Loading...
HomeMy WebLinkAboutSW6210505_Stormwater Report_20210723Stormwater Narrative and Calculations NCDENR Stormwater Permit Submittal For the proposed FTCC/Cumberland County - Emergency Services Campus Fayetteville, North Carolina Prepared for HH Architecture Prepared By Stewa rt r� 1 AU STEWART 1ST Submittal: 01.18.2021 2nd Submittal: 05.12.2021 3rd Submittal: 07.22.2021 Stormwater Narrative For FTCC/Cumberland County - Emergency Services Campus Fayetteville, North Carolina Prepared for: HH Architecture Prepared by: Stewart 223 S. West St. Suite 1100 Raleigh, NC 27603 919.380.8750 L,IIP10rrr0,,l r L t + 5$3 F.22_ 1 1all11174ti3tik FOR REVIEW ONLY Stewart Project No. L19032 July 22, 2021 STORMWATER DESIGN NARRATIVE FTCC/CUMBERLAND COUNTY — EMERGENCY SERVICES CAMPUS FAYETTEVILLE, NORTH CAROLINA Executive Summary These calculations have been prepared specifically to address the requirements of The North Carolina Department of Environmental and Natural Resources SCM Manual. Site Information The proposed FTCC/Cumberland County Emergency Services Campus is located at the Cumberland Industrial Center Lots 37 and 43 off Tom Starling Drive and Corporation Drive in Fayetteville, NC (34.955139°N-78.891752°W). The parcel is currently undeveloped. The parcels combined acreage is 30.0 acres with 6.85 acres of disturbance with the current development phase. The project is split into two area; the west parcel houses the administration/classroom building whereas the east parcel houses the training village. Each parcel has a wet detention pond that will capture post -construction runoff. The wet detention ponds will be used as sediment basins during construction. Additional erosion control devices utilized to control sediment transport will include stone construction entrances, perimeter silt fence with outlets, inlet protection and concrete washout areas. Proposed Improvements The west parcel will include a classroom building, surface parking area and training facilities. The east site will predominately be used for training. Both sites will capture a portion of the new built upon area (BUA) and treat with wet detention ponds. Both sites fall below the BUA threshold for Low Density however a portion of the BUA is captured with piped convenances. The areas captured with piped convenances are directed to the wet detention ponds. Drainage Areal (West Parcel) has a total area of 16.40ac with 2.35 ac of total BUA (14.35%). Drainage Area 2 (East Parcel) has a total area of 14.00 ac with 1.86 ac of BUA (13.28%). The West wet detention pond captures runoff from 2.90 ac of drainage area including 1.55 ac of BUA. The East wet detention pond captures runoff from 2.14 ac of drainage area including 1.71 ac of BUA. Site Information The National Map USTopo HOPE MILLS QUADRANGLE NORTH CAROLINA 7.5-MINUTE SERIES 88 89 90 91 92 93 -78.8750° 75 74 73 72 71 70 35.000( National Flood Hazard Layer FI RMette 78o53'49"W 34o57'33"N 10 FEMA I -.t7,000 0 250 500 1,000 1,500 2,000 Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020 Legend SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT Without Base Flood Elevation (BFE) Zone A, V, A99 SPECIAL FLOOD With BFE or Depth ZoneAE,AO,AH,Ve,Aa HAZARD AREAS Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zonex Future Conditions 1% Annual Chance Flood Hazard Zonex Area with Reduced Flood Risk due to OTHER AREAS OF Levee. See Notes. zone FLOOD HAZARD O'j Area with Flood Risk due to Leveezone D NO SCREEN Area of Minimal Flood Hazard Q Effective LOMRs OTHER AREAS Area of Undetermined Flood Hazard GENERAL - — - - Channel, Culvert, or Storm Sewer STRUCTURES i i i i i i i Levee, Dike, or Floodwall e zo.z Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation a - - - Coastal Transect ,— Base Flood Elevation Line (BFE) Limit of Study Jurisdiction Boundary — --- Coastal Transect Baseline OTHER _ Profile Baseline FEATURES Hydrographic Feature Digital Data Available AN No Digital Data Available MAP PANELS Unmapped PA The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 1/18/2021 at 3:24 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data overtime. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. 692270 340 57 26" N g r �i r �i r �i 1 34o 579" N 692270 692350 692430 692510 692590 692670 b M Map Scale: 1:3,530 if printed on A landscape (11" x 8.5") sheet. Meters N 0 50 100 200 300 Feet 0 150 300 600 900 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Soil Map —Cumberland County, North Carolina (FTCC) 692350 692430 692510 692590 692670 692750 692830 692910 692750 692830 692910 0 6992990 34o 5726" N mo r �i r �i r �i 1 34o 579" N 692990 b 1 /18/2021 Pagel of 3 MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils 0 Soil Map Unit Polygons 0 Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit , Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip oa Sodic Spot Soil Map —Cumberland County, North Carolina (FTCC) Spoil Area Stony Spot Very Stony Spot Wet Spot Other . - Special Line Features Water Features Streams and Canals Transportation Rails ,., Interstate Highways US Routes Major Roads Local Roads Background N Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Cumberland County, North Carolina Survey Area Data: Version 21, Jun 2, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 1, 2018—Jul 31, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 1/18/2021 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map —Cumberland County, North Carolina FTCC Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI GdB Gilead loamy sand, 2 to 8 percent slopes 3.1 12.0% KaA Kalmia loamy sand, 0 to 2 percent slopes 14.1 54.7% KeA Kenansville loamy sand, 0 to 3 percent slopes 2.3 8.9% TR Torhunta and Lynn Haven soils 6.3 24.4% Totals for Area of Interest 26.9 100.0% USDA Natural Resources Web Soil Survey 1/18/2021 Conservation Service National Cooperative Soil Survey Page 3 of 3 Wet Pond Sizing Calculations A STEWART Project: FTCC 06.17.2020 Revision: 0 Project No: L19032 DMB Drainage Area Characteristics / Curve Number Method West Wet Pond Input values in red Total Drainage Area = 126,274 sf Directly Connected Impervious Area = 67,446 sf CN for re Soil Type A B C D Developed Urban Areas sf sf sf sf Open Space turf areas - Poor; <50% grass cover 0 0 0 0 Open Space turf areas - Fair; 50% - 75% grass cover 0 0 0 0 Open Space turf areas - Good; >75% grass cover 0 58,828 0 0 Impervious Areas 0 0 0 0 Gravel Areas 0 0 0 0 Bare compacted dirt 0 0 0 0 Developing Urban Areas sf sf sf sf Bare uncom acted areas 0 0 0 0 Pasture - Poor; <50% ground cover 0 0 0 0 Pasture - Fair; 50% - 75% ground cover 0 0 0 0 Pasture - Good; >75% ground cover 0 0 0 0 Meadow - continuous grass, not grazed or mowed 0 0 0 0 Brush - Poor; <50% ground cover 0 0 0 0 Brush - Fair; 50% - 75% ground cover 0 0 0 0 Brush - Poor; <50% ground cover 0 0 0 0 Woods - Poor 0 0 0 0 Woods - Fair 0 0 0 0 Woods - Good 1 0 1 0 1 0 0 STRONGER BY DESIGN 233 S. WEST ST. SUITE 1100 RALEIGH, NC 27603 T 919.380.8750 F 919.380.8752 A STEWART Project: FTCC Date 06.17.2020 0 Project No: L19032 By: DMB Wet Detention Pond Sizing Calculations (90% TSS Removal) :alculation Method - Discrete NRCS Curve Number Method West Wet Pond Input values in red Draina a Area from revious tab Total Drainage Area (sf) 126,274 Directly Connected Imp (sf) 67,446 Disconnected Imp (sf) 0 Other Areas (sf) 58,828 Directly Connected Imp CN 98 Remainder CN 61 Required Surface Area Required Storage Volume Total Drainage Area = 2.90 ac Discrete NRCS CN Method Total Impervious Area = 1.55 ac Percent Impervious = 53.41% S = (1000/CN) - 10 Design Rainfall Depth = 1 in Q* = (P-0.2S)2/ (P+0.8S) S Q* Volume (cf) Average Perm. Pool Depth = 3.71 ft Directly Connected Imp 0.204 0.791 4,445.29 Max. Perm. Pool Depth = 5.5 ft Remainder of Drainage Area 0.000 0.00000 0.00 SA/DA Ratio = 1.68 Temporary Storage Vol Required = 4,445 cf Surface Area Required = 2126 sf = 0.05 ac Surface Area Required at Normal Pool = 2,126 sf Surface Area Provided at Normal Pool = 2,401 sf Temporary Storage Volume Required = 4,445 cf Temporary Storage Volume Provided = 4,750 cf STRONGER BY DESIGN 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603T 919.380.8750 F 919.380.8752 A STEWART Project: FTCC Date 06.17.2020 0 Project No: L19032 By: DMB Wet Detention Pond Sizing Calculations (90% TSS Removal) alculation Method - Simple Method West Wet Pond Input values in red Drainage Area Total Drainage Area (sf) 126,274 Impervious Area (sf) 67,446 Other Areas (sf) 58,828 Required Surface Area Required Storage Volume Total Drainage Area = 2.90 ac Storage Volume Required Total Impervious Area = 1.55 ac Percent Impervious = 53.41% Total Drainage Area = 2.90 ac Design Rainfall Depth = 1 in Total Impervious Area = 1.5483471 ac Percent Impervious = 53% Average Perm. Pool Depth = 3.71 ft Max. Perm. Pool Depth = 5.5 ft Rv = 0.05 + 0.009(I) SA/DA Ratio = 1.60 I = % impervious = 53% Rv = 0.53 in Surface Area Required = 2024 sf = 0.05 ac Runoff Vol. Re '= 5585 cf Surface Area Required at Normal Pool = 2,024 sf Surface Area Provided at Normal Pool = 2,401 sf Temporary Storage Volume Required = 5,585 cf Temporary Storage Volume Provided = 4,750 cf STRONGER BY DESIGN 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603T 919.380.8750 F 919.380.8752 STEWART Project: Project No: West Wet Pond Input values in red FTCC _,. 06.17.2020 L19032 By: DMB Stage -Storage Analysis Revision: Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) Stage Z (ft) In S In Z Zest 90.5 2401 0 0 0 91 2989 1348 1348 0.5 7.206 -0.693 0.503 92 3634 3312 4659 1.5 8.447 0.405 1.475 93 4336 7325 8673 2.5 9.068 0.916 2.529 b = 1.15 Ks = 2977 STRONGER BY DESIGN 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603 T 919.380.8750 F 919.380.8752 "D STEWART Project: FTCC Project No: L19032 West Wet Pond Input values in red Forebay Bottom Elev = Forebay Berm Elev = Main Pond Bottom Elev = Bottom Of Veg. Shelf Elev = Normal Pool Elev = Top Of Veg. Shelf Elev = Top of Dam Elev = Forebav Volume Date: 06.17.2020 Revision By: DMB Volume Calculations - 85 ft 84.5 ft 85 ft 90 ft 90.5 ft 91 ft 94 ft Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 85 96 0 0 86 138 117 117 87 185 162 279 88 237 211 490 89 294 265 755 90 355 324 1079 90.5 456 203 1282 Pond Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 85 385 0 0 86 1 552 468 468 87 740 646 1114 88 948 844 1958 89 1174 1061 3019 90 1420 1297 4316 90.5 1824 811 5127 Forebay Vol (NP) = 1282 cf Total Vol (NP)= 6409 cf Volume above Normal Pool I Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 90.5 2401 0 0 91 2989 1348 1348 92 3634 3312 4659 93 4336 3985 8644 Average Depth of Permanent pool to use in the SA DA tables ft Vperm_pool = 6409 cf Aperm_pool = 2401 sf Abot shelf = sf Abot_pond = 552 sf Depth = 5 ft Option 1: day = 2.67 ft Option 2: day = 3.71 ft Forebay equals 20.0% of total volume 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603 T 919.380.8750 F 919.380.8752 STEWART Project: FTCC Date 06.17.2020 Project No: L19032 By: DMB Water Quality Drawdown Calculations West Wet Pond Input values in red 5: Storage Volume Required Basin Characteristics Discrete NRCS Method - 4,445 Pond Invert = 85.00 ft Normal Pool Elevation = 90.50 ft Simple Method - 5,585 Next available Outlet = ft Storage Depth = 1.50 ft Req' Runoff Volume = 4,445 cf Driving Head (H/3)= 0.50 ft Ks = 2977 Provided Runoff Volume = 4,750 cf b= 1.15 Minimum depth Provided Surface Area = 3,650 sf required for storage = 1.42 ft Find orifice size for 2-day drawdown time Flow Rate = Volume (cf) / Time (sec) 0.0257 cfs Q=CD*A*(2*g*h)^(1/2) (Orifice Equation - solve for A (area)) A= 0.00756 ftZ 1.08803 in Orifice Size 2 day) = 1.18 in dia Find orifice size for 5-day drawdown time Flow Rate = Volume (cf) / Time (sec) 0.0103 cfs Q=CD*A*(2*g*h)^(1/2) (Orifice Equation - solve for A (area)) A= 0.00302 ftZ 0.43521 in Orifice Size 5 day) = 0.74 in dia act orifice size between 2 and 5 day size Size selected � i " dia -W aal Drawdown Times Required Volume = 4,445 cf Provided Volume = 4,750 cf Pipe Size = 1 "dia Area = 0.0054542 ftZ Flow Rate = 0.0185698 cfs Reg' Drawdown Time = 2.77 day Prov' Drawdown Time = 2.96 day STRONGER BY DESIGN 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603T 919.380.8750 F 919.380.8752 A STEWART Project: FTCC 06.17.2020 Revision: 0 Project No: L19032 DMB Drainage Area Characteristics / Curve Number Method EAST WET POND Input values in red Total Drainage Area = 93,304 sf Directly Connected Impervious Area = 74,636 sf CN for re Soil Type A B C D Developed Urban Areas sf sf sf sf Open Space turf areas - Poor; <50% grass cover 0 0 0 0 Open Space turf areas - Fair; 50% - 75% grass cover 0 0 0 0 Open Space turf areas - Good; >75% grass cover 0 18,668 0 0 Impervious Areas 0 0 0 0 Gravel Areas 0 0 0 0 Bare compacted dirt 0 0 0 0 Developing Urban Areas sf sf sf sf Bare uncom acted areas 0 0 0 0 Pasture - Poor; <50% ground cover 0 0 0 0 Pasture - Fair; 50% - 75% ground cover 0 0 0 0 Pasture - Good; >75% ground cover 0 0 0 0 Meadow - continuous grass, not grazed or mowed 0 0 0 0 Brush - Poor; <50% ground cover 0 0 0 0 Brush - Fair; 50% - 75% ground cover 0 0 0 0 Brush - Poor; <50% ground cover 0 0 0 0 Woods - Poor 0 0 0 0 Woods - Fair 0 0 0 0 Woods - Good 1 0 1 0 1 0 0 STRONGER BY DESIGN 233 S. WEST ST. SUITE 1100 RALEIGH, NC 27603 T 919.380.8750 F 919.380.8752 A STEWART Project: FTCC Date 06.17.2020 0 Project No: L19032 By: DMB Wet Detention Pond Sizing Calculations (90% TSS Removal) :alculation Method - Discrete NRCS Curve Number Method EAST WET POND Input values in red Drainage Area from revious tab Total Drainage Area (sf) 93,304 Directly Connected Imp (sf) 74,636 Disconnected Imp (sf) 0 Other Areas (sf) 18,668 Directly Connected Imp CN 98 Remainder CN 61 Required Surface Area Required Storage Volume Total Drainage Area = 2.14 ac Discrete NRCS CN Method Total Impervious Area = 1.71 ac Percent Impervious = 79.99% S = (1000/CN) - 10 Design Rainfall Depth = in Q* = (P-0.2S)2/ (P+0.8S) S Q* Volume (cf) Average Perm. Pool Depth = 4.26 ft Directly Connected Imp 0.204 0.791 4,919.17 Max. Perm. Pool Depth = 6.5 ft Remainder of Drainage Area 0.000 0.00000 0.00 SA/DA Ratio = 2.94 Temporary Storage Vol Required = 4,919 cf Surface Area Required = 2740 sf = 0.06 ac Surface Area Required at Normal Pool = 21740 sf Surface Area Provided at Normal Pool = 2,887 sf Temporary Storage Volume Required = 4,919 cf Temporary Storage Volume Provided = 5,027 cf STRONGER BY DESIGN 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603T 919.380.8750 F 919.380.8752 A STEWART Project: FTCC Date 06.17.2020 0 Project No: L19032 By: DMB Wet Detention Pond Sizing Calculations (90% TSS Removal) alculation Method - Simple Method EAST WET POND Input values in red Drainage Area Total Drainage Area (sf) 93,304 Impervious Area (sf) 74,636 Other Areas (sf) 18,668 Required Surface Area Required Storage Volume Total Drainage Area = 2.14 ac Storage Volume Required Total Impervious Area = 1.71 ac Percent Impervious = 79.99% Total Drainage Area = 2.14 ac Design Rainfall Depth = in Total Impervious Area = 1.7134068 ac Percent Impervious = 80% Average Perm. Pool Depth = 4.26 ft Max. Perm. Pool Depth = 6.5 ft Rv = 0.05 + 0.009(I) SA/DA Ratio = 1.98 I = % impervious = 80% Rv = 0.77 in Surface Area Required = 1851 sf = 0.04 ac Runoff Vol. Re '= 5986 cf Surface Area Required at Normal Pool = 11851 sf Surface Area Provided at Normal Pool = 2,887 sf Temporary Storage Volume Required = 5,986 cf Temporary Storage Volume Provided = 5,027 cf STRONGER BY DESIGN 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603T 919.380.8750 F 919.380.8752 0 STEWART Project: FTCC 06.17.2020 Revision: Project No: L19032 DMB Stage -Storage Analysis - EAST WET POND Input values in red Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) Stage Z (ft) In S In Z Zest 85.5 2887 0 0 0 86 3523 1603 1603 0.5 7.379 -0.693 0.512 87 4215 3869 5472 1.5 8.607 0.405 1.450 88 4964 8487 10090 2.5 9.219 0.916 2.437 89 5770 9985 15457 3.5 9.646 1.253 3.499 90 6631 11595 21685 4.5 9.984 1.504 4.663 b = 1.18 Ks = 3529 STRONGER BY DESIGN 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603 T 919.380.8750 F 919.380.8752 "D STEWART Project: FTCC Project No: L19032 EAST WET POND Input values in red Forebay Bottom Elev = Forebay Berm Elev = Main Pond Bottom Elev = Bottom Of Veg. Shelf Elev = Normal Pool Elev = Top Of Veg. Shelf Elev = Top of Dam Elev = Forebav Volume Date: 06.17.2020 Revision By: DMB Volume Calculations - 79 ft 85 ft 79 ft 85 ft 85.5 ft 86 ft 90 ft Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 79 106 0 0 80 149 128 128 81 198 173 301 82 251 224 525 83 309 280 805 84 371 340 1145 85 439 405 1549 85.5 549 247 1796 Pond Volume Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 79 424 0 0 80 1 597 511 511 81 790 694 1205 82 1002 896 2101 83 1234 1118 3219 84 1484 1359 4579 85 1754 1619 6198 85.5 2194 987 7185 Forebay Vol (NP) = 1796 cf Total Vol (NP)= 8981 cf Volume above Normal Pool I Contour (ft) Area (ft2) Incr Vol (ft3) Accum Vol (ft3) 85.5 2887 0 0 86 3523 1603 1603 87 4215 3869 5472 88 4964 4590 10061 89 5770 5367 15428 90 6631 6201 21629 Average Depth of Permanent pool to use in the SA DA tables ft Vperm_pool = 8981 cf Aperm_pool = 2887 sf Abot shelf = sf Abot_pond = 597 sf Depth = 6 ft Option 1: day = 3.11 ft Option 2: day = 4.26 ft Forebay equals 20.0% of total volume 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603 T 919.380.8750 F 919.380.8752 STEWART Project: FTCC Date 06.17.2020 Project No: L19032 By: DMB Water Quality Drawdown Calculations EAST WET POND Input values in red 5: Storage Volume Required Basin Characteristics Discrete NRCS Method - 4,919 Pond Invert = 79.00 ft Normal Pool Elevation = 85.50 ft Simple Method - 5,986 Next available Outlet = 86.85 ft Storage Depth = 1.35 ft Req' Runoff Volume = 4,919 cf Driving Head (H/3)= 0.45 ft Ks = 3529 Provided Runoff Volume = 5,027 cf b= 1.18 Minimum depth Provided Surface Area = 4,391 sf required for storage = 1.33 ft Find orifice size for 2-day drawdown time Flow Rate = Volume (cf) / Time (sec) 0.0285 cfs Q=CD*A*(2*g*h)^(1/2) (Orifice Equation - solve for A (area)) A= 0.00881 ftZ 1.26914 in Orifice Size 2 day) = 1.27 in dia Find orifice size for 5-day drawdown time Flow Rate = Volume (cf) / Time (sec) 0.0114 cfs Q=CD*A*(2*g*h)^(1/2) (Orifice Equation - solve for A (area)) A= 0.00353 ftZ 0.50766 in Orifice Size 5 day) = 0.80 in dia act orifice size between 2 and 5 day size Size selected � i " dia -W aal Drawdown Times Required Volume = 4,919 cf Provided Volume = 5,027 cf Pipe Size = 1 "dia Area = 0.0054542 ftZ Flow Rate = 0.0176168 cfs Reg' Drawdown Time = 3.23 day Prov' Drawdown Time = 3.30 day STRONGER BY DESIGN 421 FAYETTEVILLE ST. SUITE 400 RALEIGH, NC 27603T 919.380.8750 F 919.380.8752 r/ r: STEWART RIPRAP OUTLET PROTECTION WORKSHEET Project FTCC EMERGENCY SERVICES CAMPUS Project No. L19032 Outlet ID O1-FES Outlet flowrate 6.48 cfs Pipe diameter 15 inches Outlet pipe slope 1 percent Full flow velocity 5.28 ft/sec Fieure 8.06.b.1 Date 2020.10.05 Designer CBC 25 Zone 7 ' 20 Zone 6 U 15 w J; 2 10 Zone 5 Zone 4- 5 Zone 1-1 sec Zone 3 ' Zone -2 - 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Zone from graph above = 1 Outlet pipe diameter 15 in. Length = 5.0 ft. Outlet flowrate 6.5 cfs Width = 3.8 ft. Outlet velocity 5.3 ft/see Stone diameter = 3 in. Material = Class A Thickness = 9 in. Zone Material Diameter Thickness Length Width 1 Class A 3 9 4 x D(o) 3 x D(o) 2 Class B 6 22 6 x D(o) 3 x D(o) 3 Class I 13 22 8 x D(o) 3 x D(o) 4 Class I 13 22 8 x D(o) 3 x D(o) 5 Class 11 23 27 10 x D(o) 3 x D(o) 6 Class 11 23 27 10 x D(o) 3 x D(o) 7 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 223 S. West Street, Suite 1100, Raleigh, NC 27603 Tel 919.380.8750 Fax 919.380.8752 www.stewart-eng.com r/ r: STEWART RIPRAP OUTLET PROTECTION WORKSHEET Project FTCC EMERGENCY SERVICES CAMPUS Project No. L19032 Outlet ID 40-FES Outlet flowrate 10.53 cfs Pipe diameter 18 inches Outlet pipe slope 1 percent Full flow velocity 5.96 ft/sec Fieure 8.06.b.1 Date 2020.10.05 Designer CBC 25 Zone 7 20 Zone 6 U 15 w 41 Zone 5 10 Zone -4- 5 5 96 ft/sec Zane 3 Zone 1 Zone 2- 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Zone from graph above = 1 Outlet pipe diameter 18 in. Length = 6.0 ft. Outlet flowrate 10.5 cfs Width = 4.5 ft. Outlet velocity 6.0 ft/see Stone diameter = 3 in. Material = Class A Thickness = 9 in. Zone Material Diameter Thickness Length Width 1 Class A 3 9 4 x D(o) 3 x D(o) 2 Class B 6 22 6 x D(o) 3 x D(o) 3 Class I 13 22 8 x D(o) 3 x D(o) 4 Class I 13 22 8 x D(o) 3 x D(o) 5 Class 11 23 27 10 x D(o) 3 x D(o) 6 Class 11 23 27 10 x D(o) 3 x D(o) 7 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 223 S. West Street, Suite 1100, Raleigh, NC 27603 Tel 919.380.8750 Fax 919.380.8752 www.stewart-eng.com