Loading...
HomeMy WebLinkAbout20130473 Ver 1_Staff Comments_20130606Strickland Bev From: Sent To: Cc: Subject: Attachments Sue, SW condition attached. Thanks, Annette Lucas, Annette Thunsdoy, June 08. 2013 10:04 AM Homewood, Sue Strickland, Bev 13-0473 Novonne|t Americas, LLC — SW CONDITION 13-O473Novonne|t Americas, LLC—SVVCONO|T|ONdoox Annette M. Lucas, PE Environmental Engineer lVCI}IClVR I DW() I Wetlands and BtorcuwaterBranch I85O Mail Service Center, Raleigh, lVC 27699 -1650 (D�ail) 512 N. Salisbury St, Raleigh, NC 27804 1 Q'u Floor (.Looatiora8n Parcels) Phone: (9I9) 807-838I 1 Fax: (919) 807-6494 1 Email: Weboite: A Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 13 -0473 Novamelt Americas, LLC — SW CONDITION AML comments June 6, 2013 Stormwater Management Plan (SMP) Approval by the Division for High Density Projects The Division approves the SMP consisting of one wet detention pond and all associated stormwater conveyances, inlet and outlet structures, and the grading and drainage patterns depicted on plan sheets dated April 24, 2013 and June 5, 2013, which are incorporated by reference and are enforceable by the Division. The following conditions also apply: a) The maximum allowable drainage area for the approved wet detention pond shall be 174,420 square feet and the maximum allowable built -upon area within that drainage area shall be 130,680 square feet. Any changes to these maximum areas shall require the applicant to submit and receive approval for a revised SMP by the Division. b) The footprint of all stormwater management devices as well as an additional 10 -foot wide area on all sides of the devices shall be located in either public rights -of -way, dedicated common areas or recorded easement areas. The final plats for the project showing all such rights -of -way, common areas and easement areas shall be in accordance with the approved plans. c) The approved SMP shall be constructed and operational before any permanent building or other structure is occupied at the site. d) The SMP may not be modified without prior written authorization from the Division. A copy of the approval letter and the modified SMP shall be submitted to the DWQ Webscape Unit prior to the commencement of the modifications. e) Maintenance activities for the wet detention pond shall be performed in accordance with the notarized O &M agreements signed by Donna Hedrick (Registered Agent) on April 11, 2013. The O &M agreement shall transfer with the sale of the land or transfer of ownership /responsibility for the BMP facility. The Division shall be notified promptly of every transfer. f) The applicant and /or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at http: / /porta 1. ncden r.org /web /wq /swp /ws /401 /certsa nd perm its /apply /forms).