Loading...
HomeMy WebLinkAboutNCS000040_Tier Relief Letter_20200527 (2)ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality May 27, 2020 Charlotte Pipe & Foundry Co. Attention: David Waggoner, Contact Person 1335 South Clarkson Street Charlotte, North Carolina 28208 Subject: Relief from Monthly Monitoring Stormwater Permit # NCS000040 Charlotte Pipe & Foundry Co. Mecklenburg County Dear Mr. Waggoner: We are in receipt of your 2019 / 2020 TSS / Metals monitoring study and your April 28, 2020 email requesting next steps at the Charlotte facility. Based on a May 21, 2020 site inspection, the facility is in compliance with the tiered response actions and other conditions of the NCS000040 Permit. Therefore, the Division is granting regulatory relief from the Tier responses based on the condition that the TSS Abatement / Best' Management Plan be continued and that quarterly reports documenting maintenance be submitted to this office. Upon receipt of this letter, the subject facility may resume the permit specified semi-annual analytical monitoring at outfalls A, B and C for the remainder of the current permit term which expires on January 31, 2024. This decision applies to all the permitted benchmarks. Please update your SWPP plan to reflect outfalls A, B & C as representative for the site industrial activities. You must notify this office, in writing, within five business days if you become aware of any other significant source of TSS / Metals at your facility that have the potential to be exposed to stormwater. The relief granted in this letter is contingent upon the current industrial practices at Charlotte Pipe & Foundry Charlotte facility. Please retain and append this letter to your Stormwater Pollution Prevention Plan (SPPP) or permit. If you have any questions or comments concerning this letter, please contact James Moore or me at 704-663-1699. D E North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue. Suite 301 1 Mooresville. North Carolina 28115 rooatH cu��u '. 704.663.1699 Letter of Approval with Modifications Charlotte Pipe & Foundry Company May 27, 2020 Page 2 of 2 Sincerely, �L S-. lc� Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Enclosure: Inspection Report cc: Stormwater Laserfiche File NCS000040 Compliance Inspection Report Permit: NCS000040 Effective: 02/05/19 Expiration: 01/31/24 Owner: Charlotte Pipe & Foundry Co SOC: Effective: Expiration: Facility: Charlotte Pipe & Foundry Company - Cast Iron County: Mecklenburg 1335 S Clarkson St Region: Mooresville Charlotte NC 28208 Contact Person: David Waggoner Title: Phone: 704-332-2647 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/21/2020 Primary Inspector: James D Moore Secondary Inspector(s): Entry Time 11:30AM Reason for Inspection: Follow-up Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Certification: Phone: Exit Time: 12:15PM Phone: 704-663-1699 Inspection Type: Technical Assistance Page 1 of 3 permit: NCS000040 Owner - Facility: Charlotte Pipe & Foundry Co Inspection Date: 05/21/2020 Inspection Type : Technical Assistance Reason for Visit: Follow-up Inspection Summary: Based on the inspection and a review of 1) outfalls to be representative and 2) TSS abatement plan and record keeping / reporting it is recommended that outfalls & B and C be representative for the site and that semi-annual monitoring be initiated on the condition that quarterly reports be submitted regarding TSS abatement and maintenance Please email the reports to james.moore@ncdenr.gov. Page 2 of 3 permit: NCS000040 Owner - Facility: Charlotte Pipe & Foundry Co Inspection Date: 05/21/2020 Inspection iype : Technical Assistance Reason for Visit: Follow-up Page 3of3 BEST MANAGEMENT PRACTICES Outfall Impacted Location BMP Descriptio ' Sweeping outside areas of foundry Appr Outfall A Foundry Areas draining to Continuous SWO W Outfall A Foundry Areas draining to Implemented policy that as galvanized metal siding is 2013 SWO W replaced, galvanized aluminum siding will be used Outfall A Behind Pipe Storage Installed sock insert at storm culvert: Behind Pipe Storage Nov 2018 (swig) Outfall A Product Storage Cover Product Storage Areas Not Feasible Outfall 8 Foundry Areas draining to Sweeping outside areas of foundry Continuous Outfall B Outfall B Melt Sweep up dustings around the Cupola baghouse Continuous Outfall B Melt Operation & Collection of Dust in Cupola Baghouse Continuous while in Operation Outfall B Hot Dip #2 & #3 Hot Dip Collection Totes relocated to be within 2008 the building Outfall B Hot Dip Sump from Hot Dip Main Storage Tank piped to WWTP for 2008 treatment Outfall B Melt Sumps from Coke Unloading piped to WWTP for treatment 2009 Outfall B Melt Sumps from Additives Handling piped to WWTP for 2010 treatment Outfall B Melt Sumps from Charging System and ground area around 2010 charging area piped to WWTP for treatment Outfall B Foundry Areas draining to Implemented policy that as galvanized metal siding is 2013 Outfall B replaced, galvanized aluminum siding will be used BEST MANAGEMENT PRACTICES BMP Descrptio Outfall B E-Coat Process Started e-coating fittings; more rust -resistant therefore June 2013 less rust present on stored fittings product Outfall B Melt Dust Supression - Water Spray on charging system to keep 2013 metallics from drifting to areas where run-off will go to stormwater Outfall B Melt Dust Supression - Water Spray in scrap yard to keep Jan 2015 metallics contained to that area where run-off will go to WWTP for treatment Outfall B Foundry Areas draining to Installed filter inserts into storm drains: Corner of Office Nov 2018 Outfall B Bldg (SW1), Hot Dip Lean -To (SW2) Outfall B Main Gate/E-coat Installed sock insert into storm culvert: Outside E-coat Nov 2018 (SW18) Outfall B Scrap Yard Cover Scrap Yard Not Feasible Outfall B Product Storage Cover Product Storage Areas Not Feasible Outfall B Other Foundry Areas Treat Stormwater Not Feasible draining to Outfall B Outfall C Foundry Areas draining to Sweeping outside areas of foundry Continuous Outfall C Outfall C Foundry Areas draining to Operation & Collection of Dust in Baghouses associated Continuous while in Outfall C with HWS, NPF and Rolocast areas Operation Outfall C NPF Sweep dustings around the HWS, NPF and Rolocast Continuous baghouses sand handling collection bins BEST MANAGEMENT PRACTICES Outfall ' Impacted I Location Waste Area a BMP Descriptio ' Installed building to cover Waste Aggregate Area Approved 2009 Outfall C Outfall C NPF Dust Supression - Covered NPF & Rolocast baghouse dust 2012 collection boxes Outfall C NPF Dust Supression - Covered HWS baghouse dust collection Feb 2018 boxes Outfall C Foundry Areas draining to Installed filter inserts into storm drains: Oil house (SW6), Nov 2018 Outfall C NPF Bagouse (SW7), Sand Lab (SW8), 3 hill @ gas pumps (SW9, SW10, SW11), HWS Baghouse (SW12), Top of Hill (SW17) Outfall C Core Storage Cover Core Storage Areas Not Feasible Outfall C Hill Cover roll -off bins Not Feasible Outfall C Foundry Areas draining to Treat Stormwater Not Feasible Outfall C Misc Areas Facility -Wide Sweeping outside areas of foundry Continuous Misc Areas Facility -Wide Dust Supression - Covered facility -wide baghouse dust Continuous collection boxes Misc Areas Facility -Wide Sweep dustings around all baghouse collection bins Continuous Misc Areas Facility -Wide Operation & Collection of Facility -Wide Baghouses Continuous while in Operation Misc Areas Gun Drill Collect Compressor Condensate in a Tote that is carried to Continuous WWTP for treatment BEST MANAGEMENT PRACTICES Outfall Impacted BMP Descriptio p Misc Areas Facility -Wide Implemented policy that as galvanized metal siding is 2013 replaced, galvanized aluminum siding will be used Misc Areas WWTP Required the feldspar delivery truck to place catch pans Feb 2014 under hopper bottoms to catch potential leaks Misc Areas Rolocast Rolocast Office AC Condensate collected and taken to Sep 2014 WWTP for treatment Misc Areas Rolocast Dust Supression - Replaced Silo Bin Vent with ductwork to Feb 2018 vent through baghouse for better capture Misc Areas Shell Core/NPF Installed filter inserts into storm drains: Kitchen Alley side Jun 2018 (SW13, SW14, SW15), Alley @ Pattern Shop (SW16) Misc Areas Rolocast Installed filter inserts into storm drains: Corner of Oct 2018 Substation & Rolo Laempe (SW4), Corner of Substation & Rolo Electr Rm (SW5) Misc Areas WWTP Installed filter inserts into storm drain: Water Treatment Nov 2018 (SW3) Misc Areas Foundry Areas draining to Treat Stormwater Not Feasible Misc Areas Date of Completion Continuous 2013 Dec 2018 Not Feasible Continuous Continuous Continuous while in Operation 2008 2008 2010 2011 2011 2013 Date of Completion June 2013 2014 Mar 2015 Dec 2018 Dec 2018 Not Feasible Not Feasible Not Feasible Continuous Continuous while in Operation Continuous Jul 2010 2012 Feb 2018 Nov/Dec2018 Not Feasible Not Feasible Not Feasible Continuous Continuous Continuous Continuous while in Operation Continuous Date of Completion 2013 Mar 2014 Oct 2014 Aug 2018 Jun 2018 Oct 2018 Nov 2018 Not Feasible Stormwater Insert Schedule ID# Location Change Schedule Mar-20 Apr-20 May-20 Jun-20 Jul 20 Aug-20 Sep-20 Oct-20 SW1 Corner of Office Building 1/yr x SW2 Behind Slag Pile 1/grtr x SW3 Water Treatment 1/6m x SW4 Corner of Substation & Rolo Laempe 1/6m x SW5 Corner of Substation & Rolo Electr Rm 1/6m x SW6 Oil House 1/6m x SW7 NPF Baghouse 1/grtr x SW8 Sand Lab 1/grtr x SW9 Oil House Hill 1/6m x SW10 Middle Oil House Hill 1/6m x SW11 Gas Pump 1/6m x SW12 HWS Baghouse 1/grtr x SW13 Alley @ HWS & Bath House 1/grtr x SW14 Alley @ Kitchen 1/grtr x SW15 Alley @ Cope & Drag 1/mo x x x SW16 Alley @ Pattern Shop 1/mo x x x SW17 Top Hill 1/yr SW18 E-Coat 1/yr x SW19 Behind Pipe 1/yr Nov-20 Dec-20 Summary of Analytical Monitoring Results Bench-jini.L. 2018 Ol/2019 06/2019 10/2019 03/2020 Filter Post Filter Post Filter Post Filter Post Filter Markques�m MR,q ,"E ASRryuesled AS Requesed AS Requesed Cu 0.01009 0.005 0.030 0.006 0,012 Pb 0.075054 ND 0.009 ND 0.010 Zn 0.126138 0.076 0,048 0.110 0.147 TSS 1001.0 51.6 22.2 20.8 55 PH 6-9.8 5,2 5.3 52 8.6 COD 1208.9 NO ND 41.2 60 Total Rainfall1.8 1.2.4 1.0 1.8 0.5 Bench- 10/2018 01/2019 06/2019 10/2019 03/2020 .,. No Filter No Filter Pre -Filter Pre -Filter Pre -Filter Requested ASRequested ASRequested as flequuted ASRequested Cu 0.01 mg/L : 0.024 0.007 0.OG6 0.006 OA15 Pb 0.075 mg/L 0,033 0.0091 0.010 0.007 0.028 Zn 0.126 mg/L 0.553 0.120 0.099 0.095 0.203 TSS 100 mg/L 108 34.5 43.6 36.9 66 pH 6-9 7.2 6.7 6.2 5.8 8.7 COD 120 mg/L 103 32.5 ND 29.3 55 Total Rainfall in 1.8 1.24 1.0 1.8 0.5 Bench- 10/2018 01/2019 06/2019 10/2019 03/2020 ""' , " """" No Filter No Filter Post Filter Post Filter Post Filter AS Reque4etl ASRequested ASRequested ASRequested ASRequested Cu 0.01 mg/L 0.009 0.012 0.006 0.932 0.016 Pb 0.075 mg/L 0.01 0.014 0.010 0.124 0.027 j Zn 0.126 mg/L 0.223 0. 210 0.096 1.27 0.216 TSS 100 mg/L 31 125 24.6 1640 111 PH 6-9 7.6 5.4 5.4 6.2 8.8 COD 120 mg/L 44-2 531 NO 19311 87.7 Total Rainfall in 1.8 1 1.24 1.0 1.8 0.5 Bench- 10/2018 O1/2019 0612019 10/2019 03/2020 '•-"'^"t^'�"•-"'•''^s^'_"' "^ Pre -Filter Pre -Filter Pre -Filter Post -Filter Pre -Filter Post -Filter Pre -Filter Post -Filter _ AZ Requested AS Requesletl AS Requesed ASRequested ASRequested ASRequested MR,SrI ASRepu Md ND ND ND ND ND ND ND ND Oil & Grease 15 mg/L Cu 0.01 mg/L 0.023 0.016 ND 0,006 0.035 0,014 0.039 0.132 Pb 0.075 mg/L 0.023 0.014 ND 0.005 0.040 0.010 0.035 0.134 Zn 0.126 mg/L 0.651 0,372 0.404 0307 0.356 0.577 0.652 0.657 TSS 100 mg/L 178 88.3 15.9 27.0 238 14.0 317 836 PH 6-9 7.2 6.4 5.5 5.8 6.0 5.2 9.0 8.7 COD 120 mg/L 156 80.9 ND 1 202 117 60.1 232 678 Total Rainfall in 1.8 1.24 1.0 1.8 0.5 10/2018 01/2019 0612019 10/2019 03/2020 Requested AS Requened AS Rrqufszed ASRequested ASRequested Oil & Grease 15 mg/L ND Cr - mg/L ND Cu 0.01 mg/L NO Pb 0.075 mg/L ND Ni - mg/L ND Zn 0.126 mg/L 0.013 TSS 100 mg/L ND PH 6-9 5.6 4.3 5.6 TKN - mg/L ND Phenols - mg/L 0.014 COD 120 mg/L ND Total Rainfall in 1 A LR 0 c