Loading...
HomeMy WebLinkAboutNCC201350_Notice of Termination_20210721 Action History (UTC-05:00)Eastern Time(US&Canada) Subrrit by Anonymous User 7/21/2021 3:14:23 PM(NOT Submittal) Approve by Morman,Alaina 7/23/2021 3:40:59 PM(NOT Request Review-NCC201350) • The task was assigned to Morman,Alaina.The due date is:July 26,2021 5:00 PM 7/21/2021 3:14 PM " RequestNOT • Construction Stormwater 1 i �a•aThis formto request Notice of • • for •co\erage under • NORTH CAROLINA General - for • i i• Activities Qr�arrry Certificate of NCC201350 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status PAID fvby be blank(if not yet billed). Information associated with this permit: Project Name PING Line 243 Retrofit Launcher Address Tuscarora Rhems Road, New Bern, NC County Craven Latitude 35.0000 Longitude -77.0000 Permittee Listed Piedmont Natural Gas inc. Legally Responsible Sanu Odugbesan Individual NC Reference No. NCG01-2020-1350 E&SC Plan ID Crane-2020-026 Original NOI 23908 Tracking No. Date COC Issued 4/3/2020 Prior Rescission Cate populates only if COC was already rescinded at tin-e of subrrittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed-Out Termination of r Sale(Another Owner/Operator obtained a new COC) Coverage* r Mistake or Invalid Coverage r Other Addional We information about the basis of this request,if needed. Explanation Project complete, please see attached Final Inspection performed July 9,2021 and inspection report dated July 12,2021. Supporting Upload Supporting Documentation if applicable. Documentation Wst be FM format Project Close-out Information: Final Close-out 7/12/2021 Inspection Approval Project Close-out 210709 LAUNCHER DUKE CRAVE-2020-026.pdf 32.3KB Approval Mast be FDFformat Documentation North Carolina General Statute 143-215.613(i) provides that: Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars($10,000). 17 I,as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true,complete and accurate. 'This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary,treasurer,or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV, Section B, Item(6)of that permit. Signature AOlc�Y# i0olk9' Type Name* Adam Pollak Title* Project Manager Organization* Piedmont Natural Gas Date* 07/21/2021 Email for adam.pollak@duke-energy.com Confirmation Contact Telephone* 9524562648 NOT Certification Line 243 Launcher NOT NCC201350.pdf 40.57KB Form Mast be FDF Format Is this COCAlready Ensure this OOC has not been rescinded since subnittal! Rescinded? Additional Email CCd on Notification Emails (Optional) Alicia.DePalma@duke-energy.com Original Permittee 0Cd on Notification BTails Email sanu.odugbesan@duke-energy.com Original Site Contact CCd on Notificaiton Bmils Email wkennedy@troyconstruction.com