Loading...
HomeMy WebLinkAboutNCG030591_MONITORING REPORT_20201109Semi-annual Stormwater(Lscharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted October 2, 2020 CERTIFICATE OF COVERAGE No. NCG030591 FACILITY NAME Ward Tank & Heat Exchanger, Cor COUNTY MECKLENBURG PERSON COLLECTING SAMPLES J FREI/ SwSG LABORATORY Pace Analytical Lab Cert. # 12/ 40/ 633 . Comments on sample collection or analysis: PH measured by Stormwater Services Group (Lab Cert No. 5054) Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2020 SAMPLE PERIOD ❑ Jan -June 0 July -Dec or ❑ Monthly' (month) .RISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Watersupply ❑SA o C) 00ther C 2'P �� /G� PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 % 1 °oyacr? °' ❑ No discharge this period?Z Outfall No. Date Sample Collected' (mo/dd/yr) 24 hour rainfall amount, Inches" Total Suspended Solids A pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks => - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L 001 09/17/20 2.18" 208 6.82 0.0082 < 0.0050 0.013 < 5.0 n/a ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfa11. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 "E ) upon my inquiry of the person or persons directly responsible for manag )ompliance with the permit monitoring requirement for total toxic ort )s (TKO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier2, or Tier responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks ===> 15 mg/L 100 mg/L or 50 mg/L' 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If y` eport a sample value in excess of the benchmark, you must im, .nent Tier 1, Tier 2, or Tier 3 responses. See General Permit text. " FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. TIER 3: HAS YOUR FACILITY HAD 4OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO H IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an orlainol and one copy of this DMR including all "No Discharge" reports within 30 days of receipt of the lab results for at end of monitoring period' in the case of "No Discharae" reports) to: Stormwater Permits Supervisor NCDEQ/ DEMLR 610 E. Center Ave., Ste. 301 Mooresville NC 28115 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." //-Y-aoan (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3