Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG030246_MONITORING REPORT_20190918
Ahed CORNING PlantM nagekh September 12lh, 2019 Hickory Manufacturing and t 828-901-5699 Technology Center f828-901-5665 1164 A 23i°St SE ahmed.koilakh@coming.com Hickory, NC 28602 W .coming.com North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Mooresville Regional Office Attn: Mr. James Moore 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Dear Mr. Moore: �ooal�aP`y➢� ' u '19 `® �cP Please find enclosed the Stormwater Discharge Monitoring Report for Corning Optical Communications, LLC — Hickory Manufacturing and Technology Center (HMTC) located in Hickory, Catawba County, North Carolina. The stormwater samples were collected on 8/19/2019 for the permitted outfalls and represent the quarterly sample as specified in the requirements set forth by NCDEQ for HMTC. The results reflect HMTC to be outside the benchmark value for the following: Copper and Zinc at SDO #3 Copper at SDO #5 Please contact Steve Street should you have any questions regarding this submittal at 828- 901-6695 should you have any questions. Sincerely, Ahmed Koilakh Plant Manager cc: Kim Kelley Steve Street © 2019 Corning Incorporated. All Rights Reserved. Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 9112/2019 CERTIFICATE OF COVERAGE NO. NCG03 0 2 4 6 FACILITY NAME Hickory Manufacturing and Technology Center COUNTY Catawba PERSON COLLECTING SAMPLES Steve Street LABORATORY Water Tech Labs Lab Cert. If 50 Comments on sample collection or analysis: Quarterly sample Part A: Stormwater Benchmarks and Monitoring Results Q SAMPLECOLLECTION YEAR 2019 -Quarter 3 SAMLZLOERIOD Q Jan -June ❑ July -Dec C or ❑ Monthly' (month) E#54H RGING TO CLASS ❑ORW ❑ []Trout Trout ❑PNA �7 0 b t ❑Zero -flow ❑Water Supply ❑SA \ d z Mother Q oaT G N � o PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 0 ❑ No discharge this period?' Outfall No. Benchmarks Date Sample Collected 1 (mo/dd/yr) _ 24-hour rainfall amount, Inches" - Total Suspended Solids 100 mg/L or S0. mg/L° PH. Standard units 6.0 — 9.0 Total Copper 0.010 in Total Lead 0.075 mg/L Total Zinc 0.126 mg/L Non -Polar 0&G/ Total Petroleum Hydrocarbons 15 mg/L Total Toxic Organics 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 SDO 3 08/19/19 .1 4.7 7.21 .019 <.005 .613 <5.6 N/A SOO 5 08/19/19 .1 6.1 7.52 .021 <.005 .087 <5.6 N/A ' Monthly sampling (instead of semi-annual) must begin with the second consecutive Dencnmark exceeudnce lur UIC bdmc lJ010111CLCJ a..11� Jo..l� x For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." N/A Name (Print name) N/A Title (Print title) Signature Date Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. n No discharge this period?2 Outfall No. Date Sample CollectIedi (mo/dd/yr) 24-hour rainfall`amount, Inches3 New Motor Odor Hydraulic Oil Usage Non -Polar O&G/ Total Petroleum Hydrocarbons Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L4 Parameter Code 46529 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. 0 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES 0 NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES S NO REGIONAL OFFICE CONTACT NAME: James Moore Mar! an original copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permittee Permit Date: 11/1/2018-05/31/2021 Date SWU-245, last revised 11/1/2018 Page 3 of 3