Loading...
HomeMy WebLinkAbout20211071 Ver 1_Meeting Request Review_20210705 DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20211071 Version* 1 Regional Office* Winston-Salem Regional Office-(336)776-9800 Reviewer List* Dave Wanucha Pre-Filing Meeting Request submitted 7/5/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* NCDOT-Kevin Hining Contact Email Address* kjhining@ncdot.gov Project Name* Alleghany Bridge 133 replacement Project Owner* NCDOT Project County* Alleghany Owner Address: Street Address 801 Statesville Hwy Address Line 2 City State/Rovince/Region North Wilkesboro NC Fbstal/Zip Code Country 28659 USA Is this a transportation project?* (' Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express • Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Dave Wanucha Please give a brief project description below and include location information.* Bridge replacement project-build new bridge and remove old one. Meeting not needed unless requested by NCDWR. Please attach the documentation you would like to have the meeting about. Alleghany 133 Maps.pdf 2.97MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 7/5/2021 Reviewer Meeting Request Decision ........................................................................................................................................................................................................................................................................................................................................................................................................................................................ Is a meeting required or is there more info needed?* r Yes r No If rmre inforrration is needed,please add comrents for the errail notification below.