Loading...
HomeMy WebLinkAbout20180582 Ver 2_Plan Modifications_20210528Strickland, Bev From: Clement Riddle <clement@cwenv.com> Sent: Friday, May 28, 2021 11:53 AM To: Brown, David W SAW; Homewood, Sue; Yankura, Kaylie Subject: [External] Canoe Club Attachments: Impact Map Mitigation Updated Shore Line 3-Figure 3.0 4.21.21.pdf; DTL-EROSION CONTROL-C3-04_REV.pdf; 508 Cashiers Canoe Club Permit Modification Request 5.27.21.pdf Follow Up Flag: Flag for follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. David, Sue, and Kaylie Attached is the permit modification request for the Canoe Club. P{ease do not hesitate to contact me if you have any questions or need additional information. Thank you, Clement CLearWa er 145 7th Ave West, Suite B Hendersonville, NC 28792 Office: 828-698-9800 Mobile: 828-606-5168 clement@cwenv.com WWW.CWENV.COM The information in this email is confidential and may be legally privileged. It is intended solely for the addressee(s). Disclosure to other parties is prohibited. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is prohibited and may be unlawful. 1 IMPACT #13 PROP. LAYDOWN YARD & MAINTENANCE ACCESS WETLAND FILL - 0.36 AC PROJECT DATA TOTAL PROJECT AREA " 89 AC IMPACT #14 PROP. FOREBAY CONSTRUCTION WETLAND FILL - 0.21 AC IMPACT #15 PROP. TEMP. (2) 48" CMP CULVERTS WETLAND IMPACT: 30 LF IMPACT #11 PROP. BULK AD & WETLAND FILL - 0. AC IMPACT #10 PROP. WETLAND DREDGE (1951-1998) - 5.07 AC IMPACT #9 PROP. WETLAND FILL - 0.03 AC EX. OUT PARCEL IMPACT #5 PROP. BULKHEAD & OPEN WATER FILL - 1.39 A PROP. BRIDGE (NO IMPACT) EX. FOOT BRIDGE PROP. BRIDGE (NO IMPACT) TUCKASEIGEE WATER & SEWER AUTHORITY AS • LEGEND EXISTING HOUSE PROPOSED SITE PLAN PROPOSED WETLAND FILL (WTH BULKHEAD) PROPOSED BULKHEAD & FILL OUT PARCEL WETLANDS AVOIDED STREAM PROPOSED WETLAND DREDGING - 1998 WETLAND PROJECT BOUNDARY - - - - 30' ORW BUFFER EXISTING ARTS & EVENTS CENTER CASHIERS LAKE /�� PROP. MATERIAL FILL AREA FUTURE DEVELOPMENT � J JURISDICTIONAL WATER OF THE US STREAMS 5,332 LF WETLANDS "12.31AC OPEN WATERS '"18.99AC JURISDICTIONAL IMPACTS TOTAL PERMANENT STREAM IMPACTS '" 0 LF WETLANDS (FILL) WETLAND (DREDGE) TOTAL WELAND IMPACTS OPEN WATER(FILL) OPEN WATER (DISTURBANCE) TOTAL OPEN WATER IMPACTS 0.91 AC "" 6.22 AC 7.13 AC ^1.39AC 3.34 AC 4.73 AC AVOIDANCE/MINIMIZATION STREAMS "' 5,212 LF WETLANDS "' 5.18 AC OPEN WATERS "'14.26AC MITIGATIONS STREAMS N/A WETLANDS (PAYMENT TO DMS) ^'10.07AC BULKHEAD DISTANCE 2,318 LF IMPACT #12 PROP. WETLAND D EDGING (1998-PRESENT) - 1. 5 AC IMPACT #1 PROP. DISTURBANCE OPEN WATER - 3.34 AC IMPACT #2 REMOVED IMPACT #3 PROP. BULKHEAD & WETLAND FILL - 0.10 AC SCALE: 1 "=250' 0 125' 250' CASHIERS LAKE DEVELOPMENT • JACKSON COUNTY • STREAM & WETLAND IMPACT MAP FIG. 3.OA I PN 8118069 104.21.2021 4/29/2021 9:36 AM JCURLEY O:\2018\8118068 CASHIERS LAKE MASTER PLAN & PERMITTING\CAD\EXHIBITS\IMPACT MAP MITIGATION UPDATED SHORE LINE 3.DWG LandDesign LandDesign® 100 S. ORANGE AVE., SUITE 700 ORLANDO, FL 32801 407.270.7800 WWW.LANDDESIGN.COM ENG. FIRM LICENSE # C-9520 EXISTING GRADE \ \ BACKFILL WITH WASHED STONE, WRAP WITH FILTER FABRIC SECURELY STACKED BOULDER WALL, STONE TYPE AND COLOR TO BE BROWN/GRAY VARIATIONS TO MATCH STONE NATIVE TO AREA, "PLANT" FIRST BOULDER COURSE HEIGHT IN LAKE BED 01 BOULDER SEA WALL ALLOW FOR POSITIVE DRAINAGE BEHIND WALL 12" LAKE BED DETAIL NTS NOTE: CONTRACTOR TO VERIFY EXISTING CONDITIONS, TOPOGRAPHY, AND STREAM PROFILES BEFORE CONSTRUCTION BEGINS. TEMP. DIVERSION DITCH TABLE NUMBER TYPE BOTTOM WIDTH (FT) MIN. DEPTH (FT) 1 TRAPEZOIDAL 6 3.76 2 TRAPEZOIDAL 6 3.76 3 TRIANGULAR N/A 1.04 4 TRIANGULAR N/A 1.04 5 TRIANGULAR N/A 1.31 6 TRIANGULAR N/A 0.74 7 TRIANGULAR N/A 0.59 NOTE: ALL DITCHES SHALL BE DESIGNED AT A LONG TUDINAL SLOPE OF 1.0%, CHANNEL SLOPE OF 3.5:1, AND LINED WITH 6" DIAMETER RIPRAP (d50). TYPICAL BULKHEAD SEQUENCE OF CONSTRUCTION: 1. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE AT CONSTRUCTION ACCESS LOCATION. 2. LOWER LAKE LEVEL FOLLOWING ALL FINAL DREDGING AND EROSION CONTROL PLANS TO A LEVEL THAT WILL PROVIDE AN ADEQUATE WORK AREA FOR BULKHEAD CONSTRUCTION. 3. INSTALL PIERS, TIEBACKS AND REMAINING BULKHEAD COMPONENTS IN ACCORDANCE WITH FINAL PLANS. 4. INSTALL DRAINAGE SYSTEM AT BACK OF BULKHEAD AND FILL TO FINISHED GRADE BEHIND BULKHEAD. 5. SEED AND MULCH AND ESTABLISH PERMANENT GRASSING OR ACCEPTABLE GROUND COVER IN ALL ABOVE WATER LEVEL DISTURBED AREAS. 6. REMOVE ALL TEMPORARY CONSTRUCTION AND EROSION CONTROL DEVICES. NOTE: PRELIMINARY- DO NOT USE FOR CONSTRUCTION.THIS PLAN IS NOT INTENDED TO IN ANY WAY REPRESENT A FINAL DESIGN. PLOT DATE: 2/20/18 WETLAND OR OPEN WATER IMPACT AS APPLICABLE IN BULKHEAD BACKFILL AREA T (SEE SEDIMENT REMOVAL MAP) 'I CLEAN AGGREGATE DRAINAGE COURSE ENCAPSULATED IN FILTER FABRIC SOIL FILL & PLANTING BED AS APPLICABLE EXISTING GRADE GALVANIZED STEEL, EPDXY COATED STEEL OR STAINLESS STEEL TIE ROD TIEBACK ANCHORED WITH DEADMAN OR PRESSURE GROUTED TIE ROD WALES AT REGULAR INTERVALS AS NEEDED. STEEL, WOOD OR PRECAST CONCRETE SHEATHING. DRIVEN STEEL OR DRILLED STEEL OR PRECAST CONCRETE SOLDIER PILES AT REGULAR INTERVALS 2 FT WIDE WETLAND OR OPEN WATER IMPACT BY BULKHEAD (SEE SEDIMENT REMOVAL MAP) OPTIONAL CONCRETE, STEEL OR WOOD BULKHEAD CAP PRECAST CONCRETE, WOOD OR STEEL SOLDIER PILES AT REGULAR INTERVALS NORMAL WATER LEVEL LOWERED WATER LEVEL DEWATER LAKE AS NEED FOR ADEQUATE WORK AREA AND TO PREVENT LOSS OF SEDIMENT OR UNCURED CONCRETE PILE DEPTHS VARY DEPENDING UPON SITE SPECIFIC SOIL & ROCK CONDITIONS LAKE BED BULKHEAD INSTALLATION SECTION NOT TO SCALE TEMPORARY STREAM CROSSING Cross -Section Design settled top 2' to 3.5' _L 21' 12" min. of NCDOT #5 or #57 washed stone tt filter fabric Plan View 4' 3' min. z 1.5' min. Overfill 6" for rsettlement Natural Ground 5' max Emergency by- pass 6" below settled top of dam N.T.S. SEDIMENT TRAP DETAIL 36" MIN. SPACING TYP.* 12" MIN. SPACING TYP.* /6" OVERLAP N SLICE WATER TABLE N.T.S. KEY/ANCHOR MATERIAL AT TOP OF SLOPE. GENERAL NOTES: 1. LAY BLANKETS LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH THE SOIL. DO NOT STRETCH. 2. * DIMENSIONS SHOWN ARE MINIMUM, MANUFACTURED PRODUCTS MAY HAVE ADDITIONAL REQUIREMENTS THAT MUST BE MET. 3. SLOPE SURFACE SHALL BE FREE OF ROCKS, SOIL CLODS, STICKS, GRASS. MAT/BLANKETS SHALL HAVE GOOD SOIL CONTACT. 4. THE DETAIL SHOWN IS FOR SLOPE MATTING. FOR CHANNEL OR PIPE OUTFALL MATTING SPECIFICATIONS, PLEASE REFER TO NCESCPDM STANDARD #6.17 AND MANUFACTURER'S GUIDELINES. NON —WOVEN GEOTEXTILE FILTER CLOTH FABRIC 4' ABOVE SOURCE WATER. KEY/ANCHOR MATERIAL TO TOE OF SLOPE. EMBANKMENT MATTING DETAIL N.T.S. SEAL \\\\\11 IIII 11,,,/ oN.Lf • SEAL - 19018 :�•' •CSC. ` GINEE�. 1N/IIIIII0\0 \\�DE SIGN�I'% �v. CORPORATE Agov'\. �IIIII II\\\\ PROJECT CASHIERS LAKE DREDGING PLAN CASHIERS TOWNSHIP JACKSON COUNTY, NC LANDDESIGN PROJ.# 8118068 REVISION / ISSUANCE NO. DESCRIPTION DATE DESIGNED BY: MBT DRAWN BY: MBT CHECKED BY: RRW SCALE VERT: N/A HORZ: NTS NORTH (NOT TO SCALE) SHEET TITLE 5/26/2021 2:22 PM JAMES CURLEY O:\2018\8118068 CASHIERS LAKE MASTER PLAN & PERMITTING\CAD\CONSTRUCTION DOCUMENTS\DTL-EROSION CONTROL.DWG ORIGINAL SHEET SIZE: 24" X 36" EROSION CONTROL DETAILS SHEET NUMBER C3-04 DocuSign Envelope ID: 57AA0F82-5BFB-45B8-A214-4F63F74577FC May 27, 2021 Water ClearWater Environmental Consultants, Inc. www.cwenv.com Mr. David Brown US Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-2638 Ms. Sue Homewood NC DWR, 401 & Buffer Permitting Unit 450 W. Hanes Mill Road, Suite 300 Winston-Salem, North Carolina 27105 RE: Permit Modification Cashiers Canoe Club Jackson County, North Carolina Action ID SAW-2016-00032; DWQ Project # 2018-0582v2 Dear Mr. Brown and Ms. Homewood, The applicant, Cashiers Canoe Club Development, LLC, is requesting a modification to the US Army Corps of Engineers Section (USACE) 404 permit and NC Division of Water Quality (DWQ) 401 Certification dated January 14, 2021 and April 8, 2020, respectively. There are no proposed increases in authorized impacts to wetlands (7.13), open water 4.73 acres) or streams (0 lf.) resulting from this minor modification. Please note that the scope of the overall project purpose and planned dredging quantities have remained the same. The applicant proposes to reconfigure the open water impacts as shown on the revised Figure 3 (attached). This will be done by removing open water impact #2 (0.52 acres) on the east side of the lake and relocating this open water fill and bulkhead to the west side of the lake to combine with Open Water impact #5 (0.87 acres). This will make the combined open water impact #5 1.39 acres. This minor change within the authorized permit limits will (1) reduce the land disturbance area within the lake, (2) eliminate a haul road and temporary culverts within the lakebed for moving dredged material (3) provide the same total acreage to dispose of approximately 14,000 cubic yards (4) move all open water impacts to one side of the lake which, the applicant believes will simplify and expedite the dredging process. 145 7th Avenue West, Suite B Hendersonville, NC 28792 828-698-9800 Tel DocuSign Envelope ID: 57AA0F82-5BFB-45B8-A214-4F63F74577FC Cashiers Canoe Club Permit Modification Request May 27, 2021 Page 2 of 2 The applicant is also proposing an additional option for the bulkhead walls. Approved plan (LandDesign Sheet C3-04) details vertical bulkhead walls constructed with precast concrete, wood or steel. The applicant is including an additional wall detail on this revised sheet (attached) that may be used in combination with the approved bulkhead wall. Please do not hesitate to contact me at 828-698-9800 if you have any questions. Sincerely, DocuSigned by: 2. U 2,aai� 0A79F7DC85EE4F7... R. Clement Riddle, P.W.S Principal