Loading...
HomeMy WebLinkAbout20160803 Ver 2_DCM Permit_20210716Permit Class NEW Permit Number 88-21 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Robert and Christy Peyton 8108 Bald Eagle Ln., Wilmington NC 28411 Authorizing development in New Hanover County at adi to the AIWW, at 8108 Bald Eagle Lane, in Wilmington as requested in the permittee's application dated 3/5/21 (MP-1) and "Rev 4/5/2l" (MP-4), including attached workplan drawings (4) Sheets 1 2 4 of 4 all dtd 3/6121 and Sheet 3 of 4 dtd "Rev 4/5/21". This permit, issued on July 16, 2021 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation if these terms may be subject to tines, imprisonment or civil action; or may cause me permit w oe null airu vvru. Docking Facility Expansion 1) This permit authorizes only the jet ski lift and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility expansion without permit modification. No non - water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2024 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. zljiļæ½ Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Robert and Christy Peyton Permit No. 88-21 Page 2 of 2 ADDITIONAL CONDITIONS 3) This permit authorizes one (1) additional formalized boat slips for a maximum of four (4) formalized boat slips at this docking facility. 4) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 5) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. 6) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the northern adjacent property owner's area of riparian access. General 7) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 8) All debris associated with the removal or construction of the permitted docking facility shall be contained within the authorized project area and removed to an appropriate upland location. 9) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Regional General Permit 197800056 (Action ID SAW-2016-01740). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2016-0803 v2. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high-water level. NOTE: An application processing fee of $250 was received by DCM for this project.