Loading...
HomeMy WebLinkAbout20070743 Ver 1_Mitigation Information_20070228STATE OF NORTH CAROLINA DEPARTwNT oF TRANSPORTATION, ' 1, 1 . (X MICHAEL F. EASLEY bO'T GOVFRNOR M 00 T� sh IEC February 19, 2007 Mr. William D. Gilmore, P.E., Director rEB Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652 e1 P A Dear Sir: Subject: Request for Stream and Wetland Mitigation for the Widening of US 1, Richmond County. Federal Project No. STP-0001(7), WBS No. 34950.1.1, State Project No. 8.1581301, T.I.P. No. U-3456, Division 8, The purpose of this letter is to request that the North Carolina Ecosystem Enhancement Program (EEP) provide confirmation that you are willing to provide compensatory mitigation for the project in accordance with the Memorandum of Agreement (MOA) signed July 22, 2003 by the US Army Corp of Engineers (USAGE), the North Carolina Department of Environment and Natural Resources (NCDENR), and the North Carolina Department of Transportation (NCDOT). The NCDOT proposes to widen US I from SR 1424 to SR 1640/SR 1442, in Richmond County. There will be impacts to a jurisdictional stream and two wetlands associated with this project which will require compensatory mitigation. We have avoided and minimized the impacts to Waters of the US to the greatest extent possible as described in the permit application. An application for a Nationwide Permit 14 and General Water Quality Certification 3404 will be submitted upon receipt of acceptance of this mitigation. A copy of the permit application, when submitted, can be found at http://www.nedot.orWplanning/pe/naturalunit/Applications.htTiil. The project is located in the Sandhills region of the Coastal Plain Physiographic Province of North Carolina in the Yadkin River basin in Hydrological Cataloguing Unit 03040201, sub-basin 03-07-16. Mitigation is required for the following impacts: 107 linear feet of warm perennial stream (unnamed tributary to Falling Creek) • 0.08 acres of riverine wetland • 0.13 acres of non-riverine wetland MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTAT[ON PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 TELEPHONE: 919 -715 -1334 or 919-715-1335 FAX: 919-715-5501 WEBSITE: WWWWWOTORG LOCATION: 2728 CAPITAL BLVD. SUITE 240 RALEIGH NC 27604 Please send the letter of confirmation to Richard Spencer at U. S. Army Corps of Engineers Wilmington Regulatory Field Office, PO Box 1890, Wilmington, NC 28402 -1890. Mr. Spencer's FAX number is 910 -251 -4025. In order to satisfy regulatory assurances that mitigation will be performed; the NCDWQ requires a formal letter from EEP indicating their willingness and ability to provide the mitigation work requested by NCDOT. The NCDOT requests such a letter of confirmation be addressed to Mr. John Hennessy of NCDWQ, with copies submitted to NCDOT. Please respond to NCDOT in writing within 10 business days with an EEP acceptance letter for this NCDOT project. If you have any questions or need additional information please call Ashley Cox at 919 -715 -5534. cc: Sincerely, Gregory J. Thorpe, Ph.D., Manager Project Development and Environmental Analysis Branch Mr. Richard Spencer, USACE Mr. John Hennessy, NCDWQ Ms. Polly Lespinasse, NCDWQ Ms. Linda Fitzpatrick, NCDOT Natural Environment Unit Mr. Majed Alghandour, P. E., NCDOT Project Management/Scheduling Unit Mr. Todd Jones, NCDOT External Audit Branch 2 / / 3 ®& a \\\� c Q \ @ LO ± - /� LD \ \ \® CD k / \ ��£� i w /U2G\ \ \a \ \\ / / ® \m \(_ § e /�� ° m2 =F- 0 / / \Q\ e ¥ /3 %ssuf j E < Q C) \ / ƒ/{ m 3 708 CD g 2 x Q / / \/ � \ u�)�� («/ §e Ea� wi i �c U/ wz §\ \ \\ { i \� � »kJ/ E \26 \ / U) � 2 2 / @ w \ . & Q )& � ƒ n \ \ \� \ /} J / / a/ 2 \ \ G/ 7a 0 z \ \ E « \ƒ � � u § . X w / = y 2 O I _ G e f 2 i ƒ \ \ \� \ a/ G/ 7a \ƒ � � § . w