Sue,
SW condition attached.
Thanks,
Annette
Lucas, Annette
Thunsdoy, June 08. 2013 10:04 AM
Homewood, Sue
Strickland, Bev
13-0473 Novonne|t Americas, LLC — SW CONDITION
13-O473Novonne|t Americas, LLC—SVVCONO|T|ONdoox
Annette M. Lucas, PE
Environmental Engineer
lVCI}IClVR I DW() I Wetlands and BtorcuwaterBranch
I85O Mail Service Center, Raleigh, lVC 27699 -1650 (D�ail)
512 N. Salisbury St, Raleigh, NC 27804 1 Q'u Floor (.Looatiora8n Parcels)
Phone: (9I9) 807-838I 1 Fax: (919) 807-6494 1 Email:
Weboite:
A Before printing this email, please consider your budget and the environment.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
13 -0473 Novamelt Americas, LLC — SW CONDITION
AML comments
June 6, 2013
Stormwater Management Plan (SMP) Approval by the Division for High Density Projects
The Division approves the SMP consisting of one wet detention pond and all associated stormwater
conveyances, inlet and outlet structures, and the grading and drainage patterns depicted on plan sheets dated
April 24, 2013 and June 5, 2013, which are incorporated by reference and are enforceable by the Division. The
following conditions also apply:
a) The maximum allowable drainage area for the approved wet detention pond shall be 174,420 square feet
and the maximum allowable built -upon area within that drainage area shall be 130,680 square feet. Any
changes to these maximum areas shall require the applicant to submit and receive approval for a revised
SMP by the Division.
b) The footprint of all stormwater management devices as well as an additional 10 -foot wide area on all
sides of the devices shall be located in either public rights -of -way, dedicated common areas or recorded
easement areas. The final plats for the project showing all such rights -of -way, common areas and
easement areas shall be in accordance with the approved plans.
c) The approved SMP shall be constructed and operational before any permanent building or other structure
is occupied at the site.
d) The SMP may not be modified without prior written authorization from the Division. A copy of the
approval letter and the modified SMP shall be submitted to the DWQ Webscape Unit prior to the
commencement of the modifications.
e) Maintenance activities for the wet detention pond shall be performed in accordance with the notarized
O &M agreements signed by Donna Hedrick (Registered Agent) on April 11, 2013. The O &M agreement
shall transfer with the sale of the land or transfer of ownership /responsibility for the BMP facility. The
Division shall be notified promptly of every transfer.
f) The applicant and /or authorized agent shall provide a completed Certificate of Completion form to the
Division within thirty (30) days of project completion (available at
http: / /porta 1. ncden r.org /web /wq /swp /ws /401 /certsa nd perm its /apply /forms).