Loading...
HomeMy WebLinkAboutNCC202457_Notice of Termination_20210726Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 7/26/2021 11:47:58 AM (NOT Submittal) Approve by Morman, Alaina 7/27/2021 1:59:04 PM (NOT Request Review- NCC202457) • The task was assigned to Morman, Alaina. The due date is: July 29, 2021 5:00 PM 7/26/2021 11:48 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC202457 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status PAST DUE Nby be blank (iF not yet billed). This permittee owes a fee that is PAST DUE and has a pending NOD or NOV. Do not approve this NOT request until payment is resolved. If this NOT request is acceptable, payment may be waived if applicable, but that action must be completed first (at the NOD or NOV Review step) to ensure records are routed to the correct folder in the repository. However, you can reject the NOT now if it is not acceptable. Information associated with this permit: Project Name Whittier Creek Restoration Address Rock Hill Church Road, Eldora, NC County Surry Latitude 36.3779 Longitude -80.5999 Permittee Listed Michael Baker International Legally Responsible Dwain Hathaway Individual NC Reference No. NCG01-2020-2457 E&SC Plan ID SURRY-2020-026 Original NOI 26824 Tracking No. Date COC Issued 6/11/2020 Prior Rescission Cate populates only ff OOCwas already rescinded at tirre of subaittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a newCOC) Coverage * r Mistake or Invalid Coverage f Other Add ional Mxe information about the basis of this request, if needed. Explanation This was a stream restoration project that was completed in early June 2021. The closeout inspection was completed by Tyler Pearson on 7/19/21. Supporting Upload Supporting DDcurrentation if applicable. Documentation Mist bePDFformat Project Close-out Information: Final Close-out 7/19/2021 Inspection Approval Project Close-out 07-14-2021 Closure Inspection Report (SURRY- Approval 245.31 KB 2021-026).pdf Documentation Mast be FDFforrrat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Atcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Dwain Hathaway Title * Office Executive Organization* Michael Baker International Date * 07/26/2021 Email for dhathaway@mbakerintl.com Confirmation * Contact Telephone* 919-481-5702 NOT Certification NCG01-eNOT-Certification-Form-20210514- Form DEMLR-SW forDH SIGNED.pdf Mast be PDF Forrrat Is this COCAlready Ensure this OOChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Bmils (Optional) katie.mckeithan@mbakerintl.com Original Permittee 0Cd on Wification Errails Email DHathaway@mbakerintl.com Original Site Contact CCd on Notificaiton Emils Email kory@KBSearthworks.com 337.1 KB