Loading...
HomeMy WebLinkAboutNCC192485_NOT Closeout Documents_20210723North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: Onslow Project: Duke Energy Grant's Creek River basin: White Oak Person financially responsible: DUKE ENERGY PROGRESS LLC - Thomas C Project #: ONSLO-2020-013 Williams, Manager of Transmission Engineering Address: 410 S. Wilmington Street, Raleigh, NC 27601 1. Project Location: NC Highway 101, Jacksonville Pictures: No 2. Weather and soil conditions: Raining and workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): None Title: Inspection report: Sent Report Date given/sent: July 19, 2021 9. Corrective action needed: 10. Comments: Project appears complete and stabilized. File will be closed. Any further/future development will require a new permit application to be submitted. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.deq.ne.gov/Fonus/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Connor Musial Others present: Date of inspection: July 12, 2021 Time arriving on site: 1:00 PM Time leaving site: 2:00 PM cc: