Loading...
HomeMy WebLinkAboutNC0024210_FTSE_20210709Public Services Department Water & Sewer Mains Division Michael S. Parrish ORC WWCS NC Department of Environmental Quality Received JUL 0 1 2021 June 28, 2021 Winston-Salem Jenny Graznak Regional Office NCDENR Winston-Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 NORTH CAROLINNS fNTERNATIONALCITyn' RE: Follow up to the meeting concerning the Flow Tracking Form for Sewer Extension Permits meeting on satellite obligations and allocation Dear Ms. Graznak, This letter is in response to the Teams meeting on May 181 concerning satellite obligations and allocation. We determined that the spreadsheet was not initially set up to account for the satellite obligations (Jamestown, Archdale & Sedgefield) within the FTSE form. While the data was tracking the permitted, obligated and tributary flows for the satellite allocations, the numbers were not being added to the cumulative "Estimated obligated flow not yet tributary to the WWTP"— thus the number being reported was low. To correct this: A line item has been added for each of the satellite allocations within the corresponding pump station/plant tabs of the tracking spreadsheet. Additional tables have been added to the 'Plant Data" tab to allow for entry of tributary flows for each satellite area (bi-annual data) — this data was previously not available. We have included a revised copy of the FTSE for Chris Cox Subdivision with changes. If you have any questions or require further information, please feel free to call me at (336) 883-3691. Sincerely, Michael S. Parrish ORC WWCS cc: Terry Houk- Public Services Director, Derrick Boone- Assistant Public Services Director, Joe Holden- WIS Mains Superintendent, Carrie Hyler-Pretreatment Supervisor, Mike Mickey- NCDENR, File City of High Point, P.O. 230, 211 South Hamilton Street, High Point, NC 27261 USA Office: 336-883-3691 Fax: 336.822.7071 TDD 336.883.8517 NC Department of Environmental d Quality �111I11(�j��, Dittkiou of Wa(rr Rm+ollfcos JUL 0 1 2021 Winston-Salem Regional Office State of North Carolina Department of Environmental Quality Division of Water Resou•ces Flow Tracking fo• Sewer) xtension Applications (FTSE 10-18) Application Number: 2020-160 Entity Requesting Allocation: City of Archdale Project Name for which flow is being requested: Chris Cox Subdivision (REVISED) Afore than one FTSE amy be rtagrihedfor a singleprojeet 1011c owner of the 1PIP7/' Is not resparsiblefor all ptuup stations along the ronfe ofthe p/oposed ipaslaivaterflom. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility name: Eastside WWTP b. WWTP Facility Permit il; NC-0024210 Allflbiasare /it MGD it, WWTP facility permitted flow: 26.0000 d. Estimated obligated flow not yet tributary to the WWTP: 2.8726 e. WWTP facility's actual average flow: 16.1917 E 'Total flow for this specific request: 0.0018 g. Total actual and obligated flows to the facility: 19.0660 It. Percent of permitted flow used: 73.33% 11. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP. (A) (D) M (D)-(g+C) (a)°(A-D) Pump Pomp Man Design Appron. Obligated, 'total Qlarmt Available Station Station Capacity' Average current Not Yet Flow Film Capacity' (Namaor Pemdt Daily Flmv' Avg, Daily Tributary Obligated Number) Number (FhMpQ Flow, DailyFlour. Flow MOD AIGD AIGD MGD MGD MGD MWA MWA MWA MWA MWA MWA MA MWA W/A MA MA "A MA neA eWA MWA MWA MWA MWA MIA MA MA MIA MWA MWA *N/A TWA MWA MN/A MN/A MN/A MN/A MWA *NIA MN/A MWA MWA aN/A MA ".'ncc Fhmt Cnpaelty (design aoi;) of miy pump slnllon Is deaned m Ike nmxbnunn pumped now limt can be achieved with Ilia largest pump taken out of service. "• Design Average Flow Is Ike ID•at capacity of the pump rtntlon divided by the perking fnclor (pq not - less than 2.5, per Section 2.02(A)(4)(e) of the Minimum Design Criteria. """ A Planning Assessment Addendum shall be allached for ench pump station torn led between lira project connection point and ilia WWTP where the AvOimble Capacity is 5 0. Downstream Facility Name (Sewer): Downstream Pennit Number: Page 1 of 6 FTSE 10.10 Ill. Certification Statement I, Terry Houk certify to the best of my knowledge that the addition of the volume of wastewater to be permitted In this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow firm this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat tine proposed now wastewater. 6M/2021 SigningO()`ih' Signahae Date Pob I r c. Scyz u i ckv T 4--)l iLCG.T,) R Title of Signing Official Page 2 of a FTa810.10