Loading...
HomeMy WebLinkAboutNCC214221_Site Plan or Location Map (4)_202107270�0���o cti9 �c 0 �o 0 SITE O� v N P� 9F o ° U ° w ir 2 VICINITY MAP (NOT TO SCALE) NOTES 1. AREA CALCULATED BY COORDINATE METHOD. 2. ALL ELEVATIONS ARE (NAVD 88) 3. THIS PARCEL IS NOT LOCATED WITHIN A SPECIAL FLOOD HAZARD AREA AS SHOWN ON FEMA FLOOD MAP NO. 3720428800J BEARING AN EFFECTIVE DATE OF NOVEMBER 3, 2005. 4. UTILITIES AS SHOWN ARE PLOTTED FROM INFORMATION VISIBLE IN THE FIELD AND FROM INFORMATION PROVIDED BY UTILITY COMPANIES. ADDITIONAL UTILITIES NOT SHOWN MAY EXIST. THE APPROPRIATE UTILITY COMPANIES SHOULD BE CONTACTED PRIOR TO LAND DISTURBING ACTIVITIES. 5. THIS LOT IS SUBJECT TO ALL UTILITY EASEMENTS, RESTRICTIONS, OR COVENANTS OF RECORD. 6. CONTOUR INTERVAL =1". 7. CONTRACTOR TO PROVIDE POSITIVE DRAINAGE AWAY FROM HOUSE TOWARD THE STREET. 7. ALL GUTTER DOWNSPOUTS TO DIRECT WATER FLOW TO LEFT AND RIGHT SIDE OF PROPERTY 8. CONTRACTOR TO GRADE FOR POSITIVE DRAINAGE TO PROPOSED SIDE SWALES 9. SWALES ALONG SIDE YARD SLOPE TO DRAINAGE EASEMENT 10. IN LIEU OF SIDE DITCHES DIRECTING ROOF DRAIN STORMWATER CONTRACTOR MAY REPLACE WITH DRAINAGE BUBBLER DEVICES WHILE DIRECTING SURFACE STORMWATER FLOW TOWARDS STREET. 11. PROVIDE AND INSTALL SILT FENCE AROUND PERIMETER OF CONSTRUCTION 12. ALL HEAVY GRADING AND CONCRETE EQUIPMENT MUST BE WASHED AT DESIGNATED CONCRETE WASH AREA BEFORE ENTERING ANY PUBLIC ROAD SYSTEM. 13. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATIONS INTO NON -PAVED AREA. (NO SEPARATE PAYMENT). 14. ALL CONSTRUCTION ENTRANCES WILL BE PERIODICALLY TOP DRESSED WITH AN ADDITIONAL 2 INCHES OF #4 STONE TO MAINTAIN PROPER DEPTH. ANY SEDIMENT THAT IS TRACKED INTO THE STREET WILL BE IMMEDIATELY REMOVED. COARSE AGGREGATE PEAR VIEW 50' MIN. DIVERSION TO DIRECT RUNOFF FROM R/W SECTION VIEW TEMPORARY C ORUTRUC TIOR ENTRANCE PIPE OUTLETS SHALL HAVE FLARED END SECTIONS (UNLESS OTHERWISE INDICATED OR IF PIPES ENTERING PONDS ARE SUBMERGED) STORM DRAIN PIPE ci now - not NON -WOVEN FILTER FABRIC (GEOTEX 801 OR APPROVED SUBSTITUTE) La, LENGTH . W3 SECTION NCDOT CLASS B (d50=8") EROSION CONTROLSTONE ON A LAYER OF 4" NCDOT #5 OR #57 STONE (t) RIP -RAP APRON SCHEDULE RIPRAP LOCATIONS PIPE DIA. LENGTH, La UPSTREAM WIDTH DOWNSTREAM STONE THICKNES: (IN.) (ft) (FT) WIDTH, W (FT.) t (IN.) DRIVEWAY PIPE 15 6.0 3.0 7.0 18 RIP RAP APRON DETAIL NOT TO SCALE VARIES AS DIRECTED BY ENGINEER (6' MAX.) 2. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND SHALL BE FASTENED ADEQUATELY TO THE WIRE AS DIRECTED BY THE ENGINEER 3. STEEL POST SHALL BE 5' 0" IN HEIGHT AND BE OF SELF FASTENER ANGLE STEEL TYPE - S00 4R �\ so yR \ 11 LIMITS OF WETLANDS (TYP.) WF WETyR WETLANDS 0 STEEL POST FILTER FABRIC FILL SLOPE GROUND LINE GUIDELINES FOR TEMPORARY SILT FENCE DETAIL NOT TO SCALE EC DA#4 0.11 AC. o I LOT154R MB 78, PG 194 I I/ PROPOSED PAD ELEVATION 15.5Q$°O M l °¢ wm A� I 1 \ N � 5 h I1 � � FROSISY-ARD 7 1 i 15' DRAINAGE & UTILITY EASEMENT - (SEE D a PROX. 344 15" R KIV�VVHy 500 YR'� EC DA#1 El 0.30 AC1 _o S-2 ZEC DAB 0.03 AC. - - - ENT-RANCE LIMITS OF DISTURBANCE =0.47 AC. (TYP.) 0 _LLD =-_ - L4C� - 1'3 16 .i.�- y - ` - _ FE LOT 313R MB 78, PG 194 PROPOSED PAD ELEVATION 17.00' �y ANCHOR FILTER FABRIC SKIRT AS DIRECTED BY THE ENGINEER - PERIMETER SILT FENCE --(TYP.-SEE DETAIL) LOD I � / � J / 0 o / 16 _15 _ col 0.03 AC., rT 50'R/IT'(PRlYt1TGL - CONSTRUCTON ENTRANCE (SEE DETAIL) Preserve at Tidewater Phase 2 - Section 5, Lots 154 & 313R Temporary Sediment Fence and Silt Fence Outlets Requirements: 0.25 ac (10,000 SF) per 100 LF for slopes < 2% 0.17 ac (7,500 SF) per 100 LF for slopes 2-5% 0.06 ac (2,500 SF) per 100 LF for slopes 10-20% 0.03 ac (1,500 SF) per 100 LF for slopes >20% Slope of Max. Avg. Silt Disturbed Total Slope Drainage Slope Fence Silt Fence Provided Area Drainage Area Length Basin Allowed Length Required EC DA # (ac) (ac) % (ft) (ft) I (ft) (ft) 1 0.30 ac 0.30 ac 5 75 60 174 240+ 2 0.03 ac 0.03 ac 20 25 8 50 55+ 3 0.03 ac 0.03 ac 20 25 8 50 60+ 4 0.11 ac 0.11 ac 10 25 20 183 220+ 0 IPF IRON PIPE FOUND 0 IRS IRON ROD SET ova LIGHT POLE TR TRANSFORMER ® TELEPHONE RISER 0 WATER METER x WATER VALVE ono CLEAN -OUT 0 SANITARY SEWER MANHOLE TREES PROPERTY LINE EASEMENT LINE RIGHT OF WAY LINE - - - - - - - BUFFER LINE SILT FENCE LINE - - DITCH LINE PROPOSED CONTOUR LINE 16 LOD LOD LINE WET WETLAND LINE CONSTRUCTION ENTRANCE 9:Z•]a•><y01.l►IXTOCK•]►1Celli :&I SCALE: 1 "=30' 0 30 60 90 z 0 U) w z O Q O LL z_ z w_ J U W U Ow O z 0p N _ � U � � 0C zQ �oU O � ) W. O Uj 1 z(V pt` b-'jo� U �z �o A w CU � N ,O/ � U � I 000moo N M2=0-' u U U z0 0 U ~ < O O zILL 0 O 0 l� vJ i J X _jrz0 z (� Qof(,� U HQ�O ILL! L ) w�pc0 z_ o > o > ZZY O U J_ W d OUav < W J0 U 0 �U SEAL 00111iluiii/ = SEAL = - 028852 - GINE�� //iiillilw04/19/21 C-1 PEI JOB#: 15289.PE GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HOW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HOW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities an areas with temporary p Y p Y round stabilization shall be converted to permanent round stabilization as soon as g p g practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled sized and laced appropriately for the needs of site. p 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER 0 0 , a o R=TAPL" 0 0 0 0 =1L.1EN1E 1nAPL1= °EV„.2 �CE1, GE VV_T�N M�N� o��aERM ° 0 0 0 0 �_ 0 0 01LBERM 0 0 =` 0 0 0 o sE�TIoN �a „ OF THE E=.R STRUCTURES �A . o oREA E_T.N of E ,a., MN, o A.oN DETERMINED NFIELD TURE E L ID BELOW GRADE WASHOUT STRUCTURE ABOVE GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division, (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. flame of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours S. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs1 and within 24 3. lame of the person performingthe inspection, . hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours S. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actionstaken, and accessible) event > 1.0 inch in 2. Records of the required reportsto the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit of th Is pe rm it. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. Corrective actions have been taken Initial and date a copy of the approved E&SC E&SC Measures. Ft Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] EFFECTIVE: 04/01/19 SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated . A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. I NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING I EFFECTIVE: 04/01/19 1 Z O U) W O Q IY O LL z_ H z w J U W U Ow O Z � Ncu U N zQ �oU O � ) W. O Z N p I b,0 U �z �o A w I --I H � U O,�/ P O O 0 I�-T�`�I /FJr�Y•� � r�-1 �7� b m m m (V M 2 = of 6 1100, ZO 0 U F Q z 00 O cQc G O LL Il vJ J J X J>_ZO Z_ (� Q of (D ILL U HQ�O � w�0(0 Z_ o > LU LU > ZZY O U J J W d OUaliLU Q W J U 0 �u ILL! afU SEAL ���111111111// - SEAL 9� - 028852 - 1 1 01 1 1 1 111 �04 19 21 C-2 PEI JOB#: 15289.PE