Loading...
HomeMy WebLinkAboutNCC214162_NOI 59182 Payment Verification_20210726Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 7/15/2021 1:45:07 PM (NCG01 NOI Submission) Approve by Broussard, Brooklyn C 7/16/2021 7:08:40 AM (Review- Construction NOI 59182) • The task was assigned to Broussard, Brooklyn C by round robin distribution 7/15/2021 1:46 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: July 19, 2021 5:00 PM 7/15/2021 1:46 PM Submit by Selkane, Aziza 7/26/2021 2:36:14 PM (Payment Verification for NCC214162) * Track Side Trucking LLC • Selkane, Aziza assigned the task to Selkane, Aziza 7/26/2021 2:35 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: August 27, 2021 5:00 PM 7/16/2021 7:09 AM �.• �,+STA7E o� NORTH CAROLINA Environmental Quvllty Project Name TRACK SIDE TRUCKING SITE Lot Numbers (If listed on the eNOI) NC Reference No.* NCG01-2021-4162 Certificate of NCC214162 Coverage (COC) No.* Invoice Date 7/16/2021 Initial Invoice No. NCC214162-2021 Initial Fee $ 100.00 Invoice Due Date 8/15/2021 Important: If you change the choice below to Payment NOT RECEIVED, the application will be rejected, and a COC will not be issued. This is the ONLY way to reject an eNOI at this step. Payment Received* r Payment Received. f Payment NOT RECEIVED. Payment Status PAID Date Payment 7/26/2021 Received* (Or, if not received, date rejected for no payrrent) Method of Payment* r electronic r check f Other Check Number* 1042 NOI Tracking No. 59182 Tracking ID referenced upon subrrittal This is an Express r No Review Project r Yes Project Tracking ID NCC-RUTHE-2021-TRACK SIDE TRUCKING SITE Georgoulias, Bethany From: Clyde Kerns <clyde@kernstrucking.com> Sent: Monday, July 26, 2021 2:34 PM To: Selkane, Aziza Subject: [External] RE: Construction Stormwater eNOI Status - Payment Instructions CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Ms. Selkane, Please consider this email as permission to process m application for stormwater permit. Sincerely Clyde C. Kerns From: Selkane, Aziza <aziza.selkane@ncdenr.gov> Sent: Thursday, July 22, 2021 12:21 PM To: clyde@kernstrucking.com Cc: Broussard, Brooklyn C<Brooklyn.Broussard@ncdenr.gov>; clyde@kernstrucking.com; larissa@odomengineering.com Subject: RE: Construction Stormwater eNOI Status - Payment Instructions Good afternoon, I received check # 1042 for $100 for NCC214162. The legal line on the check is missing. I need your confirmation to write it down before I process the payment. Otherwise, I have to mail the check back since it cannot be deposited and a new check needs to be sent. Thank you. Aziza Selkane Stormwater Program Billing Specialist Division of Energy, Mineral and Land Resources Department of Environmental Quality 512 N. Salisbury Street, Office 640K, Raleigh, NC 27604 1612 Mail Service Center, Raleigh, NC 27699-1612 919-707-3710 Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater bp�}Eeln�r.��i of Eny�ronmpn jnl q�a11Yy Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Before printing this email, please consider your budget and the environment. From: laserfiche@ncdenr.gov [mailto:laserfiche@ncdenr.gov] Sent: Friday, July 16, 2021 7:09 AM To: clyde@kernstrucking.com Cc: Broussard, Brooklyn C<Brooklyn.Broussard@ncdenr.gov>; clyde@kernstrucking.com; larissa@odomengineering.com Subject: Construction Stormwater eN01 Status - Payment Instructions Dear Construction Stormwater Permit Applicant: We have reviewed the eNOI that you submitted for TRACK SIDE TRUCKING SITE submitted on 7/15/2021 and found it to be complete. Your Certificate of Coverage (COC) number: NCC214162 Project Name: TRACK SIDE TRUCKING SITE Permittee Name: TRACK SIDE TRUCKING LLC Legally Responsible Person: CLYDE KERNS This e-mail serves as the invoice for the initial annual permit fee. Application Invoice No. NCC214162-2021 Annual Permit Fee: $100 Invoice Date: 7/16/2021 Due Date: 8/15/2021 After we receive payment of the $100 annual permit fee, we will e-mail you the COC for this project. Failure to pay the annual fee in 30 days will result in your application being rejected, and you will need to re- apply for a new COC. You have two options for paying the $100 fee: 1. Electronic payment by debit/credit card is preferred. To access the ePayment website, go to https://deq.nc.gov/sw-epayments You will need to enter the COC number above (NCC214162). If you select eCheck, there is no convenience fee. The convenience fee for a credit card is 2.65%, and the convenience fee for debit card is $3.95. 2. Mail a $100 check made payable to "DEMLR Stormwater Program." After we receive the check in the Raleigh Central Office, it will take 1-2 business days for us to e-mail your COC. A $25.00 processing fee will be charged for a returned check in accordance with NC General Statute 25-3-512. No matter which method of payment you choose, you must mail the original signed NOI Certification Form to: DEMLR Stormwater Program 512 N. Salisbury Street, 640K 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, contact Aziza Selkane at aziza.selkane@ncder The NC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor (640K), 1612 Mail Service Center, Raleigh, NC 27699- 1612 This email was automatically generated by Laserfzche. Please do not respond to this email address, as responses are not monitored.