Central Files: Tier 2 Monthly Monitoring -April 2021
Attached, please find stormwater monitoring data for Permit No NCS000329. The originals and
one copy are included. The monitoring data is for the following monitoring schedule:
Analytical monitoring includes:
® Outfall #01 (B), commingled stormwater
® Outfall #02 (B), non -commingled stormwater
® Outfall #03 (B), non -commingled stormwater
If you have any questions or need additional information, please contact me at 704-289-4511
x3800. Thank you.
Sincerely,
!7 Michael McMan
EHS Coordinator
ATI
Specialty Materials
ATI (Allvac) — Bakers Campus (BNO)
Stormwater Monitoring Report Form
Sample Date:
Sample Time: -'jr�
o>pr-►
Sample Location:
Stormwater Discharge Outfall # 01 (Commih
Drainage Area= 2,915,470 sq. ft. = 69 Acres..f.
Ltd p
Impervious= 34%
Person Collecting Samples:
Laboratory Performing Analysis:
Analytical Techniques and Methods:
40 CFR Part 136
Results of Sample Analysis:
Parameter
Results (mg/1)
Benchmark Values (mg/1)
TSS
100
BOD
30
COD
4'
120
Cadmium
0.003
Chromium
0.905
Total Calcium
915
Total Copper
0.01
Total Nickel
0.335
Total Zinc
0.126
pH
(std units)
6-9
Temperature
Deg. Celsius
Total Residual Chlorine
.017
Oil and Grease
15
Storm Date: Storm Duration: (Hrs.) Inches of Rainfall:
Duration of time preceding rain event exceeding 0.1": (Hrs.)
Estimated Flow Calculation:
Q=CIA
Q (Total) = Q (Pervious Area) + Q (Impervious Area)
Rev. 01
Date of Rev.: 1/22/2020
�kA
iatedals
ATI (Allvac) — Bakers Campus (BNO)
Stormwater Monitoring Report Form
Q (Tot., cfs) _ (A x inches rain/12 inches/ft. x 69 acres x .66) + (.9 x inches rain/12 inches/ft. x 69 x .34)
Q (Total, cfs) = 1.15180 x (inches of rain) + 1.7595 x (inches of rain)
cfs
Rev. 01
Date of Rev.: 1/22/2020
40-1ATI
Specialty Materials
ATI (Allvac) — Bakers Campus (BNO)
Stormwater Monitoring Report Form
Sample Date: y
Sample Time:,,
Sample Location:of
Stormwater Discharge Outfall # 02 (Non-
`
Commingled)-'
Drainage Area= 212,952 sq. ft. = 4.9 Acres
Impervious= 12%
Person Collecting Samples:
Laboratory Performing Analysis:
Analytical Techniques and Methods:
40 CFR Part 136
Results of Sample Analysis:
Parameter
Results (mg/1)
Benchmark Values (mg/1)
TSS
100
BOD
30
COD
6 .
120
Cadmium
�, �.
0.003
Chromium
0.905
Total Calcium
915
Total Copper
0.01
Total Nickel
0.335
Total Zinc
0.126
pH
(std units)
6-9
Temperature
Deg. Celsius
Storm Date:
Storm Duration:
Duration of time preceding rain event exceeding 0.1":
Estimated Flow Calculation:
(Hrs.) Inches of Rainfall:
(Hrs.)
Q=CIA
Q (Total) = Q (Pervious Area) + Q (Impervious Area)
Q (Tot., cfs) = (A x inches rain/12 inches/ft. x 4.9 acres x .88) + (.9 x inches rain/12 inches/ft. x 4.9 x .12)
Rev. 01
Date of Rev.: 1/22/2020
I-tATI
Specialty Materials
ATI (Allvac) — Bakers Campus (BNO)
Stormwater Monitoring Report Form
Q (Total, cfs) = 0.1437 x (Inches of rain) + 0.0441 x (Inches of rain)
cfs
Rev. 01
Date of Rev.: 1/22/2020
ATI (Allvac) — Bakers Campus (BNO)
Stormwater Monitoring Report Form
Sample Date: r
Sample Time: f
Sample Location: ��
Stormwater Discharge Outfall # 03
Commingled),p�
Drainage Area= 336,580 sq. ft. = 7.8 Acres
Impervious=15%
Person Collecting Samples:
Laboratory Performing Analysis:
Analytical Techniques and Methods:
40 CFR Part 136
Results of Sample Analysis:
Parameter
Results (mg/1)
Benchmark Values (mg/1)
TSS
100
BOD
30
COD
120
Cadmium
./'► Sri
0.003
Chromium
0.905
Total Calcium
915
Total Copper
0.01
Total Nickel
0.335
Total Zinc
0.126
pH
(std units)
6-9
Temperature
Deg. Celsius
Storm Date:
Storm Duration:
Duration of time preceding rain event exceeding 0.1":
Estimated Flow Calculation:
(Hrs.) Inches of Rainfall:
(Hrs.)
Q=CIA
Q (Total) = Q (Pervious Area) + Q (Impervious Area)
Q (Tot., cfs) = (A x inches rain/12 inches/ft. x 7.8 acres x .85) + (.9 x inches rain/12 inches/ft. x 7.8 x .15)
Rev. 01
Date of Rev.: 1/22/2020
ATI (Allvac) — Bakers Campus (BNO)
Stormwater Monitoring Report Form
Q (Total, cfs) = 0.2210 x (Inches of rain) + 0.0878 x (Inches of rain)
cfs
Rev. 01
Date of Rev.: 1/22/2020
O
ea
CE
"O
O
M
ffi
CC �a
�
O
i. +•'
�
O
O
,Q
G ..
d �q
Q p
W
C7 u
y
O
r
A��
z
'v
z z
wd`
®°
a �
Va
o 'O V
S. W
� O
C O
U)
L
W
Y
(0
LYl
0
G
O
E
N
co
to
0
a
i.
� d
O �
z _o
,
0
G•,
�
O
0
o"H o w
zo
�.
c� a
o
O
'
O U
O
U
Q
U
C
�
�
w
�AAv1U
u
:e
d
a
W
w
L
� Q
®.z
a
E
C