HomeMy WebLinkAbout20040090 Ver 3_Modifications_20070612~, F~
~~~o
~ ,,:n
.~~~.
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY
GOVERNOR
U. S. Army Corps of Engineers
Regulatory Field Office
6508 Falls of the Neuse Road
Suite 120
Raleigh, NC 27615
ATTN: Mr. Eric Alsmeyer
NCDOT Coordinator
~ ~ ~~,~
l,s~r ur,k. ,
~ ,~ ~f>~~
'~i yl;.,....~
~~~;,>
;yc
'~
LYNDO TIPPETT
SECRETARY
oy oo~v v. 3
SUBJECT: Request For Permit Re-issuance for the relocation of Service Road (SR 1126)
near the intersection of US 15-501 and Garrett Road (SR 1116) and addition of a
left turn lane from southbound US 15-501 onto Garrett Road with an additional
westbound receiving lane on Garrett Road in Durham County. State Project No.
9.8059077 T.I.P. No. U-4009: $200.00 Debit work order 9.8059077, WBS
35010.1.1
REFERENCE: 1) USACE 404 NW 14 Permit, Action ID Number 200021007, dated
November 16, 2006
2) NCDWQ 401 Water Quality Certification (WQC 3404), dated June 1, 2006,
Project No. 20040090 v.2
Dear Sir:
On June 1, 2006 and November 16, 2006, the United States Army Corps of Engineers (USACE)
and North Carolina Division of Water Quality (DWQ) re-authorized the relocation of SR 1126
and the addition of a left turn lane onto Garret Road along with an additional westbound
receiving lane on Garret Road via a 404 NW 14, (Number 200021007), and a 401 Water Quality
Certification (WQC 3404). The permits expired on March 18, 2007.
Table 1. Stream and Wetland Im acts for TIP Project U-4009, Durham County
Site Station Stream Name DWQ Index
No. Stream Impacts
feet Wetland
Impacts (ac)
1 NSR114+04 NA NA - 0.019
2 NSR2 14+00 UT to Sandy Creek 16-41-1-11 45 0.056
Total 45 0.075
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
NATURAL ENVIRONMENT UNIT
1598 MAIL SERVICE CENTER
RALEIGH NC 27699-159$
June 6, 2007
TELEPHONE:919-715-1334 or
919-715-1335
FAX: 919-715-5501
WEBSITE: WWW.NCDOT.ORG
LOCATION:
PARKER LINCOLN BUILDMG
272$ CAPITAL BLVD. SUITE 240
RALEIGH NC 27604
As indicated in the table, total stream impacts are 45 feet and wetland impacts are 0.075 acres.
The project at this time has a Let Date of July 17, 2007. NCDOT respectfully requests that the
referenced section 404 NW 14 and section 401 WQC be re-issued. The project has not changed.
Therefore, all previously submitted permit drawings and plan sheets are current. All
environmental commitments and special conditions, referenced in the NW 14 Permit
Application, will continue to be followed throughout project construction.
If you have any questions or need any additional information, please contact Ms. Deanna Riffey
at 919-715-1409.
ice"
Sincerely,
~.
Gregory J. Thorpe, Ph.D.
Environmental Management Director, PDEA
cc: Mr. John Hennessy, NCDWQ (5 Copies)
Mr. Travis Wilson, NCWRC
Mr. Gary Jordan, USFWS
Dr. David Chang, P.E., Hydraulics
Mr. Mark Staley, Roadside Environmental
Mr. Greg Perfetti, P.E., Structure Design
Mr. Jay Bennett, P.E., Roadway Design
Mr. Victor Barbour, P.E., Project Services Unit
Mr. J. Wally Bowman, PE., Division Engineer
Mr. Chris Murray, Division Environmental Officer
Mr. Majed Alghandour, P. E., Programming and TIP
Mr. Art McMillan, P.E., Highway Design
Mr. Scott McLendon, USACE, Wilmington
Mr. Derrick Weaver, P.E., PDEA Project Planning Engineer
;~