LET'T'ER. OF APPROVAL WITH Nll®D)1F'ICA' IONS
Carolina Development Services, LLC
Attention: G. David Cuthbertson, Manager
2627 Brekonridge Centre Drive
Monroe, North Carolina 28110
RE: Project Name: Broadmoor
Acres Approved: 75.8
Project ID: UNION-2021-008
County: Union, City: Marvin
Address: Waxhaw-Marvin Rd.
River Basin: Catawba
Stream Classification: Other
Submitted By: Matthew Kirchner, PE, Eagle Engineering
Date Received by LQS: June 23, 2021
Plan Type: Revised
Dear Mr. Cuthbertson:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for
Approval are listed on the attached page.. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (NOI) form requesting a Certificate of Coverage (COC) under theNC0010000 Construction Stormwater
General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on
the above named project. The NOI form may be accessed at deq.nc.gov(NCG0l. Please direct questions about
the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul,clark@ncdenr.gov. After
you submit a complete and correct NOI Form, a COC will be emalled to you within three business days.
Initially, DEMLR will not charge a fee for coverage under the' NCO 1 permit, However, on of after May 1,.
2019, a $100 fee will be charged annually. This fee is to be sent to the DE1df.,R Stormwater Central Office staff
in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file
at the job site:
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
ivleoresvil[e Regional office ? 610 East Center Avenue, Suite 301] Mooresville, North Carolina 28115
-f Oil _05) 704-6634599
Letter of Approval with Modifications
Carolina Development Services, LLC
July 8, 2021
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCGOI permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. I13A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act
of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to ensure compliance with the Act_
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
A�� ,� rf
Shannon Leonard
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGOI Fact Sheet
c: Inspection Department
Eagle Engineering
Attn: Matthew Kirchner, PE
2013-A Van Buren Ave.
Indian Trail, NC 28079
Letter of Approval with Modifications
Carolina Development Services, LLC
July 8, 2021
Page 3 of 3
Project Name: Broadmoor
Project ID: UNION-2021-008
County: Union
1. A diversion berm shall be installed and maintained along the \ITOrth side of the "Clean Water
Diversion Channel" to divert disturbed areas to SK-4 throughout all phases of construction.
2. Sheet C-6.3 Comment: During the placement of fill in low area oa NW side of Basin SK-4, a
temporary diversion berm shall be installed upstream of the proposed fill slope to direct upland areas
to Basin SK.-3. Once fill slope is installed, the diversion berm can be installed along top of the fill
slope as shown on this sheet.
3. Where emergency spillways for basins are shown on fill, the rip -rap for the spillways shall be
extended to the toe of the embankment.
4. The four (4) weir openings on the riser structure for Basin SK-4 shall be temporarily blocked up to
Elev. 653.4' while basin is being used for erosion control purposes.
_. 5. Basin SK-1 is showing a 36" CMP riser and 18" RCP barrel pipe. A watertight connection must be
provided between the riser and barrel pipe. It is recommended that the riser and barrel pipe be
constructed out of the same materials (e.g. both CMP or RCP).
6. Adequately sized slope drains shall be provided to convey runoff down fill slopes throughout site.
Diversion berms shall be provided along top of the fill slopes to direct runoff into slope drains.
7. The diversion berm to SK-I shall be extended Eastward to contain the disturbed areas located below
Lots 10 & 11.
Fact Sheet on the New NCGO1 Permit
April2019
The NC Construction General Permit (also known as "NCGO1") was renewed on April 1, 2019. The updated permit
does not significantly change the measures that are required to. be impleme rated on construction sites. However,
there are some organizational and technical updates to the permit as descri bed below. Most notably, there is a new
process in which construction. sites will obtain official coverage under an NCGOI permit through an electronic
process. DEMLR worked with a broad team of stakeholders to make all of these updates. -if you have questions,
contact Annette Lucas at Annette. luca_s_ ncdenr.goy or (919) 707-3639.
organizational Updates
Acronyms to Know
The new permit:
COC: Certificate of Coverage, proof of coverage under an NCGO1 permit
s Repeats state requirements for E&SC
DEMLR: NC Division of Energy, Mineral, and Land Resources
Plans and organizes them with federal
E&SC: Erosion & Sedimentation Contra
construction activity requirements;
a-NOI: Notice of Intent, application form for the NCG01 permit
-NOT: Notice of Termination, form for closing out the NCGO1 permit
9 Is clearly organized by topic; and
a
SWPPP: Stormwater Pollution Prevention Plan, required by the NCGO1
• Has less text and more tables.
Technical Updates
The new permit:
s Requires that the E&SC Plan meet
SWPPP requirements (p. 2);
s Provides a list of items that must be
included in the SWPPP, such as the
construction sequence, plans,
calculations, etc. (p. 2-4);'
9 Has updated language on bypasses and
upsets that is tailored to construction
activities (p. 10);
e Puts all timeframes for inspections,
The NCGO1 Process
record -keeping and reporting in
The new NCGO1 applies to permits approved on or after April 1, 2019.
"calendar days" for clarity and
consistency (p. 11-14);2
Permittees will no longer receive a copy of the NCGO1 permit in the mail
® Changes the inspection frequency
with their E&SC Plan approvals and be considered as covered under the
(during business hours) to at least
permit. Federal rules require thaatIDEN7LR receive an NOI on each
once per 7 calendar days and after
construction project and issue each construction project its own COC.
every storm > 1.0 inch (previously 0.5
inch);' and _
Under the new NCGO1 process, construction sites will continue to
a Excludes weekends, state and federal
receive approval for E&SC Plansfrom either DEMLR' or the delegated
holidays from normal business hours
local E&SC program just like before. After receiving E&SC Plan approval,
unless construction activities take
permittees will officially obtain coverage under the NCGO1 by
place (p. 23).
completing an e-NOI (available at dell. nc.gov/NCGO1). The e-NOI will
only take about 20 minutes tofiii out: and submit on-line.
This list is based on website guidance
there will be no charge associated with applying for an NCGO1
by the DEMLR Sediment Program,
Initially,
permit but on or around June1., 2019, DEMLR will begin charging a $100
a The number of calendar days was
annual general permit fee as required per §143-215.3D,
selected to be as equivalent as.
possible with the previous permit.
DEMLR is working on creatingasingle application form that will allow an
3 The intent is to provide predictability
applicant to simultaneously applyforan E&SC permit and an NCGO1
to the inspection schedule.
COC. That effort is part of a iargerPermit Transformation project at
DEMLR.