HomeMy WebLinkAbout20061327 Ver 3_CAMA Permit Application_201306060 U v3
N A NCDEENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory Braxton C. Davis John E. Skvarla, III
Governor Director Secretary
June 5, 2013
MEMORANDUM:
TO: Karen Higgins
401 Oversight
DWQ - Surface Water Protection
FROM: Doug Huggett, NC DENR -DCM Major Permits Co
400 Commerce Ave., Morehead City, NC 28557 (Courier 11- 12 -09)
SUBJECT: CAMA Major Permit Application Review
Applicant: REDUS NC Land, LLC / Watermark Landing Marina
Project Location: 8400 River Rd., adjacent to the Cape Fear River in Wilmington, NH County
Proposed Project: to construct a community marina & timber access bridge for a 48 -lot subdivision
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Doua Hu_aaett at the address above by June 28, 2013. If you have any
questions regarding the proposed project, contact Robb Mairs at (910) 796 -7215, when
appropriate, in -depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
SIGNED
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
DATE
127 Cardinal Drive Ext., Wilmington, NC 28405
Phone: 910 -796 -7215 \ FAX: 910- 395 -3964 Internet: www.nccoastalmanaaement.net
An Equal Opportunity \ Affirmative Action Employer
61 '
ar ;, .
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
APPLICANT'S NAME: REDUS NC Land, LLC Watermark Landing c/o Ross Painter
2. LOCATION OF PROJECT SITE: Located at 8400 River Road, adjacent to the Cape Fear River, in New
Hanover County.
Photo Index - 2006: 14 -6644: I, 8 -9 2000: 14 -137: P -Q, 16 -17 1995:14-140: P -Q, 4 -5
State Plane Coordinates - X: 2326508 Y: 119580 Rover File — 0- 052813A
Lat:34 °04'25.23359 "N Long: 77 °55'18.90568 "W
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 05/28/2013
Applicant Present — No
5. PROCESSING PROCEDURE: Application Received Complete — 05/10/2013
Office — Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Wilmington/New Hanover County
Land Classification From LUP — Conservation, Limited Transition
(B) AEC(s) Involved: PT, EW, CW
(C) Water Dependent: Yes
(D) Intended Use: Private/Residential
(E) Wastewater Treatment: Existing — Municipal
Planned — N/A
(F) Type of Structures: Existing — Retaining walls, rough grading and some sub - surface utilities
Planned — Community marina and timber access bridge
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION:
(A) Vegetated Wetlands — "404" and Coastal
3,628 sq. ft.
(shaded)
(B) Non - Vegetated Wetlands — Open Water
8,048 sq. ft.
(incorporated)
(C) Other — High Ground
T
900 sq. ft.
(D) Total Area Disturbed: 12,576 sq. ft. (0.288 acres)
(E) Primary Nursery Area: Yes
(F) Water Classification: SC Open: Closed
8. PROJECT SUMMARY: The applicant proposes to construct a community marina into the Cape Fear
River and a timber access bridge to accommodate a 48 -Lot residential subdivision.
REDUS NC Land, LLC Watermark Landing
Page Two
9. PROJECT DESCRIPTION:
The project site is located at 8400 River Road, adjacent to the Cape Fear River, in New Hanover County. To
locate the property of interest from the Wilmington Regional Office (WiRO) travel south approximately 9.0
miles on College Road South. Turn right (west) onto Sanders Road and continue traveling west approximately
0.9 miles until the road terminates at River Road. Turn left onto River Road and travel south approximately 3.5
miles until you reach the property of interest which will be located on the right, located directly across from
The Cape Subdivision.
The entire property is approximately 32.94 acres in size, however, only approximately 10.0 acres is
highground. There is approximately 1,904 linear feet of shoreline along the Cape Fear River. Roughly two -
thirds of the site is comprised of both Section "404" and Coastal Wetlands. High ground vegetation at the site
consists of Live Oak, Laurel Oak, Magnolia, Pine, Maple, Cedar and Sweet Gum. Understory vegetation
consists of Red Cedar, Wax Myrtle and Marsh Elder (Baccharis). The upland portions of the property are
bordered by either "404" or Coastal Wetlands, which include: Smooth Cordgrass (Spartina alterniora), Black
Needle Rush (Juncos roemarianus), Salt Meadow Grass (Spartina patens), Giant Cordgrass fSpartina
cynosuroides) and Narrow Leaf Cat -tails (Typha sp.).
The previous property owner (Watermark New Hanover, LP) obtained State Permit No. 64 -08 on June 30,
2008 through the Express Permit Program, which authorized the development of a 48 -Lot residential
subdivision including infrastructure, amenities, utilities, elevated boardwalks, retaining wall and a kayak
launching facility into a canal located on the southern end of the project site. The previous authorization
included the filling of approximately 8,276 sq. ft. of Section "404" wetlands for the construction of the road
crossing and associated culverts. The U.S. Army Corp of Engineers ( USACE), on 02/28/2007, approved this
fill activity under Nationwide Permit 14 (Action ID #2001 -1253 -065). In addition to the Nationwide Permit 14,
the previous property owner obtained CAMA Minor Permit No. 07 -063 through the New Hanover County
Inspections Department, which was issued on 10/03/2007. This permit authorized the construction of a timber
access bridge, measuring approximately 134 feet in length by 26 feet in width, which crosses both Section
"404" and Coastal Wetlands. Detailed drawings and descriptions of the proposed bridge were included in the
application for State Permit No. 64 -08 as well. The approved vehicular bridge, once constructed, would
provide access to the far western peninsula along the Cape Fear River.
To date, the site is currently undeveloped, with the exception of some of the authorized retaining walls, rough
grading and some sub - surface utilities. State Permit No. 64 -08 was recently transferred on February 22, 2013
to the applicant ( REDUS NC Land, LLC) and is due to expire on December 31, 2016, which was subject to
extension by Session Law 2009 -406, and as amended by Session Law 2010 -177, the Permit Extension Act
(See Sheets 1 and 2 of 7 and Project Narrative).
The previous property owner submitted an Essential Fish Habitat Assessment (EFH), Submerged Aquatic
Vegetation (SAV), Shellfish and hydrographic surveys to be included in an Environmental Assessment to
satisfy the State Environmental Policy Act (SEPA) process in October of 2011 for a community marina;
however, it appears at the time the previous owner did not complete the SEPA process and did not receive a
Finding of No Significant Impact (FONSI) (See EFH and SAV and Shellfish Surveys).
It should be noted that the acting agents for this application held a scoping meeting at the WiRO on November
5, 2012 and at the USACE Wilmington District Office to discuss this proposal with the interested review
agencies.
The Wilmington -New Hanover County 2006 Land Use Update Plan classifies the area as Conservation. The
waters of the Cape Fear River are classified SC, by the Division of Water Quality. The area IS designated as a
Primary Nursery Area (PNA), by the Division of Marine Fisheries and is CLOSED to the harvest of shellfish.
REDUS NC Land, LLC Watermark Landing
Page Three
PROPOSED PROJECT:
The applicant proposes to construct a community marina into the Cape Fear River and a timber access bridge
to accommodate a 48 -Lot residential subdivision. The application does not include modifications to the
authorized upland development, elevated boardwalk and the kayak launching facility under State Permit No.
64 -08, aforementioned. The applicant proposes to modify State Permit No. 64 -08 to allow for an open water
marina and a timber bridge for vehicular use, which would serve the previously authorized upland
development. The marina would be located along the central portion of the project site at the location of an
authorized elevated boardwalk and platform. An access pier would extend from this location towards the west
into the Cape Fear River, measuring approximately 60 feet in length by 6 feet in width. An access ramp would
then lead from the access pier onto a main floating dock, measuring approximately 213 feet in length by 8 feet
in width, which would run parallel to the shoreline. As proposed, handrails would be placed on the landward
side of the main floating dock to prevent possible dockage (See Sheets 4 and 5 of 7).
Two (2) floating dock spines would extend waterward from this main floating dock, each measuring
approximately 176 feet in length by 8 feet in width, which would run perpendicular to the shoreline and
channel of the river. As proposed, 24 floating finger piers, each measuring approximately 35 feet in length by
3 feet in width would extend from these dock spines, six (6) on each side. The finger piers would be spaced
approximately 25 feet apart with two (2) tie pilings between each finger pier. These slips would accommodate
approximately 48 designated vessels averaging 35 feet in length. The application states that a pump -out
facility would be located on the waterward end of the northern floating dock spine (See Sheets 4 and 5 of 7).
The application states the open water marina would be located within water depths ranging from approximately
-4.14 feet to 4.25 feet at mean low water (MLW) based on NGVD29 Datum. It should be noted that the
proposed marina would be located east of the Cape Fear River shipping channel and would be subject to
frequent wave wash from passing vessels. The application also states that the applicant is currently in the
process of submitting an application for a Special Use Permit through the New Hanover County Planning and
Inspections Department for the community marina (See Sheets 2 through 7 of 7 and Project Narrative).
The application also proposes to construct the timber bridge, which was originally authorized to the previous
owner under a CAMA Minor Permit through New Hanover County, aforementioned. As stated, the bridge
would provide vehicular access to the peninsula on the western end of the project site at the proposed location
of the community marina. The bridge would span over an area of Coastal and Section "404" wetlands,
measuring approximately 134 feet in length by 26 feet in width and elevated approximately 3 feet above the
marsh substrate (See Sheets S1 through S4 and Project Narrative).
10. ANTICIPATED IlVIPACTS:
The proposed marina docking system would incorporate approximately 8,048 sq. ft. of Estuarine Waters and
Public Trust Areas. Approximately 3,628 sq. ft. Smooth Cordgrass and Black Needle Rush would be impacted
due to shading as a result of the construction of the timber bridge for vehicular access. The timber bridge
would also impact approximately 900 sq. ft. of highground. The structures would not encroach into the
adjacent 15 feet riparian corridor setback requirement. The proposed open water marina would extend
approximately 256 feet into a waterbody measuring approximately 5,291 feet across. The proposed structures
would not exceed the 1/4 distance and would not encroach into the USACE navigation channel setback. The
application states the open water marina would be located within water depths ranging from approximately -
4.14 feet to -4.25 feet at MLW based on NGVD29 Datum. Minor turbidity increases may be expected during
the construction process. Due to the proximity of the Cape Fear River shipping channel, boats utilizing the
docking facility will be subject to frequent wave wash from passing vessels.
Submitted by: Robb L. Mairs Date: June 3, 2013 Office: Wilmington
CAMA Major Narrative
Watermark Landing Marina
June 3, 2013
The Watermark Landing Marina is proposed as an amenity in support of
the previously approved upland residential development comprised of 48
single family lots. CAMA permits issued for these upland improvements
include a CAMA Minor Permit for a Vehicular bridge, #07 -063, issued
10/3/07, with an expiration date of 12/30/14 *, and a CAMA Major Permit
for the upland development,, #64-008, issued on 02/22/13 with an expiration
date of 12/31/16. It should be noted that the CAMA Minor Permit for the
vehicular bridge is resubmitted within this permit submittal to consolidate
the permits into one name. The vehicular bridge design remains the same.
These respective permits provide access to the proposed marina location.
( *Expiration dates comply with the HB permit extension act.)
During the previous design phase for this marina a SEPA document was
required. Thus several required site reconnaissance efforts have been
conducted including the following:
- Hydrographic Survey
- EFH Assessment
- SAV Survey
- Shellfish Survey
- Coastal Marsh Survey
- 404 Wetlands Survey
All of the above documents have been provided with the CAMA Major
permit modification to enable a comprehensive project understanding.
The community marina is located over open water and no dredging will be
required. An elevated fixed boardwalk will extend to a floating dock area.
No Coastal marsh or 404 wetland impacts will occur.
The marina area is in compliance with the SF public trust waters occupy
limitations. A fish cleaning station will be provided at one location on the 8'
wide dock approach area. Water supply and electricity will be provided to
each boat slip. A pump out station will be provided at the north pier
terminus. RECEIVED
DCM WILMINGTON, NC
jUN 0 3 2013
The Cape Fear River is classified SC at this location and are further
classified as a Secondary Nursery area. The PNA boundary is 1000 feet
north of the proposed marina. Stormwater and Erosion Control permits will
not be required for the marina.
A Special Use Permit will be required by New Hanover County and the
applicant is in the process of pursing. Communication with the county
suggests this effort could take 2 — 3 months.
A regulatory interagency scoping meeting was held on Nov. 5, 2012. A
copy of the meeting attendees is attached. Lastly a regulatory scoping
meeting was held with the USACE on Dec. 13, 2012 as they were unable
to attend the regulatory interagency scoping meeting.
IBM MP-1
APPLICATION for
Major Development Permit
(last revised 12127106)
North Carolina DIVISION OF COASTAL MANAGEMENT
- - -------- -
Business Name
REDUS NC Land LLC
Project Name (it applicable)
Watermark Landing
Applicant 1: First Name
Ross
MI
Last Name
Painter
Applicant 2: First Name
Ml
Last Name
H additional applicants, please attach an addNonalpage(s) with names fisted.
Mailing Address
301 South College St
PO Box
I
city
I Charlotte
State
NC
ZIP
28202
Country
us
Phone No.
704 - 716-2041 ext.
FAX No.
Street Address (if different from above)
city
State
ZIP
Email
Ross.L.Painter@welisfargo.com
<Form continues on backs R-ECEIVED
DCM WILMINGTON, NC
MAY i 0 26H
252-808.2808 :* 1.888-4RCOAST -I www.nccoastalmanagernant.net
'Business Name
Mcklm & Creed, Inc.
Agent/ Contractor 1: First Name
Margaret
MI
A.
Last Name
Gray
Agent/ Contractor 2: First Name
Ml
Last Name
Mailing Address
243 North Front St.
PO Box
City
Wilmington
state
NC
ZIP
28401
Phone No. I
910 - 343 -1048 exi. 244
Phone No. 2
ext.
FAX No.
910 261 8282
Contractor If
Street Address (it different from above)
city
State
ZIP
Email
<Form continues on backs R-ECEIVED
DCM WILMINGTON, NC
MAY i 0 26H
252-808.2808 :* 1.888-4RCOAST -I www.nccoastalmanagernant.net
Form DCM MP -1 (Page 2 of 4)
APPLICATION for
Major Development Permit
=: R1oJec_f Loc�tfen =_= _ _- _- -_ -- -- - - -_:: _ :_ -.: _ - -,_; , _ = -:;_ - __ -• -- - -_ - - _ - - _ - -- -___ - ___ _ - -- - -- -
Ceunly (can be multiple)
Street Address
State Rd. #
New Hanover
8400 River Road
1100
Subdivision Name
City
stale
Zip
Watermark Landing
Wilmington
NC
-
Phone No.
Lot No.(s) (if many, attach additional page with list)
- - ext.
1-48, , ,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Cape Fear
Cape Fear
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Cape Fear
e. is proposed work within city limits or planning jurisdiction?
f. if applicable, list the planning jurisdiction or city limit the proposed
Was ❑No
work fails within.
New Hanover County
-
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
1,600
1,434,736
c. Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
6,500 SF average,
NWL (normal water level)
(if many lot sfzes, please attach addittonal page with a list)
5' ®NHW or ❑NW L
e. Vegetation on tract
Undisturbed upland and wetland areas with mature trees and understory
f. Man -made features and uses now on tract
Retaining walls, rough grading, and some sub - surface utilities
g. Identify and describe the existing land uses adjacent to the proposed project site.
Residential
h. How does local government zone the tract?
f. is the proposed project consistent with the applicable zoning?
R -15
(Attach zoning compliance certificate, ti applicable)
®Yes []No ❑NA
J. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ONO
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. Wes ❑No DNA
if yes, by whom? Dawn Reid, Archaeological
Consultants of the Carolinas, Inc.
I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA
National Register listed or eligible properly?
<Form continues on next page> RECEIVED
GM �fli!! nil N i ON, NC
282- 808.2808 :: 1.888.4RCOAST :: www.nccoastalmanagemMWnit 0 2013
Form DCM MP -1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. () Are there wetlands on the she? ®Yes []No
(n) Are there coastal wetlands on the site? ®Yes []No
(ii) If yes to either () or (o) above, has a delineation been conducted? Was ❑No
(Attach documentation, it available)
n. Describe existing wastewater treatment facilities.
Cape Fear Public Utility Authority
o. Describe existing drinking water supply source.
The Cape Master System
p. Describe existing storm water management or treatment systems.
None
<Form continues on back> RECEIVED
XM VVP..lN1Fv1 (':, 3"ON. NO
252.808.2808 :: 1.888.4RCOAST :: www.nccoastatmanapemevootn a 2013
a. Will the project be for commercial, public, or private use?
❑Commercial ❑Pubiic/Government
®Private /Community
b. Give a brief description of purpose, use, and dairy operations of the project when compiete.
A SF development comprised of 48 SF lots with access to a 48 slip open water marina
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where It Is to be stored.
Road graders, dump trucks, and back -hoes
d. List all development activities you propose.
The previously approved CAMA Major improvements within permit 64 -08.
e. Are the proposed activities maintenance of an existing project, now work, or both?
Previously approved work
f. What is the approximate total disturbed land area resulting from the proposed project?
9.69 ❑Sq.R or ®Acres
g. Will the proposed project encroach on any public easement, public accessway or other area
[]Yes SNo ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the slate.
None, all stormwater run -off will be treated via infiltration systems
1. Will wastewater or stormwater be discharged into a wetland?
❑Yea SNo ❑NA
If yes, will this discharged water be of the same salinity as the receiving water?
❑Yes ❑No SNA
J. Is there any mitigation proposed?
❑Yes SNo ❑NA
If yes, attach a mitigation proposal.
<Form continues on back> RECEIVED
XM VVP..lN1Fv1 (':, 3"ON. NO
252.808.2808 :: 1.888.4RCOAST :: www.nccoastatmanapemevootn a 2013
Form DCM MP -1 (Page 4 of 4)
APPLICATION for
Major Development Permit
in ado!ilivn to tilts completed /rcpt on lord _(MP-1J _k fdllotvLl�)ter» tae /d►t; it pliC$Hld{7nds( be rbinifted Iri oidei fog Iha application = _
package`fo bs aEVirplete_ilems_(a) ( /j!9. "L4Y8 ePlk►iC8k19 f4.A8Y fi►ajr aisvAloA1R$R(�l?P1JCatioA please coasvltltie ePp/roatlorr - -:::_-
- — - - - --
-i nstructionbaotrletar�howtls pmpetlyprepareihetes (u1�13ditemsbeloix_- -__, -_,":--=-== '•_ °--- ----- •----------- - - - - -- _ __._ - - --
a. A project Rama ►IY @. - - - - -
b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly Indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other Instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
-- -- -
= Name•Eug@ne &Sa[ab FRSlet: = _- - -___: - -_ - - - -r -•- -- - - - -= = - _ _ =- __ =___
-= Phone No:= =_- = -- " = -'- -
_Raldress:114 VaUeyrood_l;iicie_
:= Smfthfiefd; NIT- 27577=- =_ =_ =_
Name Hatcher Family Ltd Partnership Phone No.
PO Box 98209
Raleigh, NC 27624
Address
- - -- - - _
- - - -- - - -- - -- - -- -- -- = - - -= - - - - - -- - -- — - - - -- -
Address= ::-= :_:__�__._____ -,-_ ---• -
- -- -- •--- ----- - - - - -- • -•- - -- -- -- - - -- _ - - -- - -- - ---- -- -- - - - --
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permiltee, and issuing dales.
See attached permit entitlement spread sheet
h. Signed consultant or agent authorization form, it applicable.
I. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by properly owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S.113A 1 -10), If necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
- .- tars daffona nd-
1 understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained In the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date yjol(3 Print Name 'Z-S-5 j- q"tklL
EIV �=-D
Signature NC
Please indicate application attachments pertaining to your proposed project. M k- \y 1 a 20113
❑DCM MP -2 Excavation and Fill Information ODCM MP -5 Bridges and Culverts
ODCM MP -3 Upland Development
®DCM MP -4 Structures Information
252 - 808.2808 :: 1.888.4RCOAST t: www.rticcoastalmanagement.net
Form eeMMF-5
BRIDGES and CULVERTS
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. BRIDGES 13 This section not applicable
a Is the proposed bridge: b. Water body to be crossed by bridge:
❑Commercial ❑Public/Govemment ®Private /Community Un -named tributary to Cape Fear River
c. Type of bridge (construction material):
Wood
e. (i) Will proposed bridge replace an existing bridge? ❑Yes ®No
If yes,
(ii) Length of existing bridge:
(iii) Width of existing bridge:
(iv) Navigation clearance underneath existing bridge -
(v) Will all, or a part of, the existing bridge be removed?
(Explain)
9 Length of proposed bridge- 136
1. Will the proposed bridge affect existing water flow? ❑Yes ®No
If yes, explain- Channel elevation is at T and bridge deck
elevation is at 9.
d. Water depth at the proposed crossing at NLW or NWL:
2'
f. (i) Will proposed bridge replace an existing culvert? ❑Yes ®No
If yes,
(IQ Length of existing culvert:
(iii) Width of existing culvert:
(iv) Height of the top of the existing culvert above the NHW or
NWL.
(v) Will all, or a part of, the existing culvert be removedl
(Explain)
h. Width of proposed bridge: 26'
j. Will the proposed bridge affect navigation by reducing or
increasing the existing navigable opening? []Yes ®No
If yes, explain:
k. Navigation clearance underneath proposed bridge: 4 I. Have you contacted the U.S. Coast Guard concerning their
approval? []Yes ®No
If yes, explain:
m. Will the proposed bridge cross wetlands containing no navigable n. Height of proposed bridge above wetlands: 4'
waters? ❑Yes ®No
If yes, explain:
2. CULVERTS ®This section not applicable
a. Number of culverts proposed: b. Water body in which the culvert is to be placed:
RECEIVED
0CM WILMINGTON, NC
c Form continues on back),, JUN 0 4 201 3
252.808 -2808 :: 1- 888 -4RCOAST :: www.nccoastaimanagament.net revised: 10/26106
Form DCM MP -5 (Bridges and Culverts, Page 2 of 4)
c. Type of culvert (construction material):
d (i) Will proposed culvert replace an existing bridge?
❑Yes ❑No
If yes,
(ii) Length of existing bridge:
(ii) Width of existing bridge
(iv) Navigation clearance underneath existing bridge:
(v) Will all, or a part of, the existing bridge be removed?
(Explain)
f. Length of proposed culvert:
h. Height of the top of the proposed culvert above the NHW or NWL
J. Will the proposed culvert affect navigation by reducing or
increasing the existing navigable opening? ❑Yes ❑No
If yes, explain:
e. (i) Will proposed culvert replace an existing culvert?
❑Yes ❑No
If yes,
(h) Length of existing culvert(s):
(iii) Width of existing culvert(s).
(iv) Height of the top of the existing culvert above the NHW or
NWL,
(v) Will all, or a part of, the existing culvert be removed?
(Explain)
9• Width of proposed culvert:
I. Depth of culvert to be buried below existing bottom contour.
k. Will the proposed culvert affect existing water flow?
If yes, explain:
❑Yes ONO
3. EXCAVATION and FILL ❑This slw9wi not apprrcabfe
a. (i) Will the placement of the proposed bridge or culvert require any
excavation below the NHW or NWL? ❑Yes ®No
If yes,
(a) Avg. length of area to be excavated:
(M) Avg. width of area to be excavated:
(iv) Avg. depth of area to be excavated:
(v) Amount of material to be excavated in cubic yards:
c 0) Will the placement of the proposed bridge or culvert require any
high - ground excavation? ❑Yes ®No
If yes,
(i) Avg. length of area to be excavated:
(a) Avg. width of area to be excavated:
(iv) Avg. depth of area to be excavated:
(v) Amount of material to be excavated in cubic yards:
b. () Will the placement of the proposed bridge or culvert require any
excavation within coastal wetlands/marsh (CW), submerged
aquatic vegetation (SAV), shell bottom (SB), or other wetlands
(WL)? If any boxes are checked, provide the number of square
feet affected.
❑CW ❑SAV ❑SS
OWL ®None
(d) Describe the purpose of the excavation In these areas.
252 -808 -2808 c 1- 888.4RCOAST :: www.nccoastalmana4ement.net revised: 10/26/06
Form DCM MP -5 (Bridges and Culverts, Page 3 of 4)
d. If the placement of the bridge or culvert involves any excavation, please complete the following.
(i) Location of the spoil disposal area
(h) Dimensions of the spoil disposal area.
(iii) Do you claim title to the disposal area? ❑Yes []No (N no, attach a leftergrantmg permission from the owner)
(iv) Will the disposal area be available for future maintenance? []Yes []No
(v) Does the disposal area include any coastal wetlandstmarsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell
bottom (SB)?
❑CW ❑SAV OWL ❑S8 ❑None
If any boxes are checked, give dimensions N different from (i) above.
(vi) Does the disposal area include any area below the NHW or NWL? ? ❑Yes ❑No
If yes, give dimensions H different from (ii) above.
e. (i) Will the placement of the proposed bridge or culvert result in any
fill (other than excavated material described in Item d above) to
be placed below NHW or NWL? ❑Yes ®No
If yes,
(ii) Avg. length of area to be filled.
(iii) Avg. width of area to be filled:
(iv) Purpose of fill:
(i) Will the placement of the proposed bridge or culvert result in any
fill (other than excavated material described in Item d above) to
be placed on high - ground? Oyes ®No
If yes,
(ii) Avg. length of area to be filled:
(iii) Avg. width of area to be filled:
(iv) Purpose of fill:
4. GENERAL
a. Will the proposed project require the relocation of any existing
utility lines? ❑Yes ®No
If yes, explain:
If this portion of the proposed project has already received
approval from local authorities, please attach a copy of the
approval or certification,
(i) Will the placement of the proposed bridge or culvert result in any
fill (other than excavated material described in Item d above) to
be placed within coastal wetlands/marsh (CW), submerged
aquatic vegetation (SAV), shell bottom (SB), or other wetlands
(WL)? If any boxes are checked, provide the number of square
feet afrected.
[]CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of the excavation in these areas:
b Will the proposed project require the construction of an temporary
detour structures? an ®No
If yes, explain:
e Form continues on back;,,
RECEIVED
DCM V'!U'�,II N:a i ,:)N, NC
JUN 0 4 2013
252- 808.2808 :: 1- 888 -4RCOAST :: wwwmcconstafmana ement.net revised: 10/26106
Form DCM MP -5 (Bridges and Culverts, Page 4 of 4)
c. Will the proposed project require any work channels?
❑Yes ®No
If yes, complete Form DCM -MP -2
e. What We of construction equipment will be used (for example,
dragline, backhoe, or hydraulic dredge)?
Backhoe
g. Will the placement of the proposed bridge or culvert require any
shoreline stabilization? ❑Yes ®No
1f yes, complete form MP -2. Section 3 for Shoreline
Stabilization only.
June 4, 2413
Date-
Watertnerk Landing
Project Name — — --
Margaret Gray /Agent
ADDIi�aittName� ;�
A00CI �
d. How win excavated or fill material be kept on site and erosion
controlled?
Sift fence
f. Will wetlands be crossed in transporting equipment to project site?
Oyes []No
If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
All equipment will work from wooden mats
252 -808 -2808 :: 1.888.4RCOAST :: www.nccoastaimanagement.net revised: 10/26/06
Form DCM MP -4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental Information.
,-ii-DOCKING FACIL /TYlAfARIN,9'CHARAC7RRISTICS` -=
a. 0) Is the docking facnnyhnadna:— b. (p Win the facility be open to the general public?
OCommercial OPubndGovemment OPrivate/Communny []Yes ®No
c. 0) Dock(s) and/or pler(s)
(u) Number a
(M Length
(iv) Width
(w) Floating ®Yes ONo
e. (l) Are Plallorms Included? Was ONo
It yes:
(g) Number I
(11i) Length =
((v) Width
(v) Floating Was []No
Note: Roofed areas are calculated from dr*fto drmensbu
g. (I) Number of slips proposed
48
(ii) Number of sups exialng
0
1. Check the proposed typo of ailing:
❑ Land cut and access channel
❑Open water; dredging for basin and/or charmel
®Open water; no dredging required
[]Other, please describe:
k. Typical boat length: 35
m. p) Win the facility have Be plloas?
®Yes ONo
pi) It yes number of Oe pilings?
9$
d. (1) Are Finger Piers Included? Was ONO
u yes:
pq Number �¢
(Ili) Length
(Iv) Width
(v) Floating Was ONO
1. (1) Are Boalluts included? ❑Yes ONo
9 yes:
(g) Number
(Ili) Length
Qv) Width
h. Check all the types of services to be provided.
❑ Full service, including travel lift andlor rail, repair or
maintenance service
O Dockage, fuel, and marine supplies
® Dockage (twat amps') only, number of slips: 4ft
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
j. Describe the typicat boats to be send (e.g., open runabout,
charter boats, sal boats, mbusd types).
open nmabout
I. (q Wig the fac#gy be open to the ganaml mMIO
DYes ®No 917' F 9 a,/ F r)
OCM WN
IIJ�I , 1 2013
282.808.2808 :: 4- 688 .4ACOAWr :: WW W ricconstalmenanement net revised; 12/27106
Form DCM MP-4 (Structures, Page 2 of 4)
2,_ DOCKING FACILITY /MARINA_ :OPERATIONS ' _ - : = , :Q_Thrs secuorr:aot app�ca6le.
a. Check each of the fallowing sanitary facilities that will be included in the proposed project.
D Office Toilets
D Toilets for patrons; Number: : Location:
D Showers
® Boathold'mg tank pumpoul; Give type and location: Single location 1.5 Hp Keco dockside suctlon/discharge pump located at
northern pier terminus
b. Descn'be treatment type and disposal location for all sanitary wastewater.
Discharge to public sewer system
a. Describe the disposal of solid waste, fish offal and trash.
Private collection service
d. How will overboard discharge of sewage from boats be controlled?
Posted signs
e. 0) Give the location and number of 'No Sewage Discharge signs proposed.
One at the south pier terminus
tli) Give the loceDOn and number of'Pumpout Available' signs proposed.
One at the north pier terminus
I. Describe the special design, 8 applicable, for containing Industrial type pollutants, such as paint, sandblasting waste and petroleum products.
NA
g. Where will residue from vessel maintenance be disposed of?
NA
h. Clive the number of channel markers and *No Wake signs proposed. None
i. Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality.
None proposed
J. What will be the marina policy on overnight and five-aboard dockage?
Prohibited
k. Describe design measures that promote boat basin flushing?
Open water marina
I. If this project is an expansion of an existing marine, what types of services are currently provided?
No
282 -8011-2808 :s 1.888.4RCOAST :s ww%riccoastalmananement.net revised: 12127/06
Form DCM MP-4 (Stnicitires, Page 3 of 4)
m. Is the marinaidocking faclilly proposed within a primary orsecondary nursery area?
Oyes ❑NO
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes Wo
o. Is the marine/docking facility proposed within or a(gaceni to coastal wellandaftersh (CW), submerged aquatic vegetation (SAV), shell bottom
(138), or other wetlands (WQ? If any boxes are checked, provide the number of square loot affected.
MCW N= ❑SAV - ❑SB
OWIL None []None
p. Is the proposed madnefdocking facility located within or wthin close proximity to any shellfish leases? Mee ONO
If yes, give the name and address of the leaseholdeF(s), and give the proximity to the lease.
a. (I) Is the boathouse struclure(e):
❑Ccounercial ❑PuWic/GOVeFnrnent [313rivals/Communily
(I) Number
(III) Length
(iv) Width
Note Roofed areas am cakulated from *4*ne dVmwslm
M �20- Eircpip orF
(I) Number
(iI) Length
(111) Width
BREAKWATER
a. Length b. Average distance from NHW, NWL, or wetlands
e Maximum distance beyond NHW, NWL or wetlands
'77= -Z '2�
a. ls the slructure(qx b. Number
Mommerclaf ❑IPubfid0overnment ❑PrIvale/Communfly
C. Distance to be placed beyond shoreline d. Description of buoy (oolor, Inscription, size, anchor. etc.)
We. Ms should be measured from marsh a*% 11P=wL
e. Arc of the swing
5'
2910,
7
1 C
252-608-21108 .-:11-898-4RCOAST:- www.necometalmanNemenignat revised: 12117108
ti
Form DCM MP-4 (Structures, Page 4 of 4)
S. Proximity of struclure(s) to adjacent riparlen properly lines
64V
Note., For buoy or mooring pift, use am of swing inickft length
ol'vessel.
c. Width of water body
52212
9. (1) Will navigational aids be required as a result of the project?
(]Yes ONo EINA
01) 11 yes, explain whal type and how they will be Implemented.
b. Proximity of struclufe(s) to adjacent docking laciffles.
None
d. Water depth at walefflard end of structure at NLW or NWL
AA:
K16THER
a. Give complete description.
The proposed open water marina Is a modification to CAMA permit 64-08. All remaining site Improvements allowed within that
permit remain unchanged.
, 9
-A
.p
ZO
252-908.2808.-.- I.888.4RCOABT -- www.nacoastallpanagement-Bet revised- 12127108
Watermark Landing
Permit Extensions Table
31 -Dec -2011 March 21, 2011
Calculated Confirmed Permit Individual Providing
Permit Approval Expiration Days Remaining at Revised Permit Extpminn Harp rr..r;... ,. .
The response from NCDOT appears to disregard the information and intent of the HB permit extension act.
*** The original state water permit (ATC) was for two years and was extended for an additional 2 years in Oct 2009. PWS interpretation is that
three additional years are added to this automatically by the HB.
RECEIVED
DCM WILMINGTON, NC
MAY 1 0 1013
F-91
LAA
ill,PQ-O J-
ljw M�I- 0
" 17
Jo
Li
lk
1 0 AL Ilk
Alf
Ilk
Ilk
OF
)6L-
%
ci
MOPM
UP-16
.0
-,I
q-,
LL
S:16016 \0003\80- Drawings \E2_6016- 0002.dwg, 4/18/2013 11:17:23 AM, mgray
I
I
I
I
Ni I
I
f
I �•
II �• � % \S'%, k4 \ _ NA��C �r?'r -" oi�C7 .an• •-p. •!•.
� � �� a�4C� ` \ y \ 'RCS -CY� • � G
Arc
II.iI �\ �' \ A}� � ion *�" \ s— ^ � - y� \ �'\ • a•
n'
J f � . . �' *` ' �� • � 1 ' � �\,� \ is • '
I� J ,<� •`�• 'ran � •1• \ .� •
II cn=_,
cv
cm
I •1 T
I 7 9 \ A
Cl
0
py-
Qr 031
1 /
/I
m
m o%
Syr I
Z Q
i � 434
I
n oz�
\
g'o
m�� r
N
O�
N
I
N
I
I
I
N
�
`I
I
I
O
I
�
:2
05.
3U3
c
x
m
p r
0
om
no
N
Z�r
D
r
ten-
c r
rnZ
�r
Rr,
Vn
i.li
I �•
II �• � % \S'%, k4 \ _ NA��C �r?'r -" oi�C7 .an• •-p. •!•.
� � �� a�4C� ` \ y \ 'RCS -CY� • � G
Arc
II.iI �\ �' \ A}� � ion *�" \ s— ^ � - y� \ �'\ • a•
n'
J f � . . �' *` ' �� • � 1 ' � �\,� \ is • '
I� J ,<� •`�• 'ran � •1• \ .� •
II cn=_,
cv
cm
I •1 T
I 7 9 \ A
Cl
0
py-
Qr 031
1 /
/I
m
m o%
Syr I
Z Q
F-
0
M3 -
c
c
0.
m�� r
_
� r
I
(A
r«
-4 G
(7 a
rm'
�
:2
05.
3U3
c
x
m
p r
0
om
no
N
n
Z�r
D
r
ten-
rn
rnZ
Rr,
r�
N �
i.li
D
\ J ll
I
`sa
o
nT
EL
r
IED-
I �•
II �• � % \S'%, k4 \ _ NA��C �r?'r -" oi�C7 .an• •-p. •!•.
� � �� a�4C� ` \ y \ 'RCS -CY� • � G
Arc
II.iI �\ �' \ A}� � ion *�" \ s— ^ � - y� \ �'\ • a•
n'
J f � . . �' *` ' �� • � 1 ' � �\,� \ is • '
I� J ,<� •`�• 'ran � •1• \ .� •
II cn=_,
cv
cm
I •1 T
I 7 9 \ A
Cl
0
py-
Qr 031
1 /
/I
m
m o%
Syr I
`c
m
�Zz
n o
O�
-0 m
l
M�
�
3
m�� r
(-n
n
N
w
o
z=
rm'
c
T
'I O
c
x
m
p r
O
Z�r
ten-
rnZ
Rr,
r�
N �
\
\ J ll
I
rn
n / Ul A3
r' In' no r
.I A. �• �. 'rJ .3 ,051'• •�'s D �v!S ,t�
in n, s
rD T I 3
co :• 1- a
I �' °' 1•% ! �¢� rte; c � x
D rnm>
I
I ) r a In
/ O 70
I O D / I : r r
�
G m z
qS,B P
N /p
T
TI
(i
m p -o �
vl�
m m D O0
pN47N
I ZNDn
C)tnr;
rOD�C
D Z
Z N
N
m
I�
M�
(-n
O
N
w
o
O
Z
CA
2
cn
O
n
T
TI
(i
m p -o �
vl�
m m D O0
pN47N
I ZNDn
C)tnr;
rOD�C
D Z
Z N
N
m
co
O
N
w
o
O
Z
In
fn
Rr,
O
Z
M
m
p
=
o
O
T
Z
=
r
m
r
C
D
D
z
A
rn
M
T
TI
(i
m p -o �
vl�
m m D O0
pN47N
I ZNDn
C)tnr;
rOD�C
D Z
Z N
N
S:16016 \0003 \80 - Drawings \E3_6016- 0003.dwg, 5/2/2013 4:58:05 PM, mgray
g�w
3 !• m Z
T�Nm?
�O
ip r
O
N
N
1
N
N
o�
ZZ
z�n
ti ari
c t`
�r
V � J
V
Z
D
a �
`8' 2
.« o
m
0
O O
1 C,
W fi
d
Z
n
FED
MA/NT
A/NIFD ; I
CHANNe
L
I
1�
l�
1
I
s
ZO.
b
M
z K
e1>
I V
J
9i f
z
C)
3
_1=
(� (1 I�v IPA
JIB 'NO l.ON1IU`11M AIJO
D
9
F
U,Rl
FED
MA/NT
A/NIFD ; I
CHANNe
L
I
1�
l�
1
I
s
ZO.
b
M
z K
e1>
I V
J
9i f
z
C)
3
_1=
(� (1 I�v IPA
JIB 'NO l.ON1IU`11M AIJO
S:\ 6016 \0003 \80 - Drawings \E4_6016- 0002.dwg, 4/18/2013 12:21:10 PM, mgray
/ �121
T
J
I T
I T
/ qFC, 1 62 �yJ R
\ 10
1 R
q� F
C' V) F
\ T co
\ G K T
R
F
� n T
m T R
T
M
m T T R K
--I
D F K R
z G (�
z K N
L7 R n F rE0
T T F R
D T
F r � M1 T T R
p T rt-
F O v c T T
F �
F T ly T R
m F 01
F n U R C F
p C T-�97YL n T 97
R
T C T
T �1 m
F F
F mR g F rn
F n'
�U
(A
M1'
LA
Z I
3 0 mT
�s� n T n
/� 3 V �j F
. 1 F
. F nom' D
rmi � T R .Z1
T \ T
R F F T
0
T
f• F rA`
F
F
fi %
N
F ^
F F F F F v J b
F v S
r.
\1
T
n a
n T
XZI
� F F
�
-0 Z
%u O
O�
R F T
F R F
m
r
(� F
.. C)
�
F
R
F �c
T
F
� 2
D F
A
F
r L7
z
F
0
F
r) F R
m
n F
O
n F
Dn
f F
OF
N F
-4
F
I" F
n n.
m rn
F D r. K
N
�n
T m F F
F n
F
T F (n F
O
0
co
Q
D
u
m
T
D
N
C
N
r
O
A
D
x --i
N Z
O G7
Z o
D \
m _
O N
CO
O CA
D
X I/
D �1
x N
n
Ln r
�m
1Z
O Z
Z 0
C-)
O
Z
"a Z
D C
Po
�N
� N
E
0
1
f• F rA`
F
F
fi %
N
T
n- T
F n
F
G
XZI
Q
F T
oz
0
U)
C7
z
(� F
.. C)
D
F �c
T
F
r
rn
0
_ T
F r T
F
O
0
F
r) F R
ja
7
n F
A
OF
N F
c
b b
0
n n.
o
Lo
N
0-
_
0
co
Q
D
u
m
T
D
N
C
N
r
O
A
D
x --i
N Z
O G7
Z o
D \
m _
O N
CO
O CA
D
X I/
D �1
x N
n
Ln r
�m
1Z
O Z
Z 0
C-)
O
Z
"a Z
D C
Po
�N
� N
E
0
1
O
fi %
N
0
G
XZI
V O
oz
0
U)
C7
Z
V/
.. C)
D
F
r
rn
0
m
176'
ja
o
`l
A
G)
m
c
b b
_
OD.
0) 3.--
f "� ,
Lo
N
W
Iii
O
m
m
m
_
r.
0
co
Q
D
u
m
T
D
N
C
N
r
O
A
D
x --i
N Z
O G7
Z o
D \
m _
O N
CO
O CA
D
X I/
D �1
x N
n
Ln r
�m
1Z
O Z
Z 0
C-)
O
Z
"a Z
D C
Po
�N
� N
E
0
1
O
N
N
0
N
XZI
V O
m
Z
V/
.. C)
r
F
v (TI
m
176'
A
G)
m
T
m
O
m
m
m
_
r.
m
T
r
Cn
1
m
:(m1
H
�I�
nn 1 (a 1�8
(O
O
O
n
z
�F
,0 5Z " m
O10�0 ,®
• O.
,07 l
cn
Lll
C'J.
'or l ®.
�W
LA '(
`.cn "G)
N m
r �
m r^
4
M 00
°' o
C)
O
z
;uZ
D C
F O
.D N
TO-,j
9
m
C
v
O
C
D
n
r
co N) m.-z
O n O
D r
C
D z0
'o c Om
D m -, r
Ln � m
>�
c m e
o
-P -1 41
-.P * D
O > M
�m �X
Z) < N
n(A (nJ
W0 CA
LA
to
C
Ln
*I m II
r �
M m
110
Z) O
Z co
z
I �
M
r z
r D
m
r
0
O
N
N
m
XZI
V O
Z
V/
.. C)
r
F
v (TI
176'
nn 1 (a 1�8
(O
O
O
n
z
�F
,0 5Z " m
O10�0 ,®
• O.
,07 l
cn
Lll
C'J.
'or l ®.
�W
LA '(
`.cn "G)
N m
r �
m r^
4
M 00
°' o
C)
O
z
;uZ
D C
F O
.D N
TO-,j
9
m
C
v
O
C
D
n
r
co N) m.-z
O n O
D r
C
D z0
'o c Om
D m -, r
Ln � m
>�
c m e
o
-P -1 41
-.P * D
O > M
�m �X
Z) < N
n(A (nJ
W0 CA
LA
to
C
Ln
*I m II
r �
M m
110
Z) O
Z co
z
I �
M
r z
r D
m
r
J
p0
Np
> N
CD Q
z
i +-425
} -3 95 +-405 +-375 + -+g9 15 + -3 95 + -3 85
} -4 25 +-425
+-415 +-375 +-375
54 +-454 +-454
+-434 +-404 +-404
k -4 23 +-433 +-413
WLL
Z
J
F
c
LL
m
W
Z
x
LL
J
x
V1
¢4
W
O
Z
W
x0
7
m
r
d
C
�
m
WYcn
N
} -3 95 +-405 +-375 + -+g9 15 + -3 95 + -3 85
} -4 25 +-425
+-415 +-375 +-375
54 +-454 +-454
+-434 +-404 +-404
k -4 23 +-433 +-413
I
tr
w
w
= z
(� J
2}
J H
2a
+-d 34 } -4 14 + -3 54 + -3 34 0 Cy- 0
+-384 +-384 +-414 -4 44 Z d of
t+ -1 84
+ -383 + -393
+ -305 + -1 75 y
y
J
-v
"v L
�5
v �
y
y
y
y �
y �
y
y
a/ Y
al
y
y
y
-v
.v
ar
y
v
+235
`�( y
+239 71
Jzj
Uri
U
I
c
Q1 IS
CO
N
n
m
I
I N
0
�v
O
4
s5$ = s
.128174 y b s°
y
+263 y
y � y
cn .v
-V
�l y
y
y
y J (m y y
y
y U
y v y W
+ -373 + -353 + -333 + -303 y y
+-273 -v
y y �
y
+ -173 �y y y
�/ Ln y
wwl
W
y y
y y
y .� 3
y
I.L y L
Qy
W y co
3 +-393 +-373 +-353 +-373 +-393 +-373 +-313 *Q 93 +-233 y
+-3 63 + -3 23
y
w -V
U -V y y
y� 1
Fej6w'Wd9 494,£LOZ/Z /S'BmP'£000 -9109 93 \s6uimeia -08 \£000 \9L09\ :s
0
1
r
d
C
�
Li
N
-¢
x
\
V^
J
�
0
L Li
J
Q
�
cU N
.� Z
O c
0
u7
CU N
2 C
ZZ �
I
tr
w
w
= z
(� J
2}
J H
2a
+-d 34 } -4 14 + -3 54 + -3 34 0 Cy- 0
+-384 +-384 +-414 -4 44 Z d of
t+ -1 84
+ -383 + -393
+ -305 + -1 75 y
y
J
-v
"v L
�5
v �
y
y
y
y �
y �
y
y
a/ Y
al
y
y
y
-v
.v
ar
y
v
+235
`�( y
+239 71
Jzj
Uri
U
I
c
Q1 IS
CO
N
n
m
I
I N
0
�v
O
4
s5$ = s
.128174 y b s°
y
+263 y
y � y
cn .v
-V
�l y
y
y
y J (m y y
y
y U
y v y W
+ -373 + -353 + -333 + -303 y y
+-273 -v
y y �
y
+ -173 �y y y
�/ Ln y
wwl
W
y y
y y
y .� 3
y
I.L y L
Qy
W y co
3 +-393 +-373 +-353 +-373 +-393 +-373 +-313 *Q 93 +-233 y
+-3 63 + -3 23
y
w -V
U -V y y
y� 1
Fej6w'Wd9 494,£LOZ/Z /S'BmP'£000 -9109 93 \s6uimeia -08 \£000 \9L09\ :s
S:\ 6016\ 0003 \80 - Drawings \E6 —E7- 6016 -0002.dwg, 4/18/2013 12:28:16 PM, mgray
a
a
o
x�
�S
0
N
r
1
m
N
V O
� C
m m �
?m Z
n
r �
th
�r
mr
�n
x Z� g
0 z
f�
°
-
0 3
0 :°
3 0�
c
�c
0- 0 Q
0-
°— 2to
W
0
0
O
O
O
+
Cn
0
+
O
0
0
N
+
O
0
ti
U
c
C.
+
c
c
I
0
I
0
Cn
-5.0
p
-4.25 I
5
7
00:3
(7 0
N
O un
z
I°
I
O 3'
0 3' 6'
-5.0
00 I D
I
w
I
SCALE: 1"=3' (Vert.)
x
0O
_
-
O
O
D
U4
o
z
F
-5.0
IF
O
o
m
O On
z F°
0 m
D
IM
I z
x m
I rl
�la I Z
m
m
m
�
Si
-5.0
�b
rt
k
I
I
I
-
-5.0
Z
C7
-5.0
I
I
-5.0
I
ry
-50
______
________
v
rn
-5.0
I
I
-50
-5.0
00
-5.0
I
m
o
D
�
—
— —
0
z
0
D
—50
D
(7
zDOml
-5.0
I
c K
I
Cn
p
-4.25 I
5
7
00:3
(7 0
N
O un
m
O 3'
0 3' 6'
II
SCALE: 1"=3' (Vert.)
U4
o
F
IF
0
A
O
Si
�b
rt
k
I
Am
EM
cr)
o
Z
C7
I
Cn
S:\ 6016\ 0003 \80 - Drawings \E6_E7_6016 -0002.dwg, 4/18/2013 12:29:04 PM, mgray
3 X34
a
s
3
N
N
1
N
°m
�c
m m Qj
10 R
n
N
C',�4
t I�
�n
v
O
+
O
O
O
+
cp
0
0
0
+
0
N
0
0
I
O
T
rib]
LP
-5 0
Zo
m
N
N IZ
o
00-
+
ZG
I
0
0
D
r
m
.
0
o
co
Q
Ila
c
on
o
ZZ!
Io
o
o
Z
D
y
o a.
W
o
c5
C)
o
I
I
-5.0
0
0
O
+
I
O
T
rib]
LP
-5 0
Zo
m
-'
N IZ
o
00-
N
C7
I
_
D
r
m
.
0
co
Q
Ila
ZZ!
O ID
o
Z
D
O r
D
C)
o
I
I
-5.0
x
O
= i`
D
p
D
;
0
r
r
D
00
ZJ
Im
-5.0
-5.0
I
I
I
I
-5.0
>W
o
D
I
I
I
z
-5.0
0
O
C7
-5.0
-5.0
I
I
I
-5.0
CA 1
_
---------------
_ _
-50
I
I
I
I
I
cn
3' 0 3' 6'
SCALE: 1 " =3' (Vert.)
.7
T
Zo
0 -5.0
N
C7
D
r
m
.
0
Q
O
= (Tj
O
O
= i`
;
u
V
g
I
I
cn
3' 0 3' 6'
SCALE: 1 " =3' (Vert.)
.7
T
S: \6016 \0003 \80 - Drawings \CAMA Major Bddge.dwg, 6/3/2013 12:28:30 PM, mgray
U'
s
I
�$ x
88 FFii �pxy{
.. - - -1
1
+
H
u D N g
3 �n 3z
r
b � � m O 3• J' -� T
g kes O D ?
4ss m m — u
aS N
N 0
M
s
N
N
O O / &+ 9
N
"0
om �
CD \\ I
� /mom
� J
V� (b' M O + N
n c� Z J s
�Zr 0 Z�
rnoZ3 6
v \
v 1
f N °° c7 m I i `Q I I
_
in z!
- -- f
CD p m z� _
IQ p z
�¢3 $ 0
in 3 C £m�m0� °
° +mAcv
N Cia • �m om�r�syo
p C >z Z- 1'OZA_
C)w oD ti °<
Z :3
;Z NC'l�mn <2
Q I I D <
> o c
ow Z
> o tn
z x
w>
o --i v,
Q 1S�g Ta N Cs3 V O °
G t
A
N Z
� N m
ul Ell
109
WAI
BPI[
4.12
BOA
FILT
12.12
(ONEI
lif. -1
ADJUI
TO SU
COND
BRIDGE PLAN @ ABUTMENT
SCALE. 3/16'= V
NOTE: BRIDGE WAS PREVIOUSLY PERMITTED PER NHC 07 -063 (10/5107)
314.12 u
EXTEM S
BLAB
SLOPED C
APPROACI
REINFORC
TYPICAL E
ACCORDPIG TO
FIELD CONDITIONS
RECEIVED
BRIDGE APPROACH PLAN DCM WILMINGTON, NC
SCALE: 3/16'= V J U r,f o 3 2013
NOTE: BRIDGE WAS PREVISOSLY PERMITTED PER NHC 07-063 (10/5107)
♦ Watermark Landing Marina
VVOA&�D REDUS NC Land, LL New Hanover County, NC
243 North Front Street 8540 Colonnade Dr. Suite 111
Wilmington. North Carolina 28401 vnalra+ w10 NA 2 4
Phone: (910)343 -1048 . Fa. (910)251 -8282 Coma Major
"AST teaaoeesi Raleigh, NC 27615 Bridge Details
a
pan ea�M — methnereeaeom " AMA Major Submittal enm
m
E
a
_N
07
(V
6x12 SI
AT ALL
4x12 DECKIN
WEAR DECK
NOT SHOWN
END CAP
VEHICLE CURB DETAIL
SCALE: 1"= 1'
WEAR DECK NOT SHOWN
4x12 DECK —1 1 CURB NOT SHOWN
STRINGER
(2) FASTENERS PER PIECE
THRU CAP INTO EACH
STRINGER
VEHICLE CURB DETAIL
SCALE: 1"= 1'
K12 BUMPER CURB
12 BUMPER CURB
CIRCULAR WASHERS
(TYP•)
VEHICLE CURB DETAIL
SCALE: 1"= V
Watermark Landing Marina
V New Hanover County, NC
VIED &QIMD REDUS NC Land, LLC
243 North Front Street 8540 Colonnade Center Dr. Suite 11 f
Wilmington, North Carolina 28401 Coma Major
Phone- (910)]43-1048 , Fax (910)251 -8282 Raleigh, NC 27615
„A�07 tea, Bridge Details
mckimcreeE com
WEAR DECK
NOT SHOWN
RECEIVED
DCM WILMINGTON, NC
iU;1 o 3 2013
NOTE: BRIDGE WAS PREVIOUSLY
PERMITTED PER NHC 07-063 10/5/07)
rc we xue
DAZE
AA27M7
SCALE
tICE PRQL I
DIIAMN
e01IF000.7
YAa
IIOeIIDMTAL
fro
aE9aNFD
� ��
d1E0aD
YAO
YENIIGL
PROJ. YtA
YAa
YA
] d 4
Submittal
s17ut—AMA
Major
8x12 RAIL
(8) 3/4 "0 TIMBER BOLTS
(4) EA SIDE OF POST
W/ GALV. HVY DUTY -
CIRCULAR WASHER
WEAR DECK -- \ I
4x12 —
DECKING
1 t-0"i
(4) 5/8"0 TIMBER BOLTS
W/ WASHERS
8x10 POSTS
(1) 1" 0 GALV. TIMBER BOLT
W/ LARGE HVY DUTY
CIRCULAR WASHER
LARGE HEAVY DUTY GALV.
CIRCULAR WASHER
(1) 1" 0 GALV. BOLTS
W/ LARGE HVY DUTY
CIRCULAR WASHER
SOLID BLOCKING 0 POST
LOCATIONS
VEHICLE GUARDRAIL DETAIL
SCALE: 3/4"= 1'
. -tG /lv I WWI I - %3ru -v.
CIRCULAR WASHERS (TYP)
VEHICLE GUARDRAIL DETAIL
SCALE: 3/4"= 1'
. dv19 r1Gr_I[ %A=A o n�nv
12X12 PILE CAP
WEAR DECK
NOT SHOWN
RECEIVED
9-CM WILMINGTON Ni
JUN 0 3 2013
BUTT JOINTS AT OUTSIDE STRINGER
SCALE: 314"= 1'
NOTE: BRIDGE WAS PREVIOUSLY
PERMITTED PER NHC 07-063 10/5/07)
46 Watermark Landing Marina DATE JUNE 1017 SCME
``v' hfM4 &CREED REDUS NC Land, LLC New Hanover County, NC m� ' _
DRAW MAC IlaeZplTAL aunr�
243 North Front Street 8540 Colonnade Center Dr. Suite 111 acaan MAC V°"IC"`
MAlminglon. N"M Carolina 28401 Coma Major "aa. Met "AD "" s or s
Phone (910)343 -1048 . Fax (910)251 -8282 Raleigh, NC 27615
AADDD ck m=odem Bridge Details ri7tAMA Major Submittal 161pO1
QVA q
www mckknereea can