Loading...
HomeMy WebLinkAboutSW5200201_Plan (Misc. Detail)_20200413THESE PLANS AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF SHIPMAN ENGINEERING, PLLC AND MAY NOT BE REPRODUCED IN WHOLE OR IN PART. THESE DOCUMENTS SHALL NOT BE USED FOR ANY PURPOSEWHATSOEVER, INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION, BIDDING, AND/OR CONSTRUCTION STAKING WITHOUT THE EXPRESS WRITTEN CONSENT OF SHIPMAN ENGINEERING, PLLC.REVISIONSSYMBOLDATE137 MIDDLEGREEN PLACEHOLLY SPRINGS, NC 27540NCBELS LICENSE P-1963DESIGNED BY:WZS DRAWN BY:WZS CHECKED BY:WZS DRAWING DATE: SE PROJECT #:LEE STREET ATHLETICCOMPLEX IMPROVEMENTSTOWN OF BENSONJOHNSTON COUNTY, NORTH CAROLINASHEET NUMBER: 2019-017SHIPMANENGINEERING 919.900.0006SHIPMAN ENGINEERING, PLLC07-11-19103-12-2020PER NCDEQ EROSION CONTROL COMMENTS204-7-2020PER DWQ STORMWATER COMMENTSD-04 NOTES AND DETAILSFRONT VIEW SIDE VIEW 8" DOWN AND 4" FORWARD ALONG TRENCH 8" MINIMUM COVER OVER SKIRT * GRADE FILL SLOPE SILT FENCE FABRIC WOVEN WIRE FABRIC STEEL POST 32" MIN. WIDTHNOTE: USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. MINIMUM 10 GAUGE LINE WIRES SILT FENCE FABRIC INSTALLED TO SECOND WIRE FROM TOP MINIMUM 12-1/2 GAUGE INTERMEDIATE WIRES GRADE 3'-0" 2'-0" 24" 8'-0" MAXIMUM NOTES: 1. L = THE LENGTH OF THE RIPRAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (INCHES). 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. 4. MAINTAIN ENERGY DISSIPATERS INSTALLED DURING EARLY SITE WORK THROUGHOUT THE CONSTRUCTION AREA. A A I.D. 3 TIMES I.D. (W2) PLAN VIEW SECTION 'A-A' FILTER FABRIC d L PIPE PIPE MAINTENANCE INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS WHEN DEPTH OF SEDIMENT REACHES 12" TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. MAINTENANCE RIP RAP SHOULD BE INSPECTED PERIODICALLY FOR SCOUR OR DISLODGED STONES. CONTROL OF WEED AND BRUSH GROWTH MAY BE NEEDED IN SOME LOCATIONS. W1 PIPE OUTLET TO FLAT AREA (NCDENR 6.15)-NO WELL DEFINED CHANNEL NOT TO SCALE SILT FENCE (NCDENR 6.62) NOT TO SCALE PERMANENT SEEDING PREPARE SEEDBED BY RIPPING, CHISELING, HARROWING, OR PLOWING TO DEPTH OF 6 INCHES SO AS TO PRODUCE A LOOSE, FRIABLE SOIL SURFACE. REMOVE ALL STONES, ROCKS, BOULDERS, STUMPS, OR OTHER DEBRIS FROM THE SURFACE WHICH WILL PREVENT GERMINATION OR PLANT GROWTH. INCORPORATE INTO THE SOIL 800-1000 LBS OF 10-10-10 FERTILIZER PLUS 500 LBS OF 20% SUPERPHOSPHATE PER ACRE AND TWO TONS OF DOLOMITIC LIME PER ACRE UNLESS SOIL TESTING INDICATES THAT A LOWER RATE OF LIME MAY BE USED. MULCH AFTER SEEDING WITH 2 TONS OF GRAIN STRAW PER ACRE AND EITHER CRIMP STRAW INTO SOIL OR TACK WITH LIQUID ASPHALT AT 400 GALLONS PER ACRE OR EMULSIFIED ASPHALT AT 300 GALLONS PER ACRE. IF DISC BLADE/CRIMPING IS USED, APPLY 1/2 OF THE MULCH, THEN CRIMP, AND FINISH BY APPLYING THE OTHER 1/2 OF MULCH. PERMANENT SEEDINGS: PLANTS AND MIXTURE:PLANTING RATE/ACRE:PLANTING DATES: TALL FESCUE 110 LBS/ACRE AUGUST 15- OCTOBER 15 FEBRUARY 15- MAY 1JAPANESE CLOVER CHINESE LESPEDEZA (LOW MAINTENANCE SLOPE 3:1 OR LESS) TALL FESCUE 140 LBS/ACRE AUGUST 15- OCTOBER 15 FEBRUARY 15- MAY 1JAPANESE CLOVER CHINESE LESPEDEZA (LOW MAINTENANCE SLOPE 3:1 OR LESS) BLEND OF TWO TURFTYPE TALL FESCUES (90%) AND TWO OF MORE IMPROVED KENTUCKY BLUEGRASS VARIETIES (10%) (GENERAL LAWN AREAS) 200 LBS/ACRE AUGUST 15- OCTOBER 15 FEBRUARY 15- MAY 1 NOTE: FOR SPRING SEEDINGS, USE SCARIFIED LESPEDEZA SEED. FOR LATE FALL AND WINTER SEEDINGS, USE UNSCARIFIED SEED. TEMPORARY SEEDING (PIEDMONT REGION)-LATE WINTER/EARLY SPRING SEEDING MIXTURE: SPECIES:RATE (LB/ACRE) RYE (GRAIN)120 ANNUAL LESPEDEZA (KOBE IN PIEDMONT & COASTAL PLAIN, KOREAN IN MOUNTAINS) 50 SEEDING DATES: MOUNTAINS: ABOVE 2500 FEET- FEBRUARY 15- MAY 15 BELOW 2500 FEET- FEBRUARY 1- MAY 1 PIEDMONT: JANUARY 1- MAY 1 COASTAL PLAIN: DECEMBER 1- APRIL 15 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LBS/ACRE OF GROUND AGRICULTURAL LIMESTONE AND 750 LBS/ACRE OF 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LBS/ACRE OF STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING (PIEDMONT REGION)-FALL SEEDING MIXTURE: SPECIES:RATE (LB/ACRE) RYE (GRAIN)120 SEEDING DATES: MOUNTAINS: AUGUST 15- DECEMBER 15 COASTAL PLAIN & PIEDMONT: AUGUST 15- DECEMBER 30 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LBS/ACRE OF GROUND AGRICULTURAL LIMESTONE AND 1,000 LBS/ACRE OF 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LBS/ACRE OF STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LBS/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LBS/ACRE KOBE (PIEDMOND AND COASTAL PLAIN) OR KOREAN (MOUNTAIN) LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. TEMPORARY SEEDING (PIEDMONT REGION)-SUMMER SEEDING MIXTURE: SPECIES:RATE (LB/ACRE) GERMAN MILLET 40 SEEDING DATES: MOUNTAINS: MAY 15- AUGUST 15 PIEDMONT: MAY 1- AUGUST 15 COASTAL PLAIN: APRIL 15- AUGUST 15 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LBS/ACRE OF GROUND AGRICULTURAL LIMESTONE AND 750 LBS/ACRE OF 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LBS/ACRE OF STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. IN PIEDMONT AND MOUNTAINS, A SMALL-STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LBS/ACRE. #57 WASHED STONE PLACED TO A HEIGHT OF 16"-18" MINIMUM ABOVE THE TOP OF BOX GALVANIZED HARDWARE WIRE EXTENDS TO THE TOP OF THE BOX STANDARD METAL POSTS 2'-0" IN GROUND MAINTENANCE: INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1 2 INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. 3' FILTER FABRIC ON GROUND STEEL FENCE POST WIRE FENCE HARDWARE CLOTH FILTER OF #57 WASHED STONE BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH BURY WIRE FENCE AND HARDWARE CLOTH TOP OF SILT FENCE MUST BE AT LEAST 1' ABOVE THE TOP OF THE WASHED STONE SILT FENCE FRONT VIEW SECTION VIEW STEEL FENCE POST SET MAX 2' APART MIN. 18" INTO SOLID GROUND BURY WIRE FENCE, FILTER FABRIC, AND HARDWARE CLOTH IN TRENCH 4' MIN. MAINTENANCE: 1.INSPECT SILT FENCE OUTLET AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT (1 2" OR GREATER). REPAIR ANY DAMAGE TO THE OUTLET IMMEDIATELY. 2.REMOVE SEDIMENT FROM BEHIND THE OUTLET WHEN HALF OF STONE OUTLET IS COVERED. 3.REPLACE STONE AS NEEDED TO ENSURE PROPER DEWATERING. 4.PERIODICALLY CHECK THE STRUCTURE FOR DAMAGE. ANY STONE DISPLACED FROM BEHIND THE HARDWARE CLOTH SHALL BE REPLACED IMMEDIATELY. 18" SILT FENCE OUTLET (NCDENR 6.62) NOT TO SCALE HARDWARE CLOTH & GRAVEL INLET PROTECTION NOT TO SCALE TOP ELEVATION OF STORMWATER FRONT VIEW EXISTING SLOPE SIDE VIEW 11 MAX. STEP SEQUENCE EXISTING S L O P E WEIR NOTE: 1.HEIGHT & WIDTH DETERMINED BY EXISTING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. 2.KEY RIP RAP INTO THE DAM FOR STABILIZATION. #57 WASHED STONE FILTER FABRIC CLASS 1 RIP-RAP VARIES VARIES 6"-1' EXISTING SLOPES KEYED RIP RAP #57 WASHED STONE VARIES 6"-1' VARIES DESIGN OF SPILLWAYS DRAINAGE AREA (AC) MIN. WEIR LENGTH (FT) 1 4 2 6 3 8 4 10 5 12 CHECK DAM NOT TO SCALE PIPE CLASS B RIP-RAPNCDOT #5 OR #57 STONE 1' THICK x 2' HIGH (MINIMUM) FLOW FLOW SEDIMENT STORAGE AREA PERSPECTIVE VIEW PIPE FINISHED GRADECLASS B RIP-RAP 1.5' MAX SEDIMENT DEPTH (CLEAN OUT POINT) SEDIMENT STORAGE ZONE FLOOD STORAGE ZONE NCDOT #5 OR #57 STONE FLO W 2' 1'3' CONSTRUCTION SPECIFICATIONS: 1.CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SPOIL. 2.INSTALL THE CLASS B OR CLASS I RIPRAP IN A SEMI-CIRCLE AROUND THE PIPE INLET. THE STONE SHOULD BE BUILT UP HIGHER ON EACH END WHERE IT TIES INTO THE EMBANKMENT. THE MINIMUM CREST WIDTH OF THE RIP-RAP SHOULD BE 3 FEET, WITH A MINIMUM BOTTOM WIDTH OF 11 FEET. THE MINIMUM HEIGHT SHOULD BE 2 FEET, BUT ALSO 1 FOOT LOWER THAN THE SHOULDER OF THE EMBANKMENT OR DIVERSIONS. 3.A 1 FOOT THICK LAYER OF NC DOT #5 OR #57 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE RIPRAP. 4.THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE OF THE STONE HORSESHOE 18 INCHES BELOW NATURAL GRADE. 5.WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER. MAINTENANCE: INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2" OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. AFTER ALL THE SEDIMENT AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER (SURFACE STABILIZATION). RIP-RAP HEAD WALL, 1' MIN HEIGHT FROM ROAD SHOULDER RIP RAP FILTER DAM INLET PROTECTION (NCDENR 6.55) NOT TO SCALE MAINTENANCE: INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1 2" OR GREATER) RAINFALL EVENT. REPAIR DAMAGE IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DRAINAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION , ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION.