Loading...
HomeMy WebLinkAboutWQ0041853_FTSE_20210702State of North Carolina T") i 12 ..tea Department of Environment and Natural Resources Division of Water Resources i�ivislon Flow Tracking/.Acceptance for Sewer Extension Permit Applications (FTSE 1Owl 8) Entity Requesting Allocation City of Burlington Project Name for which flow is being requested; Quarry Hills Phase 1 West More than one F7S� maX kerev�uired for a single p_rajeat if the owner of the N'Yi�TP is not respansikle far atl pomp stations along the routo of the proposed wastewater flow.. I, Complete this section only if you are the owner of the wastewater treatment plant. a, WWTP Facility Name; South Burlington WWTP b. WWTP Facility Permit #; NC0023870 All fl'ptvs ttre Its MGD c, WWTP facility's permitted flow 12.00 d, Estimated obligated flow not yet tributary to the WWTP 1.833643 e, WWTP facility's actual avg. flow 8,7S20Q0 f Total flow for this specific request (0.0274) 8wepsonville Allocation g. Total actual and obligated flows to the facility 10585643 h. Percent of permitted flow used 8821 % Il. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the projcct connection point and the WWTP (A) Design Average Daily Pump Station Firm Flow** (Name or Capacity, (Firmlpf), Number) GPD GPD NONE Obligated, Approx. Not Yet Total Current Current Avg, Tributary Flow Plus Daily Flow, Daily Flow, Obligated Available GPD GPD Flow Capacity*** *The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service, ** Design Average Daily Plow is the firm capacity of the pumpstation divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity 8 Q. Downstream Facility Name (Sewer) ; NIA Downstream Permit Number; NtA FTSB 10-18 III, Certification Statement. I, W. Todd Lambert, P.E. certify to the hest of my knowledge that the addition of the. va ume of' wastewater To 5e permitted in this project has boon evaluated along the route to the rocolving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station on xauto to the receiving treatment plant under normal circumstances, given the impleme_ntatlon, of the planned improvements Identi#led in the plaruring asssossmont whore applicable, This analysis has been performed in accordance with local established policies and procedures using the best available data, This certification applies to those items listed above In Soctlons I and II plus all attached planning assessment add@ndums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capaclty to transport and treat the proposed now wastewater, It 7 wLt=� icxl Signature Date