Loading...
HomeMy WebLinkAboutNCC190603_Annual Fee NOD Letter_20210722 ROY COOPER co�ar JOHN AIICRCLSON lnrerini 5'eerrr�y BRAN WRENN NORTH CAWLINA 7/22/2021 Davidson County Attn:Zeb Hanner PO Box 1067 Lexington, NC 27292-2699 Subject: Notice of Deficiency-Failure to Pay Annual Fee Invoice No. NCC190603-2021 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of$100.00 for coverage under NPDES General Stormwater Permit NCGO10000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee was billed on 6/1/2021 and was due on 7/1/2021.The annual fee applies to the following construction site: 1-85 Business Park Phase 2 Sewer Belmont Road, Linwood, NC Davidson County Certificate of Coverage No. NCC190603 NC Reference No. NCG01-2019-0603 If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date, please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at annette.lucas@ncdenr.gov. Sincerely, Annette Lucas Stormwater Program Supervisor Division of Energy, Mineral, and Land Resources Nun Carolina Qrparlment of Errvironmenral Q"Alty I UIvlslon of Energy,Mlneral and Land Resources S12NanhSallsburyStreet 1 3612 Mall SerAce center I Ral&lgkNanhCarclkn3276W-1612 w +�+a 919.707.9246