HomeMy WebLinkAbout20211042 Ver 1_Pre-Filing Meeting Request_20210625 tie R•.'.
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20211042 Version* 1
Regional Office* Winston-Salem Regional Office-(336)776-9800
Reviewer List* Dave Wanucha
Pre-Filing Meeting Request submitted 6/25/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* NCDOT Kevin Hining
Contact Email Address* kjhining@ncdot.gov
Project Name* Alleghany bridge 35 replacement
Project Owner* NCDOT
Project County* Alleghany
Owner Address: Street Address
801 Statesville Hwy
Address Line 2
City State/Rovince/Region
N.Wilkesboro NC
Fbstal/Zip Code Country
28659 USA
Is this a transportation project?* (' Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Dave Wanucha
Please give a brief project description below and include location information.*
No visit necessary, unless Dave wants one.
Replacing the existing bridge with a new bridge. Project located at
36.334762,-81.013894
Please attach the documentation you would like to have the meeting about.
Alleghany 35 bridge replacement-aerial photo
1.13MB
with study area.pdf
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
(�L'��z� `�`YG�I•f�
Submittal Date 6/25/2021