Loading...
HomeMy WebLinkAboutSW6200102_Plan (Demo)_20200608ELEVATION=265.75' BOLT OF FIRE HYDRANT INSCRIBED "X" ON BONNET #22 TBM ELEVATION=263.66' E=1991187.54 N=484419.59 #31 RB&C ELEVATION=260.32' E=1990596.36 N=484414.62 #32 RB&C ELEVATION=251.86' E=1990440.94 N=483961.51 #7 RB&C ELEVATION=261.48' E=1990917.38 N=484492.73 #5 RB&C ELEVATION=255.43' E=1990436.55 N=484427.73 #6 RB&C ELEVATION=262.75' E=1991205.96 N=484027.22 #3 RB&C ELEVATION=266.42' E=1991347.23 N=484491.19 #4 RB&C ELEVATION=258.52' BOLT OF FIRE HYDRANT INSCRIBED "X" ON BONNET #23 TBM ELEVATION=261.6' P-02 BORE HOLE INV.OUT=244.19' (E) INV.IN=244.33' (SW) TOP=249.97' INV.OUT=241.87' (S) INV.IN=243.76' (E) TOP=249.82' INV.OUT=244.94' (NE) TOP=247.66' 18" RCP 1 8 " RCP 18" RCPELEVATION=257.1' B-02 BORE HOLE ELEVATION=255.5' B-01 BORE HOLE ELEVATION=259.8' P-04 BORE HOLE ELEVATION=256.0' S-03 BORE HOLE ELEVATION=253.3' S-04 BORE HOLE ELEVATION=252.1' B-05 BORE HOLE ELEVATION=259.2' S-02 BORE HOLE ELEVATION=258.5' P-03 BORE HOLE (NO ACCESS TO INVERTS) TOP=256.76' (NO ACCESS TO INVERTS) TOP=256.80' CONC CONC CI W/3SBW 84" CHLK CI CI CI CONC SW 72" CHLK DI BOLLARDS (4) CB CB ELEVATION=260.8' S-01 BORE HOLE ELEVATION=259.7' B-04 BORE HOLE 72" CHLK (4) BOLLARDS ELEVATION=260.1' P-01 BORE HOLE 84" CHLK W/3SBW84" CHLK W/3SBWW/3SBW 84" CHLK ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT18" C&G 18" C&G 18" C&G18" C&G 18" C&G18" C&G18" C&G18" C&G18" C&G 18" C&G (NO ACCESS TO INVERTS) TOP=265.06' CI WW WW HW HW WW WW INV.=260.00' INV.=260.97' ASPHALT INV.OUT=251.44' (W) INV.IN=251.52' (E) TOP=261.75' TOP=262.48' COMM MH BOTTOM BOX=242.28' TOP=251.94' COMM MH BOTTOM BOX=243.25' TOP=252.87' COMM MH PVC PIPES VERTICAL UNKNOWN 6" CURB 6" CURB 6" CURB6" CURB 6" CURB6" CURB 6" CURB(NO ACCESS TO INVERTS) INV 251.25' (FROM ASBUILTS) TOP=262.10' (NO ACCESS TO INVERTS) INV 250.68' (FROM ASBUILTS) TOP=262.04'24" RCPEXISTING ASPHALTPARKING LOT EXISTING ASPHALT PARKING LOT EXISTING ASPHALT WOODED AREA WOODED AREA WOODED AREA WOODED AREA WOODED AREA WOODED AREA WOODED AREA WOODED AREA WOODED AREA 248249250 250250250 10" PVC10" PVC2 5 1 251 2512512512512512 5 1 T 252 252252252 2 5 2 252252 2 5 2 252 252252252 T 253 253 253253253253253253253 253253253254 254 2 5 4 254254254254254254254254 254254254254P 2 5 5255255255 255255 255 255255255255255255255 255 2 5 6256256256256 256256256256256 2 5 6 2 5 6 256256256256256256 256256 256 2 5 7257257257 257257257257257257257257257257257257257257257257257257 258 258 2582582582582 5 8258258258258258 2 5 8258258258258258258258258 258 258 DILAPIDATED FENCEEAGLE TALON DRIVE EAGLE TALON DRIVE259 259259 259259259259 259259 259 259 259259259259259259259 259259259259259 2598" PVC 260 260 260 260 260 260 260 260260260260260 260260 260 2602602602602602602 6 0 260260260260260 260 26026018" RCP 261261 261261261 2612612612612 6 1 261 261 2612612612612612612612612612 6 1 261261261261261261261261 EL*515 2 62 262 262262262262262 262 2 6 2 262262262262262262262262262262262262 T 263 263263263263 2 6 3 263263263263 263 263263 2632632632638" PVC INV.OUT=241.37' (S) INV.IN=241.42' (N) INV.IN=242.69' (W) TOP=252.51'OFF SITE (IN SECURED AREA) EL JB #108689 EL JB #112804 INV.OUT=255.50' (W) TOP=265.16' INV.OUT=242.90' (S) INV.IN=243.19' (N) TOP=256.48' 8" PVC 10" PVC INV.OUT=243.68' (S) INV.IN=245.63' (W) INV.IN=245.64' (E) TOP=256.74' (IN SECURED AREA) OFF SITE WM WV WV WV WVFH BOX HOT WMV PIV FHFH WV WV WV FH WV FH WV PPL PPL PPL #79677 83696 PPL PPL PPL #108680 EL JB 83648 #79679 PPL #79677 83740 PPL 83786 #79678 PPL TOP=254.09' EL MH 8" PVC 264 264 264 264 264 EL*515BL*515 BL*515 265 265 265265 266 266 2 6 6 266 267 U.S. ARMY CORPS OF ENGINEERSHPTC_CD101.dgnANSI DCHECKED BY:DRAWN BY:ISSUE DATE:SHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONP:\Projects\017001\03 CAD_BIM\_Sheets\05_Civil\HPTC_CD101.dgn23-MAR-202014:46 171-20-13R. BOSTONW912PM-19-C-000769 DARLINGTON AVENUEWILMINGTON DISTRICTWILMINGTON, NORTH CAROLINAFORT BRAGG, NORTH CAROLINASOF HUMAN PERFORMANCE TRAINING CENTER (HPTC)FY18 PN 79443W912PM-18-R-0003SOLICITATION NO.:DECEMBER 2019N 484,450.710 E 1,990,693.107 N 484,450.697 E 1,990,810.107 N 484,093.466 E 1,991,269.069 N 484,072.408 E 1,991,269.446 N 484,495.449 E 1,991,219.929 N 484,451.086 E 1,991,219.111 N 484,463.392 E 1,991,202.812 N 484,040.699 E 1,990,761.394 N 483,976.199 E 1,990,498.934 N 483,942.952 E 1,990,497.708 N 484,084.041 E 1,990,501.339 N 484,053.348 E 1,990,501.339 N 484,083.344 E 1,990,653.208 N 484,051.898 E 1,990,677.486 N 484,039.831 E 1,991,062.862 N 483,957.464 E 1,991,062.862 N 483,957.478 E 1,991,240.837 N 484,454.143 E 1,990,653.208 N 484,495.318 E 1,991,203.562 N 484,450.158 E 1,991,269.375 N 484,093.404 E 1,991,295.657 N 484,087.362 E 1,991,274.937 N 484,081.408 E 1,991,274.918 N 484,072.347 E 1,991,295.608 N 483,959.576 E 1,991,113.602 N 484,058.285 E 1,991,269.429 N 484,058.186 E 1,991,245.810 N 484,016.093 E 1,991,245.810 N 484,012.297 E 1,991,240.754 STAGING AREA CONTRACTOR CD101S.HAGGARDM.MEYERG.LYNNN GEOGRAPHIC COORDINATE DATA HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE, NAD83. VERTICAL DATUM: NAVD88. UNITS OF MEASURE: U.S. SURVEY FEET. COORDINATES SHOWN IN FORMAT OF EASTING, NORTHING AND ELEVATION.DEMOLITION PLANSHEET NOTES 1 2 3 4 GENERAL NOTES EXISTING TREES TO BE CLEARED AND GRUBBED. EXISTING ASPHALT PAVEMENT TO BE REMOVED. EXISTING CURB AND GUTTER TO BE REMOVED. EXISTING FENCE AND POST TO BE REMOVED. 3 3 3 4 4 4 4 4 4 4 4 2 2. 1. GRAPHIC SCALE: 1"=40'-0" 120'80'40'020'40' 4 1 1 2 2BEGIN END 2 GENERAL CIVIL NOTES. REFER TO G-202 AND C-001 FOR WORKZONE AND VERTICAL CONTROL. REFER TO SHEET CS101 FOR HORIZONTAL AND LEGEND TREES TO BE CLEARED AND GRUBBED ASPHALT TO BE REMOVED CONSTRUCTION LIMITS 2 2