HomeMy WebLinkAboutNCC200585_NOT Closeout Documents_20210720 Sedimentation/Constiruction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919) 791-4200
County: Lee Project: Ascend Leadership Academy Expansion River basin: Cape Fear
Person financially responsible:BC Construction Group-Paul H Lemley,Exectuive Project#: LEE-2020-025
Vice President
Address: 400 W.North St.,Suite 112,Raleigh,NC 27603
1. Project Location: Harvey Faulk Road,Sanford
Pictures: No
2. Weather and soil conditions: sunny Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): no one Title: n/a
Inspection report: Sent Report Date given/sent: July 14,2021
9. Corrective action needed:
10. Comments: Permanent groundcover sufficient to restrain erosion has been established.No additional self
inspection or monitoring is required.Project is released under the NPDES General Storm
Water Permit for construction activities is terminated.
Complete the electronic notice of intent(eNOT)form at deq.nc.gov/NCGOI
Reported by: Diane Adams Others present:
Date of inspection: June 24,2021 Time arriving on site: 12:30 PM Time leaving site: 12:40 PM
cc: