Loading...
HomeMy WebLinkAboutNCC202423_NOT Closeout Documents_20210727Town of ��teced 1$87 Ines -CHquthern ',,, North Carolina /t The Mid South Resort Internationally Recognized for Program Excellence Barry & Marilyn Wilson 182 Juniper Cr. Blvd Pinehurst, NC 28374 Public Works Department 140 Memorial Park Court • Southern Pines, NC 28387 May 20, 2021 RE: Soil Erosion and Sediment Control Plan Certificate of Compliance TSPE #20-1290 115 Eagle Point Lane To whom it may concern: A final inspection of the Soil Erosion and Sediment Control Plan for the above referenced project has been conducted. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. All requirements of the plan have been met and properly completed. You are reminded of the requirement to maintain any permanent structures of this plan. Receipt of this letter is notification that the erosion control project plan is completed and is being removed from our active file. Any further development will require the submittal of a new plan for review and approval. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. If I can be of further assistance, please contact me at 910-692-1983. Sincerely, Jay Hough Construction Inspector cc: Eddie Garner, Chief Building Inspector Phone:910-692-1983 Fax:910-692-1085