _ 950 -L3- 950 643+50.00 EX. EL. 954.25 -L3- �1 L- b 40 3p 20 10 1� 2.3 33 4.3 5.0 60 70 83 90 100 110 120 130 140 150 140 170 150 190 200 2"0 220 230 240 250 260 IT o. PERMIT DRAWING "` Dewberry PROJECT REFERENCE NO. SHEET NO. a N 6 MA V MI:A" R-2233BA 13 tn SHEET 17 OF 26 RAN SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACOUISITION i / Y pQ rn / . I I _ DOCUMENT NOT CONSIDERED FINAL J UNLESS ALL SIGNATURES COMPLETED / 0, .� ,.E _. I L____J i _� NAD 83 &/ 1. BFG 16G` 1 - - BEGIN CONSTRUCTION 4- 4 / - 0� j DENOTES IMPACTS IN O EXISTING CHANNEL SKETCH ra'7/'' —DRW6— POT Ste./0+20.00 i7 x 1, // SURFACE WATER N I f -C%rtW6- POT Sta.I0+00.00 } ✓// DENOTES TEMPORARY U.S FT.FLOW I I 7 ��° / IMPACTS IN SURFACE WATER SILT,GRAVEL.SOME $ �.,J 9n `r1 0=VARIES 2-4 FT. +� Ln r E=VARIES 6-6 FT. COBBLE.STABLE VEG 1.�,. N T.VARIES 8-10 FT. ON BANKS / TDE '� O �`t,t -DRW6- PC Sta.11+gB.72 O �--, -CL 6 RIP RAP (� 39 43 I I I m m Est 5 TONS © \ Z DOUGLAS W.ARROWOOD EST 14 SY GFD �Rl- PRC Ste.29+91.79 �� 0 D.B.866.PG.35E KATHY PATE MORGAN - t- '' S i - PORTION OF P.B.6.PG.152 LYNN PATE hrj, E E E—� ._ T.O oe n67 Pc 785 TDE A RFM ESE W �F 22:: 146 E� ' Z I\ �, LOYD C.PATE,JP CL B RIP RAP F �t rcx Q 'O /CHANNEL CHANGE �B n67 PG 783� EST.S TONS �� 0 SEE DETAIL E p ,�___ __----_ _ EST.14 SY GFD •O CO Ilk / >s�►a . N Iz'�'a it• oRaIKL ''a- ���L��—� ^;rx - i / 0$414$%���. O W . �' sue! __ rr !6 ►I �cPTlc try?/ t F � F_ F_-__ \\ _ -_,,�4�'�''i ���ii .V C Fp_ .� © '� - \� '18%MH �Cg�'S''' • ��/�/ ;, , _ 1441. -DRW6- PT Sta.13+3 .99 �� �f�� -�:r 0 •'' `fir 4' ��J l w LOYO PATE& 1:. _ 1 0 \xx �\ fix 9.4**`�� SOT 170 PROTECTION e Wea���� yy PAMELA LYNN PATE / ' II �' # EST.170 TONS I C / '��'/�'� 1� D.B. 584 } F p WF x ✓/'���r EST.215 GFD c G Js H z �.,*1'1���� 1 ▪ a°W 7' —` _____F i` \\ !� _ F r�1'��' !Ii �.w'�! ,.29. 46 CL B RIP RAP_/'� I \ \__tx # x ) �� ?��� V IF �� I 1 '' EST.2 TONS ���_I S } ✓ `-`� " /� `mac GQ 24"RCP-III '"5 �1 EST.7 SY GFD P Q' ■ II .X L0Y0 C.PATE,7 JR b �� / / / _ �y ��I �, Y —x -X 08 1167 PG 783 I �� % ., —SRI— POT Sto.28+00,00= 4,5 n �,I I [ x I I S' "•' V-° -DRW6- POT Sto.13+75.00 S c f 12GI ' i I I Ii `L I N b� BERM DITCH <7 f ■ Q WW FENCE l]]] o•(T�WW FENCE 15"RCP-III�� ,,...._ s9�l SEE DETAI.C ! - �� a x F•• C.A EST 124 SY GFD _ L17 *Ive f � / zGl 'x ` e ` ,,, iL —SRI— PC Sto.27+49.39 ���,F _- Fs 2GI . p zGl /Id - �- v Rl lti�r. P J a m I ' �.��, ��' x a � � `" n r1�A J N vs n_ 1r'►• O w \\yIUf+ I .- I 'I �`1��15"RCP-III L 15"RCP-III —I I 4' `� po ( / 2GI 15"RCP-III = - IIri- I I_ C'� - - ...A11111111W ,..1 /" ■ 2GI z D f N ' a r- C j.. x r 1 2G— I�,r FS-C • Vf a1 'f' Z 44 ('? U7 iNS om„s,� E_ I Ie I�1 I --��'F — 2GI �� 0 i O- / _"-- C / �D 0° @P"4t / I ,5 I X _ 35"yC--F_-_-_— F C _ )yj0 1- olik 7 irk —22 / //��//I �� A n 14-$._j,7",ifiliI X I k ��5���1♦1♦1•�li►��3 LOYD G.1167 PG E783 CH•11,0440- \- ci k /j a45 �11NN sosN 0 0p k . i//i////, A ' ^/Itff? �;., •'' i A���4i�����4��� ,.. +z9:06 �- +B3.ts PUE 46 X t 11/ I /�// /Ai/�/ , 'a"5�11►60 /' ® 22. t 130.21'RT e:q 4.� fey157.11'RT r 43. _ / I ri.!/!!� 4,4 �t • _ +47.5B • - / KATHY PATE MORE. TOE PROTECTION / ///yF'-�I /U/jl'��/T/�IU//'��*�4440 �' Y y 154.07 PAT +62.22 NEY PUE JDST2 T.MCcJ LYNN PATE SEE DETAIL A ;'�� //.,/yi 6///IA.l1//I` TOE PROTECTION 160.5'RT DB 2026 PG 4557 k DB n67 PC TR5 EST.152 TONS � ��� r SEE DETAIL B CI Q' s PUE ,.,j EST.191 SY GFD y Tgyyy'/� I r EST.357 SY EST.366 °GFD 177.8 NS 6 R 45 lj ei m7'7 p .tI �: I„ ,. +49.56 KEVIN MARTIN PATE �,. CHANNEL CHANGE"' I RI C,r JST "UE SEE TAIL E / }" RX Ad �/ L� SITE 11 /� FILL EXISTING CHANNEL C k � � .� 1 % TO CEL.245 s: r' ''��e' 8 ---, TDE /"� .a F� 4. D- E \ � . 3 ..,, 't sr� /;',z ' SEE SHEET 35 FOR-L3-PROFILE �m ranr ,1 L'� -. IS �. SEE SHEETS 49 & 50 FOR-SRI-PROFILE S � SEE SHEET 52 FOR-DRW6-PROFILE . PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING Dewberry OP° R-22338A 13 L SHEET 18 OF 26 RNJ SHEET NO. ///• ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER \ INCOMPLETE RiW PLANS \ DO NOT USE FOR Rf W ACQUISITION / / / 0 \\ -.-- k h / , ., ISMTL \\ (,;,7DOCUMENT NOT CONSIDERED FINAL �`�/ \ 1 � GUNLESS ALL SIGNATURES COMPLETED \„,,,, .f?li , , \,,,„,,„ ,,i_ 7 BEGIN CONS R CTION y\\ Ti//7/y .„ __ +. �. f � .F DENOTES IMPACTS IN �� \\ �E . �G �. DRW6- PdT Stn.ld 2d.d0 k . A\ j SURFACE WATER / \ N',,,K m T / -°RW6- POT Stn.10+00.00 i�.'. a s �%\\ % MPAOCTSS INE SURFACE WATER / e a i E� a`1 \� TIDE : cV 11'�� I �\'L -DRW6-\C f;t/t98. 7i I ' g�1P RAP I �C� Tr° / / 4` 7 GL TO. 1 „/ D I Elk I 0,,) EST;4 -SR/ PRC Stn.29+9�, ' (f, UG W. WOOD a .8.86 G.35 tbU _!a&JAL 757:7 • /:______QL� �' > ).ir,1',on,,t . ol.a ,.I\_ Q � \ M► • r AIL Dr , fp•\ / 7 ./ 4 it eekk// I yq �►�j ir° Plih:IL ipst N1�•• \I �:✓ „ 5 W ��b `, #J., 6E G o f a. _ F ' � •.••� ET\21. F dill \w1 el i• I ��� FF 46 ��, aIPR.AR-��� -�'� ,�, <,„1• ic �, �� Esr.2 TONS ��{witeoope dli��_ :u i P LOB \ EST 7 SY GFD \ �_�=.xm� I: I‘V if 1l ■/ E\1IIINII11�IH1ll 1121N11111NINIIAIn11lnN111►f�®1l eke u , _ fr 1 1 1.- al� �� # nI�L� ;�\�11]♦v�ltastm���lnrl11111111111►11N1N11111I \\ °4',c //�II11111111f1 11C�IIi11 '� Sr �SRI POT Ski.28+OO.Oo _ � � d'�;� �' r" �11Y6- POT Sto-L 3+75.00� Pill gnn fill i'_ '� 111611 FENCE/�_ 15"RCP III 1 � ,-k'-` -BERM DITCH �� 0 Cl O Lt11111111‘11//1111111/ �� N I_I' �C .. _ NC �B SEE-D dILE- \ _ /“41 I Bri y , 1 , i SRl- PC Sta.27+49.39 I ; �' ENCE _ ,;,��o 1 EKE a ��� iiiylT' � r� II ra 65T�124 SY GFD / + 9 _ ■■■ v N�� _ F ���FS 2GI/ — �__ AMP' L. 1 ilkii ///IIIII/IIIIIIIIIftA(t\11N S:m1:1' 1hIAIIIIILW:111i111 Y I 6 F ii alillii1111111,1111E11111111111111111V1r/Iffailll! liilii, oa v I / i I/r72f♦�A//11111A111AN1\\\\�11'U Ll t1\. imil �i II I!ri 3 - M rammillY ifgAIIIWILI1i1MWNIVIV IA MAW Y G r j 2IFSBIIjIIRTPIII �I l - O I I i �f• a//)/ � � _Ell/ dR_I� I_II_I� ---YI III --- ' '�'�� �� Hill i _� " Lu r / g�1 j l -mrs O gyp N\ \� ��;llwwsI_NIIIIY11Riigni 1111111N 1 �_ ■I I _ i r _ If11IW!�!!!.r■ E CT 1�, cLvy g _ , -------___ v) P RJR! �ri1j/hI1//1JPPI!LK1L -'J/�� � 7,.. T ��if I z\ 11 c c -- ,V � 14 o�� om uR�••►I��iup • �� iil II �o:DUSi F-'WIN - Ill -' . 4164,41*i ;l'ab hi/,, itsII u1rllt1rt : ':1 sm4�j \ a I ••4+1" �1 i IU Im'ykl �P iiv-ail i 4I ••d N•,8'l/ 6 + 71: IYPST RGN P• • , �1 UI/3.I r,.....1x••rr•0 11Iu" f16 7 \L-r8 - JU INT.MC�LUNEY \Y N A E EE • . � %q••IET•PA• N� IIE P'O I• / 160 �� OB 202PCt557 \I ( y� 77 D:AIL B1. Ek- �\ .-.67 P i E, 1.2 T• � r 3 T• 5 +2•.5 J \ E. 1;T S • "11;flr':111111!°H ��'/ 5.35. SY .. (77.8'R � / \ 1I lY \ \ d9.56 KEWNIyiARTIN PATE �� ��3A i C � /\ li , / / y� c if " � 11 ST'1� FILL 1(I NGGI4! I ■ ■ 9e , s:\ J� TO DEL.t45 e;1.'o k. ti, i 1► s 2 /,i 4v A , ) gill ' Ili c //74 1 " , ift • t \ \ . h9-4 / P a' 141 ° \� 1� �Q\� \\.Ea\ \ \i1 . i \ • 'P �\k. \ \ \ \ '.., SEE SHEETS349F&R50L FORK-OSR1E PROFILE o SEE SHEET 52 FOR-DRW6-PROFILE 0N. PROJECT REFERENCE NO. SHEET NO. N. v ROADWAY DESIGN HYDRAULICS to ENGINEER ENGINEER SITE 11 T PERMIT DRAWING SHEET 19 OF 26 100 CL 100 CENTERLINE STA -L3- 672+17 NOTE: 2 @ 8' X 8' RCBC PROPOSED GRADE WITH SILLS AND BAFFLES BURIED 1' BACKFILL WITH NATIVE MATERIAL. NATIVE MATERIAL GRADE POINT EL.=1004.25 CONSISTS OF MATERIAL THAT IS EXCAVATED FROM SKEW = 87 DEG ��_&- THE STREAM BED AT THE PROJECT SITE DURING 1000 I CULVERT CONSTRUCTION. NATIVE MATERIAL IS GRADE SUBJECT TO APPROVAL BY THE ENGINEER AND -SR1- \ FOINT MAY BE SUBJECT TO PERMIT CONDITIONS. \\111\\\44 2.3:1.0 2:1 NORMAL PROP 100 YR 980 = 945.4 2:1 NORMAL PROP 50 YR = 945.1 I I \ TOP OF BANK RT 960 EXISTING GRADE NWSEL=942.3 (42/19) ALONG a TOP OF BANK LT I .sue t - - 940 =- TOP OF BANK RT -1----- - ` -- ----- 1STREAM BED - 7-- CHANNEL CHANGE 7a R' X FI' RrRr TOP OF BANK LT -24" RCP GI EL. = 936.3 CHANNEL CHANGE INV 935.0 SLOPE = 1.95% 920 OFFSET 13' R. oy oWa E' f ROAD Q. 4,L,f _„oN 27607 PROJECT REFERENCE NO. SHEET NO. v f- ! a;. Dewberry ncc"o`n rvoFucze° R-22338A 15 //// DENOTES IMPACTS IN SURFACE WATER WW SHEET NO. 7/y/ / ENOTESIN E SURFACE WATER ROADWAY DESIGN HYDRAULICS ENGINEER PERMIT DRAWING ENGINEER INC® PL E1[E CLANS \ 4) I SHEET 20 OF 26 DOIvI NOT USE FOR ROW ACOIIISFTION \ 1111/im=-----{-2161°.-- Mom`h1z `;r ` I NAD 83 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Ln , 0 Ln \t\ Ii i ,--` SITE 12 SS . 1 ,, ;,, 0he/ t1 TDE TDE _al �- _ JEREMIAH S.MCCLUNEY "' 48 y,�_ j' DB 2026 PG 4562 m / �,A.L.COSTNER HEIRS W 1 ^ _ ., S 1 D.B.156,P.G.468 �+ -4 7 m o — TOf c __ \ I roe �� t �°S -�F1140: + t^-� +54.00 4, �. \ / f 1;,\ \J-O BEGIN SBG -' Os 2GI FS-C SI• \ /./ sO so 18"RcP-III 2GI \ O ll Sir Q} Q Jr V.A I- E" ��d �' N " -v-bi --a..�-- 18"RCPIII I -L3- l I I / I zGl VJin._____________ 2GI N 3'22 34.3E /,. l i ", " CP-III N It —BA- - 2GI-A 201 ,/f./�/ �0.4 _ a N FS-A 24" C njj `to O 2G-.0 I RCP-IIILTO'jr Al i 30'RCP-III R 30„ /� ~ �-2GNCA J@ JB w/MH PY// JB v,MH / / Q I RC `/' /y:�. < BEGIN.SBG . " I _ CL II RIPRAP ] / �-- 655 TONS I¢IPRAP ENERGY DISSIPATOR BASIN /� 1 _, 0 - 695 SV GFD S(E DETAIL 1 SHEET 2D-2 116 Ivy W �I�' c- c 0 m I �j// —TDE�7DE� / j' /��/� / 5 McCLUNEY / JEREMIAH DB 2026 PG 4562 4 / , , 0°E /ye9 Z2 0 ,y, _ /— / STEVEN HOWARD ROSS& �_ i�Y ALLISON B..698 p' D.B.982.PG.698 ,- II i --- ) I r / ,,r,1 W \Z,c;� / OWN " ei.W=2t ono W y/ o s'I �Sf JS Sr pf - _.- fa j/,JS \ ` /'' SEE SHEET 37 FOR-L3-PROFILE SfaV a- ROAD or (� ���' DewberryPROJECT REFERENCE NO. SHEET NO. vLI ` � ..✓ / ��� / LL'' -ooze A R-22338A 75 $r C s r \ \ / S DENOTES TEMPORARY ROADWAYDIGN i IMPACTS IN SURFACE WATER PERMIT DRAWING ENGINEER ENGINEER ��� // SHEET 21 OF 26 INCOMPLETE PLANS / // DO NOT USE FOROR ROW ROW ACQUISITION , ct)( / / /% e4 s66 / / / l NAD SQm / m \\, see it j DOCUMENT NOT CONSIDERED FINAL /� W ��� ��F" ��� UNLESS ALL SIGNATURES COMPLETED .•\ , \ \ /v i ��, 5�0��� ` 666‘ \\NN, //Iii � gee 01}/ '% , \ / yr // _ 1 ..„ ,/ ,.. e��; -, SITE 12 SS f I 0. ,x____.„._,,s,___.,:, \,,\ TD. e i I ithdiiiiiilli, ," :O\ _,--2r,LG-,' z,,,, / i iii?/), .1 )) Ullitlk sr ''',--__ --''''' '/I' Y"!/A' (# l)2(2/i/II ilii ill/11/1 C li,( ,' '' � 11 y it. � _ _Ac /ice `� // /: J l \1 / ,./:< -,. q ,4„\,' ,,, \z\\° \ 0 :11"r 47:/2";.7'71', 2/'''''IM.45.411* , / / / // / - - 0/ A s s. ., 0 .BEGIN SBG Y� �l�:l II ..11l ` i'14,4,,, sfrt. i , —�vGl _ FS-C �` £ _ //,,, 18' RCP-III 2GI �� b,:; �� �.:.., / qm �, � ,: �':.so so 11 ggiaal ii1Nli/NU/,t1//fi == 1 1 11=M11IlWMll_ 1 _ MEM (I _ ' -fir En i I l8"RCP IIItea. u 4 '/ _ J - Ai 2GI +1A %ems-__=� /� 1 W NI r ' III 1 `li f- 'ilk ����� 1 .®�p �d 'CP-III I"'^ 2GI-A _ p 2 v / DN/ _— .g1`L�1Il�m�j��n IMIIMPRIEN Ilh �i Lj Q vI / / / / �� R�G�IP III c 30 xf,'`,.71�JRR �_� �'.. R 3p„ �/a/ �� ��\ �1�ii N / / 0. /6'/61A, w,M d c-4% 7B i/t/e/y i4i, 1, ,-----;_------cr,, t/MPI /. , /:,% �� --N- \ ,_ 15 ; I 6, I l ' ( A lAt se/ �4 ,m .A'/�/ / ., N,t - /� C �/ / //� FD 1, / I �' SE DETAILR SHEGY DEIT 520 0R BASIN a /' 1' ,g %1,,, -'-:-/.---':,,, IC -1_7,,, I' 41#T'I.//10^.. / , I q, __ c --,-- , „. �y �j / /�. J/ i ri ---i' /// / / / // 0b/ // .q0 II/ g% qg/f/ m'... ,... . /7/// e ,<"/"//7 7 / / i N ^ `a/:// / ,f' / /^'„'Q q'I/ O /f,a , e ,R i�` N„ / ,''11..� \/ 0Y Ld \ „0,1":": '''' '' / ''''''Y'/ ." ' — .24 :: ; ;____,_,.//I ' / .,;6-14: \__ 7" ,,J4 ,0,25 ir: // / \\f/1/1 70,4T-4 2 '/--- '''-.-- -'----- itA R 1 s. / / l' .,.'.0-000' 7 i ' ) '' '------'', / / ,,,,,,,,../'---j /---- ) Q 1 96e, / / ' L,VV_. s ,...,-.10-'''''''' ,--,-1,-->_____________ r----1,,,,----7' / . „.) ) v. ,,,,,, ,.:_______ ____ ,,,, / /(--- 8 —10? ) \� // a n fir^-- ��' � e",A / if Eh sly Js�_ -JS --Sr / �� ` SEE SHEET 37 FOR-L3-PROFILE SfaV u- S ano A rot/C 10+00.00 4., PROJECT REFERENCE NO. SHEET NO. DewberrySURE 410 Ca ww - T sm. NE _Yi y N�,NO F0922 Cool/ -1-.,' ; ROADWAY DESIGN HYDRAULICS I H4' X p `?- ENGINEER ENGINEER �� GY" v / �� — PERMIT DRAWING bu �D 83 I INCOMPLE I]E PLANS V �.3 0 �" / ' NAD 83 DO NOT USE FOR •/W Acoulo ION N' -4 SHEET 22 OF 26 \\ 5 � L _ , oY_`aAi5 04'35'oO'E -7 �� SURFACE WATERTS IN 1,03T +339��� �I 1 �� DENIMPACTS OTES IN SURFACE WATER RY 49.7�R y '1 1 +27.0 1 rn 30.1T RT , +48.17 DOCUMENT NOT CONSIDERED FINAL 1-10,1� 20.00 RT UNLESS ALL SIGNATURES COMPLETED \3CA +54.13 SA.?a, lifillhe .7'R 1 w1 - +68.17 / 01 I 2681 RT ii 7 \\ '\\ SITE 13 SXJ r' l''' \\\\ MATCH TO SHEET 16A � © bo �� 11j % f 5H ,�+68.58 CHARLES JEFFREY EVANS i n '/ (Q - ;DB 839,PG 166 I� [ � i / d- MILbREO OWENS MCPHERSON � /,/��_ � 2�111 SITE 1,4: SXI } j co / O �, O.B.849.PG.316 ,.N,,, V / Lp10 \ 11G AZALEAINVESTMENT CORP, i ` (j3 �/ / (nill, 'T P;y+98 5L3REMAINING PORTION OF D.B.326,Pg.628v6.63'LT �TDE � / �/ U __ ���` :\ \ % +24.00 L3 .. / �// `�11 43q.Wp 'V�6. :-IrI / /f � �n,Lu 1` p TFALl+26.50 L3 � p99.95`Il f� f W /1it OVE 00'L / /.40 HO 4'X4'X1' R EIP ¢e /./ 1 efi 2 // / O1 111 -L3- POTSta, 84,83= 59 ® iT/` Lon1 � -Yl POT Sta.l5J3 E HAR@ryR& +o CL I RIP RAP # YN G,\H NV 717"v. / / / Po EST 7 TONS A - 79'00'26J° 91,PG L"L6 �/ /O EST 17 SY GFD 1l_ * Ip / /-"fit Ln 1s _ 3 ccOLIC \ /A. Iy18'w4H �5 \ / Q C 30"RCP-III D �.? // // N030 Iy 4L -P.- 2GI ,�, , / L") I WA --Milli ":„Lifilltell. >a `-; w \ V. �-�.y t� I 4 m J L,,r I CONC Fill 2 / G A 24"RCP-III C �� yiiirtiturei W _,� a�� nF1's II--1 2 / EM's. ham ' to pi m w �_�I I. CMII o" / '9Ir. "+ r- ism / h W 1 (Z C /o�IMMIIMIIMMIMIalla / _4.r _ Z �\ z U m /� z 2GI ILLIAM WYMAN / /° I : 1 y NFC��K r/ O O° r' F YEWTON& REBEC �� rj�j Iry o24.5/' \ �:s� GREGG N.LYNCH _, N 3 41 -5 P - __ BARRIER YELTO _ /0- �P b 8 = 1 W j I, -I''F —��B 927,PG ��,� U / JIMMY D BRADLEY& " �. ii - ,,, DB 43 PGA 445Y ,4- \\Vffirali52, H o 48 '� _ cO , IIL. O \ O ,r---�.-� ^. � CI '. Fir/ C -/� C -_� lc ,..�$( I� r. f�l rn- t"f�i BSTS ..;j f' 1480 TONS WILYEEI LA�ONWp®/ AN. A I - ��r .�" f . '� // \ f,- �I 1575 SY GDF G' REBEE/CAYEL RRIE I _ - e W �B 9z7,��17 F -Y7- PC Sta.11+7 d J F W > E z �/ r//� 89 N ,,,,.16,E °• -Y7- PT Sta,12+25,40 ' I �, �` v , F\`�'.= RE:11154 PIP / ?pc `SH \` / k/ G a�i' AD cH IP •-Y68 PC Sta.l3+ o aR'c AZAin :DB?: s?-_, '1 . m\ ..EST INC CHANNEL SKETCH q-- Tr ? -RN p `" r SUSAN C.FOSTER LIVING TRUST INN.- \ t- -Y6,u P C Sta.t3+ l L _ _ �J_ DB B12 PG 253 I N � 1pP�1/o13}� �. / Q' ^. 1 I TOI SAND.NOEL. - 9 \ �9-2 IN."1006..,G : 56 I r _r., R_yd—__ q,UA \ '' 1 ,, COBBLE.BEDROCK , �, O53O 7 IaRl 10-IS FT. '/2.s �D VaPlfs,.1-z FT.Low BaNK 2 �� - ��`' I `�-.-r ,�. O1 aH1E �s wGH BANK F __ _Law N D' o 7 POT Sta,13+50,00 iy,� �9a.er I apz' \_'a ] _ - I� �II� JV % EI_ Ion, �21264 �� c �� 4 - ��� Icoo, II s 1 / _ usA e HOPPEs I Q/ r m �, �o \\2 DB II49 PG 749 I .� /0p1\•A6' NI 4 1t`� S U22325� W >IOC , 9 / O,`cP � j moo548 ? 11 �70 9 o I EIP ,_�3ei.ap'm � S, w f" _ ,.! i0, t 3 I •I '' IB�932.AG.605 y�� \\ e / O ` 0 E rr 1 A�,�z_ ��� �s a I_ E� 'o Q Y B-'PT Sta.14+99:94 suss 5 A r/��y� 1 1 ,- STRASS RO R' A.A3'Z4E�I3<4��y' 1 RLP I \ I� 11''', � Y RAY�S�,,,, / ] • 57 ti� DST oaf RGsdz 7 2A� !�y - �"'t '1 _ - ` \ ANGELA A TAUS& \ \ ANGELA A TAUB& _ A (((�. F- CI r > MICHAEL B TAUB MICHAEL B T4U8 hh _ 'S 6M ^7 D8 82MI PG 390,TRACT TWO �< S s �>) \\�` -� ?I REMAINING LANDS Oh �l 30"CMP ?sDB 829.PG 390.TRACT ONE p DAVID JAMES BUHITEE,�8 y� E,' OF AZALEA INVESTMENTS,CORP F=,yo n i P`4Q, CORINA TSERINC CARLIS„On \ j '1 2Q OB 295 PG 599 ,E ,„'.I#`L' \\'`+ / O' N- — 6d` -."i' ^a. F. / PROP PAVED SHOULDER O.B.I009,PG.850, ^^r \ �� S r p2;.E I 11 6'PVG L oi� 968.35' �°\o DP �; \ SEE SHEET 38 FOR—L3—PROFILE 1 / oos NeA9?Z �, �'� \. m _ \,'. ,.� Tnn-4T495' \ N'"' /" , Dewberry PROJECT REFERENCE NO. SHEET NO. ww c PO �'Sta.10+00�00 toR-2233SA 16 u ; . v ` 'Y1 I * -.'.�I (J \ \\� RNJ SHEET NO. Il \\ \ ROADWAY DESIGN HYDRAULICS 8r, 0 ' 4 } ENGINEER ENGINEER 1`,'ar. OP \ I\ �I ► ( PERMIT DRAWING p��® ����� ��..sN� I .. M: , \ i . DO NOT USE FOR i/W ACQUISITION ,,. , .0 \ ?1 �\ SHEET 23 OF 26 yam\ / I ,\ fy E� jj ' ' g DENOTES IMPACTS IN „t..-. L �'-__- ,- , � SURFACEWATER\ ) / /0�� \ �7/y/ DENOTES TEMPORARY Jce� %\\ IMPACTS IN SURFACE WATER ,,.., 9 70 RI 1 3017 RTC `p 0�'° DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ,T, L,---- \ 20 00 RT---,....... s , „ i ,,., 7: ,., _ 4'45g713RT r ifiC i (_,..----."---------------------- f. 4 - a s'1 a43ar.1 \ a TO SHEET 16A � mob MATCH % I 3 .: .- �.a, ITE 13 8 +6S 58 �'i 1 �- R � �6 E 0C,`D J / `- �// e r(i :).iii � B:r:. p e 764.33 LT �s° ( itl ,' ' :,,,. /4/ Eis���l \ a ok, i !i //? c T J / � 1,/ //4 1 a ti(t lir ittlii 1, M \ .. , - " �ill 1 I .P t ,0 ' // , I In L3 POT Sto.707+84.8 r t v ^1 C L R�\�, >� ,.\' Y -Yl- POT Sto./5 56./3 V ' li ., ;. ?�� . �r** %/ a•oi e (-./ m �� � o. I IrdMs �. � � - 750Q'26.1" k \1� \��(�; �' L' ifiI 0 , �,, D: P �5/ �'�8, T 1 ss ,.z10l 7972 \v\K \ ,v ,\ A f,. ! A� � `� \. / s , 1 � • A 4, '� � iU` I5 /7v iP` FSA zGI n 3 RCP-III \!WI ` � ♦ -i. .9 • N P. - - - 1111111RI,' 'ARNE MfflaffillfirgintX204,,,freimi-1----;ar—_______ ,, , e , 4,I1 yr \,, \___ g I z _ _, A . I -ti � I 6 _.— F 24"RC 0.E 1N i. = 2�' .1 �_- Q = s *o-, "'. l� w -a -� :p a w '\-V1L ___ .\ _ _.�_` -tip;_ 1 i', :�../saw /ea :41'� �� C) 1I ` q�{ 'N1 \ \ �' .3 1 \C TS \ z �IIL J/1 \ a �' �� �, 7'11 1.�. �\ ;il���` I Y• 1.}\. '#9I' J9 f\ :, p �. � ?aR 9 \� F' OF �F�\S\�\ - r . , \\. \'%`� \\ YIA I I ,, 1 .11.• I ;I •..: A ,� I\\\ \a yy�` 0 �,n\ N.LYNCN' `\\,s\ S N, 1 it l\ I \ \ vq vi ` Ml'.D \2. \\ \ �C , \.:,' 2Y0" 7, m iIl 4 battik -- `- / - .., • 7n9 A 101.601,-J ', t o CV `k km rivpr. i -----,---_ .4 ik I'L ' ,. Ilt N.kik-4147-4:: '':',.14 7 .1''' N I1u11 > i Iv 14a6, r;/' If1 i il 1 '�� r 444 -L N. \ c \> mAit.ak, .- / T _ m1� 1575.SY GDF�� ty',,li' il� l/� ( f' \F; - _ _-� �\4. ... . , \\,$\ 1• kNd \� \ .., ,,)�f/�" li' I '' 7 . MI al fits„ Y7 PC Sta.11+7 •e L F — r .y. c z ( ' / \ i/�l : =w ` �1P'' 1`L Sto. 2+2 \ ` alligl i....._ NA Lk"----RETAIN ...y.,&...„0,4, it 4 . M a. a J �� --, Y7 PT l 5.4(Y.,< y6B_ pc .221 -ft:4 1 4*N; ' ., 4#,Np.,,,,N,._-- - .0, ' 4..,..,.% 7.''-'4N!': ." 1 4.‘' . :%..\ \ ,, 1 I \ it(,/ 5„-----,' (_{. 'Ss i, .:5",""'-''''''e'\I' AK) ' 14,,,,,,, .. , ..13..-. . . •41,,%.,‘4,,...ip 1 HILDIA1 pi 1,3,,, ce � ��11/AY� I'(t.(<4,,,,lry, �t.,/ ,c2.°' ,yr,,, A!,k ,' \ MJ !11'4IS _H,u'a I6 '� RETNI -' . . •rY6B- PO Sto.131'�7I iii ,� {;�s 1 1' = ''7, ; s� .'\z•. �. . .. ��� �I( P ,, t 0' �k. ...v 56 A TpP=l03R'.16' 1114 v a.1i.�'1 i.�i tom. / + A. \\Ls : .% I TA CS '1:., 1 I 'OT Sta. 3 50.7 ‘ ' l Z��65' ,s ��,' il.�lnl - .�� 1 I fl ; _,„-:,) � ,� N(1 �. 1 11� � I�. i 1 P , ‘ . ., ,:i 1 ) ,_i •,, : ' Nj1---6'`'e'l \ 141 °_:) II\ 51'3 illh.J. , LLor '41# 4 /: lk 1 oilikh, . m p , y IPi d \lt,v,:e-, PT Sto.14+99.94 rRsss6 80t..T., I!! 57 oy" \ \\\ / \ Ifss N : - 'A ANGELn A TAU"d —� � % ` 1�.• f ALBT \ s �MICHAEL By74@� w \ o \i((fielliir j ��. ggg.JJJ F k LEl A N•q \ ,6 it kii 1 \•III Da •.P 3 0 T 1 TWi A E5 \� 3 T h� �\ l'� - 'b m \, ) A 1 � \ PROP PAVED SHOULDER ` , t \B.PVC ss \\ \\ `\ ctb '' - IJ \� boo / 3 r 1 "9 0� 9G8 ss IP ,,',; \ SEE SHEET 38 FOR-L3-PROFILE -.� >� i5 �\ NoU o,'°'A9:>� ,A`R; ��%M:.n,n om q, %" Tin 4,4 95' V /" (r. 2610,CLIFF ROAD PROJECT REFERENCE NO. SHEET NO. Cr SUITE 410 D mf9gT2 J v 1,050 : ry nrvo.F oszs R-2233BA 37 in to ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PERMIT DRAWING 1,040 SHEET 24=�F 26 I INCOMPLETE PLANS ............1 _ -L3- _ DO NOT USE FOR 1 d W ACQUISITIONL, 1,030 ♦ DOCUMENT NOT CONSIDERED FINAL �. UNLESS ALL SIGNATURES COMPLETED 1,020 ♦ BM #6 ♦ —L3— STA 695+58.14 • • 1,010 395.76'LEFT 1,010 ELEV.1000.12' ——' RR SPIKE IN BASE 6" REDCEDAR `• EXISTING 1,000 EL = 97+00. 0� ['•,..`•[GROUND 1,000 973.00'- .� M. DS •70 MPH �. - - -■ 1 990 1 o - --- o 1 L_ ■■■■o■■■ ■m■■■ __L►c 1L, ■■■ ■ u P OPOSEe _ IIIII■�1 _ i oo■oo - ■� o0 980 - GRADE �M_■M. ... _ 980 ri __ 11111_I — • — 11111 :■ ® 0000% (+J0.7440% II i mm ■�NEENINIIMI i ■ �I I o■____■__- ... 97� 111M■I■1��� - - 970 II 1 ..■■■ __■ s IIIII 1 960 - -L-I ■ ,1,1■,�� III11�. 960 1 950 = I = I = I • T __ _ 950 940 - �_11 it H - - _ 940 G 930 - NN r 930 JJ 1-- r 920 1J1� G _ 920 , , I I, L-- %• II I w LI _ -=I o. oo. o.■■■�o.0000. y o. oo. o.■■■�o.0000■ --- - - I _ , • I -i I I I = &■■■- oo I 910 - ■ ■■ 1■ .M � 910 _ oo ■■■NEN INEENEmmom —■ -- _ _ ■ _ ■■■■_■__■ �— — _■■■ BRIDGE HYDRAULIC DATA L S. ■ � o. ......�. . CI. ■.■. I << REM ■ m 1111 ■ =■Io■ I■I■3 u- ' ■■I �■��■■I Imo■ _ _ G� ■_■■■■- ■■■i� ■■"II -- — —■■■ -_ --�' DESIGN DISCHARGE = 1,000 CFS --I' �• 900 ■■■■■■ ■' DESIGN FREQUENCY = 50 YRS • 900 H IIII IIII. 11 _ 1 IIIII of _ o i .. ... ■■■ ■ ■ ■ I ■ o■ _■�■_o■_ DESIGN •HW ELEVATION 860.7 FT �, _ ■ o■ ■ = r 111111 �IMI�11 = ` 1111 11111111 1 �I ■■ ■ _ I Iili Iili�_ === I I EMS I I I BASE DISCHARGE = /200 CFS �1 ■��■ ■■■■ ■■s■■■■■■ o0000 �■ �■ �■ ■�■ BASE FREQUENCY 100 YRS ,� 890 ■ 1111 1111� ■■ BASE HW ELEVATION 861.3 FT �� = I I 1 890 I �II.I1111I11■111111 �IIIIII i1M1.1I -EC ■ 1 ■-_ ■■ ■ _ 1_111■ ■ I r' n I__ �■-■■■ C1=1=11111 OVERTOPPING DISCHARGE= 100,000 CFS �' C ■ ■ ■� "■ ■ ■ ■ lei ■ ■■■ „ ■ ■ OVERTOPPING FREQUENCY= 500+ YRS `� _ iiii ■ OVERTOPPING ELEVATION = 975.7 FT `, t•�111 880 1 -ham a � s8o = t* r r1 , ... I ■, _ I DATE OF SURVEY = 4/3/2019 S. i I W.S.ELEVATION 857.0 FT `�` �- 870 _ 1 AT DATE OF SURVEY = • • $70 1_ --i - IL 860 �■�I-I L 860 II E • 11 , III. III cgs 850. SEE SHEET 15 FOR-L3- I_1■H. -r ' I-L3-STA 693+50.00 TO STA.706+50.00 850 0.E 694 695 696 697 698 699 700 701 702 703 704 705 706 1 Si : PROJECT REFERENCE NO. SHEET NO. a 1,050 e � _ f� --- _ Dewberr E \ I --- I 1 ,, 1 ROADWAY DESIGN HYDRAULICS ry ' '= 33BA 38 B Fry — 1 O ENGINEERSIG HENGINEERS 1,040 . . . .. --- INCOMPLETE PLANS L i I� DO NOT USE FOR Si W ACQUISITION i3 fill 1 1,03© 4 e��r 1 BM #7 �� � �� -L3- STA 714 33 1 , is 411.46'RIGHT _, �...., .: .. .: : .. ELEV 974 54' DOCUMENT NOT CONSIDERED FINAL RR SPIKE IN BASE 12" HONEYLOCUST COMPLETED 1,020 UNLESS ALL SIGNATURES ,... _- , _ — 1,010 Ex rI H �• 1,010 e _ G: ,i I . 1,000 _- . . _. 1,000 . `r''� ; 990 n /te 990 i 4 ni 4 / 1 2 I ,� � ii I T� I I I I ir.. I I I L. I I i II IWI 1 TI MAIM 980 '. ,d/' 980 970 �> 970 960 960 _. . . _ 950 950 ;: _ _ i940 940 I te 930 rj 930 I r 920 /'... _. .. 920 , .. .. .. _ .. _., _ I 910 ,f 910 . r . / 900 /:.. 900 I I yf 890 890 - - ,/ :: ::• :: :: :: / . 880 / 880 I _ � . f�. 870 % 870 I n r I . 860 _ .../�`- .1 _ .. .. .. . . 860 ' -, / , I a R50 a o�� SEE SHEET 16 FOR-L3- '. -'. ..: : �.: -'::- --_. _.. -..- . ---------------1 I . .:, -. '.. -'-� — -� 7-��- --- �'.7.- -:S - ' -_-'- I -L3-STA.706+50.00 TO STA{77R+50.00 850 o 707 708 709 710 711 712 713 714 715 716 717 718 719 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site JD Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. ID (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 SZ L3 561+11 TO 561+24 RT 2-5'x 6'RCBC 0.02 136 1 SZ L3 561+24 RT CHANNEL REALIGNMENT <0.01 <0.01 24 18 2 SY L3 584+19 TO 585+04 54"RCP 0.03 <0.01 323 60 3 WF L3 584+16 TO 585+35 ROADWAY FILL 0.47 0.02 3 WF L3 584+16 TO 585+35 TEMPORARY BYPASS CHANNEL 0.01 4 SX L3 606+50 TO 617+50 54"RCP/LAT BASE DITCH 0.21 0.01 1509 88 _ 5 WE L3 607+66 TO 608+22 LT ROADWAY FILL 0.02 6 SW L3 616+76 LT TO 618+60 RT 8'X 8'RCBC 0.09 583 6 SW L3 617+00 RT CHANNEL REALIGNMENT <0.01 <0.01 21 48 6 SW L3 618+58 LT CHANNEL REALIGNMENT 0.01 <0.01 75 18 7 WD L3 643+23 RT TO 643+80 RT ROADWAY FILL 0.02 8 SV L3 643+38 RT TO 643+91 LT ROADWAY FILL <0.01 102 9 SU L3 643+13 RT TO 645+10 LT 66"RCP 0.10 0.02 702 136 9 SU L3 645+10 LT CL II RIPRAP ON BANKS <0.01 <0.01 20 10 10 L3 649+55 LT TO 651+18 RT 30"RCP 0.02 <0.01 369 29 10 L3 649+55 LT CL II RIPRAP ON BANKS <0.01 <0.01 8 91 11 ST L3 671+97 LT TO 672+82 RT 2 @ 8'x 8'RCBC 0.10 582 11 ST L3 672+08 RT CHANNEL REALIGNMENT <0.01 0.01 44 66 11 ST L3 672+34 LT CHANNEL REALIGNMENT <0.01 0.01 36 70 12 SS L3 703+45 RT TO 705+77 LT TEMPORARY WORK BRIDGE 0.04 457 13 SXJ L3 705+79 RT TO 707+66 RT TEMPORARY WORK BRIDGE 0.11 410 14 SXI L3 706+90 RT TO 707+54 RT TEMPORARY STREAM CROSSING <0.01 67 • TOTALS*: 0.51 0.01 0.02 0.60 0.23 4534 1568 0 *Rounded totals are sum of actual impacts NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 6/14/2021 RUTHERFORD R-2233BA 34400.1.S5 (Revised 2016 09 09 SHEET 26 OF 26