Loading...
HomeMy WebLinkAbout20211102 Ver 1_Meeting Request Review Doc Attachment_20210707(Version 2.07; Released October 2016)17.BP.11.R.122TIP No.:SF-050027County(ies):Avery Page 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?NoDesign/Future:Year:2016Existing:Year:Aquatic T&E Species?NoComments:YesN/ANoN/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)ac.2-lanes at 11' each with 4' paved shoulders before bridge, 4' unpaved after bridge.5100aburnette@rkk.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class BNCDWR Surface Water Classification for Water BodyN/ABuffer Rules in Effect:None51002-lanes at 12' each with 8' shoulders, 2' full depth shouldersWaterbody Information2016NCDWR Stream Index No.:17.BP.11.R.122Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)This project replaces existing bridge #050027: 4@40’, for an overall length of 160’. The bridge consists of reinforced concrete deck girders on concrete bents with spill through abutments with an out to out bridge width of 32’. The proposed bridge will be (3)-spans 1@40'; 1@95'; 1@40' for an overall length of 175'. Bridge will use 54" concrete girders on concrete piers with will thru abutments with an out to out width of 43'-3". No deck drains will be required. Runoff from the bridge will be captured and discharged onto Class B rip rap outlet pads. There is a slight increase in the impervious area of the project, however there is no significant increase in the discharge from the roadway runoff.900 Ridgefield DriveNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:801 Statesville RoadAddress:General Project InformationSF-050027WBS Element:Bridge ReplacementWBS Element:RK&K - Audrey Burnette, PENCDOT Contact:336-903-9202Suite 350Raleigh, NC 27609Contractor / Designer:919-878-9560hslaughter@ncdot.govAddress:12/13/2017AveryPineolaHeath Slaughter - Division Environmental OfficerNorth Wilkesboro, 28659River Basin(s): City/Town:0.9Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)NoRuralLinville River11-29-(4.5)0.7750 ft. (0.1420 mi.)Project DescriptionProposed ProjectCatawbaNoneSupplemental Classification: Trout Waters (Tr) Wetlands within Project Limits? Bridge 27 NC-181BlueRidg e P k yTuttleLn PritchardR dSR#1151SR# 1 518P in e ola RdUS-221 A n d y C r o weRdLinvill e A v e L invilleFallsHwy Michelle Ln RidgeRdJonasRidgeHwySt i l l C r L n A ld r id g e R dS R # 1 54 1 LinolaLnGoose Hol l owRdMil l T i mb e rCrRdL a k e vie wRdRiverHollowR d H ig h landHills Rd Oak Hill sRdSR#1538Fairway LnOld Jonas Ridge RdOldMortimer R d La u r e l R d Red Oak Rd TroutBrookLoopKn o l l C i r B r i a r Rd NC-194Yarr o w C i r Twin Pine LnT aylor -H u g h e s R d Lo v e L nSpruce Ln Oak Ln LadyS lip p er LoopSuns hi n e L n Laurelw o od Ln NC-181US-221NC- 18 1LinvilleRiverMillTimb e r C r e ek Antho nyCreekJennyBranchStace y C r eekLostCoveCreekW hite Pi neCree k Bunt Cree k ( B u r nt Cre e k BRIDGE 27 AVERY COUNTY NORTH CAROLINA SHEET 1 0 2,000 4,000 Feet Express Design - Build Bridge Program Division 11 NCDOT Division of Highways WILKES SURRY ASHE CALDWELL AVERY WATAUGA MITCHELL ALEXANDER ALLEGHANY BRUNSWICK VICINITY MAP 3495 34953495 3500350035003505349534953495 349534953495349534953495 3495 3495 3495 3500 3 5 0 0 3 5 0 0 3 5 0 0 350035003500350035003500 3500 35003 5 0 0 3 5 0 0 3500 3500 3 5 00 3500350035003500350035003500350035 0 0350035003500 350035003 5 0 0 350035003 5 0 0 350035003500 35003500350035003500 35053505 3 5 0 5 3 5 0 5 35053505 3505 3505 35053505 3505350535053505350535053505 350535053505 3505 350535053505350535053 5 0 5 3505 35053 5 0 5 3 5 0 5 350535053505350535053505 3505 350535053 5 0 5 3505 35 0535053505 350535053 5 0 5 3505 3505 350535053505 3505 350535053505350535053505350535053505 3510351035103510 3510 3510 3510351035103 5 1 0 3510 3510 3510 3510 3510 3510 35103515 3 5 15 3515351535153515 3515 3 5 1 5 3515 3520 3 5 2 035203520352035203520 3 5 2 0 3520 352535253525 3525 3525352535253525352535303530 353035303 5 3 0 3530 3535 3535 3535 3535 3 5 3 5 354035403540 3545 3 5 4 5 3545 3550 355035553555 3 5 6 0 3560 3 5 6 53565 3570 3575 36" CMP18" CMPPINEOLA BAPTIST CHURCH RD.SR 1505TUTTLE LN.LINVILLE FALLS HWY. NC 181US 221 LINVILLE RIVER LIN VILLE RIVER GATE GREENHOUSE GREENHOUSE GREENHOUSE GREENHOUSE1SFD GR GR BST BST BST BSTRET. WALLBESIDE JACK HEAD 5/8" REBAR 5/8" REBAR MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W40.00’40.00’30.00’ LT LT 22’ BST 18’ BST18’ BST22’ BST COVERED PORCH NC 194 TO MILLERS GAP HWY. NC 181 S. TO JONAS RIDGE HWY. WD BST W/ LIGHT STONE COLUMN 33.10’ LEFT -EL- AT&T TELEPHONE CONC. CONC. POWER METER POST AND BILLBOARD CONC. WALL 2SF BUS. PINEOLA INN NC 181 US 22122’ BST LINVILLE FALLS HWY. BETTE AND HIS WIFE TROY ODELL CLARK J. RUFUS HENLEY LINDA F. COMBS AND DAVID W. HARDING PINEOLA BAPTIST CHURCH JUDITH L. BLACKBURN BRENDA S. STILLWELL AND WIFE LARRY R. STILLWELL DWIGHT GENTRY DB 15 PG 582 PINEOLA BAPTIST CHURCH .01.02.02.02.02.02.03.03.00.01.01.02.02.01.00.02.02.02.02.03 .03.02 .01.02 .00.01 .00.01 .02 .01 .02 .02 .01 .00 .01 .02 .03 .04 .05EXIST.EXIST.8 :1 8:1 8:1 PROP SBG PROP SBG TYP. 25’+37.67TYP. 25’+27.50WATER IMPACTS PERMANENT SURFACE 1"=25’ SCALE EACH END OF DITCH WATER IMPACTS AT TEMPORARY SURFACE WATER IMPACTS PERMANENT SURFACE S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY WETLAND AND SURFACE WATER IMPACTS PERMIT NAD 8 3 (NS RS 2 0 0 7 ) SHEET 2 OF 11 PERMIT DRAWING CLEARING DENOTES MECHANIZED** * * ** * ** * * E E IN WETLAND DENOTES EXCAVATION HAND CLEARING EXCAVATION DUE TO CAUSEWAY WATER IMPACTS TEMPORARY SURFACE PI Sta 10+86.27 D L = 72.43’ T = 36.39’ R = 300.00’ -Y1- AT-1 -L--Y2--Y1-10+00 15+00TYPE III TYPE III TYPE III TYPE III GREU 350 TL-3 GREU 350 TL-3GREU 350 TL-3-DET- SE = 0.03 V = 30mph @ Stop. Cond. F F F F F F C F F F F F F F F F F F F F C 1 2 5 3 4 6 7 18" RCP-IV 15" R C P-III 18" RCP-IV F SEE DETAIL B CONSTRUCTED DURING TEMP. DETOUR PHASE LATERAL BASE DITCH W/2 ELBOWS15" CSP SEE DETAIL A TEMP. DETOUR PHASE CONSTRUCTED DURING SP. LAT. BASE DITCH ON TEMPORARY BRIDGE SLOPES FROM STA. 12+07 TO STA. 12+75 RT Type of Liner= CL B Rip-Rap SEE DETAIL D STREAM BANK STABILIZATION SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/993/20/2018R:\Hydraulics\PERMITS_Environmental\Drawings\050027_PER_psh04_con.dgnaburnettePLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 050027 4 LINVILLE RIVER 140.00’ GREU 350 TL-3MAINTAINED R/W FF 36" CMP18" CMPPINEOLA BAPTIST CHURCH RD.SR 1505TUTTLE LN.LINVILLE FALLS HWY. NC 181US 221 LINVILLE RIVER LIN VILLE RIVER GATE GREENHOUSE GREENHOUSE GREENHOUSE GREENHOUSE1SFD GR GR BST BST BST BSTRET. WALLBESIDE JACK HEAD 5/8" REBAR 5/8" REBAR MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W40.00’40.00’30.00’ LT LT 22’ BST 18’ BST18’ BST22’ BST COVERED PORCH NC 194 TO MILLERS GAP HWY. NC 181 S. TO JONAS RIDGE HWY. WD BST W/ LIGHT STONE COLUMN 33.10’ LEFT -EL- AT&T TELEPHONE CONC. CONC. POWER METER POST AND BILLBOARD CONC. WALL 2SF BUS. PINEOLA INN NC 181 US 22122’ BSTLINVILLE FALLS HWY. BETTE AND HIS WIFE TROY ODELL CLARK J. RUFUS HENLEY LINDA F. COMBS AND DAVID W. HARDING PINEOLA BAPTIST CHURCH JUDITH L. BLACKBURN BRENDA S. STILLWELL AND WIFE LARRY R. STILLWELL DWIGHT GENTRY DB 15 PG 582 PINEOLA BAPTIST CHURCH .01.02.02.02.02.02.03.03.00.01.01.02.02.01.00.02.02.02.02.03 .03.02 .01.02 .00.01 .00.01 .02 .01 .02 .02 .01 .00 .01 .02 .03 .04 .05EXIST.EXIST.8 :1 8:1 8:1 PROP SBG PROP SBG TYP. 25’+37.67TYP. 25’+27.50WATER IMPACTS PERMANENT SURFACE 1"=25’ SCALE EACH END OF DITCH WATER IMPACTS AT TEMPORARY SURFACE WATER IMPACTS PERMANENT SURFACE S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY WETLAND AND SURFACE WATER IMPACTS PERMIT NAD 8 3 (NS RS 2 0 0 7 ) DUE TO CAUSEWAY TEMPORARY SURFACE SHEET 3 OF 11 PERMIT DRAWING CLEARING DENOTES MECHANIZED** * * ** * ** * * E E IN WETLAND DENOTES EXCAVATION HAND CLEARING EXCAVATION PI Sta 10+86.27 D L = 72.43’ T = 36.39’ R = 300.00’ -Y1- AT-1 -L--Y2--Y1-10+00 15+00TYPE III TYPE III TYPE III TYPE III GREU 350 TL-3 GREU 350 TL-3GREU 350 TL-3-DET- SE = 0.03 V = 30mph @ Stop. Cond. F F F F F F C F F F F F F F F F F F F F C 1 2 5 3 4 6 7 18" RCP-IV 15" R C P-III 18" RCP-IV F SEE DETAIL B CONSTRUCTED DURING TEMP. DETOUR PHASE LATERAL BASE DITCH W/2 ELBOWS15" CSP SEE DETAIL A TEMP. DETOUR PHASE CONSTRUCTED DURING SP. LAT. BASE DITCH ON TEMPORARY BRIDGE SLOPES FROM STA. 12+07 TO STA. 12+75 RT Type of Liner= CL B Rip-Rap SEE DETAIL D STREAM BANK STABILIZATION SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/993/20/2018R:\Hydraulics\PERMITS_Environmental\Drawings\050027_PER_psh04_wo_con.dgnaburnettePLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 050027 4 LINVILLE RIVER 140.00’ GREU 350 TL-3MAINTAINED R/W FF -EL- -EL--EY--EY1-PINEOLA BAPTIST CHURCH RD.SR 1505TUTTLE LN.LINVILLE FALLS HWY. NC 181US 221 GATE GREENHOUSE GREENHOUSE GREENHOUSE GREENHOUSE1SFD GR GR BST BST BST BSTRET. WALLBETTE AND HIS WIFE TROY ODELL CLARK J. RUFUS HENLEY LINDA F. COMBS AND DAVID W. HARDING BESIDE JACK HEAD 5/8" REBAR 5/8" REBAR N 6622’00" W 160.57’ MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W40.00’40.00’30.00’ POWER = MOUNTAIN ELECTRIC LT LTN 0405’21" E66.26’31.47’S 1128’47" E 152.56’ N 1758’50" W 198.40’ 22’ BST 18’ BST18’ BST22’ BST COVERED PORCH NC 194 TO MILLERS GAP HWY. NC 181 S. TO JONAS RIDGE HWY. WD BST W/ LIGHT STONE COLUMN BM #2 19.82’ RIGHT -EL- MOUNTAIN ELECTRIC POWER 20.80’ RIGHT -EL- MOUNTAIN ELECTRIC POWER 22.02’ RIGHT -EL- MOUNTAIN ELECTRIC POWER 33.10’ LEFT -EL- AT&T TELEPHONE LEFT -EL- 26.23’ POWER ELECTRIC MOUNTAIN -EL- 53.23’ LEFT POWER ELECTRIC MOUNTAIN PINEOLA BAPTIST CHURCH CONC. BRENDA S. STILLWELL AND WIFE LARRY R. STILLWELL CONC. POWER METER POST AND BILLBOARD CONC. DWIGHT GENTRY 2SF BUS. PINEOLA INN 34953495 349534953495349534953495 3495 3495 3 5 0 0 3 5 0 0 35003500350035003 5 0 03500 3500 3500 35003 5 0 0 3 5 0 0 3500 35003500350035003500350035003 50035003500 35003500 3 5 0 5 3 5 0 5 35053505 3505350535053505350535053505 3505 3505 350535053505350535053 5 0 5 3505 35053 5 0 535053505 3 5 0 5 3505 350535053505 350535053505 3505 35053505350535053505350535053505 351035103510 3510 3510 3510351035103 5 1 0 3510 3510 3510 3510 3510 3 5 15 3515351535153515 3515 3515 352035203520 3525352535253530 353035303535 LINVILLE RIVER LIN VILLE RIVE R PROPOSED GRADE EXISTING GROUND GROUND EXISTING PROPOSED GRADE .02.01.00.01.02.03.04.04.03.02.01.00.02.01.02.02.01OF TRAFFIC FOR MAINTENANCE TEMPORARY SHORING OF TRAFFIC FOR MAINTENANCE TEMPORARY SHORING 8:1 +68 RT BEGIN SBG PROP SBG .03 .02.03 10’10’2’1 0 ’ 1 0’ PLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/993/20/2018R:\Hydraulics\PERMITS_Environmental\Drawings\050027_PER_psh05.dgnaburnette 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00NAD 83/ NSRS 2007-DET--Y1_DET- 100 100 50 50 50 50 10 2010 050027 5 3,510 3,520 3,500 3,490 3,480 11 12 1310 14 15 16 17 18 19 3,510 3,500 3,490 3,480 3,470 10 SHEET 4 OF 11 PERMIT DRAWING 3,450 3,460 3,470 3,480 3,490 3,500 3,510 3,520 3,499.9’ 10-YR WSEL. PI = 13+70.00 EL = 3,509.06’ (-)0.3525%(+)0.3000% VC = 70’ K = 107 V = 53 mphEL = 3,509.74’ -DET- STA. 11+76.33 BEGIN GRADE EL = 3,510.10’ -DET- STA. 17+17.16 END GRADE V = 28 mph PI = 10+65.00 EL = 3,508.46’(-)4 .4 8 0 1%(-)6.2505% VC = 30’ K = 17 EL = 3,507.21’ -Y1- STA. 10+85.00 -Y1_DET- STA. 10+85.00 = END GRADE EL = 3,509.34’ -DET- STA. 12+77.65, 10’ LT -Y1_DET- STA. 10+45.38 = BEGIN GRADE ** GREU 350 TL-3 TEMP. GREU 350 TL-3 TEMP. AT-1 TEMP. GREU 350 TL-3 TEMP. C C F F F F F F F F F F C C INV=3500.04’ INV=3498.50’36" CMP18" CMP WALL TO BE EXCAVATED 18" RCP-IV SEE DETAIL C TOE PROTECTION SEE DETAIL B LATERAL BASE DITCH SEE DETAIL A SP. LAT. BASE DITCH 0408 0404 0403 0409 W/ (2) ELBOWS15" CSP DRAINAGE DETAILS GROUND NATURAL ( Not to Scale) STREAM BANK STABILIZATION DETAIL D SHEET 5 OF 11 PERMIT DRAWING OR FLATTER SLOPE=2.0:1 Matting (TYP.) Coir Fiber Type of Liner= Coir Fiber Matting, Banks Only 050027 2D-1 d 2:1B D ( Not to Scale) Flatter2:1 or SPECIAL LATERAL BASE DITCH FROM STA. 12+00 TO STA. 12+65 LT Slope Fill DETAIL A B=4.0 Ft. Max. d=0.5 Ft. Min. D=0.5 Ft. Type of Liner= CL B Rip-Rap Ground Natural Geotextile ( Not to Scale) LATERAL BASE DITCH 2:1D B b d 2:1 1"/Ft. FROM STA. 17+00 TO STA. 17+75 LT (CL I RIP RAP D=1.5) FROM STA. 14+00 TO STA. 17+00 LT (CL B RIP RAP D=2.0) DETAIL B b=5.0 Ft. B=4.0 Ft. Max. d= Ft. Min. D= Ft. *When B is < 6.0’ Type of Liner= CL B Rip-Rap Ground Natural Slope Fill GEOTEXTILE ( Not to Scale) TOE PROTECTION d ON TEMPORARY BRIDGE SLOPES FROM STA. 12+07 TO STA. 12+75 RT Fill Slope2:1 or Flatter Fill Sl ope2:1 or Flatter DETAIL C d=0.5 Ft. Type of Liner= CL B Rip-Rap Geotextile SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/993/20/2018R:\Hydraulics\PERMITS_Environmental\Drawings\050027_PER_Drain_Det.dgnaburnettePLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 CURB & GUTTER LOCATIONS ALN STATION STATION LOCDESCRIPTION SBG SBG -L- -L- 14+86.95 15+05.00 LT 15+10.05 15+22.35 RT PINEOLA BAPTIST CHURCH RD.SR 1505TUTTLE LN.LINVILLE FALLS HWY. NC 181US 221 GATE GREENHOUSE GREENHOUSE GREENHOUSE GREENHOUSE1SFD GR GR BST BST BST BSTRET. WALLBETTE AND HIS WIFE TROY ODELL CLARK J. RUFUS HENLEY LINDA F. COMBS AND DAVID W. HARDING BESIDE JACK HEAD 5/8" REBAR 5/8" REBAR MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W40.00’40.00’30.00’ LT LT 22’ BST 18’ BST18’ BST22’ BST COVERED PORCH NC 194 TO MILLERS GAP HWY. NC 181 S. TO JONAS RIDGE HWY. WD BST W/ LIGHT STONE COLUMN 33.10’ LEFT -EL- AT&T TELEPHONE -EL- 53.23’ LEFT POWER ELECTRIC MOUNTAIN PINEOLA BAPTIST CHURCH CONC. JUDITH L. BLACKBURN BRENDA S. STILLWELL AND WIFE LARRY R. STILLWELL CONC. CONC. DWIGHT GENTRY 2SF BUS. PINEOLA INN 34953495349534953495349534953495349534953495 3495 3495 3495 3500350035003500 3 5 0 0 3 5 0 0 3 5 0 0 35003500350035003 5 0 03500 3500 3500 35003 5 0 0 3 5 0 0 3500 3500 3 5 0 0 3500350035003500350035003500350035 0 0350035003500 35003 5 0 0 35003 5 0 0 350035003500 3500350035003500 350035053505 3 5 0 5 3 5 0 5 35053505 3505 3505 35053505 3505350535053505350535053505 350535053505 3505 3505 350535053505350535053 5 0 5 3505 35053 5 0 5 3 5 0 5 350535053505350535053505 3505 350535053 5 0 5 3505 350535053505 350535053505 3505 350535053505 3505 350535053505350535053505350535053505 3510351035103510 3510 3510 3510351035103 5 1 0 3510 3510 3510 3510 3510 3510 3510 35103515 3 5 15 3515351535153515 3515 3515 3520 3 5 2 035203520352035203520 35 2 0 352535253525352535253530 353035303535 3535 35403540 LINVILLE RIVER LIN VILLE RIVER .02.01.00.01.02.03.04.04.03.02.01.00.02.01.02.02.01OF TRAFFIC FOR MAINTENANCE TEMPORARY SHORING OF TRAFFIC FOR MAINTENANCE TEMPORARY SHORING 8:1 +68 RT BEGIN SBG PROP SBG .03 .02.03 10’10’2’1 0 ’ 1 0 ’ 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 ADT = 5,100 (2013) DESIGN SPEED = 50 MPH AVERY #27 50 100 50 100 10 20 50 50 10 CAUSEWAY CONSTRUCTION SEQUENCE INSTALL BANK STABILIZATION AFTER REMOVING CAUSEWAY.7. REMOVE CAUSEWAY UPON COMPLETION OF PHASE I.6. INSTALL TEMPORARY BEAMS OVER END BENT #2 & INTERIOR BENT #2 FROM CAUSEWAY.5. CAUSEWAY. AFTER COMPLETION OF BENT CONSTRUCTION, REMOVE BENT ACCESS PORTION OF4. CONSTRUCT END BENT #2 & INTERIOR BENT #2.3. NO MORE THAN HALF THE STREAM SHALL BE BLOCKED DURING PHASE I CONSTRUCTION. CONSTRUCT CAUSEWAY WITH FLOW THROUGH PIPES AS SHOWN ON PLAN.2. CONSTRUCT GRAVEL ACCESS AS SHOWN ON PLAN.1. PLAN OF CAUSEWAY - PHASE I 050027 SHEET 6 OF 11 PERMIT DRAWING EC-2 BM #1 BM #2 1015** GREU 350 TL-3 TEMP. GREU 350 TL-3 TEMP. AT-1 TEMP. GREU 350 TL-3 TEMP. C C F F F F F F F F F F C C GEOTEXTILE FABRIC (TYP.)GEOTEXTILE FABRIC (TYP.) BENT ACCESS MAIN CAUSEWAY 1.5:1 SLOPE (TYP.) CLASS II RIP RAP CLASS B RIP RAP 1.0’ 15’ 20’ BENT ACCESS MAIN CAUSEWAY CLASS II RIP RAP CLASS B RIP RAP 1.0’ 15’ 20’ TOP OF CAUSEWAY EL. = 3,496.8’ DETAIL OF CAUSEWAY N.T.S. (SURVEYED 5/254/2016) NWS EL. 3,492.8’ STREAM BED EL. 3,491.9’ SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/993/20/2018R:\Hydraulics\PERMITS_Environmental\Drawings\050027_PER_Causeway_I.dgnaburnettePLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETEDNAD 8 3 (NSRS 2 0 0 7 ) CURB & GUTTER LOCATIONS ALN STATION STATION LOCDESCRIPTION SBG SBG -L- -L- 14+86.95 15+05.00 LT 15+10.05 15+22.35 RT INV=3500.04’ INV=3498.50’INV=3501.17’INV=3502.57’36" CMP18" CMP WALL GRAVEL ACCESS PINEOLA BAPTIST CHURCH RD.SR 1505TUTTLE LN.LINVILLE FALLS HWY. NC 181US 221 GATE GREENHOUSE GREENHOUSE GREENHOUSE GREENHOUSE1SFD GR GR BST BST BST BSTRET. WALLBETTE AND HIS WIFE TROY ODELL CLARK J. RUFUS HENLEY LINDA F. COMBS AND DAVID W. HARDING BESIDE JACK HEAD 5/8" REBAR 5/8" REBAR MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W40.00’40.00’30.00’ LT LT 22’ BST 18’ BST18’ BST22’ BST COVERED PORCH NC 194 TO MILLERS GAP HWY. NC 181 S. TO JONAS RIDGE HWY. WD BST W/ LIGHT STONE COLUMN 33.10’ LEFT -EL- AT&T TELEPHONE -EL- 53.23’ LEFT POWER ELECTRIC MOUNTAIN PINEOLA BAPTIST CHURCH CONC. JUDITH L. BLACKBURN BRENDA S. STILLWELL AND WIFE LARRY R. STILLWELL CONC. CONC. DWIGHT GENTRY 2SF BUS. PINEOLA INN 34953495349534953495349534953495349534953495 3495 3495 3495 3500350035003500 3 5 0 0 3 5 0 0 3 5 0 0 35003500350035003 5 0 03500 3500 3500 35003 5 0 0 3 5 0 0 3500 35003500 350035003500350035003500350035 0 0350035003500 35003 5 0 0 350035003 5 0 0 350035003500 35003500350035003500 350035053505 3 5 0 5 3 5 0 5 35053505 3505 3505 35053505 3505350535053505350535053505 35053505 3505 3505 350535053505350535053 5 0 5 3505 35053 5 0 5 3 5 0 5 350535053505350535053505 3505 350535053 5 0 5 3505 350535053505 350535053505 3505 350535053505 3505 350535053505350535053505350535053505 3510351035103510 3510 3510 3510351035103 5 1 0 3510 3510 3510 3510 3510 3510 35103515 3 5 15 3515351535153515 3515 3515 3520 3 5 2 035203520352035203520 35 2 0 352535253525352535253530 353035303535 3540 LINVILLE RIVER LIN VILLE RIVER .02.01.00.01.02.03.04.04.03.02.01.00.02.01.02.02.01OF TRAFFIC FOR MAINTENANCE TEMPORARY SHORING OF TRAFFIC FOR MAINTENANCE TEMPORARY SHORING 8:1 +68 RT BEGIN SBG PROP SBG .03 .02.03 10’10’2’1 0 ’ 1 0 ’ CAUSEWAY CONSTRUCTION SEQUENCE PLAN OF CAUSEWAY - PHASE II INSTALL BANK STABILIZATION AFTER REMOVING CAUSEWAY.9. REMOVE CAUSEWAY UPON COMPLETION OF PHASE I.8. INSTALL TEMPORARY BEAMS OVER END BENT #2 & INTERIOR BENT #2 FROM CAUSEWAY.7. CAUSEWAY.AFTER COMPLETION OF BENT CONSTRUCTION, REMOVE BENT ACCESS PORTION OF6. CONSTRUCT END BENT #2 & INTERIOR BENT #2.5. NO MORE THAN HALF THE STREAM SHALL BE BLOCKED DURING PHASE I CONSTRUCTION. CONSTRUCT CAUSEWAY WITH FLOW THROUGH PIPES AS SHOWN ON PLAN.4. CONSTRUCT GRAVEL ACCESS AS SHOWN ON PLAN.3. LATERAL BASE DITCH, SEE DETAIL A ON SHEET 2 OF ROADWAY PLANS. INSTALL 18" RCP UNDER PINEOLA BAPTIST CHURCH ROAD. CONSTRUCT2. INSTALL IMPERVIOUS DIKE AS SHOWN ON PLAN.1. EC-2A050027 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 ADT = 5,100 (2013) DESIGN SPEED = 50 MPH AVERY #27 50 100 50 100 10 20 50 50 10 SHEET 7 OF 11 PERMIT DRAWING BM #1 BM #2 C C F F F F F F F F F F C C 1015** GREU 350 TL-3 TEMP. GREU 350 TL-3 TEMP. AT-1 TEMP. GREU 350 TL-3 TEMP. GEOTEXTILE FABRIC (TYP.)GEOTEXTILE FABRIC (TYP.) BENT ACCESS MAIN CAUSEWAY 1.5:1 SLOPE (TYP.) CLASS II RIP RAP CLASS B RIP RAP 1.0’ 15’ 20’ BENT ACCESS MAIN CAUSEWAY CLASS II RIP RAP CLASS B RIP RAP 1.0’ 15’ 20’ TOP OF CAUSEWAY EL. = 3,498.2’ DETAIL OF CAUSEWAY N.T.S. (SURVEYED 5/254/2016) NWS EL. 3,492.8’ STREAM BED EL. 3,491.9’ DIKE IMPERVIOUS SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/993/20/2018R:\Hydraulics\PERMITS_Environmental\Drawings\050027_PER_Causeway_II.dgnaburnettePLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETEDNAD 8 3 (NSRS 2 0 0 7 ) CURB & GUTTER LOCATIONS ALN STATION STATION LOCDESCRIPTION SBG SBG -L- -L- 14+86.95 15+05.00 LT 15+10.05 15+22.35 RT INV=3500.04’ INV=3498.50’INV=3501.17’INV=3502.57’36" CMP18" CMP WALL GRAVEL ACCESS 18" RCP-IV SP. LATERAL BASE DITCH SEE DETAIL A (2)-72"x44" CSP ARCHES PINEOLA BAPTIST CHURCH RD.SR 1505TUTTLE LN.LINVILLE FALLS HWY. NC 181US 221 GATE GREENHOUSE GREENHOUSE GREENHOUSE GREENHOUSE1SFD GR GR BST BST BST BSTRET. WALLBETTE AND HIS WIFE TROY ODELL CLARK J. RUFUS HENLEY LINDA F. COMBS AND DAVID W. HARDING BESIDE JACK HEAD 5/8" REBAR 5/8" REBAR MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W40.00’40.00’30.00’ LT LT 22’ BST 18’ BST18’ BST22’ BST COVERED PORCH NC 194 TO MILLERS GAP HWY. NC 181 S. TO JONAS RIDGE HWY. WD BST W/ LIGHT STONE COLUMN 33.10’ LEFT -EL- AT&T TELEPHONE -EL- 53.23’ LEFT POWER ELECTRIC MOUNTAIN PINEOLA BAPTIST CHURCH CONC. JUDITH L. BLACKBURN BRENDA S. STILLWELL AND WIFE LARRY R. STILLWELL CONC. CONC. DWIGHT GENTRY 2SF BUS. PINEOLA INN 3495349534953495 3495349534953500350035 0035003500350035003 5 0 0 3500 3500 35053505 3505 3505 3505350535053505 3505 3505 3505350535053505 35103510 3510 34953495349534953495349534953495349534953495 3495 3495 3495 3500350035003500 3 5 0 0 3 5 0 0 3 5 0 0 35003500350035003 5 0 03500 3500 3500 35003 5 0 0 3 5 0 0 3500 3500 3 5 0 0 3500350035003500350035003500350035 0 0350035003500 35003 5 0 0 350035003 5 0 0 350035003500 3500350035003500 350035053505 3 5 0 5 3 5 0 5 35053505 3505 3505 35053505 3505350535053505350535053505 350535053505 3505 3505 350535053505350535053 5 0 5 3505 35053 5 0 5 3 5 0 5 350535053505350535053505 3505 350535053 5 0 5 3505 350535053505 350535053505 3505 350535053505 3505 350535053505350535053505350535053505 3510351035103510 3510 3510 3510351035103 5 1 0 3510 3510 3510 3510 3510 3510 35103515 3 5 15 3515351535153515 3515 3515 3520 3 5 2 035203520352035203520 35 2 0 352535253525352535253530 353035303535 3535 35403540 3545 LINVILLE RIVER LIN VILLE RIVER .02.01.00.01.02.03.04.04.03.02.01.00.02.01.02.02.018:1.03 .02.03 10’10’2’1 0 ’ 1 0 ’ 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 ADT = 5,100 (2013) DESIGN SPEED = 50 MPH AVERY #27 50 100 50 100 10 20 50 50 10 CAUSEWAY CONSTRUCTION SEQUENCE PLAN OF CAUSEWAY - PHASE III 050027 EC-2B INSTALL BANK STABILIZATION AFTER REMOVING CAUSEWAY.6. REMOVE CAUSEWAY UPON COMPLETION OF PHASE III.5. REMOVE END BENT #1 AND INTERIOR BENT #1 & #2 FROM CAUSEWAY.4. CONSTRUCTION IF POSSIBLE. NO MORE THAN HALF THE STREAM SHALL BE BLOCKED DURING PHASE III CONSTRUCT CAUSEWAY WITH FLOW THROUGH PIPES AS SHOWN ON PLAN.3. CONSTRUCT GRAVEL ACCESS AS SHOWN ON PLAN.2. INTERIOR BENT #2 FROM ABOVE. REMOVE BRIDGE DECK & SUPERSTRUCTURE FROM END BENT #1 THROUGH1. SHEET 8 OF 11 PERMIT DRAWING BM #1 BM #2 C C F F F F F F F F F F C C 1015** GREU 350 TL-3 TEMP. GREU 350 TL-3 TEMP. AT-1 TEMP. GREU 350 TL-3 TEMP. GEOTEXTILE FABRIC (TYP.)GEOTEXTILE FABRIC (TYP.) BENT ACCESS MAIN CAUSEWAY 1.5:1 SLOPE (TYP.) CLASS II RIP RAP CLASS B RIP RAP 1.0’ 15’ 20’ BENT ACCESS MAIN CAUSEWAY CLASS II RIP RAP CLASS B RIP RAP 1.0’ 15’ 20’ TOP OF CAUSEWAY EL. = 3,495.0’ DETAIL OF CAUSEWAY N.T.S. (SURVEYED 5/254/2016) NWS EL. 3,492.8’ STREAM BED EL. 3,491.7’ SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/993/20/2018R:\Hydraulics\PERMITS_Environmental\Drawings\050027_PER_Causeway_III.dgnaburnettePLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETEDNAD 8 3 (NSRS 2 0 0 7 ) CURB & GUTTER LOCATIONS ALN STATION STATION LOCDESCRIPTION SBG SBG -L- -L- 14+86.95 15+05.00 LT 15+10.05 15+22.35 RT INV=3500.04’ INV=3498.50’INV=3501.17’INV=3502.57’36" CMP18" CMP WALL (2)-72"x44" CSP ARCHES GRAVEL ACCESS PINEOLA BAPTIST CHURCH RD.SR 1505TUTTLE LN.LINVILLE FALLS HWY. NC 181US 221 GATE GREENHOUSE GREENHOUSE GREENHOUSE GREENHOUSE1SFD GR GR BST BST BST BSTRET. WALLBETTE AND HIS WIFE TROY ODELL CLARK J. RUFUS HENLEY LINDA F. COMBS AND DAVID W. HARDING BESIDE JACK HEAD 5/8" REBAR 5/8" REBAR MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W MAINTAINED R/W MAINTAINED R/WMAINTAINED R/W40.00’40.00’30.00’ LT LT 22’ BST 18’ BST18’ BST22’ BST COVERED PORCH NC 194 TO MILLERS GAP HWY. NC 181 S. TO JONAS RIDGE HWY. WD BST W/ LIGHT STONE COLUMN 33.10’ LEFT -EL- AT&T TELEPHONE -EL- 53.23’ LEFT POWER ELECTRIC MOUNTAIN PINEOLA BAPTIST CHURCH CONC. JUDITH L. BLACKBURN BRENDA S. STILLWELL AND WIFE LARRY R. STILLWELL CONC. CONC. DWIGHT GENTRY 2SF BUS. PINEOLA INN 34953495349534953495349534953495349534953495 3495 3495 3495 3500350035003500 3 5 0 0 3 5 0 0 3 5 0 0 35003500350035003 5 0 03500 3500 3500 35003 5 0 0 3 5 0 0 3500 3500 3 5 0 0 3500350035003500350035003500350035 0 0350035003500 35003 5 0 0 350035003 5 0 0 350035003500 3500350035003500 350035053505 3 5 0 5 3 5 0 5 35053505 3505 3505 35053505 3505350535053505350535053505 350535053505 3505 3505 350535053505350535053 5 0 5 3505 35053 5 0 5 3 5 0 5 350535053505350535053505 3505 350535053 5 0 5 3505 350535053505 350535053505 3505 350535053505 3505 350535053505350535053505350535053505 3510351035103510 3510 3510 3510351035103 5 1 0 3510 3510 3510 3510 3510 3510 35103515 3 5 15 3515351535153515 3515 3515 3520 3 5 2 035203520352035203520 35 2 0 352535253525352535253530 353035303535 3535 35403540 3545 LINVILLE RIVER LIN VILLE RIVER .02.01.00.01.02.03.04.04.03.02.01.00.02.01.02.02.01.03 .02.03 CAUSEWAY CONSTRUCTION SEQUENCE PLAN OF CAUSEWAY - PHASE IV INSTALL BANK STABILIZATION AFTER REMOVING CAUSEWAY.6. REMOVE CAUSEWAY UPON COMPLETION OF PHASE IV.5. REMOVE END BENT #2 AND INTERIOR BENT #3 FROM CAUSEWAY.4. CONSTRUCTION IF POSSIBLE. NO MORE THAN HALF THE STREAM SHALL BE BLOCKED DURING PHASE III CONSTRUCT CAUSEWAY WITH FLOW THROUGH PIPES AS SHOWN ON PLAN.3. CONSTRUCT GRAVEL ACCESS AS SHOWN ON PLAN.2. INTERIOR BENT #2 FROM ABOVE. REMOVE BRIDGE DECK & SUPERSTRUCTURE FROM END BENT #2 THROUGH1. 050027 EC-2C 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 ADT = 5,100 (2013) DESIGN SPEED = 50 MPH AVERY #27 50 100 50 100 10 20 50 50 10 SHEET 9 OF 11 PERMIT DRAWING BM #1 BM #2 C C F F F F F F F F F F C C 1015GREU 350 TL-3 TEMP. GREU 350 TL-3 TEMP. AT-1 TEMP. GREU 350 TL-3 TEMP. GEOTEXTILE FABRIC (TYP.)GEOTEXTILE FABRIC (TYP.) BENT ACCESS MAIN CAUSEWAY 1.5:1 SLOPE (TYP.) CLASS II RIP RAP CLASS B RIP RAP 1.0’ 15’ 20’ BENT ACCESS MAIN CAUSEWAY CLASS II RIP RAP CLASS B RIP RAP 1.0’ 15’ 20’ TOP OF CAUSEWAY EL. = 3,499.7’ DETAIL OF CAUSEWAY N.T.S. (SURVEYED 5/254/2016) NWS EL. 3,492.8’ STREAM BED EL. 3,491.7’ SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/993/20/2018R:\Hydraulics\PERMITS_Environmental\Drawings\050027_PER_Causeway_IV.dgnaburnettePLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETEDNAD 8 3 (NSRS 2 0 0 7 ) CURB & GUTTER LOCATIONS ALN STATION STATION LOCDESCRIPTION SBG SBG -L- -L- 14+86.95 15+05.00 LT 15+10.05 15+22.35 RT INV=3500.04’ INV=3498.50’INV=3501.17’INV=3502.57’36" CMP18" CMP WALL GRAVEL ACCESS DIVISION OF HIGHWAYS NCDOT TEMPORARY WORK PAD DETAIL 1.5:11.5:1 CLASS B RIP RAP CLASS II RIP RAP CHANNEL BED NOT TO SCALE 2/14/2018 CLASS II RIP RAP AVERY COUNTY PROJECT: 17BP.11.R.122 (050027) WIDTH OF PROP. BENT CAP + 5’ EACH END FABRIC GEOTEXTILE FLOW INTERIOR BENT C OF PROPOSEDL NATURAL GROUND 1.0’1.5:1 FABRIC GEOTEXTILE CLASS B RIP RAP FLOWNWS EL.=3,492.8’ BRIDGE NO. 27 OVER LINVILLE RIVER (LINVILLE FALLS HWY) ON US 221/NC 181 =3,492.8’ NWS EL. PHASE IV=3,495.0’ PHASE III=3,499.7’ PHASE II=3,498.2’ PHASE I=3,496.8’ CAUSEWAY TOP ELEV. APPROX. EL. = 3,491.7’ @ STREAM CENTER CHANNEL BOTTOM VARIES PER PHASE) (QUANTITY AND PLACEMENT 72"x44" CSP ARCH PIPES SHEET 10 OF 11 HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)1-L- 12+70 LT Bank Stabilization due to ditch0.002 0.001 16.000 10.0002-L- 13+38 LT Bank Stabilization due to ditch0.003 0.001 26.000 10.0003-L- 12+83 to 14+27Causeway0.198 166.0004-L- 16+35 LTDitch Excavation0.0015-L- 16+06 to 16+79 LTR/W Clearing0.135TOTALS*:*Rounded totals are sum of actual impactsNOTES:Revised September 2014 SHEET 11OF11 WETLAND PERMIT IMPACT SUMMARYSURFACE WATER IMPACTSWETLAND IMPACTSDIVISION OF HIGHWAYS0.908 ac of Tree Clearing within the project limits. Includes area impacted by Temporary Detour and power lines within the R/W.SF-0500272/14/2018Avery CountyNC DEPARTMENT OF TRANSPORTATION17BP.11.R.122