HomeMy WebLinkAbout20001432 Ver 1_Other Agency Comments_20130603CONTRACT # C200480 WBS# 34431.3.5 TIP# R- 2417BA PRELIMINARY PUNCH LIST ITEMS FOR PERMITTED AREAS Note: The following items were noted during a preliminary review by USACOE representative Mr. Richard Spencer on 9 -8 -05. Additional inspection to follow upon completion of project. SITE# REQUIRED REPAIR 1 No items noted at this site 2 No items noted at this site 3 No items noted at this site 4 No items noted at this site 5 No items noted at this site 6 No items noted at this site 7 No items noted at this site 8 No items noted at this site 9 Repair silt fence and hardware cloth at Type A Basin Removal. Re- construct cross vane rock weir at outlet of box culvert 10 No items noted at this site 11 Remove rip rap from stream channel at outlet end. Only remove rip rap above bank full elevation (waterline). Reconstruct and rearmour bank at inlet end. 12 Remove rip rap from channel at outlet end. Remove only portion above bank full elevation (waterline). Remove straw bale from lateral ditch at inlet end. 13 No items noted at this site. 14 Rip rap pad has been constructed at outlet end of 1350mm RCP due to excessive slope on pipe to prevent further scour. Mr. Spencer asked that we keep this area monitored. No further comments at this time. 15 No items noted at this site 16 Re- construct cross vane rock weir at outlet end of box culvert. 17 No items noted at this site 18 No items noted at this site 19 No items noted at this site 20 No items noted at this site 21 No items noted at this site 22 Mr. Spencer advised that water could be placed into stabilized stream relocation channel at inlet end. Mr. Spencer advised that 2 -3 cross vane rock weirs may be required due to elevation difference, and asked that this area be closely monitored during construction /repair. Remove rip rap from channel. Remove only portion of rip rap above bank full elevation (waterline). 23 Add cross vane structures in lateral ditch at left to reduce flow velocities in lateral ditch. Mr. Spencer recommended to install a "Plunge Pool" at the end of lateral ditch.