HomeMy WebLinkAboutNCC202423_NOT Closeout Documents_20210727Town of ��teced 1$87
Ines
-CHquthern
',,, North Carolina
/t The Mid South Resort
Internationally Recognized for Program Excellence
Barry & Marilyn Wilson
182 Juniper Cr. Blvd
Pinehurst, NC 28374
Public Works Department
140 Memorial Park Court • Southern Pines, NC 28387
May 20, 2021
RE: Soil Erosion and Sediment Control Plan Certificate of Compliance
TSPE #20-1290 115 Eagle Point Lane
To whom it may concern:
A final inspection of the Soil Erosion and Sediment Control Plan for the above referenced project
has been conducted. Permanent ground cover sufficient to restrain erosion has been
established. No additional self -monitoring or self -inspections are required. All requirements of
the plan have been met and properly completed.
You are reminded of the requirement to maintain any permanent structures of this plan.
Receipt of this letter is notification that the erosion control project plan is completed and is
being removed from our active file. Any further development will require the submittal of a new
plan for review and approval. Termination of coverage under the NPDES General Stormwater
Permit for Construction Activities should be requested by the permittee via a Notice of
Termination. Please note that this correspondence must be uploaded as part of completing the
Notice of Termination process.
If I can be of further assistance, please contact me at 910-692-1983.
Sincerely,
Jay Hough
Construction Inspector
cc: Eddie Garner, Chief Building Inspector
Phone:910-692-1983 Fax:910-692-1085