Loading...
HomeMy WebLinkAboutWQ0041848_FTSE_20210702State of North Carolina Department of Environment and Natural Resources Iavision of Water Resources [7ivt tag aF w t � esa��,ce plow Tracking/Acceptance for Sewer Extension Permit ApplicatilonS (FTSE 10x18) Entity l?equesting Allocation City of Burlington project Name for which flow is being requested; quarry Mills Phase 9 fast tUlare than one it 7SE rnpy be requiredfor a single proieot if the owner of the WWTP is not responsible for all paunp stations along the route of the proposed wastewater flow, T, Complete this section only if you are the own@r of the wastewater treatment plant, a, WWTP Facility Name. South Burlington WWTP b, WWTP Facility Permit #; NC0023876 ACl flows are in MGD c, WWTP facility's permitted flow 12400 d. Estimated obligated flow not yet tributary to the WWTP 1.777679 e, WWTP facility's actual avg. flow V52000 f. Total flow for this specific request (0,0192) Sviepsonville Allocation g. Total actual and obligated flows to the facility M529679 h. Percent of permitted flow used 8735% tI, Cotaaplete this section for each pump station you are responsible for along the route of this proposed wastewater flow, List pump stations located between the project connection point and the WWTP Design Average Roily Approx. Pump Station Firm Flow** Current Avg, (Name or Capacity, * (Firm/pD, Daily Flow, Number) GPD GPD GPD (E) Obligated, Nct Yet Total Current Tributary Flow Plus Daily Flow, Obligated Available GPD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pumpstation divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity S 01 ppwnstream Facility Name (Sewer) Downstream Permit Number; NIA FTSF 10-18 III, Certification Statement: i, fit, Todd Lambert, PR certify to the best of my knowledge that the addition of the vo ume n wastewater to a permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station on route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning asssessment where applicable, This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and It plus aIt attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. �'�grr�n� C�cia� Sr`�natur�c 2of6 FTSE 10-18