Loading...
HomeMy WebLinkAboutNCC201350_NOT Closeout Documents_20210721 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481 County: Craven Project: PNG Line 243 Retrofit Launcher River basin: Neuse Person financially responsible:Piedmont Natural Gas-Oluwasann(Sanu) Project#: CRAVE-2020-026 Odugebesan,Project Manager Address: 4720 Piedmont Row Drive,Charlotte,NC 28210 1. Project Location: Tuscarora Rhems Road,New Bern Pictures: No 2. Weather and soil conditions: sunny,hot,dry Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No one. Title: Inspection report: Sent Report Date given/sent: July 12,2021 9. Corrective action needed:None at this time. Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA. 10. Comments: Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:httt)s:Hcdocs.dea.nc.t!ov/Forms/NCGO1-Termination.Please note that this correspondence must be unloaded as nart of comnleting the NOT nrocess. Reported by: James Edwards Others present: No one. Date of inspection: July 09,2021 Time arriving on site: 11:15 AM Time leaving site: 11:30 AM cc: