HomeMy WebLinkAbout20060684 Ver 1_Year 2 Monitoring Report_20130610RECEIVED N.0 Dept of ENR r City of Greensboro MAY 2 4 1013 L / .North Carolina Fno,n Winston -Salem Tonal ffice LERA R OF TiRANS;MITiTAL TO: NCDENR, Div. OF WATER QUALITY DATE: MAY 23, 2013 WINSTON -SALEM REGIONAL OFFICE PROJECT: DWQ #06 -0684 585 WAUGHTOWN STREET WINSTON- SALEM, NC 27107 ATTENTION: SUE HOMEWOOD WE ARE SENDING YOU: ® ATTACHED ❑ UNDER SEPARATE COVER VIA: THE FOLLOWING ITEMS: ❑ SHOP DRAWINGS ❑ PRINTS ❑ SPECIFICATIONS ❑ CHANGE ORDER ❑ LETTER ® OTHER RE: NEW GARDEN ROAD STREAM RESTORATION MONITORING RECORD ❑ PLANS COPIES DATE REVISION DESCRIPTION 1 5/22/2013 ❑ LEVEL 1 STREAM RESTORATION MONITORING ❑ FOR REVIEW ❑ SECOND YEAR MONITORING REPORT ❑ FOR DISTRIBUTION ❑ CHANNEL STABILITY THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ FOR APPROVAL ❑ APPROVED AS SUBMITTED ® FOR YOUR USE ❑ AS REQUESTED ❑ FOR REVIEW ❑ RESUBMITTED ❑ FOR DISTRIBUTION ❑ OTHER COMMENTS. COPY To USACE, FILE ❑ APPROVED AS NOTED ❑ RETURNED FOR CORRECTIONS ❑ RETURNED AFTER LOAN SIGNED GUY B. INGLE P.O. Bog 3136 • Greensboro, NC 27402 -3136 • www.greensboro- nc.gov • 336- 373 -CITY (2489) • TTY # 333 -6930 640 r City of Greensboro North Carolina o TO: U.S. ARMY CORPS OF ENGINEERS DATE: RALEIGH REGULATORY FIELD OFFICE PROJECT: 3331 HERITAGE TRADE DRIVE, SUITE 105 RE: WAKE FOREST, NC 27587 ATTENTION: MR. THOMAS BROWN / ANDREW MR. ANDREW WILLIAMS WE ARE SENDING YOU: ® ATTACHED THE FOLLOWING ITEMS: ❑ SHOP DRAWINGS ❑ CHANGE ORDER ❑ UNDER SEPARATE COVER VIA: Engineering & Inspections MAY 23, 2013 SAW- 2007 -03980 NEW GARDEN ROAD STREAM RESTORATION MONITORING RECORD ❑ PRINTS ❑ SPECIFICATIONS ❑ PLANS ❑ LETTER ® OTHER COPIES DATE REVISION DESCRIPTION 1 5/22/2013 AS REQUESTED LEVEL 1 STREAM RESTORATION MONITORING ❑ RESUBMITTED ❑ FOR DISTRIBUTION SECOND YEAR MONITORING REPORT OTHER COMMENTS: CHANNEL STABILITY THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ FOR APPROVAL ❑ APPROVED AS SUBMITTED ® FOR YOUR USE ❑ AS REQUESTED ❑ FOR REVIEW ❑ RESUBMITTED ❑ FOR DISTRIBUTION ❑ OTHER COMMENTS: COPY To DWO -WSRO. FILE ❑ APPROVED AS NOTED ❑ RETURNED FOR CORRECTIONS ❑ RETURNED AFTER LOAN SIGNED GUY B. INGLE P.O. Box 3136 . Greensboro, NC 27402 -3136 - www.greensboro- nc.gov . 336- 373 -CITY (2489) • TTY # 333 -6930 "0 N.C.Dept. of ENR MAY 2 4 2013 Winston -Salem Regional Office CITY OF GREENSBORO ENGINEERING DIVISION NEW GARDEN ROAD WIDENING, PHASE II PROJECT # P -3741 CULVERT REPLACEMENT AND STREAM RELOCATION/RESTORATION HORSEPEN CREEK MAIN TRIBUTARY #2 AND TRIBUTARY A LEVEL 1 STREAM RESTORATION MONITORING SECOND YEAR MONITORING REPORT CHANNEL STABILITY MAY 229 2013 USI US Infrastructure of Carolina, Inc. 125 South Elm Street, Suite 510 Greensboro, North Carolina 27401 N.C. License #C -1950 w7s ilk!' rLJUN � �� 2013 - WATE,�. ;,,jAuty a aw Brand► Carolina Wetland Services, Inc. 880 East Westinghouse Blvd. Charlotte, NC 28273 1 1 1 1 1 1 1 1 i 1 1 1 i I 1 1 1 1 1 Level 1 Stream Restoration Monitoring Horsepen Creek Main Tributary #2 and Tributary A SECOND YEAR MONITORING REPORT Channel Stability New Garden Road Widening Phase II City of Greensboro, North Carolina Engineering Division Project No. P -3741 May 22, 2013 US Infrastructure of Carolina, Inc. 125 South Elm Street, Suite 510 Greensboro, North Carolina 27401 N.C. License #C -1950 Prepared by: 5_4V4:�'_i3 Carolina Wetland Services, Inc. 550 East Westinghouse Blvd. Charlotte, NC 28273 � CINS 1 1 1 1 ' Table of Contents Page Introduction........................................................................................................ ..............................1 Methods............................................................................................................... ..............................1 PhotoReference Sites ...................................................................................... ............................... l ChannelStability ............................................................................................. ............................... 3 Results................................................................................................................. ............................... 3 PhotoReference Sites ....................................................................................... ..............................3 ChannelStability .............................................................................................. ..............................4 MainTributary # 2 ......................................................................................... ..............................4 TributaryA .................................................................................................. ............................... 7 ' Summary ............................................................................................................ ............................... 8 ' Comments........................................................................................................ ............................... Figures 8 Figure1: Site Location Map ................................................................................. ..............................2 Figure 2: As -Built Cross Sections and Photo Location Map ............................... ..............................5 AppendixA ........................................................................................................ ..............................9 Photopage 1 — Second Year Monitoring Photographs ' AppendixB ..................................................................................................... ............................... Main Tributary #2 Cross Sections 27 Main Tributary #2 Longitudinal Profile ' Main Tributary #2 Pebble Count Main Tributary #2 Raw Data AppendixC ..................................................................................................... ............................... 43 Tributary A Cross Sections Tributary A Longitudinal Profile Tributary A Pebble Count Tributary A Raw Data 1 1 1 1 1 1 1 1 1 1 1 1 I Second Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 Introduction The New Garden Road Widening Phase H Project is located in Greensboro, North Carolina as shown on the Site Location Map (Figure 1) on the next page. Construction of this project necessitated the relocation of portions of two tributaries to Horsepen Creek, Main Tributary #2 (South) and Tributary A (North). The relocation of these stream reaches was completed in March 2011. The stream relocations were permitted through the U.S. Army Corps of Engineers (Action I.D. SAW 2007 - 03980) and the North Carolina Department of Environment and Natural Resources (DWQ Project #06 -0684) and required a Level 1 Stream Restoration Mitigation and Monitoring Plan for this project. This level of monitoring includes the establishment of photo reference sites, plant survival monitoring, and channel stability monitoring. The relocated stream reaches were assessed using Rosgen Level II Classification methods. The following end of second year survey was conducted to evaluate and document the conditions of the relocated stream channels following two years after the completion of construction. This data will be compared to the as-built survey which provided a baseline for these future monitoring events as well as the first year survey. I Methods I 1 t 1 1 1 1 Photo Reference Sites Photographs were taken during: 1) Second Year Survey for Channel Stability on March 19, 2013 In stream structures including rock vanes, root wads, and grade control sills were photographed facing upstream and downstream. Stream bed and banks were photographed for visual comparison of stability. 1 1 1 1 1 1 I 1 Second Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 Channel Stability A geomorphic survey was performed by engineers from USI with the assistance of a scientist from CWS on March 19, 2013 following two years after the construction of the new stream channels. The survey included a longitudinal profile, a cross sectional survey, substrate sampling (Wolman reach -wide pebble count), and photo documentation of each of the stream reaches. This data was used to classify each reach using the Rosgen Level H system. Bank pins were also checked on both reaches to monitor bank stability. Surveying methods (using a rod, level, and tape) followed the guidelines given in Stream Channel Reference Sites: An Illustrated Guide to Field Technique, General Technical Report RM -245, United States Department of Agriculture, Forest Service. A relative benchmark for the Second Year survey was established on the top of an existing sanitary sewer manhole immediately adjacent to New Garden Road. The surveys of both streams were tied together to the top of the sanitary sewer manhole with a given elevation of 100.00. The actual elevation of the existing sanitary sewer manhole as a permanent benchmark is 775.70. This is shown in the Raw Data portions of the Appendices. The Raw Data also shows the correction of the elevations taken during the survey to actual elevations. r Results 1 I 1 1 f] 1 1 Photo Reference Sites As part of the Second Year survey for the project, all areas of the project were photo documented. In stream structures including rock vanes, root wads, and grade control sills were photographed facing upstream and downstream. Stream bed and banks were photographed for visual comparison of stability. Representative photographs are included in Photopage 1 (Appendix A). The locations and directions of each of these photographs are shown in Figure 2 (Page 5). As an aside, the same locations and directions were used for these photographs as those taken during the As -Built and First Year surveys. 1 3 1 n u 1 1 1 [7 1 1 1 t I I 1 1 1 Second Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 Channel Stability Main Tributary #2 Main Tributary #2 flows north through the project area and through the new culvert installed beneath the widened New Garden Road. The Second Year survey of Main Tributary #2 was conducted on March 19, 2013 by representatives from USI and CWS. The relocated stream channel exhibited substrate consisting of fine gravel (D50 = 5.7 mm). The channel slope is 0.003 ft/ft with a sinuosity of 1.18. The average bankfull width and depth for this reach are 27 feet and 1.86 feet, respectively. The average bankfull cross sectional area for riffle portions of the stream is 50.09 ft2. The average flood -prone area width for Main Tributary #2 is approximately 60 feet. The new stream channel has a Rosgen Level H classification of C5. Permanent cross sections were established during the As -Built survey and marked with rebar to allow future monitoring of the same locations. Figure 2 on page 5 shows the locations of these permanent cross sections. The As- Built, First Year, and Second Year conditions of Main Tributary #2 (Cross Sections A and B) are summarized below in the following tables. Channel cross sections, the longitudinal profile, and pebble count data for Main Tributary #2 are included in Appendix B. Provide the following data fnr each crncc_cectinn rrnee ccntinn A Date Measured: 6/28/2010 1/10/2012 3/19/2013 Cross - section being measured: A A A Cross - sectional area: as- built/present 60.01 sf 52.43 sf 50.09 sf Bankfull width: as- built/present 27.00 ft 27.00 ft 27.00 ft Floodprone Width: as- built/present 60.00 ft 60.00 ft 60.00 ft Width/depth: as- built/present 12.15 13.90 14.55 Entrenchment ratio: as- built/present 2.22 2.22 2.22 Stream Type: as- built/present* C5 C5 C5 am), reqrureu jor riUie Cross- secuom 4 w r y �� m m m� m m m m r a m� m m XAW LEGEND CONSERVATION EASEMENT - - -- NEW STREAM CORRIDOR SANKFULL IN-STREAM STRUCTURES 0 �— PHOTO LOCATION AND DIRECTION TRIBUTARY #2�--. ROOT WAD AREA D CROSS VANE D / CROSS VANE C CROSS --1 VANE B CROSS C' 1 FVANE A X ITRIBUTARY Al ROOT WAD AREA A 19 11 2 Cl 9 3 ROOT WAD ROOT WAD i 7 AREA C � / CROSS SECTION B AREA B / / D / 1 S CROSS SECTION D / 5 CROSS SECTION A rscz MOOSELODGE PARKING LOT GRADE CONTROL SILL A ICROSS SECTION CI zCA (D � � O N � CI O � � o rn st CY �4 �.02. A z 0 w iSecond Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 1 1 r Provide the following data for each crncs_cPrtinn- rrnee Cartinn R Date Measured: 6/28/2010 1/10/2012 3/19/2013 Cross - section being measured: B B B Cross - sectional area: as- built/present 73.91 sf 68.42 sf 64.21 sf Bankfull width: as- built/present 27.00 ft 27.00 ft 27.00 ft Floodprone Width: as- built/present 70.00 ft 70.00 ft 70.00 ft Width/depth: as- built/present 9.86 10.65 11.35 Entrenchment ratio: as- built/present 2.59 2.59 2.59 Stream Type: as- built/present* C5 C5 C5 I. owy requireu for riffle cross - sections ri 1 1 0 1 1 1 1 1 1 The As- Built, First Year, and Second Year conditions of Main Tributary #2 (Longitudinal Profile) are summarized below in the following table. The longitudinal profile for Main Tributary #2 is included in Appendix B. Date Measured: 6/28/2010 1/10/2012 3/19/2013 Avg. slope riffles: as- built/present 0.005 ft/ft 0.023 ft/ft 0.020 ft/ft Avg. slope pools: as- built/present 0 ft/ft 0 ft/ft 0 ft/ft Number of riffles: as- built/present 1 1 1 Number of pools: as- built/present 1 4 j 4 4 The As- Built, First Year, and Second Year conditions of Main Tributary #2 (Pebble Counts) are summarized below in the following table. The pebble count data for Main Tributary #2 is included in Appendix B. Date Measured: 6/28/2010 1/10/2012 3/19/2013 Cross - section being measured A and B A and B A and B D16: as- built/present 0.125 0.125 0.25 D50: as- built/present 0.5 8.0 5.7 D84: as- built/present 11.3 16.0 16.0 The As- Built, First Year, and Second Year conditions of Main Tributary #2 (Visual Inspection) are summarized below in the following table. Date Inspected: 6/28/2010 1/10/2012 3/19/2013 Structure Type Cross Vane Cross Vane Cross Vane Is water piping through or around structure? No No No Head cut or down cut present? No No No Bank or scour erosion present? No No No Other problems noted? 1 No No No 6 iSecond Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 Tributary A Tributary A is a minor tributary which flows west along the toe of the widened New Garden Road embankment to its confluence with Main Tributary #2. The Second Year survey of Tributary A was conducted on March 19, 2013 by representatives from USI and CWS. The relocated stream channel exhibited substrate consisting of medium gravel (D50 = 8.0 mm). The channel slope is 0.015 ft/ft with a sinuosity of 1.37. The average bankfull width and depth for this reach are 17 feet and 1.58 feet, respectively. The average bankfull cross sectional area for riffle portions of the stream is 26.85 ft2. The average flood -prone area width for Tributary A is approximately 45 feet. The new stream channel has a Rosgen Level H classification of E4. 1 u 1 t 1 1 1 Permanent cross sections were established during the As -Built survey and marked with rebar to allow future monitoring of the same locations. Figure 2 on page 5 shows the locations of these permanent cross sections. The As- Built, First Year, and Second Year conditions of Tributary A (Cross Sections C and D) are summarized below in the following tables. Channel cross sections, the longitudinal profile, and pebble count data for Tributary A are included in Appendix C. Provide the following data for each crnss_sectinn- Crnce Cpotinn f` Date Measured: 6/28/2010 1/10/2012 3/19/2013 Cross - section being measured: C C C Cross - sectional area: as- built/present 32.45 sf 34.43 sf 26.85 sf Bankfull width: as- built/present 17.00 ft 17.00 ft 17.00 ft Floodprone Width: as- built/present 45.00 ft 45.00 ft 45.00 ft Width/depth: as- built/present 8.91 8.39 10.76 Entrenchment ratio: as- built/present 2.65 2.65 2.65 Stream Type: as- built/present* E4 E4 E4 oniv requireajor ryjie cross - sections Provide the followine data for each crncs- section- Crncc Rertinn n Date Measured: 6/28/2010 1/10/2012 3/19/2013 Cross - section being measured: D D D Cross - sectional area: as- built/present 39.59 sf 44.76 sf 22.68 sf Bankfull width: as- built/present 19.00 ft 20.50 ft 20.50 ft Floodprone Width: as- built/present 55.00 ft 55.00 ft 55.00 ft Width/depth: as- built/present 9.12 9.39 18.53 Entrenchment ratio: as- built/present 2.89 2.68 2.68 Stream Type: as- built/present* E4 E4 E4 onty reguirea jor rype cross - sections 7 1 1 1 I 1 1 1 r Second Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 The As- Built, First Year, and Second Year conditions of Tributary A (Longitudinal Profile) are summarized below in the following table. The longitudinal profile for Tributary A is included in Appendix C. Date Measured: 6/28/2010 1/10/2012 3/19/2013 Avg. slope riffles: as- built/present 0.023 ft/ft 0.023 ft/ft 0.034 ft/ft Avg. slope pools: as- built/present 0 ft/ft 0 ft/ft 0 ft/ft Number of riffles: as- built/present 3 3 3 Number of pools: as- built/present 4 4 4 The As- Built, First Year, and Second Year conditions of Tributary A (Pebble Counts) are summarized below in the following table. The pebble count data for Tributary A is included in Appendix C. Date Measured: 6/28/2010 1/10/2012 3/19/2013 Cross - section being measured C and D C and D C and D D16: as- built/present 0.125 <0.062 0.062 D50: as- built/present 8.0 5.7 11.3 D84: as- built/present 1 22.6 32.0 32.0 The As- Built, First Year, and Second Year conditions of Tributary A (Visual Inspection) are summarized below in the following table. Date Inspected: 6/28/2010 1/10/2012 3/19/2013 Structure Type Cross Vane Cross Vane Cross Vane Is water piping through or around structure? No No No Head cut or down cut present? No No No Bank or scour erosion present? No No No Other problems noted? I No No No QSummary 1 1 Comments The channels (Main Tributary #2 and Tributary A) relocated as part of the New Garden Road Widening Phase II Project appear to be geomorphically and hydraulically stable with regard to pattern, profile, and dimension. Other than ongoing monitoring and observation there are no recommendations to perform any remediation at this time. 8 1 1 1 1 1 1 1 1 1 Second Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 Appendix A Photopage 1— Second Year Monitoring Photographs E Second Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 Photo 1: Tributary A — permanent cross section, left bank looking upstream Photo 2: Tributary A — permanent cross section, left bank looking upstream 10 ' Second Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 1I Photo 3: Tributary A — permanent cross section, left bank looking upstream Photo 4: Tributary A — Root Wad Area A, centerline looking upstream 11 Second Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II 11 � I � I � I � I II Project No. P -3741 ' Photo 5: Tributary A — Grade Control Sill A, centerline looking upstream Photo 6: Tributary A — Cross Vane A, left bank looking downstream 12 Second Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 Photo 7: Tributary A — Root Wad Area A, centerline looking upstream 13 Second Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 A Photo 9: Tributary A — Cross Vane A, left bank looking upstream Photo 10: Tributary A — Cross Vane A, left bank looking upstream 14 Second Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 .:3 /i 3! Photo 11: Tributary A — Cross Vane B, left bank looking downstream Photo 12: Tributary A — Root Wad Area B, left bank looking upstream 15 Second Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 Photo 13: Tributary A — Confluence with Main Tributary #2, looking downstream Photo 14: Tributary A — Cross Vane B, left bank looking upstream 16 J � I � I � I i I � I � I Second Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 P -T Photo 15: Main Tributary 42 — permanent cross section, right bank looking upstream Photo 16: Main Tributary #2 — Root Wad Area D, right bank looking downstream 17 Second Year Monitoring Report: Photo Documentation — Photopage 1 Garden New '•.• Widening Phase Il Project • .i 1 � F ^ t 18 ISecond Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Proiect No. P -3741 1 � I � I � I � I i,I it IIPhoto 19: Main Tributary #2 — Cross Vane D, centerline looking downstream Photo 20: Main Tributary #2 — Cross Vane D, centerline looking downstream 19 Second Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 Photo 21: Main Tributary #2 — Cross Vane D, centerline looking downstream Photo 22: Main Tributary #2 — Root Wad Area D, centerline looking upstream 20 � I � I i I '1 � 1 I I r Second Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 IIPhoto 23: Main Tributary #2 — Cross Vane D, left bank looking upstream Photo 24: Main Tributary 42 — Cross Vane C, left bank looking downstream 21 Second Year Monitoring Report: Photo Documentation — Photopage 1 Photo 25: Main Tributary #2 — Riffle Pool B, centerline looking upstream Photo 26: Main Tributary #2 — Cross Vane C, centerline looking downstream 22 Second Year Monitoring Report: Photo Documentation — Photopage I New Garden Road Widening Phase II No. P -3741 Photo 27: Main Tributary #2 — Cross Vane C, right bank looking downstream Photo 28: Main Tributary #2 — Confluence with Tributary A, looking downstream 23 Second Year Monitoring Report: Photo Documentation — Photopage I 24 Second Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 Photo 31: Main Tributary #2 — Root Wad D, left bank looking upstream showing both permanent cross sections Photo 32: Main Tributary #2 — Root Wad D, left bank looking downstream 25 � I � I � I � I Second Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 Photo 33: Main Tributary #2 — New Garden Road culvert, looking upstream Photo 34: Main Tributary #2 — Downstream of New Garden Road, looking downstream 26 1 1 1 1 1 1 1 i 1 1 1 1 1 1 1 1 1 1 Second Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 Appendix B Main Tributary #2 Cross Sections Second Year Monitoring Comparison — As- Built, First Year, and Second Year Main Tributary #2 Longitudinal Profile Second Year Monitoring Comparison — First Year, and Second Year Main Tributary #2 Pebble Count Main Tributary #2 Raw Data Second Year Monitoring 27 N 779 777 775 .2 773 771 w 769 767 765 New Garden Road - Main Tributary #2 - Cross Section A (Riffle) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Distance (ft.) I -------- Bankfull Width zCp CD Q CD �o aCD 00 �0, a �J � ac D CD C z 0 b w N N m m m m m m m m � m m m r m m m m r New Garden Road - Main Tributary #2 - Cross Section B (Pool) 776 774 B1 B 772 770 — - -- - - - - -- - - -- - - - - - -- - - -- _ -- - - - ---- -- --- - - - - -- -------- - - - - -- w 768 766 764 762 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 - -- Floodprone Width Distance (ft.) -- BankfullWidth --x— Water Surface zcoo CD CD :�o E a CD =q 00 a. :3. � o a 5' : va u�o � C y CD ;v N b o. CD z 0 w W 0 m i �� � r s m m m m m� m m m� m New Garden Road - Main Tributary #2 - Cross Section A (Riffle) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Distance (ft.) z� �o a� 00 � as v 0 y N z 0 b 779 777 775 0 773 771 _> w 769 767 765 New Garden Road - Main Tributary #2 - Cross Section A (Riffle) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Distance (ft.) z� �o a� 00 � as v 0 y N z 0 b W � � ' m m m m m � m � m � � m m m m New Garden Road - Main Tributary #2 - Cross Section B (Pool) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 Distance (ft.) z� �o 00 � o z 0 b w H N 776 774 772 0 770 768 _> w 766 764 762 New Garden Road - Main Tributary #2 - Cross Section B (Pool) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 Distance (ft.) z� �o 00 � o z 0 b w H N r m m m� m m� m m m m® m m m m m 774.0 772.0 770.0 a 768.0 0 R w W 766.0 N 764.0 762.0 760.0 Main Tributary #2 Longitudinal Profile New Garden Road Widening Phase II Station (feet) — Water Surface —a Thalweg x Lbkf f Rbkf zCp CD �0 CD CD w ¢' aC 0 rL rDo �. 3 o � rDy .. n w H cr N 774.0 772.0 770.0 d d 768.0 0 w W 766.0 764.0 762.0 760.0 Main Tributary #2 Longitudinal Profile New Garden Road Widening Phase II Station (feet) B Water Surface 2013 a- Thalweg 2013 - x Lbkf 2013 * Rbkf 2013 )— Thalweg 2012 z� �o CD CD zi q 0L 0 C�. o CD UQ .0 CD CD w 5' y a' N b 0 C' 0 z 0 b w J 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 Second Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 Main Tflibu ary #2 - Pebble Count 34 Metric mm Particle S A N D 1 Count Tot # % Tot % Cum <0.062 Silt/Clay 3 100 3.0 3.00 0.062 - 0.125 Very Fine Sand 5 100 5.0 8.00 0.125 - 0.250 Fine Sand 3 100 3.0 11.00 0.25-0.5 Med. Sand 6 100 6.0 17.00 0.5-1.0 Coarse Sand 9 100 9.0 26.00 1.0-2.0 Very Coarse Sand 1 2 100 2.0 28.00 2-4 Ve Fine Gravel G R A V E L 7 100 7.0 35.00 4-5.7 Fine Gravel 4 100 4.0 39.00 5.7-8 Fine Gravel 11 100 11.0 50.00 8-11.3 Medium 12 100 12.0 62.00 11.3-16 Medium 8 100 8.0 70.00 16-22.6 Coarse 18 100 18.0 88.00 22.6-32 Coarse 7 100 7.0 95.00 32-45 IVeryCoarse Very Coarse 3 100 3.0 98.00 45-64 0 100 1 0.0 98.00 64-90 Small C b b i e 1 100 1.0 99.00 90-128 Small 1 100 1.0 100.00 128-180 e 0 100 0.0 100.00 180-256 barge 0 100 0.0 100.00 256-362 Small B 0 a e 0 100 1 0.0 100.00 362-512 Small 0 100 0.0 100.00 512-1024 Medium 0 100 0.0 100.00 1024-2048 Large - Very Large 0 100 0.0 100.00 Bedrock IBedrock 0 100 0.0 100.00 34 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Second Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 N D .a r .y 4. Ix logo d D V a .O V 5 ( %) ;naaaad aAqiqnwnj 0 0 0 0 0 0 0 0 0 0 0 0 O� 00 r0 � kn le M Cs N N O R 0 R o e o !7 N N M juawaj 35 0 0 4n O 31a0jpag RVOZ - Ko f Kof -Us Us - Z9£ Z9£-9SZ 9SZ-081 08I-8ZI 9ZI-06 06-b9 b9-Sti S6-Z£ Z£ - 9'ZZ 9'ZZ-9I 9I-£'Ii £'Ii -8 8 -L'S L'S - b t-Z 0'Z - 0' I 0' I - S'0 S'0-SZ'O OSZ'0 - SZI'O SZ110 - Z90'0 Z90'0> 1 v� a w ■11 IIINIINIINII uIII��11111N 111111 ■ �����i Nmiii■�n�iiiii��l�miinmiiii■ mill I ■NIIIIII ■Illlf Illnll■11111111 I� IIIIII�11�1 NIA "III ■IIIINII 111 II ���IIIII 1111�II ■11 iiii ■11111111�� IIII ■IIINI� Illml�'j� III 11111111 ■Illllhl IIIINI ■IINIIII ■INlilll III�I 11111111■1111111 1111111■11111111 � � � � � � � �■ w � ilia � � � � � � i� � W J CROSS - SECTION: New Garden Road - CSA (Riffle) Project Name: New Garden Road Widening Phase 11 Project Location: Greensboro, NC Date: 3/19/2013 Floodprone 17ev. 772.35 Watersurface 767.03 106.03 i 91,33 - 779 _ 777 S 775 g 773 d 771 w 769 767 765 0 New Garden Road - Main Tributary #2 - Cross Section A (Riffle) 5 10 15 20 25 30 35 40 45 50 55 60 65 Distance (ft.) I ---- Bankfull Width Floodprone Elevation 0.0 59.0 Bankfu8 Elevation 19.0 43.0 Water Surface Elevation 24.0 40 772.35 772.35 769.35 769.35 767.03 767.03 z� O � a O O O'Q. CD fJq '0 N «7 tr er 7k N z 0 b La BM= 775.70 Longitudinal Station 0x37 Height of =-I oltFore Height Distance; Point Back -Sight -Sight Depth STATION B.S. ELL FS. Elevation Corrected Eleaadon Comment Width Bkfdelth AVG DEPTH BKFArea B.M. dl 6.03 106.03 100.00 Low Bank Height 6.11 Ft 0 106.03 8.97 97.06 772.76 LTOB Bank Height Ratio 2.04 6.5 106.03 11.60 94.43 770.13 6.50 SINUOSITY 1.18 19.0 106.03 1238 93.65 769.35 LBKF 12.50 0.00 LBKF 19.00 Ft, 73.0 106.03 13.57 9246 768.16 4.00 1.19 0.595 2.38 RBKF 46.00 Ft 24.0 106.03 14.88 91.15 766.85 LEW 1.00 2.50 1.845 1.84 Bankfall WIDTH (Wbko 27.00 Ft, 26.5 106.03 15.38 90.65 766.35 TW 2.50 3.00 2.75 6.88 Mean DEPTH (dbkf) 1.86 Ft 310 106.03 15.21 90.82 766.52 4.50 2.83 2.915 13.12 Bnkfl. X- Section AREA (Abkf) 50.09 SF 36.0 106.03 15.08 90.95 76665 5.00 2.70 2.765 13.82 W/D RATIO (WbkOdbko 14.55 38.5 106.03 1515 90.78 76648 2.50 2.87 2.785 6.96 Max DEPTH (dmbko 3.00 Ft. 39.5 106.03 14.88 91.15 766.85 REW 1.00 2.50 2.685 169 WIDTH of Flood Prone Area (Wfpa) 60.00 Ft. 40.0 106.03 13.48 92.55 768.25 0.50 1.10 1.8 0.90 Entrenchment Ratio (ER) 2.22 46.0 106.03 11.52 94.51 770.21 RBKF 6.00 -0.86 0.12 1.50 Slope 0.003 Ft./Ft. 54.5 106.03 10.96 95.07 770.77 8.50 Channel Substrate 8.00 (D50) 610 106.03 8.47 97.56 773.26 RTOB Rosgen Classification C5 Floodprone 17ev. 772.35 Watersurface 767.03 106.03 i 91,33 - 779 _ 777 S 775 g 773 d 771 w 769 767 765 0 New Garden Road - Main Tributary #2 - Cross Section A (Riffle) 5 10 15 20 25 30 35 40 45 50 55 60 65 Distance (ft.) I ---- Bankfull Width Floodprone Elevation 0.0 59.0 Bankfu8 Elevation 19.0 43.0 Water Surface Elevation 24.0 40 772.35 772.35 769.35 769.35 767.03 767.03 z� O � a O O O'Q. CD fJq '0 N «7 tr er 7k N z 0 b La i IM W 00 CROSS - SECTION: New Garden Road - CSB (Pool) Project Name: New Carden Road Widening Phase II Project Location: Greensboro, NC Date: 3/19/2013 Floodptone Elev. 773.52 Water surface 766.59 102.12 NJJW 90.89 - New Garden Road - Main Tributary #2 - Cross Section B (Pool) 776 774 -------------------------------------------------- e' ---------------------- 772 B 0 770 d 768 W 766 764 762 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 -- Floodprone Distance (ft.) Width - Bankfull Width Floodpmne Elevation 0.0 77350 7L0 773.50 Bankfull Elevation 19.0 BM- 775.70 46.0 Longitudinal Station 1+09 Water Surface Elevation 23.0 766.59 35 766.59 Height of Height Distance; Point Back -Sight Instrument Fore -Sight Depth STATION _ BS. HL F.S. Hewtion Corrected Demotion Comment Width Bkfdeoth AVG DEPTH BKFArea B.M. #1 2.12 10212 100.00 Low Bank Height 6.93 Ft. 0 10112 5.81 96.31 772.01 LTOB Bank Height Ratio 1.64 7.0 10112 7.20 94.92 770.62 7.00 SINUOSITY 1.18 19.0 102.12 8.52 93.60 769.30 LBKF 12.00 0.00 LBKF 19.00 Ft. 22.5 10112 1025 91.87 767.57 3.50 1.73 0.865 3.03 RBKF 46.00 Ft. 23.0 102.12 11,85 90.27 765.97 LEW 0.50 3.33 2.53 1.27 Bankfull WIDTH (WbkQ 27.00 Ft. 23.5 102.12 12.15 89.97 765.67 0.50 3.63 3.48 1.74 Mean DEPTH (dbkQ 2.38 Ft. 25.5 102.12 12.74 89.38 765.08 7W 2.00 4.22 3.925 7.85 Bnkfi. X- Section AREA (Abki) 6421 SF 30.0 102.12 12.25 89.87 765.57 4.50 3.73 3.975 17.89 W/D RATIO (Wbk OdbkQ 11.35 310 102.12 11.64 90.48 766.18 REW 3.00 3.12 3.425 10.28 Max DEPTH (dmbkQ 4.22 Ft. 35.0 102.12 11.30 90.82 766.52 2.00 2.78 2.95 5.90 WIDTH of Flood Prone Area (Wfpa) 70.00 Ft. 37.5 102.12 10.31 91.81 767.51 2.50 1.79 2.285 5.71 Entrenchment Ratio (ER) 2.59 41.0 10112 10.19 91.93 767.63 3.50 1.67 1.73 6.06 Slope 0.003 Ft./Ft. 46.0 102.12 8.65 93.47 769.17 RBKF 5.00 0.13 0.9 4.50 Channel Substrate 8.00 (D50) 60.0 102.12 8.37 93.75 769.45 14.00 Rosgen Classification C5 71.0 10112 4.30 97.82 773.52 RTOB Floodptone Elev. 773.52 Water surface 766.59 102.12 NJJW 90.89 - New Garden Road - Main Tributary #2 - Cross Section B (Pool) 776 774 -------------------------------------------------- e' ---------------------- 772 B 0 770 d 768 W 766 764 762 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 -- Floodprone Distance (ft.) Width - Bankfull Width Floodpmne Elevation 0.0 77350 7L0 773.50 Bankfull Elevation 19.0 769.30 46.0 769.30 Water Surface Elevation 23.0 766.59 35 766.59 zC4 fD N O C) O � CD � uQ rQ .� w •• rn CD ."3 rte-' N CD 0 z 0 b l� ' Second Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 ' LONGITUDINAL PROFILE: Water Surface - Main Tributary #2 Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 3/19/2013 ' Distance, Pomt STATION Back -Sight B.S. BM # 1(ft )== 775 70 Height of Height Instrument Fore-Sight Depth HL F.S. Elevation CorrectedF]evation COMMENTS ' BM #1 20 212 10212 10212 1058 10000 9154 76724 50 10212 1063 9149 76719 110 10212 1072 9140 76710 ' 370 590 10212 10212 1079 1076 9133 9136 76703 76706 820 10212 1130 9082 76652 990 10212 1129 9083 76653 1090 10212 1123 9089 76659 ' 1270 10212 1125 9087 76657 1480 10212 1138 9074 76644 1510 10212 1140 9072 76642 162 0 10212 1140 9072 76642 1760 10212 1140 9072 76642 ' 2020 10212 1146 9066 76636 2240 10212 1142 9070 76640 2240 10212 1150 9062 76632 2260 10212 1150 9062 76632 ' 2400 10212 1150 9062 76632 2640 10212 1153 9059 76629 2870 10212 1147 9065 76635 ' WS Slope (ft1ft) 0 004 1 1 1 1 I 1 1 39 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Second Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Thalweg - Main Tributary #2 Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 3/19/2013 Thalweg Slope (ft /ft ) 0 003 40 BM # 1(ft )= 775 70 Height of Height Distance, Pomt Back -Sight Instrument Fore -Sight Depth STATION B.S. RL F.S. Bevation Corrected Elevation COMNffiV1S BM #1 212 10212 10000 20 10212 1081 9131 76701 50 10212 1083 9129 76699 TOR 110 10212 1147 9065 76635 PMD 370 10212 1147 9065 76635 590 10212 1126 9086 76656 HOR 820 10212 1172 9040 76610 TOR 990 10212 1178 9034 76604 PMD 1090 10212 1274 8938 76508 1270 10212 1275 8937 76507 PMD 1480 10212 1154 9058 76628 CV 1510 10212 1266 8946 76516 PMD 1620 10212 1320 8892 76462 1760 10212 1221 8991 76561 2020 10212 1188 9024 76594 2240 10212 1178 9034 76604 2240 10212 1247 8965 76535 CV 2260 10212 1331 8881 76451 PMD 2400 10212 1395 8817 76387 PMD 2640 10212 1253 8959 76529 2870 10212 1183 9029 76599 HOR Thalweg Slope (ft /ft ) 0 003 40 1 1 1 1 1 1 li L I 1 1 41 Second Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Lett Bankfull - Main Tributary #2 Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 3/19/2013 BM #I (ft)= 775 70 ' Height of Height Distance, Pomt Back -Sight Instrument Fore -Sight Depth STATION B.S. RL F.S. Elevation Corrected Elevation COM UN S BM #1 50 212 10212 10212 833 10000 9379 76949 370 10212 847 9365 76935 590 10212 832 9380 76950 820 10212 845 9367 76937 1090 10212 852 9360 76930 ' 1270 10212 834 9378 76948 1480 10212 815 9397 76967 1760 10212 829 9383 76953 2020 10212 846 9366 76936 2240 10212 793 9419 76989 2400 10212 781 9431 77001 2640 10212 798 9414 76984 '2870 10212 801 9411 76981 1 1 1 1 1 1 li L I 1 1 41 1 Second Year Monitoring Report: Main Tributary 42 New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Right Bankfull- Main Tributary #2 Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 3/19/2013 BM # 1(ft )= 775 70 t Height of Height Distance, Point Back -Sight Instrument Fore -Sight Depth STATION B.S. H.L F.S. Elevation Corrected Elevation CONaUNTS ' BM 11 50 212 10212 10212 10000 788 9424 76994 370 10212 761 9451 77021 590 10212 804 9408 76978 820 10212 807 9405 76975 1090 10212 865 9347 76917 ' 1270 10212 819 9393 76963 1480 10212 822 9390 76960 1760 10212 851 9361 76931 2020 10212 852 9360 76930 I 2240 10212 831 9381 76951 2400 10212 827 9385 76955 2640 10212 874 9338 76908 '2870 10212 855 9357 76927 1 1 u 1 1 1 1 1 1 42 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Second Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 Appendix C Tributary A Cross Sections Second Year Monitoring Comparison — As- Built, First Year, and Second Year Tributary A Longitudinal Profile Second Year Monitoring Comparison — First Year, and Second Year Tributary A Pebble Count Tributary A Raw Data Second Year Monitoring 43 New Garden Road - Tributary A - Cross Section C (Riffle) 775 c - ------ - - - - -- 773 c 771 - -- - ---- - - - - -- -- ------------ --------------- - - - - - - - -_ - -. w 769 767 765 0 5 10 15 20 25 30 35 40 45 Distance (ft.) -- Bankfull Width - -- Flood -Prone Width — Water Surface zCp CD CD �o CD CD o �s � vo CD co y rP 0 z 0 b w a �� � r r m m m r m m m m m m m m m 775 773 771 0 ca 769 w 767 765 New Garden Road - Tributary A - Cross Section D (Pool) G 0 5 10 15 20 25 30 35 40 45 Distance (ft.) D' 50 551 zLn CD �o C) �. CD aCD 0 0 �Ot a t' CD va ua .ID CD Cy n w a 1 New Garden Road - Tributary - Cross Section C (Riffle) 775 773 c CI 771 o -- > 769 w 767 765 0 5 10 15 20 25 30 35 40 45 Distance (ft.) -K As -Built -+- 2012 2013 Bankfull zcoo CD CD �o � a CD CD 0 0 a �. �0 a 5' z � •o CD CD y b 0 CD z 0 b w a r_= � � � m � � � � � � � � � � m m m m New Garden Road - Tributary - Cross Section D (Pool) 775 D 773 D' = 771 0 769 - - w 767 765 0 5 10 15 20 25 30 35 40 45 50 55 Distance (ft.) BAs -built 2012 x-2013 Bankfull zCp CD CD �o CD CD a. �. CD a 5' via � 0 0 z 0 b w Im � i � m m m m m m m m m m m m m m m oo 778.0 776.0 774.0 772.0 a� w 770.0 c 0 r 768.0 d W 766.0 764.0 762.0 760.0 Tributary A Longitudinal Profile New Garden Road Widening Phase II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 l- 00 01 O .-i N M 7 V1 b r W Station (feet) Water Surface Thalweg — LBKF —RBKF zcoo CD CD :�o CD o o CD as .b CD co y a: z O b w Y e 778.0 776.0 774.0 772.0 w 770.0 d 0 768.0 W 766.0 764.0 762.0 760.0 Tributary A Longitudinal Profile New Garden Road Widening Phase II o e o e o e o e o 0 0 0 o e o o e e o C; o 0 0 0 o e o o e o e o o e o 0 o e .� N M 7 kn b r 00 C� O - N M V 1n b r 00 .-r .w .ti .r �--i .ti —Water Surface 2013 —X Thalweg 2013 canon - K-r— LBKF 2013 -->E— RBKF 2013 —Thalweg 2012 zcp CD CD �o aC tsq CD 0 0 SD o CD �. v�o � CD co y z 0 b w J a ' Second Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 Tnbutary A - Pebble Count 1 1 1 1 1 1 1 1 1 t I 1 1 1 50 Metric mm Particle S A N D Count Tot # % Tot % Cum <0.062 Sift/Clay 13 100 13.0 13.00 0.062- 0.125 Very Fine Sand 7 100 7.0 20.00 0.125 - 0.250 Fine Sand 5 100 5.0 25.00 0.25-0.5 Med. Sand 4 100 4.0 29.00 0.5-1.0 Coarse Sand 2 100 2.0 31.00 1.0-2.0 Very Coarse Sand 0 100 0.0 31.00 2-4 Ve Fine Gavel G R A V E L 2 100 2.0 33.00 4-5.7 Fine Gavel 5 100 5.0 38.00 5.7-8 Fine Gavel 2 100 2.0 40.00 8-11.3 Medium 6 100 6.0 46.00 11.3-16 Medium 15 100 15.0 61.00 16-22.6 Coarse 14 100 14.0 75.00 22.6-32 Coarse 7 100 7.0 82.00 32-45 Very Coarse 11 100 11.0 93.00 45-64 Very Coarse 5 100 5.0 98.00 64-90 Small C n b e 0 100 0.0 98.00 90-128 Small 0 100 0.0 98.00 128-180 Large 1 100 1.0 99.00 180-256 Large 0 100 0.0 99.00 256-362 Small B 0 1 e ` 0 100 0.0 99.00 362-512 Small 0 100 0.0 99.00 512-1024 Medium 0 100 0.0 99.00 1024-2048 Large - Very Large 0 100 0.0 99.00 Bedrock IBedrock 1 100 1 1.0 100.00 50 b m A A M, A IS Percent (%) 0 0 0 0 0 0 0 0 <0.062 0.062 - 0.125 0.125- 0.250 0.25-0.5 0.5-1.0 1.0-2.0 2 -4 4-5.7 5.7-8 8-11.3 11.3-16 16-22.6 22.6-32 32 -45 45 -64 64 -90 90 -128 128 -180 180 -256 256 -362 362 -512 512 -1024 1024 -2048 Bedrock o •.• n+ w is v� a � oo �o .. 0 0 0 0 0 0 0 0 0 0 0 0 0 o e o c b e o 0 0 Cumulative Percent (% R- I VLE-d 'ON 1340M II asew su►umm pEOg uapieo marl V AmnquZ woda -d 2uuoltuoW moA puoaaS �� m m IM m r IM m m m m m m m m a• m IM N Wolman Reachwide Pebble Count Particle Size Distributions - Tributary A 100.00 90.00 80.00 70.00 0 60.00 50.00 r+ Q 40.00 a 30.00 20.00 10.00 0.00 ' '''" V I I I I 1 1 1 1 1 1 11 I 1 1 1 1 1 1 11 I I I I I I I I I I I I I I I I I I C; Particle Size (mm) zEn CD 0 :�o co CD =� °w o � o I . C co z 0 b w a W CROSS - SECTION: New Garden Road - CSC (Riffle) Project Name: New Garden Road Widenvg Phase II Project Location: Greensboro, NC Date: 3/19/2013 Hoodprone Elev. 773.53 Water surface 767.44 10256 9134 New Garden Road - Tributary A - Cross Section C (Riffle) 775 773 -------------------------------------------------------------------------- - - - - -- 771 C- - - -- - -_ _ - r > 769 d w 767 765 0 5 10 15 20 25 30 35 40 45 Distance (ft.) - Bankfull Width - -- -Flood -Prone Width -x-- Water Surface Floodprone Elevation 0.0 BM= 715.70 Longitudinal Station Or62 Bankroll Elevation 14.0 770.20 32.0 770.20 Water Surface Elevation Height of 23.0 Height 27 767.44 Distance; Point Back -Sight In -nt Fore-Sight Depth STATION B.S. ILL F.S. Elevation Corrected Elevation Comment Width Bkf& h AVG DEPTH BEFArea B.M. #1 2.56 102.56 100.00 Low Bank Height 5.54 Ft, 0 10156 5.36 97.20 77190 LTOB Bank Height Ratio 1.689 5.0 102.56 7.45 95.11 770.81 5.00 SINUOSITY 1.37 6.0 102.56 7.67 94.89 770.59 1.00 LBKF 14.00 Ft. 14.0 102.56 8.06 94.50 770.20 LBKF 8.00 0.00 RBKF 31.00 Ft. 17.0 102.56 9.66 92.90 768.60 3.00 1.60 0.8 2.40 Bankfull WIDTH (WbkO 17.00 Ft. 19.0 102.56 10.31 9225 767.95 100 2.25 1.925 3.85 Mean DEPTH (dbkQ 1.58 Ft. 21.5 102.56 10.38 92.18 767.88 2.50 2.32 2.285 5.71 BnkB. X- Section AREA (AbkO 26.85 SF 22.0 102.56 10.51 92.05 767.75 0.50 2.45 2.385 1.19 W/D RATIO (WbkOdbkl) 10.76 23.3 10156 10.90 9166 76736 LEW 1.30 2.84 2.645 3.44 Max DEPTH (dmbkO 3.28 Ft. 25.4 102.56 I1.39 91.17 766.87 TW 2.10 3.33 3.085 6.48 WIDTH of Flood Prone Area (Wfpa) 45.00 Ft. 26.6 102.56 11,03 91.53 767.23 REW 1.20 2.97 3.15 3.78 Entrenchment Ratio (ER) 2.65 27.0 102.56 1036 9120 767.90 0.40 Slope 0.015 Ft./Ft. 310 102.56 8.30 94.26 769.96 RBKF 4.00 Channel Substrate 11.30 (D50) 37.5 102.56 7.53 95.03 770.73 6.50 Rosgen Classification E4 43.0 102.56 5.59 96.97 772.67 RTOB Hoodprone Elev. 773.53 Water surface 767.44 10256 9134 New Garden Road - Tributary A - Cross Section C (Riffle) 775 773 -------------------------------------------------------------------------- - - - - -- 771 C- - - -- - -_ _ - r > 769 d w 767 765 0 5 10 15 20 25 30 35 40 45 Distance (ft.) - Bankfull Width - -- -Flood -Prone Width -x-- Water Surface Floodprone Elevation 0.0 773.53 43.0 773.53 Bankroll Elevation 14.0 770.20 32.0 770.20 Water Surface Elevation 23.0 767.44 27 767.44 zC'n CD CD O N y zi �t PO 4 O �+ O CD QQ � CD M CD z 0 w a liiiiwimiim m m� No m m� m ! m m m iiii=! M ml llt CROSS - SECTION: New Garden Road - CSD (Pool) Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 3/192013 Floodprone Elev. 77L98 Watersurface 766.70 102.56 __, 9100 775 773 771 0 769 d M 767 765 0 New Garden Road - Tributary A - Cross Section D (Pool) 5 10 15 20 25 30 35 40 45 50 55 Distance (ft.) - Bankfuuwdtn Floodprone Elevation 4.0 BM= 775.70 55.0 Longitudinal Statio 1 +19 Bankfull Elevation 24.0 768.81 42.0 768.81 Water Su rface Elevation Height of 27.5 Height 39 766.70 Distance; Point Back -Sight Instrument Fore -Sight Depth STATION B.S. HL F.S. Elevation Corrected Elevation Comment Width Bkf depth AVG DEPTH BKFArea B.M. #1 156 102.56 100.00 Low Bank Height 6.04 Ft. 0 102.56 5.22 97,34 773.04 LTOB Bank Height Ratio 1.682 5.0 102.56 6.58 95,98 771.68 5.00 SINUOSITY 1.37 10.5 102.56 8.61 93.95 769.65 550 LBKF 22.50 Ft. 24.0 10156 9.45 93.11 768.81 LBKF 13.50 0.00 RBKF 43.00 Ft. 28.0 102.56 11.85 90.71 766.41 LkW 4.00 2.40 1.2 4.80 Bankfull WIDTH (Wbkf) 20.50 Ft. 33.0 102.56 12.62 89,94 765.64 TW 5.00 3.17 2.785 13.92 Mean DEPTH (dbkf) 1.11 Ft. 38.5 102.56 11.84 90.72 766.42 REW 5.50 2.39 2.78 15.29 Bnkfl. X- Section AREA (Abkf) 22.68 SF 43.0 102.56 8.84 93.72 769.42 R13KF 4.50 -0.61 0.89 4.00 W/D RATIO (Wbkf/dbkf) 18.53 51.0 102.56 808 94.48 770.18 8.00 -1.37 -0.99 -7.92 Max DEPTH (dmbkf) 3.59 Ft. 54.5 102.56 6.58 95.98 771.68 RTOB 3.50 -2.87 -2.12 -7.42 WIDTH of Flood Prone Area (Wfpa) 55.00 Ft. Entrenchment Ratio (ER) 2.68 Slope 0.015 FOR. Channel Substrate 11.30 (D50) Rosgen Classification E4 Floodprone Elev. 77L98 Watersurface 766.70 102.56 __, 9100 775 773 771 0 769 d M 767 765 0 New Garden Road - Tributary A - Cross Section D (Pool) 5 10 15 20 25 30 35 40 45 50 55 Distance (ft.) - Bankfuuwdtn Floodprone Elevation 4.0 771.98 55.0 771.98 Bankfull Elevation 24.0 768.81 42.0 768.81 Water Su rface Elevation 27.5 766.70 39 766.70 zcel O O O C A CD D 0 Ef CDO � �+ O UQ .� CD �] z O b w 1 [1, 1 1 1 1 1 1 1 1 I 1 1 1 1 Second Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Water Surface - Tributary A Project Name: New Garden Road Widening Phase II Project Location Greensboro, NC Date: 3/19/2013 BM #1 (ft )= 77570 WS Slope (ft /ft ) 0016 55 Height of Height Distance, Pomt Back -Sight Instrument Fore-Sight Depth STATION B.S. RL F.S. Elevation Corrected Elevation CONDONT'S BM #1 256 10256 10000 00 10256 955 9301 76871 100 10256 969 9287 76857 130 10256 1023 9233 76803 270 10256 1031 9225 76795 440 10256 1086 9170 76740 580 10256 1090 9166 76736 620 10256 1082 9174 76744 770 10256 1089 9167 76737 820 10256 1095 9161 76731 830 10256 1152 9104 76674 930 10256 1152 9104 76674 1060 10256 1152 9104 76674 1160 10256 1152 9104 76674 1190 10256 1152 9104 76674 1350 10256 1152 9104 76674 1470 10256 1164 9092 76662 1480 10256 1190 9066 76636 1540 10256 1190 9066 76636 1700 10256 1183 9073 76643 1850 10256 1194 9062 76632 WS Slope (ft /ft ) 0016 55 i i i Second Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Th hwg - Tributary A Project Name: New Garden Road Widening Phase II Pmject Location: Greensboro, NC Date: 3/19/2013 Thalweg Slope (ft /ft ) 0 014 56 BM # 1(ft )= 77570 Height of Height Distance, Pomt Back -Sight Instrument Fore -Sight Depth STATION B.S. SI F.S. Elevation Corrected Elevation COMENTS BM #1 256 10256 10000 00 10256 984 9272 76842 HOR 100 10256 982 9274 76844 TOR 130 10256 1098 9158 76728 PMD 270 10256 1039 9217 76787 HOR 440 10256 1113 9143 76713 TOR 580 10256 1165 9091 76661 PMD 620 10256 1 139 9117 76687 HOR 770 10256 1108 9148 76718 820 10256 1106 9150 76720 Cv 830 10256 1247 9009 76579 PMD 930 10256 1325 8931 76501 PMD 1060 10256 1311 8945 76515 PMD 1160 10256 1247 9009 76579 PMD 1190 10256 1262 8994 76564 1350 10256 1258 8998 76568 1470 10256 1169 9087 76657 CV 1480 10256 1335 8921 76491 PMD 1540 10256 1370 8886 76456 PMD 1700 10256 1216 9040 76610 HOR 1850 10256 1309 8947 76517 TOR Thalweg Slope (ft /ft ) 0 014 56 Second Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 ' LONGITUDINAL PROFILE: Left Bankfull - Tributary A Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 3/19/2013 1 1 1 1 1 1 1 1 1 1 57 Distance, Pont STATION BM # 1(ft )= 77570 Height of Height Back -Sight Instrument Fore -Sight Depth B.S. H.I F.S. Nevation CorrectedDevation CONVENTS BM 11 211 10211 10000 00 10256 700 9556 77126 100 10256 751 9505 77075 270 10256 738 9518 77088 440 10256 765 9491 77061 620 10256 806 9450 77020 770 10256 845 9411 76981 820 10256 845 9411 76981 1190 10256 945 9311 76881 1350 10256 882 9374 76944 1470 10256 875 9381 76951 1700 10256 886 9370 76940 1 1 1 1 1 1 1 1 1 1 57 Second Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 ' LONGITUDINAL PROFILE: Right Bankf dl - Tributary A Project Name: New Garden Road Widening Phase II ' Project Location: Greensboro, NC Date: 3/19/2013 1 1 C� 1 1 1 I 1 1 58 BM #I (ft )F= 775 70 Height of Height Distance, Point Back -Sight Instrument Fore-Sight Depth STATION B.S. ELI F.S. Elevation Corrected Elevation COMMENTS BM #1 256 10256 10000 00 10256 719 9537 77107 100 10256 697 9559 77129 270 10256 740 9516 77086 440 10256 733 9523 77093 620 10256 830 9426 76996 770 10256 807 9449 77019 820 10256 814 9442 77012 1 19 0 102 56 884 9372 76942 135 0 10256 893 9363 76933 1470 10256 866 9390 76960 1700 10256 908 9348 76918 1 1 C� 1 1 1 I 1 1 58