HomeMy WebLinkAbout20211071 Ver 1_Meeting Request Review_20210705 DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20211071 Version* 1
Regional Office* Winston-Salem Regional Office-(336)776-9800
Reviewer List* Dave Wanucha
Pre-Filing Meeting Request submitted 7/5/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* NCDOT-Kevin Hining
Contact Email Address* kjhining@ncdot.gov
Project Name* Alleghany Bridge 133 replacement
Project Owner* NCDOT
Project County* Alleghany
Owner Address: Street Address
801 Statesville Hwy
Address Line 2
City State/Rovince/Region
North Wilkesboro NC
Fbstal/Zip Code Country
28659 USA
Is this a transportation project?* (' Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
• Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Dave Wanucha
Please give a brief project description below and include location information.*
Bridge replacement project-build new bridge and remove old one.
Meeting not needed unless requested by NCDWR.
Please attach the documentation you would like to have the meeting about.
Alleghany 133 Maps.pdf 2.97MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
Submittal Date 7/5/2021
Reviewer Meeting Request Decision
........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Is a meeting required or is there more info needed?*
r Yes r No
If rmre inforrration is needed,please add comrents for the errail notification below.