Loading...
HomeMy WebLinkAbout20210796 Ver 1_Certification of Completion_20210721Strickland, Bev From: Dave Luczynski <daverooster@yahoo.com> Sent: Wednesday, July 21, 2021 5:23 PM To: Fuemmeler, Amanda J CIV (USA) Cc: Homewood, Sue Subject: [External] Re: Luczynski Driveway Culvert NWP #18 / AID 2021-01216 Attachments: Action ID number SAW-2021-01216_Driveway culvert_NWP 18_Luczynski_signed_ 07212021.pdf; Luczynski_culvert pipe_1_072021 jpg; Luczynski_culvert pipe_2_ 072021jpg Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Dear Amanda, Please see the enclosed signed certification for the completion of the authorized activity (culvert pipe installation). Please confirm if this signed PDF copy is sufficient or if you would like me to also mail the signed hard copy. Please also see the two reference pictures of the completed project. We seeded the areas outside the ends of the culvert and I was hoping they would have sprouted for the picture but I did not want to wait any longer to send this. We had wanted to follow the recommendation for the metal pipe material however it would not support the capacity needed for this crossing and therefore double walled black pipe was used. That said, I already see a nice layer of sediment along the bottom of the pipe. The crossing is actually slightly sloped essentially matching the property slight downhill slope. We have already had some heavy rains and the rain water drains across the crossing in the direction of the slope and not over the edges and into the spring ditch. All in all we feel it turned out really well. Thanks for your guidance on this project. Best Regards, Dave On Friday, June 11, 2021, 10:34:52 AM EDT, Fuemmeler, Amanda J CIV (USA) <amanda.jones@usace.army.mil> wrote: 1 Attached is the permit authorization for this project. No hardcopies will be mailed unless requested. Please let me know if you have any questions, thanks. Amanda Jones Regulatory Specialist U.S. Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 828-271-7980 ext. 4225 2 Action ID Number: SAW-2021-01216 County: Ashe Permittee: David and Lisa Luczynski Project Name: Driveway culvert / NWP #18 Date Verification Issued: June 11, 2021 Project Manager: Amanda Jones Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn.: Amanda Jones 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. A It ,',t,. :iKx. '17 Tsksti -.�4Q=4; rs;' -`rite- r r .tmuf .L" s tivitR:••• : •—yam. .-r `^^v zt -�:.. -' ,natt�� yet •�Y� �� � —tom-- :•�_C�--- •. ter_ ��• -�^ZI► 'JX_ y'�'�r TKS• a - �L~ �•`l _'� ♦ =f'1• Rsfloirsmeati.g - cw-neirtrus. - r • •'rt♦ .- i .1 a a� -4- -•_ re —la