HomeMy WebLinkAbout20060684 Ver 1_Year 2 Monitoring Report_20130610RECEIVED
N.0 Dept of ENR
r
City of Greensboro MAY 2 4 1013
L / .North Carolina Fno,n Winston -Salem
Tonal ffice
LERA R OF TiRANS;MITiTAL
TO: NCDENR, Div. OF WATER QUALITY DATE: MAY 23, 2013
WINSTON -SALEM REGIONAL OFFICE PROJECT: DWQ #06 -0684
585 WAUGHTOWN STREET
WINSTON- SALEM, NC 27107
ATTENTION: SUE HOMEWOOD
WE ARE SENDING YOU:
® ATTACHED ❑ UNDER SEPARATE COVER VIA:
THE FOLLOWING ITEMS:
❑ SHOP DRAWINGS ❑ PRINTS ❑ SPECIFICATIONS
❑ CHANGE ORDER ❑ LETTER ® OTHER
RE:
NEW GARDEN ROAD
STREAM RESTORATION
MONITORING RECORD
❑ PLANS
COPIES
DATE
REVISION
DESCRIPTION
1
5/22/2013
❑
LEVEL 1 STREAM RESTORATION MONITORING
❑
FOR REVIEW
❑
SECOND YEAR MONITORING REPORT
❑
FOR DISTRIBUTION
❑
CHANNEL STABILITY
THESE ARE TRANSMITTED AS CHECKED BELOW:
❑
FOR APPROVAL
❑
APPROVED AS SUBMITTED
®
FOR YOUR USE
❑
AS REQUESTED
❑
FOR REVIEW
❑
RESUBMITTED
❑
FOR DISTRIBUTION
❑
OTHER
COMMENTS.
COPY To USACE, FILE
❑ APPROVED AS NOTED
❑ RETURNED FOR CORRECTIONS
❑ RETURNED AFTER LOAN
SIGNED GUY B. INGLE
P.O. Bog 3136 • Greensboro, NC 27402 -3136 • www.greensboro- nc.gov • 336- 373 -CITY (2489) • TTY # 333 -6930
640
r
City of Greensboro
North Carolina
o
TO: U.S. ARMY CORPS OF ENGINEERS DATE:
RALEIGH REGULATORY FIELD OFFICE PROJECT:
3331 HERITAGE TRADE DRIVE, SUITE 105 RE:
WAKE FOREST, NC 27587
ATTENTION: MR. THOMAS BROWN / ANDREW
MR. ANDREW WILLIAMS
WE ARE SENDING YOU:
® ATTACHED
THE FOLLOWING ITEMS:
❑ SHOP DRAWINGS
❑ CHANGE ORDER
❑ UNDER SEPARATE COVER VIA:
Engineering & Inspections
MAY 23, 2013
SAW- 2007 -03980
NEW GARDEN ROAD
STREAM RESTORATION
MONITORING RECORD
❑ PRINTS ❑ SPECIFICATIONS ❑ PLANS
❑ LETTER ® OTHER
COPIES
DATE
REVISION
DESCRIPTION
1
5/22/2013
AS REQUESTED
LEVEL 1 STREAM RESTORATION MONITORING
❑
RESUBMITTED
❑ FOR DISTRIBUTION
SECOND YEAR MONITORING REPORT
OTHER
COMMENTS:
CHANNEL STABILITY
THESE ARE TRANSMITTED AS CHECKED BELOW:
❑ FOR APPROVAL
❑
APPROVED AS SUBMITTED
® FOR YOUR USE
❑
AS REQUESTED
❑ FOR REVIEW
❑
RESUBMITTED
❑ FOR DISTRIBUTION
❑
OTHER
COMMENTS:
COPY To DWO -WSRO. FILE
❑ APPROVED AS NOTED
❑ RETURNED FOR CORRECTIONS
❑ RETURNED AFTER LOAN
SIGNED GUY B. INGLE
P.O. Box 3136 . Greensboro, NC 27402 -3136 - www.greensboro- nc.gov . 336- 373 -CITY (2489) • TTY # 333 -6930
"0
N.C.Dept. of ENR
MAY 2 4 2013
Winston -Salem
Regional Office
CITY OF GREENSBORO
ENGINEERING DIVISION
NEW GARDEN ROAD WIDENING, PHASE II
PROJECT # P -3741
CULVERT REPLACEMENT AND
STREAM RELOCATION/RESTORATION
HORSEPEN CREEK MAIN TRIBUTARY #2 AND TRIBUTARY A
LEVEL 1 STREAM RESTORATION MONITORING
SECOND YEAR MONITORING REPORT
CHANNEL STABILITY
MAY 229 2013
USI
US Infrastructure of Carolina, Inc.
125 South Elm Street, Suite 510
Greensboro, North Carolina 27401
N.C. License #C -1950
w7s
ilk!'
rLJUN � �� 2013
- WATE,�. ;,,jAuty
a aw Brand►
Carolina Wetland Services, Inc.
880 East Westinghouse Blvd.
Charlotte, NC 28273
1
1
1
1
1
1
1
1
i
1
1
1
i
I
1
1
1
1
1
Level 1 Stream Restoration Monitoring
Horsepen Creek Main Tributary #2 and Tributary A
SECOND YEAR MONITORING REPORT
Channel Stability
New Garden Road Widening Phase II
City of Greensboro, North Carolina Engineering Division
Project No. P -3741
May 22, 2013
US Infrastructure of Carolina, Inc.
125 South Elm Street, Suite 510
Greensboro, North Carolina 27401
N.C. License #C -1950
Prepared by:
5_4V4:�'_i3
Carolina Wetland Services, Inc.
550 East Westinghouse Blvd.
Charlotte, NC 28273
� CINS
1
1
1
1
'
Table of Contents
Page
Introduction........................................................................................................ ..............................1
Methods............................................................................................................... ..............................1
PhotoReference Sites ...................................................................................... ...............................
l
ChannelStability ............................................................................................. ...............................
3
Results................................................................................................................. ...............................
3
PhotoReference Sites ....................................................................................... ..............................3
ChannelStability .............................................................................................. ..............................4
MainTributary # 2 ......................................................................................... ..............................4
TributaryA .................................................................................................. ...............................
7
'
Summary ............................................................................................................ ...............................
8
'
Comments........................................................................................................ ...............................
Figures
8
Figure1: Site Location Map ................................................................................. ..............................2
Figure 2: As -Built Cross Sections and Photo Location Map ............................... ..............................5
AppendixA ........................................................................................................ ..............................9
Photopage 1 — Second Year Monitoring Photographs
'
AppendixB ..................................................................................................... ...............................
Main Tributary #2 Cross Sections
27
Main Tributary #2 Longitudinal Profile
'
Main Tributary #2 Pebble Count
Main Tributary #2 Raw Data
AppendixC ..................................................................................................... ............................... 43
Tributary A Cross Sections
Tributary A Longitudinal Profile
Tributary A Pebble Count
Tributary A Raw Data
1
1
1
1
1
1
1
1
1
1
1
1
I
Second Year Monitoring Report: Channel Stability
New Garden Road Widening Phase II Project No. P -3741
Introduction
The New Garden Road Widening Phase H Project is located in Greensboro, North Carolina as
shown on the Site Location Map (Figure 1) on the next page. Construction of this project
necessitated the relocation of portions of two tributaries to Horsepen Creek, Main Tributary #2
(South) and Tributary A (North). The relocation of these stream reaches was completed in
March 2011. The stream relocations were permitted through the U.S. Army Corps of Engineers
(Action I.D. SAW 2007 - 03980) and the North Carolina Department of Environment and Natural
Resources (DWQ Project #06 -0684) and required a Level 1 Stream Restoration Mitigation and
Monitoring Plan for this project. This level of monitoring includes the establishment of photo
reference sites, plant survival monitoring, and channel stability monitoring.
The relocated stream reaches were assessed using Rosgen Level II Classification methods. The
following end of second year survey was conducted to evaluate and document the conditions of
the relocated stream channels following two years after the completion of construction. This data
will be compared to the as-built survey which provided a baseline for these future monitoring
events as well as the first year survey.
I Methods
I
1
t
1
1
1
1
Photo Reference Sites
Photographs were taken during:
1) Second Year Survey for Channel Stability on March 19, 2013
In stream structures including rock vanes, root wads, and grade control sills were photographed
facing upstream and downstream. Stream bed and banks were photographed for visual
comparison of stability.
1
1
1
1
1
1
I
1
Second Year Monitoring Report: Channel Stability
New Garden Road Widening Phase II Project No. P -3741
Channel Stability
A geomorphic survey was performed by engineers from USI with the assistance of a scientist
from CWS on March 19, 2013 following two years after the construction of the new stream
channels. The survey included a longitudinal profile, a cross sectional survey, substrate sampling
(Wolman reach -wide pebble count), and photo documentation of each of the stream reaches.
This data was used to classify each reach using the Rosgen Level H system. Bank pins were also
checked on both reaches to monitor bank stability.
Surveying methods (using a rod, level, and tape) followed the guidelines given in Stream
Channel Reference Sites: An Illustrated Guide to Field Technique, General Technical Report
RM -245, United States Department of Agriculture, Forest Service. A relative benchmark for the
Second Year survey was established on the top of an existing sanitary sewer manhole
immediately adjacent to New Garden Road. The surveys of both streams were tied together to
the top of the sanitary sewer manhole with a given elevation of 100.00. The actual elevation of
the existing sanitary sewer manhole as a permanent benchmark is 775.70. This is shown in the
Raw Data portions of the Appendices. The Raw Data also shows the correction of the elevations
taken during the survey to actual elevations.
r
Results
1
I
1
1
f]
1
1
Photo Reference Sites
As part of the Second Year survey for the project, all areas of the project were photo
documented. In stream structures including rock vanes, root wads, and grade control sills were
photographed facing upstream and downstream. Stream bed and banks were photographed for
visual comparison of stability. Representative photographs are included in Photopage 1
(Appendix A). The locations and directions of each of these photographs are shown in Figure 2
(Page 5). As an aside, the same locations and directions were used for these photographs as
those taken during the As -Built and First Year surveys.
1 3
1
n
u
1
1
1
[7
1
1
1
t
I
I
1
1
1
Second Year Monitoring Report: Channel Stability
New Garden Road Widening Phase II Project No. P -3741
Channel Stability
Main Tributary #2
Main Tributary #2 flows north through the project area and through the new culvert installed
beneath the widened New Garden Road. The Second Year survey of Main Tributary #2 was
conducted on March 19, 2013 by representatives from USI and CWS. The relocated stream
channel exhibited substrate consisting of fine gravel (D50 = 5.7 mm). The channel slope is 0.003
ft/ft with a sinuosity of 1.18. The average bankfull width and depth for this reach are 27 feet and
1.86 feet, respectively. The average bankfull cross sectional area for riffle portions of the stream
is 50.09 ft2. The average flood -prone area width for Main Tributary #2 is approximately 60 feet.
The new stream channel has a Rosgen Level H classification of C5.
Permanent cross sections were established during the As -Built survey and marked with rebar to
allow future monitoring of the same locations. Figure 2 on page 5 shows the locations of these
permanent cross sections. The As- Built, First Year, and Second Year conditions of Main
Tributary #2 (Cross Sections A and B) are summarized below in the following tables. Channel
cross sections, the longitudinal profile, and pebble count data for Main Tributary #2 are included
in Appendix B.
Provide the following data fnr each crncc_cectinn rrnee ccntinn A
Date Measured:
6/28/2010
1/10/2012
3/19/2013
Cross - section being measured:
A
A
A
Cross - sectional area: as- built/present
60.01 sf
52.43 sf
50.09 sf
Bankfull width: as- built/present
27.00 ft
27.00 ft
27.00 ft
Floodprone Width: as- built/present
60.00 ft
60.00 ft
60.00 ft
Width/depth: as- built/present
12.15
13.90
14.55
Entrenchment ratio: as- built/present
2.22
2.22
2.22
Stream Type: as- built/present*
C5
C5
C5
am), reqrureu jor riUie Cross- secuom
4
w r y �� m m m� m m m m r a m� m m
XAW
LEGEND
CONSERVATION EASEMENT
- - -- NEW STREAM CORRIDOR
SANKFULL
IN-STREAM STRUCTURES
0 �— PHOTO LOCATION AND DIRECTION
TRIBUTARY #2�--.
ROOT WAD
AREA D
CROSS
VANE D
/ CROSS
VANE C
CROSS --1
VANE B CROSS C'
1 FVANE A X
ITRIBUTARY Al
ROOT WAD
AREA A
19 11 2 Cl
9
3
ROOT WAD ROOT WAD i
7 AREA C �
/ CROSS SECTION B AREA B /
/ D /
1 S CROSS SECTION D
/ 5 CROSS SECTION A rscz
MOOSELODGE
PARKING LOT
GRADE
CONTROL
SILL A
ICROSS SECTION CI
zCA
(D �
� O
N �
CI
O �
� o
rn
st
CY
�4
�.02.
A
z
0
w
iSecond Year Monitoring Report: Channel Stability
New Garden Road Widening Phase II Project No. P -3741
1
1
r
Provide the following data for each crncs_cPrtinn- rrnee Cartinn R
Date Measured:
6/28/2010
1/10/2012
3/19/2013
Cross - section being measured:
B
B
B
Cross - sectional area: as- built/present
73.91 sf
68.42 sf
64.21 sf
Bankfull width: as- built/present
27.00 ft
27.00 ft
27.00 ft
Floodprone Width: as- built/present
70.00 ft
70.00 ft
70.00 ft
Width/depth: as- built/present
9.86
10.65
11.35
Entrenchment ratio: as- built/present
2.59
2.59
2.59
Stream Type: as- built/present*
C5
C5
C5
I. owy requireu for riffle cross - sections
ri
1
1
0
1
1
1
1
1
1
The As- Built, First Year, and Second Year conditions of Main Tributary #2 (Longitudinal
Profile) are summarized below in the following table. The longitudinal profile for Main
Tributary #2 is included in Appendix B.
Date Measured:
6/28/2010
1/10/2012
3/19/2013
Avg. slope riffles: as- built/present
0.005 ft/ft
0.023 ft/ft
0.020 ft/ft
Avg. slope pools: as- built/present
0 ft/ft
0 ft/ft
0 ft/ft
Number of riffles: as- built/present
1
1
1
Number of pools: as- built/present
1 4
j 4
4
The As- Built, First Year, and Second Year conditions of Main Tributary #2 (Pebble Counts) are
summarized below in the following table. The pebble count data for Main Tributary #2 is
included in Appendix B.
Date Measured:
6/28/2010
1/10/2012
3/19/2013
Cross - section being measured
A and B
A and B
A and B
D16: as- built/present
0.125
0.125
0.25
D50: as- built/present
0.5
8.0
5.7
D84: as- built/present
11.3
16.0
16.0
The As- Built, First Year, and Second Year conditions of Main Tributary #2 (Visual Inspection)
are summarized below in the following table.
Date Inspected:
6/28/2010
1/10/2012
3/19/2013
Structure Type
Cross Vane
Cross Vane
Cross Vane
Is water piping through or around
structure?
No
No
No
Head cut or down cut present?
No
No
No
Bank or scour erosion present?
No
No
No
Other problems noted?
1 No
No
No
6
iSecond Year Monitoring Report: Channel Stability
New Garden Road Widening Phase II Project No. P -3741
Tributary A
Tributary A is a minor tributary which flows west along the toe of the widened New Garden
Road embankment to its confluence with Main Tributary #2. The Second Year survey of
Tributary A was conducted on March 19, 2013 by representatives from USI and CWS. The
relocated stream channel exhibited substrate consisting of medium gravel (D50 = 8.0 mm). The
channel slope is 0.015 ft/ft with a sinuosity of 1.37. The average bankfull width and depth for
this reach are 17 feet and 1.58 feet, respectively. The average bankfull cross sectional area for
riffle portions of the stream is 26.85 ft2. The average flood -prone area width for Tributary A is
approximately 45 feet. The new stream channel has a Rosgen Level H classification of E4.
1
u
1
t
1
1
1
Permanent cross sections were established during the As -Built survey and marked with rebar to
allow future monitoring of the same locations. Figure 2 on page 5 shows the locations of these
permanent cross sections. The As- Built, First Year, and Second Year conditions of Tributary A
(Cross Sections C and D) are summarized below in the following tables. Channel cross sections,
the longitudinal profile, and pebble count data for Tributary A are included in Appendix C.
Provide the following data for each crnss_sectinn- Crnce Cpotinn f`
Date Measured:
6/28/2010
1/10/2012
3/19/2013
Cross - section being measured:
C
C
C
Cross - sectional area: as- built/present
32.45 sf
34.43 sf
26.85 sf
Bankfull width: as- built/present
17.00 ft
17.00 ft
17.00 ft
Floodprone Width: as- built/present
45.00 ft
45.00 ft
45.00 ft
Width/depth: as- built/present
8.91
8.39
10.76
Entrenchment ratio: as- built/present
2.65
2.65
2.65
Stream Type: as- built/present*
E4
E4
E4
oniv requireajor ryjie cross - sections
Provide the followine data for each crncs- section- Crncc Rertinn n
Date Measured:
6/28/2010
1/10/2012
3/19/2013
Cross - section being measured:
D
D
D
Cross - sectional area: as- built/present
39.59 sf
44.76 sf
22.68 sf
Bankfull width: as- built/present
19.00 ft
20.50 ft
20.50 ft
Floodprone Width: as- built/present
55.00 ft
55.00 ft
55.00 ft
Width/depth: as- built/present
9.12
9.39
18.53
Entrenchment ratio: as- built/present
2.89
2.68
2.68
Stream Type: as- built/present*
E4
E4
E4
onty reguirea jor rype cross - sections
7
1
1
1
I
1
1
1
r
Second Year Monitoring Report: Channel Stability
New Garden Road Widening Phase II Project No. P -3741
The As- Built, First Year, and Second Year conditions of Tributary A (Longitudinal Profile) are
summarized below in the following table. The longitudinal profile for Tributary A is included in
Appendix C.
Date Measured:
6/28/2010
1/10/2012
3/19/2013
Avg. slope riffles: as- built/present
0.023 ft/ft
0.023 ft/ft
0.034 ft/ft
Avg. slope pools: as- built/present
0 ft/ft
0 ft/ft
0 ft/ft
Number of riffles: as- built/present
3
3
3
Number of pools: as- built/present
4
4
4
The As- Built, First Year, and Second Year conditions of Tributary A (Pebble Counts) are
summarized below in the following table. The pebble count data for Tributary A is included in
Appendix C.
Date Measured:
6/28/2010
1/10/2012
3/19/2013
Cross - section being measured
C and D
C and D
C and D
D16: as- built/present
0.125
<0.062
0.062
D50: as- built/present
8.0
5.7
11.3
D84: as- built/present 1
22.6
32.0
32.0
The As- Built, First Year, and Second Year conditions of Tributary A (Visual Inspection) are
summarized below in the following table.
Date Inspected:
6/28/2010
1/10/2012
3/19/2013
Structure Type
Cross Vane
Cross Vane
Cross Vane
Is water piping through or around
structure?
No
No
No
Head cut or down cut present?
No
No
No
Bank or scour erosion present?
No
No
No
Other problems noted? I
No
No
No
QSummary
1
1
Comments
The channels (Main Tributary #2 and Tributary A) relocated as part of the New Garden Road
Widening Phase II Project appear to be geomorphically and hydraulically stable with regard to
pattern, profile, and dimension. Other than ongoing monitoring and observation there are no
recommendations to perform any remediation at this time.
8
1
1
1
1
1
1
1
1
1
Second Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II Project No. P -3741
Appendix A
Photopage 1— Second Year Monitoring Photographs
E
Second Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II Project No. P -3741
Photo 1: Tributary A — permanent cross section, left bank looking upstream
Photo 2: Tributary A — permanent cross section, left bank looking upstream
10
' Second Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II Project No. P -3741
1I
Photo 3: Tributary A — permanent cross section, left bank looking upstream
Photo 4: Tributary A — Root Wad Area A, centerline looking upstream
11
Second Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II
11
� I
� I
� I
� I
II
Project No. P -3741
' Photo 5: Tributary A — Grade Control Sill A, centerline looking upstream
Photo 6: Tributary A — Cross Vane A, left bank looking downstream
12
Second Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II Project No. P -3741
Photo 7: Tributary A — Root Wad Area A, centerline looking upstream
13
Second Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II Project No. P -3741
A
Photo 9: Tributary A — Cross Vane A, left bank looking upstream
Photo 10: Tributary A — Cross Vane A, left bank looking upstream
14
Second Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II Project No. P -3741
.:3
/i 3!
Photo 11: Tributary A — Cross Vane B, left bank looking downstream
Photo 12: Tributary A — Root Wad Area B, left bank looking upstream
15
Second Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II Project No. P -3741
Photo 13: Tributary A — Confluence with Main Tributary #2, looking downstream
Photo 14: Tributary A — Cross Vane B, left bank looking upstream
16
J
� I
� I
� I
i I
� I
� I
Second Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II
Project No. P -3741
P -T
Photo 15: Main Tributary 42 — permanent cross section, right bank looking upstream
Photo 16: Main Tributary #2 — Root Wad Area D, right bank looking downstream
17
Second Year Monitoring Report: Photo Documentation — Photopage 1
Garden New '•.• Widening Phase Il
Project •
.i
1
� F
^ t
18
ISecond Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II Proiect No. P -3741
1
� I
� I
� I
� I
i,I
it
IIPhoto 19: Main Tributary #2 — Cross Vane D, centerline looking downstream
Photo 20: Main Tributary #2 — Cross Vane D, centerline looking downstream
19
Second Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II Project No. P -3741
Photo 21: Main Tributary #2 — Cross Vane D, centerline looking downstream
Photo 22: Main Tributary #2 — Root Wad Area D, centerline looking upstream
20
� I
� I
i I
'1
� 1
I I
r
Second Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II Project No. P -3741
IIPhoto 23: Main Tributary #2 — Cross Vane D, left bank looking upstream
Photo 24: Main Tributary 42 — Cross Vane C, left bank looking downstream
21
Second Year Monitoring Report: Photo Documentation — Photopage 1
Photo 25: Main Tributary #2 — Riffle Pool B, centerline looking upstream
Photo 26: Main Tributary #2 — Cross Vane C, centerline looking downstream
22
Second Year Monitoring Report: Photo Documentation — Photopage I
New Garden Road Widening Phase II
No. P -3741
Photo 27: Main Tributary #2 — Cross Vane C, right bank looking downstream
Photo 28: Main Tributary #2 — Confluence with Tributary A, looking downstream
23
Second Year Monitoring Report: Photo Documentation — Photopage I
24
Second Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II Project No. P -3741
Photo 31: Main Tributary #2 — Root Wad D, left bank looking upstream showing
both permanent cross sections
Photo 32: Main Tributary #2 — Root Wad D, left bank looking downstream
25
� I
� I
� I
� I
Second Year Monitoring Report: Photo Documentation — Photopage 1
New Garden Road Widening Phase II Project No. P -3741
Photo 33: Main Tributary #2 — New Garden Road culvert, looking upstream
Photo 34: Main Tributary #2 — Downstream of New Garden Road, looking downstream
26
1
1
1
1
1
1
1
i
1
1
1
1
1
1
1
1
1
1
Second Year Monitoring Report: Main Tributary #2
New Garden Road Widening Phase II Project No. P -3741
Appendix B
Main Tributary #2 Cross Sections
Second Year Monitoring
Comparison — As- Built, First Year, and Second Year
Main Tributary #2 Longitudinal Profile
Second Year Monitoring
Comparison — First Year, and Second Year
Main Tributary #2 Pebble Count
Main Tributary #2 Raw Data
Second Year Monitoring
27
N
779
777
775
.2 773
771
w 769
767
765
New Garden Road - Main Tributary #2 - Cross Section A (Riffle)
0 5 10 15 20 25 30 35 40 45 50 55 60 65
Distance (ft.) I -------- Bankfull Width
zCp
CD Q
CD �o
aCD
00
�0,
a �J
�
ac
D
CD
C
z
0
b
w
N
N
m m m m m m m m � m m m r m m m m r
New Garden Road - Main Tributary #2 - Cross Section B (Pool)
776
774 B1
B
772
770
— - -- - - - - -- - - -- - - - - - -- - - -- _ -- - - - ---- -- --- - - - - -- -------- - - - - --
w 768
766
764
762
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
- -- Floodprone Width
Distance (ft.) -- BankfullWidth
--x— Water Surface
zcoo
CD CD
:�o
E a
CD
=q
00
a. :3.
� o
a 5'
: va
u�o �
C
y
CD
;v
N
b
o.
CD
z
0
w
W
0
m i �� � r s m m m m m� m m m� m
New Garden Road - Main Tributary #2 - Cross Section A (Riffle)
0 5 10 15 20 25 30 35 40 45 50 55 60 65
Distance (ft.)
z�
�o
a�
00
� as
v
0
y
N
z
0
b
779
777
775
0
773
771
_>
w
769
767
765
New Garden Road - Main Tributary #2 - Cross Section A (Riffle)
0 5 10 15 20 25 30 35 40 45 50 55 60 65
Distance (ft.)
z�
�o
a�
00
� as
v
0
y
N
z
0
b
W
� � ' m m m m m � m � m � � m m m m
New Garden Road - Main Tributary #2 - Cross Section B (Pool)
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
Distance (ft.)
z�
�o
00
� o
z
0
b
w
H
N
776
774
772
0
770
768
_>
w
766
764
762
New Garden Road - Main Tributary #2 - Cross Section B (Pool)
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
Distance (ft.)
z�
�o
00
� o
z
0
b
w
H
N
r m m m� m m� m m m m® m m m m m
774.0
772.0
770.0
a
768.0
0
R
w W 766.0
N
764.0
762.0
760.0
Main Tributary #2 Longitudinal Profile
New Garden Road Widening Phase II
Station (feet)
— Water Surface —a Thalweg x Lbkf f Rbkf
zCp
CD
�0
CD CD
w ¢'
aC
0
rL
rDo
�.
3
o �
rDy ..
n
w
H
cr
N
774.0
772.0
770.0
d
d
768.0
0
w W
766.0
764.0
762.0
760.0
Main Tributary #2 Longitudinal Profile
New Garden Road Widening Phase II
Station (feet)
B Water Surface 2013 a- Thalweg 2013 - x Lbkf 2013 * Rbkf 2013 )— Thalweg 2012
z�
�o
CD CD
zi q
0L 0
C�.
o
CD
UQ .0
CD
CD
w
5'
y
a'
N
b
0
C'
0
z
0
b
w
J
1
1
1
1
1
1
1
1
1
1
1
1
1
I
1
Second Year Monitoring Report: Main Tributary #2
New Garden Road Widening Phase II Project No. P -3741
Main Tflibu ary #2 - Pebble Count
34
Metric mm
Particle
S
A
N
D
1
Count
Tot #
% Tot
% Cum
<0.062
Silt/Clay
3
100
3.0
3.00
0.062 - 0.125
Very Fine Sand
5
100
5.0
8.00
0.125 - 0.250
Fine Sand
3
100
3.0
11.00
0.25-0.5
Med. Sand
6
100
6.0
17.00
0.5-1.0
Coarse Sand
9
100
9.0
26.00
1.0-2.0
Very Coarse Sand
1 2
100
2.0
28.00
2-4
Ve Fine Gravel
G
R
A
V
E
L
7
100
7.0
35.00
4-5.7
Fine Gravel
4
100
4.0
39.00
5.7-8
Fine Gravel
11
100
11.0
50.00
8-11.3
Medium
12
100
12.0
62.00
11.3-16
Medium
8
100
8.0
70.00
16-22.6
Coarse
18
100
18.0
88.00
22.6-32
Coarse
7
100
7.0
95.00
32-45
IVeryCoarse
Very Coarse
3
100
3.0
98.00
45-64
0
100 1
0.0
98.00
64-90
Small
C
b
b
i
e
1
100
1.0
99.00
90-128
Small
1
100
1.0
100.00
128-180
e
0
100
0.0
100.00
180-256
barge
0
100
0.0
100.00
256-362
Small
B
0
a
e
0
100 1
0.0
100.00
362-512
Small
0
100
0.0
100.00
512-1024
Medium
0
100
0.0
100.00
1024-2048
Large - Very Large
0
100
0.0
100.00
Bedrock IBedrock
0
100
0.0
100.00
34
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Second Year Monitoring Report: Main Tributary #2
New Garden Road Widening Phase II Project No. P -3741
N
D
.a
r
.y
4.
Ix
logo
d
D
V
a
.O
V
5
( %) ;naaaad aAqiqnwnj
0
0 0 0 0 0 0 0 0 0 0 0
O� 00 r0 � kn le M Cs N N O
R 0 R o e o
!7 N N
M
juawaj
35
0 0
4n O
31a0jpag
RVOZ - Ko f
Kof -Us
Us - Z9£
Z9£-9SZ
9SZ-081
08I-8ZI
9ZI-06
06-b9
b9-Sti
S6-Z£
Z£ - 9'ZZ
9'ZZ-9I
9I-£'Ii
£'Ii -8
8 -L'S
L'S - b
t-Z
0'Z - 0' I
0' I - S'0
S'0-SZ'O
OSZ'0 - SZI'O
SZ110 - Z90'0
Z90'0>
1
v�
a
w
■11
IIINIINIINII
uIII��11111N
111111
■
�����i
Nmiii■�n�iiiii��l�miinmiiii■
mill
I ■NIIIIII
■Illlf
Illnll■11111111
I�
IIIIII�11�1
NIA
"III
■IIIINII
111
II
���IIIII
1111�II
■11
iiii
■11111111��
IIII
■IIINI�
Illml�'j�
III
11111111
■Illllhl
IIIINI
■IINIIII
■INlilll
III�I
11111111■1111111
1111111■11111111
� � � � � � � �■ w � ilia � � � � � � i� �
W
J
CROSS - SECTION: New Garden Road - CSA (Riffle)
Project Name: New Garden Road Widening Phase 11
Project Location: Greensboro, NC
Date: 3/19/2013
Floodprone 17ev. 772.35
Watersurface 767.03 106.03 i 91,33 -
779
_ 777
S 775
g 773
d 771
w 769
767
765
0
New Garden Road - Main Tributary #2 - Cross Section A (Riffle)
5 10 15 20 25 30 35 40 45 50 55 60 65
Distance (ft.) I ---- Bankfull Width
Floodprone Elevation
0.0
59.0
Bankfu8 Elevation
19.0
43.0
Water Surface Elevation
24.0
40
772.35
772.35
769.35
769.35
767.03
767.03
z�
O
� a
O
O
O'Q.
CD
fJq '0
N
«7
tr
er
7k
N
z
0
b
La
BM= 775.70
Longitudinal Station
0x37
Height of
=-I oltFore
Height
Distance; Point
Back -Sight -Sight
Depth
STATION
B.S. ELL
FS.
Elevation Corrected Eleaadon
Comment
Width
Bkfdelth
AVG DEPTH
BKFArea
B.M. dl
6.03 106.03
100.00
Low Bank Height
6.11
Ft
0
106.03
8.97
97.06
772.76
LTOB
Bank Height Ratio
2.04
6.5
106.03
11.60
94.43
770.13
6.50
SINUOSITY
1.18
19.0
106.03
1238
93.65
769.35
LBKF
12.50
0.00
LBKF
19.00
Ft,
73.0
106.03
13.57
9246
768.16
4.00
1.19
0.595
2.38
RBKF
46.00
Ft
24.0
106.03
14.88
91.15
766.85
LEW
1.00
2.50
1.845
1.84
Bankfall WIDTH (Wbko
27.00
Ft,
26.5
106.03
15.38
90.65
766.35
TW
2.50
3.00
2.75
6.88
Mean DEPTH (dbkf)
1.86
Ft
310
106.03
15.21
90.82
766.52
4.50
2.83
2.915
13.12
Bnkfl. X- Section AREA (Abkf)
50.09
SF
36.0
106.03
15.08
90.95
76665
5.00
2.70
2.765
13.82
W/D RATIO (WbkOdbko
14.55
38.5
106.03
1515
90.78
76648
2.50
2.87
2.785
6.96
Max DEPTH (dmbko
3.00
Ft.
39.5
106.03
14.88
91.15
766.85
REW
1.00
2.50
2.685
169
WIDTH of Flood Prone Area (Wfpa)
60.00
Ft.
40.0
106.03
13.48
92.55
768.25
0.50
1.10
1.8
0.90
Entrenchment Ratio (ER)
2.22
46.0
106.03
11.52
94.51
770.21
RBKF
6.00
-0.86
0.12
1.50
Slope
0.003
Ft./Ft.
54.5
106.03
10.96
95.07
770.77
8.50
Channel Substrate
8.00
(D50)
610
106.03
8.47
97.56
773.26
RTOB
Rosgen Classification
C5
Floodprone 17ev. 772.35
Watersurface 767.03 106.03 i 91,33 -
779
_ 777
S 775
g 773
d 771
w 769
767
765
0
New Garden Road - Main Tributary #2 - Cross Section A (Riffle)
5 10 15 20 25 30 35 40 45 50 55 60 65
Distance (ft.) I ---- Bankfull Width
Floodprone Elevation
0.0
59.0
Bankfu8 Elevation
19.0
43.0
Water Surface Elevation
24.0
40
772.35
772.35
769.35
769.35
767.03
767.03
z�
O
� a
O
O
O'Q.
CD
fJq '0
N
«7
tr
er
7k
N
z
0
b
La
i IM
W
00
CROSS - SECTION: New Garden Road - CSB (Pool)
Project Name: New Carden Road Widening Phase II
Project Location: Greensboro, NC
Date: 3/19/2013
Floodptone Elev. 773.52
Water surface 766.59 102.12 NJJW 90.89 -
New Garden Road - Main Tributary #2 - Cross Section B (Pool)
776
774 --------------------------------------------------
e'
----------------------
772 B
0 770
d 768
W 766
764
762
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
-- Floodprone
Distance (ft.) Width
- Bankfull Width
Floodpmne Elevation
0.0 77350
7L0 773.50
Bankfull Elevation
19.0
BM- 775.70
46.0
Longitudinal Station 1+09
Water Surface Elevation
23.0
766.59
35
766.59
Height of
Height
Distance; Point
Back -Sight Instrument Fore -Sight Depth
STATION
_ BS. HL
F.S.
Hewtion Corrected Demotion
Comment
Width
Bkfdeoth
AVG DEPTH
BKFArea
B.M. #1
2.12 10212
100.00
Low Bank Height
6.93
Ft.
0
10112
5.81
96.31
772.01
LTOB
Bank Height Ratio
1.64
7.0
10112
7.20
94.92
770.62
7.00
SINUOSITY
1.18
19.0
102.12
8.52
93.60
769.30
LBKF
12.00
0.00
LBKF
19.00
Ft.
22.5
10112
1025
91.87
767.57
3.50
1.73
0.865
3.03
RBKF
46.00
Ft.
23.0
102.12
11,85
90.27
765.97
LEW
0.50
3.33
2.53
1.27
Bankfull WIDTH (WbkQ
27.00
Ft.
23.5
102.12
12.15
89.97
765.67
0.50
3.63
3.48
1.74
Mean DEPTH (dbkQ
2.38
Ft.
25.5
102.12
12.74
89.38
765.08
7W
2.00
4.22
3.925
7.85
Bnkfi. X- Section AREA (Abki)
6421
SF
30.0
102.12
12.25
89.87
765.57
4.50
3.73
3.975
17.89
W/D RATIO (Wbk OdbkQ
11.35
310
102.12
11.64
90.48
766.18
REW
3.00
3.12
3.425
10.28
Max DEPTH (dmbkQ
4.22
Ft.
35.0
102.12
11.30
90.82
766.52
2.00
2.78
2.95
5.90
WIDTH of Flood Prone Area (Wfpa)
70.00
Ft.
37.5
102.12
10.31
91.81
767.51
2.50
1.79
2.285
5.71
Entrenchment Ratio (ER)
2.59
41.0
10112
10.19
91.93
767.63
3.50
1.67
1.73
6.06
Slope
0.003
Ft./Ft.
46.0
102.12
8.65
93.47
769.17
RBKF
5.00
0.13
0.9
4.50
Channel Substrate
8.00
(D50)
60.0
102.12
8.37
93.75
769.45
14.00
Rosgen Classification
C5
71.0
10112
4.30
97.82
773.52
RTOB
Floodptone Elev. 773.52
Water surface 766.59 102.12 NJJW 90.89 -
New Garden Road - Main Tributary #2 - Cross Section B (Pool)
776
774 --------------------------------------------------
e'
----------------------
772 B
0 770
d 768
W 766
764
762
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
-- Floodprone
Distance (ft.) Width
- Bankfull Width
Floodpmne Elevation
0.0 77350
7L0 773.50
Bankfull Elevation
19.0
769.30
46.0
769.30
Water Surface Elevation
23.0
766.59
35
766.59
zC4
fD N
O
C)
O �
CD
� uQ
rQ .�
w ••
rn
CD
."3
rte-'
N
CD
0
z
0
b
l�
' Second Year Monitoring Report: Main Tributary #2
New Garden Road Widening Phase II Project No. P -3741
' LONGITUDINAL PROFILE: Water Surface - Main Tributary #2
Project Name: New Garden Road Widening Phase II
Project Location: Greensboro, NC
Date: 3/19/2013
'
Distance, Pomt
STATION
Back -Sight
B.S.
BM # 1(ft )== 775 70
Height of Height
Instrument Fore-Sight Depth
HL F.S. Elevation CorrectedF]evation COMMENTS
'
BM #1
20
212
10212
10212
1058
10000
9154
76724
50
10212
1063
9149
76719
110
10212
1072
9140
76710
'
370
590
10212
10212
1079
1076
9133
9136
76703
76706
820
10212
1130
9082
76652
990
10212
1129
9083
76653
1090
10212
1123
9089
76659
'
1270
10212
1125
9087
76657
1480
10212
1138
9074
76644
1510
10212
1140
9072
76642
162 0
10212
1140
9072
76642
1760
10212
1140
9072
76642
'
2020
10212
1146
9066
76636
2240
10212
1142
9070
76640
2240
10212
1150
9062
76632
2260
10212
1150
9062
76632
'
2400
10212
1150
9062
76632
2640
10212
1153
9059
76629
2870
10212
1147
9065
76635
'
WS Slope (ft1ft)
0 004
1
1
1
1
I
1
1 39
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Second Year Monitoring Report: Main Tributary #2
New Garden Road Widening Phase II Project No. P -3741
LONGITUDINAL PROFILE: Thalweg - Main Tributary #2
Project Name: New Garden Road Widening Phase II
Project Location: Greensboro, NC
Date: 3/19/2013
Thalweg Slope (ft /ft ) 0 003
40
BM # 1(ft )= 775 70
Height of
Height
Distance, Pomt
Back -Sight Instrument Fore -Sight Depth
STATION
B.S. RL
F.S.
Bevation Corrected Elevation
COMNffiV1S
BM #1
212 10212
10000
20
10212
1081
9131
76701
50
10212
1083
9129
76699
TOR
110
10212
1147
9065
76635
PMD
370
10212
1147
9065
76635
590
10212
1126
9086
76656
HOR
820
10212
1172
9040
76610
TOR
990
10212
1178
9034
76604
PMD
1090
10212
1274
8938
76508
1270
10212
1275
8937
76507
PMD
1480
10212
1154
9058
76628
CV
1510
10212
1266
8946
76516
PMD
1620
10212
1320
8892
76462
1760
10212
1221
8991
76561
2020
10212
1188
9024
76594
2240
10212
1178
9034
76604
2240
10212
1247
8965
76535
CV
2260
10212
1331
8881
76451
PMD
2400
10212
1395
8817
76387
PMD
2640
10212
1253
8959
76529
2870
10212
1183
9029
76599
HOR
Thalweg Slope (ft /ft ) 0 003
40
1
1
1
1
1
1
li
L
I
1
1 41
Second Year Monitoring Report: Main
Tributary
#2
New Garden Road Widening Phase II
Project No. P -3741
LONGITUDINAL PROFILE: Lett Bankfull - Main
Tributary #2
Project Name:
New Garden Road Widening Phase II
Project Location:
Greensboro, NC
Date:
3/19/2013
BM #I (ft)= 775 70
'
Height of
Height
Distance, Pomt
Back -Sight Instrument Fore -Sight
Depth
STATION
B.S. RL
F.S.
Elevation Corrected Elevation COM UN S
BM #1
50
212 10212
10212
833
10000
9379
76949
370
10212
847
9365
76935
590
10212
832
9380
76950
820
10212
845
9367
76937
1090
10212
852
9360
76930
'
1270
10212
834
9378
76948
1480
10212
815
9397
76967
1760
10212
829
9383
76953
2020
10212
846
9366
76936
2240
10212
793
9419
76989
2400
10212
781
9431
77001
2640
10212
798
9414
76984
'2870
10212
801
9411
76981
1
1
1
1
1
1
li
L
I
1
1 41
1
Second Year Monitoring Report: Main
Tributary 42
New Garden Road Widening Phase II
Project No. P -3741
LONGITUDINAL PROFILE: Right Bankfull- Main Tributary #2
Project Name:
New Garden Road Widening Phase II
Project Location:
Greensboro, NC
Date:
3/19/2013
BM # 1(ft )= 775 70
t
Height of
Height
Distance, Point
Back -Sight Instrument Fore -Sight Depth
STATION
B.S. H.L
F.S. Elevation Corrected Elevation CONaUNTS
'
BM 11
50
212 10212
10212
10000
788 9424
76994
370
10212
761 9451
77021
590
10212
804 9408
76978
820
10212
807 9405
76975
1090
10212
865 9347
76917
'
1270
10212
819 9393
76963
1480
10212
822 9390
76960
1760
10212
851 9361
76931
2020
10212
852 9360
76930
I
2240
10212
831 9381
76951
2400
10212
827 9385
76955
2640
10212
874 9338
76908
'2870
10212
855 9357
76927
1
1
u
1
1
1
1
1
1
42
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Second Year Monitoring Report: Tributary A
New Garden Road Widening Phase II Project No. P -3741
Appendix C
Tributary A Cross Sections
Second Year Monitoring
Comparison — As- Built, First Year, and Second Year
Tributary A Longitudinal Profile
Second Year Monitoring
Comparison — First Year, and Second Year
Tributary A Pebble Count
Tributary A Raw Data
Second Year Monitoring
43
New Garden Road - Tributary A - Cross Section C (Riffle)
775
c
- ------ - - - - --
773
c 771
- -- - ---- - - - - -- -- ------------ --------------- - - - - - - - -_ - -.
w
769
767
765
0 5 10 15 20 25 30 35 40 45
Distance (ft.)
-- Bankfull Width
- -- Flood -Prone Width
— Water Surface
zCp
CD CD
�o
CD CD
o
�s
� vo
CD
co y
rP
0
z
0
b
w
a
�� � r r m m m r m m m m m m m m m
775
773
771
0
ca
769
w
767
765
New Garden Road - Tributary A - Cross Section D (Pool)
G
0 5 10 15 20 25 30 35 40 45
Distance (ft.)
D'
50 551
zLn
CD
�o
C) �.
CD aCD
0 0
�Ot
a t'
CD va
ua .ID
CD
Cy
n
w
a
1
New Garden Road - Tributary - Cross Section C (Riffle)
775
773 c CI
771
o --
> 769
w
767
765
0 5 10 15 20 25 30 35 40 45
Distance (ft.) -K As -Built
-+- 2012
2013
Bankfull
zcoo
CD CD
�o
� a
CD CD
0 0
a �.
�0
a 5'
z
� •o
CD
CD y
b
0
CD
z
0
b
w
a
r_= � � � m � � � � � � � � � � m m m m
New Garden Road - Tributary - Cross Section D (Pool)
775
D
773
D'
= 771
0
769 - -
w
767
765
0 5 10 15 20 25 30 35 40 45 50 55
Distance (ft.) BAs -built
2012
x-2013
Bankfull
zCp
CD CD
�o
CD CD
a. �.
CD
a 5'
via �
0
0
z
0
b
w
Im � i � m m m m m m m m m m m m m m m
oo
778.0
776.0
774.0
772.0
a�
w 770.0
c
0
r
768.0
d
W
766.0
764.0
762.0
760.0
Tributary A Longitudinal Profile
New Garden Road Widening Phase II
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
l- 00 01 O .-i N M 7 V1 b r W
Station (feet)
Water Surface Thalweg — LBKF —RBKF
zcoo
CD CD
:�o
CD
o
o
CD
as .b
CD
co y
a:
z
O
b
w
Y
e
778.0
776.0
774.0
772.0
w 770.0
d
0
768.0
W
766.0
764.0
762.0
760.0
Tributary A Longitudinal Profile
New Garden Road Widening Phase II
o e o e o e o e o 0 0 0 o e o o e e o
C; o 0 0 0 o e o o e o e o o e o 0 o e
.� N M 7 kn b r 00 C� O - N M V 1n b r 00
.-r .w .ti .r �--i .ti
—Water Surface 2013 —X Thalweg 2013
canon
- K-r— LBKF 2013 -->E— RBKF 2013 —Thalweg 2012
zcp
CD CD
�o
aC
tsq CD
0 0
SD o
CD
�.
v�o �
CD
co y
z
0
b
w
J
a
' Second Year Monitoring Report: Tributary A
New Garden Road Widening Phase II Project No. P -3741
Tnbutary A - Pebble Count
1
1
1
1
1
1
1
1
1
t
I
1
1
1
50
Metric mm
Particle
S
A
N
D
Count
Tot #
% Tot
% Cum
<0.062
Sift/Clay
13
100
13.0
13.00
0.062- 0.125
Very Fine Sand
7
100
7.0
20.00
0.125 - 0.250
Fine Sand
5
100
5.0
25.00
0.25-0.5
Med. Sand
4
100
4.0
29.00
0.5-1.0
Coarse Sand
2
100
2.0
31.00
1.0-2.0
Very Coarse Sand
0
100
0.0
31.00
2-4
Ve Fine Gavel
G
R
A
V
E
L
2
100
2.0
33.00
4-5.7
Fine Gavel
5
100
5.0
38.00
5.7-8
Fine Gavel
2
100
2.0
40.00
8-11.3
Medium
6
100
6.0
46.00
11.3-16
Medium
15
100
15.0
61.00
16-22.6
Coarse
14
100
14.0
75.00
22.6-32
Coarse
7
100
7.0
82.00
32-45
Very Coarse
11
100
11.0
93.00
45-64
Very Coarse
5
100
5.0
98.00
64-90
Small
C
n
b
e
0
100
0.0
98.00
90-128
Small
0
100
0.0
98.00
128-180
Large
1
100
1.0
99.00
180-256
Large
0
100
0.0
99.00
256-362
Small
B
0
1
e
`
0
100
0.0
99.00
362-512
Small
0
100
0.0
99.00
512-1024
Medium
0
100
0.0
99.00
1024-2048
Large - Very Large
0
100
0.0
99.00
Bedrock IBedrock
1
100 1
1.0
100.00
50
b
m
A
A
M,
A
IS
Percent (%)
0 0 0 0 0 0 0 0
<0.062
0.062 - 0.125
0.125- 0.250
0.25-0.5
0.5-1.0
1.0-2.0
2 -4
4-5.7
5.7-8
8-11.3
11.3-16
16-22.6
22.6-32
32 -45
45 -64
64 -90
90 -128
128 -180
180 -256
256 -362
362 -512
512 -1024
1024 -2048
Bedrock
o •.• n+ w is v� a � oo �o ..
0 0 0 0 0 0 0 0 0 0 0
0 0 o e o c b e o 0
0
Cumulative Percent (%
R-
I VLE-d 'ON 1340M II asew su►umm pEOg uapieo marl
V AmnquZ woda -d 2uuoltuoW moA puoaaS
�� m m IM m r IM m m m m m m m m a• m IM
N
Wolman Reachwide Pebble Count Particle Size Distributions - Tributary A
100.00
90.00
80.00
70.00
0 60.00
50.00
r+
Q
40.00
a
30.00
20.00
10.00
0.00 ' '''" V I I I I 1 1 1 1 1 1 11 I 1 1 1 1 1 1 11 I I I I I I I I I I I I I I I I I I
C;
Particle Size (mm)
zEn
CD 0
:�o
co CD
=�
°w o
� o
I .
C
co
z
0
b
w
a
W
CROSS - SECTION: New Garden Road - CSC (Riffle)
Project Name: New Garden Road Widenvg Phase II
Project Location: Greensboro, NC
Date: 3/19/2013
Hoodprone Elev. 773.53
Water surface 767.44 10256 9134
New Garden Road - Tributary A - Cross Section C (Riffle)
775
773 -------------------------------------------------------------------------- - - - - --
771
C- - - -- - -_ _ -
r
> 769
d
w
767
765
0 5 10 15 20 25 30 35 40 45
Distance (ft.)
- Bankfull Width
- -- -Flood -Prone Width
-x-- Water Surface
Floodprone Elevation
0.0
BM= 715.70
Longitudinal Station
Or62
Bankroll Elevation
14.0
770.20
32.0
770.20
Water Surface Elevation
Height of
23.0
Height
27
767.44
Distance; Point
Back -Sight In -nt
Fore-Sight
Depth
STATION
B.S. ILL
F.S.
Elevation
Corrected Elevation
Comment
Width
Bkf& h
AVG DEPTH
BEFArea
B.M. #1
2.56 102.56
100.00
Low Bank Height
5.54
Ft,
0
10156
5.36
97.20
77190
LTOB
Bank Height Ratio
1.689
5.0
102.56
7.45
95.11
770.81
5.00
SINUOSITY
1.37
6.0
102.56
7.67
94.89
770.59
1.00
LBKF
14.00
Ft.
14.0
102.56
8.06
94.50
770.20
LBKF
8.00
0.00
RBKF
31.00
Ft.
17.0
102.56
9.66
92.90
768.60
3.00
1.60
0.8
2.40
Bankfull WIDTH (WbkO
17.00
Ft.
19.0
102.56
10.31
9225
767.95
100
2.25
1.925
3.85
Mean DEPTH (dbkQ
1.58
Ft.
21.5
102.56
10.38
92.18
767.88
2.50
2.32
2.285
5.71
BnkB. X- Section AREA (AbkO
26.85
SF
22.0
102.56
10.51
92.05
767.75
0.50
2.45
2.385
1.19
W/D RATIO (WbkOdbkl)
10.76
23.3
10156
10.90
9166
76736
LEW
1.30
2.84
2.645
3.44
Max DEPTH (dmbkO
3.28
Ft.
25.4
102.56
I1.39
91.17
766.87
TW
2.10
3.33
3.085
6.48
WIDTH of Flood Prone Area (Wfpa)
45.00
Ft.
26.6
102.56
11,03
91.53
767.23
REW
1.20
2.97
3.15
3.78
Entrenchment Ratio (ER)
2.65
27.0
102.56
1036
9120
767.90
0.40
Slope
0.015
Ft./Ft.
310
102.56
8.30
94.26
769.96
RBKF
4.00
Channel Substrate
11.30
(D50)
37.5
102.56
7.53
95.03
770.73
6.50
Rosgen Classification
E4
43.0
102.56
5.59
96.97
772.67
RTOB
Hoodprone Elev. 773.53
Water surface 767.44 10256 9134
New Garden Road - Tributary A - Cross Section C (Riffle)
775
773 -------------------------------------------------------------------------- - - - - --
771
C- - - -- - -_ _ -
r
> 769
d
w
767
765
0 5 10 15 20 25 30 35 40 45
Distance (ft.)
- Bankfull Width
- -- -Flood -Prone Width
-x-- Water Surface
Floodprone Elevation
0.0
773.53
43.0
773.53
Bankroll Elevation
14.0
770.20
32.0
770.20
Water Surface Elevation
23.0
767.44
27
767.44
zC'n
CD CD
O
N y
zi �t
PO 4
O
�+ O
CD
QQ �
CD
M
CD
z
0
w
a
liiiiwimiim m m� No m m� m ! m m m iiii=! M ml
llt
CROSS - SECTION: New Garden Road - CSD (Pool)
Project Name: New Garden Road Widening Phase II
Project Location: Greensboro, NC
Date: 3/192013
Floodprone Elev. 77L98
Watersurface 766.70 102.56 __, 9100
775
773
771
0
769
d
M 767
765
0
New Garden Road - Tributary A - Cross Section D (Pool)
5 10 15 20 25 30 35 40 45 50 55
Distance (ft.) - Bankfuuwdtn
Floodprone Elevation
4.0
BM= 775.70
55.0
Longitudinal Statio 1 +19
Bankfull Elevation
24.0
768.81
42.0
768.81
Water Su rface Elevation
Height of
27.5
Height
39
766.70
Distance; Point
Back -Sight Instrument Fore -Sight
Depth
STATION
B.S. HL
F.S.
Elevation Corrected Elevation
Comment
Width
Bkf depth
AVG DEPTH
BKFArea
B.M. #1
156 102.56
100.00
Low Bank Height
6.04
Ft.
0
102.56
5.22
97,34
773.04
LTOB
Bank Height Ratio
1.682
5.0
102.56
6.58
95,98
771.68
5.00
SINUOSITY
1.37
10.5
102.56
8.61
93.95
769.65
550
LBKF
22.50
Ft.
24.0
10156
9.45
93.11
768.81
LBKF
13.50
0.00
RBKF
43.00
Ft.
28.0
102.56
11.85
90.71
766.41
LkW
4.00
2.40
1.2
4.80
Bankfull WIDTH (Wbkf)
20.50
Ft.
33.0
102.56
12.62
89,94
765.64
TW
5.00
3.17
2.785
13.92
Mean DEPTH (dbkf)
1.11
Ft.
38.5
102.56
11.84
90.72
766.42
REW
5.50
2.39
2.78
15.29
Bnkfl. X- Section AREA (Abkf)
22.68
SF
43.0
102.56
8.84
93.72
769.42
R13KF
4.50
-0.61
0.89
4.00
W/D RATIO (Wbkf/dbkf)
18.53
51.0
102.56
808
94.48
770.18
8.00
-1.37
-0.99
-7.92
Max DEPTH (dmbkf)
3.59
Ft.
54.5
102.56
6.58
95.98
771.68
RTOB
3.50
-2.87
-2.12
-7.42
WIDTH of Flood Prone Area (Wfpa)
55.00
Ft.
Entrenchment Ratio (ER)
2.68
Slope
0.015
FOR.
Channel Substrate
11.30
(D50)
Rosgen Classification
E4
Floodprone Elev. 77L98
Watersurface 766.70 102.56 __, 9100
775
773
771
0
769
d
M 767
765
0
New Garden Road - Tributary A - Cross Section D (Pool)
5 10 15 20 25 30 35 40 45 50 55
Distance (ft.) - Bankfuuwdtn
Floodprone Elevation
4.0
771.98
55.0
771.98
Bankfull Elevation
24.0
768.81
42.0
768.81
Water Su rface Elevation
27.5
766.70
39
766.70
zcel
O O
O
C A
CD D
0 Ef
CDO �
�+ O
UQ .�
CD �]
z
O
b
w
1
[1,
1
1
1
1
1
1
1
1
I
1
1
1
1
Second Year Monitoring Report: Tributary A
New Garden Road Widening Phase II Project No. P -3741
LONGITUDINAL PROFILE: Water Surface - Tributary A
Project Name: New Garden Road Widening Phase II
Project Location Greensboro, NC
Date: 3/19/2013
BM #1 (ft )= 77570
WS Slope (ft /ft ) 0016
55
Height of
Height
Distance, Pomt Back -Sight
Instrument Fore-Sight
Depth
STATION B.S.
RL
F.S.
Elevation
Corrected Elevation CONDONT'S
BM #1 256
10256
10000
00
10256
955
9301
76871
100
10256
969
9287
76857
130
10256
1023
9233
76803
270
10256
1031
9225
76795
440
10256
1086
9170
76740
580
10256
1090
9166
76736
620
10256
1082
9174
76744
770
10256
1089
9167
76737
820
10256
1095
9161
76731
830
10256
1152
9104
76674
930
10256
1152
9104
76674
1060
10256
1152
9104
76674
1160
10256
1152
9104
76674
1190
10256
1152
9104
76674
1350
10256
1152
9104
76674
1470
10256
1164
9092
76662
1480
10256
1190
9066
76636
1540
10256
1190
9066
76636
1700
10256
1183
9073
76643
1850
10256
1194
9062
76632
WS Slope (ft /ft ) 0016
55
i
i
i
Second Year Monitoring Report: Tributary A
New Garden Road Widening Phase II Project No. P -3741
LONGITUDINAL PROFILE: Th hwg - Tributary A
Project Name: New Garden Road Widening Phase II
Pmject Location: Greensboro, NC
Date: 3/19/2013
Thalweg Slope (ft /ft ) 0 014
56
BM # 1(ft )= 77570
Height of
Height
Distance, Pomt
Back -Sight Instrument Fore -Sight Depth
STATION
B.S. SI
F.S.
Elevation Corrected Elevation
COMENTS
BM #1
256 10256
10000
00
10256
984
9272
76842
HOR
100
10256
982
9274
76844
TOR
130
10256
1098
9158
76728
PMD
270
10256
1039
9217
76787
HOR
440
10256
1113
9143
76713
TOR
580
10256
1165
9091
76661
PMD
620
10256
1 139
9117
76687
HOR
770
10256
1108
9148
76718
820
10256
1106
9150
76720
Cv
830
10256
1247
9009
76579
PMD
930
10256
1325
8931
76501
PMD
1060
10256
1311
8945
76515
PMD
1160
10256
1247
9009
76579
PMD
1190
10256
1262
8994
76564
1350
10256
1258
8998
76568
1470
10256
1169
9087
76657
CV
1480
10256
1335
8921
76491
PMD
1540
10256
1370
8886
76456
PMD
1700
10256
1216
9040
76610
HOR
1850
10256
1309
8947
76517
TOR
Thalweg Slope (ft /ft ) 0 014
56
Second Year Monitoring Report: Tributary A
New Garden Road Widening Phase II Project No. P -3741
' LONGITUDINAL PROFILE: Left Bankfull - Tributary A
Project Name: New Garden Road Widening Phase II
Project Location: Greensboro, NC
Date: 3/19/2013
1
1
1
1
1
1
1
1
1
1 57
Distance, Pont
STATION
BM # 1(ft )= 77570
Height of Height
Back -Sight Instrument Fore -Sight Depth
B.S. H.I F.S. Nevation CorrectedDevation CONVENTS
BM 11
211 10211
10000
00
10256
700
9556
77126
100
10256
751
9505
77075
270
10256
738
9518
77088
440
10256
765
9491
77061
620
10256
806
9450
77020
770
10256
845
9411
76981
820
10256
845
9411
76981
1190
10256
945
9311
76881
1350
10256
882
9374
76944
1470
10256
875
9381
76951
1700
10256
886
9370
76940
1
1
1
1
1
1
1
1
1
1 57
Second Year Monitoring Report: Tributary A
New Garden Road Widening Phase II Project No. P -3741
' LONGITUDINAL PROFILE: Right Bankf dl - Tributary A
Project Name: New Garden Road Widening Phase II
' Project Location: Greensboro, NC
Date: 3/19/2013
1
1
C�
1
1
1
I
1
1 58
BM #I (ft )F= 775 70
Height of
Height
Distance, Point
Back -Sight Instrument Fore-Sight Depth
STATION
B.S. ELI
F.S.
Elevation Corrected Elevation COMMENTS
BM #1
256 10256
10000
00
10256
719
9537
77107
100
10256
697
9559
77129
270
10256
740
9516
77086
440
10256
733
9523
77093
620
10256
830
9426
76996
770
10256
807
9449
77019
820
10256
814
9442
77012
1 19 0
102 56
884
9372
76942
135 0
10256
893
9363
76933
1470
10256
866
9390
76960
1700
10256
908
9348
76918
1
1
C�
1
1
1
I
1
1 58