HomeMy WebLinkAbout20001432 Ver 1_Other Agency Comments_20130603CONTRACT # C200480
WBS# 34431.3.5
TIP# R- 2417BA
PRELIMINARY PUNCH LIST ITEMS
FOR PERMITTED AREAS
Note: The following items were noted during a preliminary review by USACOE representative Mr.
Richard Spencer on 9 -8 -05. Additional inspection to follow upon completion of project.
SITE#
REQUIRED REPAIR
1
No items noted at this site
2
No items noted at this site
3
No items noted at this site
4
No items noted at this site
5
No items noted at this site
6
No items noted at this site
7
No items noted at this site
8
No items noted at this site
9
Repair silt fence and hardware cloth at Type A Basin
Removal. Re- construct cross vane rock weir at outlet of
box culvert
10
No items noted at this site
11
Remove rip rap from stream channel at outlet end. Only
remove rip rap above bank full elevation (waterline).
Reconstruct and rearmour bank at inlet end.
12
Remove rip rap from channel at outlet end. Remove
only portion above bank full elevation (waterline).
Remove straw bale from lateral ditch at inlet end.
13
No items noted at this site.
14
Rip rap pad has been constructed at outlet end of
1350mm RCP due to excessive slope on pipe to prevent
further scour. Mr. Spencer asked that we keep this area
monitored. No further comments at this time.
15
No items noted at this site
16
Re- construct cross vane rock weir at outlet end of box
culvert.
17
No items noted at this site
18
No items noted at this site
19
No items noted at this site
20
No items noted at this site
21
No items noted at this site
22
Mr. Spencer advised that water could be placed into
stabilized stream relocation channel at inlet end. Mr.
Spencer advised that 2 -3 cross vane rock weirs may be
required due to elevation difference, and asked that this
area be closely monitored during construction /repair.
Remove rip rap from channel. Remove only portion of
rip rap above bank full elevation (waterline).
23
Add cross vane structures in lateral ditch at left to reduce
flow velocities in lateral ditch. Mr. Spencer
recommended to install a "Plunge Pool" at the end of
lateral ditch.