HomeMy WebLinkAboutNCC202554_Annual Fee Unpaid Email with NOD_20210722Selkane, Aziza
From: laserfiche@ncdenr.gov
Sent: Thursday, July 22, 2021 10:25 PM
To: Carlos.Gutierrez@murphyusa.com
Cc: Selkane, Aziza; Georgoulias, Bethany; josh.autry@harcoservices.com
Subject: Notice of Deficiency: Unpaid Permit Fee for NCC202554
Attachments: Notice of Deficiency.pdf
This email is to convey a Notice of Deficiency for failure to pay the 2021 annual permit fee per the
requirements of NC General Statute 143-215.31)(a)(4). Please be sure to coordinate payment with other parties
copied on this e-mail to avoid duplicate payments.
Your Certificate of Coverage (COC) under the Construction Stormwater NPDES General Permit was not
renewed because the annual fee payment (Invoice No. NCC202554-2021) was not received. The payment is 21
day(s) overdue. A Notice of Deficiency is attached.
Please contact the Stormwater Program Billing Specialist for more information at aziza.selkane@ncdenr.gov or
(919) 707-3710. Please reference:
COC no. NCC202554
This COC is for Murphy Oil USA - Murphy, NC in Cherokee County, issued to Murphy Oil USA Inc..
If this project has been closed -out, it is important that you submit a Notice of Termination request here:
https:Hedocs.deq.nc.gov/Fonns/NCGOI -Termination
Please visit https://deq.nc.gov/NCGO1 for more information about this permit.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
This email was automatically generated by Laserfzche. Please do not respond to this email address, as
responses are not monitored.