HomeMy WebLinkAboutNCC190603_Annual Fee NOD Letter_20210722 ROY COOPER
co�ar
JOHN AIICRCLSON
lnrerini 5'eerrr�y
BRAN WRENN NORTH CAWLINA
7/22/2021
Davidson County
Attn:Zeb Hanner
PO Box 1067
Lexington, NC 27292-2699
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC190603-2021
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$100.00 for coverage under NPDES General Stormwater
Permit NCGO10000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The
annual fee was billed on 6/1/2021 and was due on 7/1/2021.The annual fee applies to the following construction site:
1-85 Business Park Phase 2 Sewer
Belmont Road, Linwood, NC
Davidson County
Certificate of Coverage No. NCC190603
NC Reference No. NCG01-2019-0603
If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at annette.lucas@ncdenr.gov.
Sincerely,
Annette Lucas
Stormwater Program Supervisor
Division of Energy, Mineral, and Land Resources
Nun Carolina Qrparlment of Errvironmenral Q"Alty I UIvlslon of Energy,Mlneral and Land Resources
S12NanhSallsburyStreet 1 3612 Mall SerAce center I Ral&lgkNanhCarclkn3276W-1612
w +�+a 919.707.9246