Loading...
HomeMy WebLinkAbout20131200 Ver 6_Year 1 Monitoring Report 2021_20210716 Tryon International Equestrian Center 2021 Monitoring Year 1 Report Polk County, North Carolina Ai.1 i fi. r .cam a'Ft .. • DWR# 20131200 v6 Data collected: July 2021 Submitted on: July 16, 2021 Prepared for: Prepared by: CLearWaer Tryon Equestrian Partners,LLC ClearWater Environmental Consultants,Inc. 145 7th Avenue W; Suite B, 2659 Sandy Plains Road Tryon,NC 28782 Hendersonville,NC 28792 Introduction The Tryon International Equestrian Center(Site) is located at the intersection of Pea Ridge Road and US Highway 74 northeast of Tryon in Polk County,North Carolina(Figures 1 and 2). A permit modification request (DWR 401 Water Quality Certification DWR#20131200 v6) resulted in a request for additional information in a letter dated August 27, 2018 and a Notification of Violation(NOV) issued March 29,2018(Attachment A)sent by the NC Division of Water Resources. In order to satisfy the conditions of the permit modification and resolve the NOV, Clearwater Environmental Consultants is conducting monitoring of a 200 ft stream reach adjacent to a 20 ft stream repair section.Odom Engineering PLLC (Odom) designed the repairs, which included streambank stabilization at a 60" RCP stormwater outlet,rock toe and slope stabilization with riparian seed mixture, and coir fabric placed on graded slopes. The purpose of monitoring is to ensure that the site continues to remain geomorphically stable following the repairs. This is the first annual monitoring report(MY1)of three years of post-construction monitoring. Construction of the initial repairs were complete in the fall of 2019,and an as built geomorphic survey was performed on November 22, 2019. Following the As-Built survey, additional matting and live stakes were installed on April 30, 2020. In January 2021 additional stabilization measures were installed along the stream banks and below the 60" RCP stormwater outlet.A rock toe was installed along the inside meander bend of the stream bank,opposite of the stormwater outlet. The inside meander bend was regraded and stabilized with seed, straw, and matting. Additional energy dissipation measures were installed on the stream bank between the existing plunge pool and the stream edge. Erosion control wattles were installed along the stream side to prevent excess sediment entering the stream from the most recent work areas. Due to the installation of additional measures,geomorphic and photographic data collected in the fall of 2020 was not used for MY1. The bank stabilization work completed after the As-Built survey destroyed the original cross section pins and PVC monuments. The cross sections pins were reestablished, to the best of our ability, in the same locations as they were in the baseline survey. Now that additional post construction repairs are complete,2021 starts MY1.This annual monitoring report documents the geomorphic condition of the channel adjacent to the stabilization efforts. Monitoring components include: geomorphic survey of stream dimension (cross sections) a longitudinal profile, and photographic reference points(photo-points)to visually document stream conditions.Please refer to Figure 3 for the location of monitoring features. Tryon International Equestrian Center page i Monitoring Year 1 Report for repairs to UT to White Oak Creek July 2021 Table of Contents Introduction Monitoring project success criteria 1 Methods 1 Geomorphic Surveys 1 Photographic Documentation 1 Results 2 Photographic Documentation Results 2 Geomorphic Monitoring 16 Conclusions 18 References 19 Attachment A • Longitudinal Profile Survey Visualization and Parameters from"The Reference Reach Spreadsheet" • Cross-Sections 1-4 Survey Visualization and Parameters from"The Reference Reach Spreadsheet"for MY 1 and the As-Built Survey Tryon International Equestrian Center page ii Monitoring Year 1 Report for repairs to UT to White Oak Creek July 2021 Monitoring project success criteria The project success criteria is evaluated using Photo documentation, and Channel stability measurements that meet published guidelines for geomorphic assessment under section VI of the 2016 USACE Wilmington District Wetland Compensatory Mitigation Update.If the repairs remain geomorphically stable through years one through three,the permit condition will be considered fulfilled. Channel stability (Cross-sections, Longitudinal Profile surveys): Minimal evidence of instability (downcutting, deposition, bank erosion, or an increase in fine substrates). Determination of success should indicate that there is no significant change from the As-Built dimension and longitudinal profile and should determine that any measurable changes are moving in a direction of stability rather than instability. Photo documentation: Visual assessment should indicate no substation aggradation, degradation or bank erosion, should demonstrate success of planted riparian vegetation (riparian seeding and live stakes), effectiveness of erosion control measures, and the absence of developing instream bars. Methods Geomorphic Surveys Stream surveys follow the methodology contained in the USDA forest service manual "Stream Channel Reference Sites(Harrelson,et al 1994).Both cross-section and longitudinal profile surveys were conducted on July 2, 2021. All monitoring locations are monumented with capped rebar and a PVC stake. The additional construction in 2020 resulted in cross section pins and monuments being reset.New monuments were placed,to the best of our abilities, in the same location as those in the 2019 As-Built monitoring. Geomorphic surveys were performed using a laser level, and laser sensor attached to stadia rod, and measuring tape. Permanent cross sections were established at four locations within the 200 ft reach to represent two riffles, one run and one pool. Cross section locations were established according to best professional judgement. Cross section data points were collected at all major changes in slope, including top of bank,bankfull,water surface and channel thalweg locations. A longitudinal survey was performed with data points collected at major changes in slope,including at the water surface and channel thalweg, head and tail of riffles, max pool depth and at bankfull or top of bank locations. Stream channel cross section dimensions and longitudinal profile slopes were calculated using "The Reference Reach Spreadsheet"version 4.3 L developed by Dan Mecklenburg. (Ohio Department of Natural Resources). A longitudinal survey will only be repeated during annual monitoring if visual assessment indicates significant incision or aggradation within the streambed. Photographic Documentation Photographic reference points (photo-points) were used to visually document stream conditions and included both a downstream facing photo and an upstream facing photo at each photo reference point. Photo-points were established at six (6) stations along the length of the 200 ft stream reach. The photographer will make a reasonable attempt to capture the same perspective in each photo-point location annually. Figure 3 includes the locations for the all monitoring features. Tryon International Equestrian Center page 1 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 Results Photographic Documentation Results Visual assessment was performed at the time of the As-Built Geomorphic Survey on November 22,2019, as well as during the MY1 Geomorphic Survey on July 2, 2021. The visual assessment photos of the As- Built and MY1 are included below for comparison. Photographs of the additional stabilization measures installed January 2021 and the current conditions of the live stakes installed April of 2020 are included in the subsequent section. Photo Points r _ , y- eta .'- 4 £S 'Ara! dirk', siiid ?ri{ 9 . -a A n.,,,,, a 1 y 'ate` 4i�`. s�^ f f- ' ~ 4't hh r 1� fa. i�i. f a di ' .. � #�_ ��, `��9 } - � ,. - • ,. S. -..; - � � L W '•' ,• 1 a+ Photo Point 1 Upstream: As Built(11/22/2019) 4� :-s ti ^r y: yE 611) f ;$ J if ,._ 7.,.. ...,..,i, „tt... , _ ,, . ,,,,.....„... ..„.. „ , , , A, A... , ,,,. ,_ z, .. ...._ .„. .;,....., „ , „..,.. ... ,,,, ,,....,„ ; ,,.4 ., . ... ....., .,.. .,,..„, .... , . , _ fo�7r r2�02 9:0s -, :tea% - ..,�' `V Pk -� Photo Point 1 Upstream: MY1 (7/2/2021) Tryon International Equestrian Center page 2 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 pppv_ Ici �: r: Tg x.': :^ _ ; ,_• - '..X.•w - E'A.�...• - e..a . z -4 '.—7 r,„... .._ _ ,::„._.,w7,...,. , . „.....,, •ri - Lt `V . " .,. 11 22/2019.'1 �a'I .\i Ta - 'fit'- ; ��, w f . 'at, "-iks-;4r." r :tea. Photo Point 1 Downstream: As-Built(11/22/2019) ,,,, >j ..` 3 1. -.� µ y a ..a:4:V _ • i•r— � a ?5' . . f _1m #41 i ,1 � r ry 07/02/2021 09 07 Photo Point 1 Downstream: MY1 (7/2/2021) Tryon International Equestrian Center page 3 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 - .t [ :n4 i.fT�e .F - �F ' bra • i 5 _L: -. ;..i `'62.!, - - fill._ ..* I:D Y • - Z �iJ, .;��F - M;'_...43+ems. r .. _ - M's •-i ¢ i .. .-- rl' GSR. . yE Wr ,' ' .J. / -. K _ a --'e ayyT .'Y , Y `t -.' Zy . i Rn �b,.F [tom .` r k' fte Ari ••yx } �.i •fit-F-Sni.-: Photo Point 2 Upstream: As-Built(11/22/2019) -fir r sr t � 1.f`✓ � c S t It*4 d LL4 d ' in 11 S A. ' 4 ` ;fi r �': �4 z k r. { .�5q..�, S�, ., JCS , S -� _^YY ;-.. `S }-:- T. - 4 1 ice' N ., r r .."-- s„ „..$4, i:2.2 T,-11V.AtVit) -'4.04.ijA-' ..:4'4. '_ .4,,,, Photo Point 2 Upstream: MY1 (7/2/2021) Tryon International Equestrian Center page 4 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 • y Y '1 iij - E ' -- tr• .6, 1 ir. _ ram• 'w - �qt:h -.�. - - - ��..�_~ + e: . .,;;.�,, ,: - -. Photo Point 2 Downstream: As-Built(11/22/2019) }' f 5.4 --, i� "' 011.'ao'.'ff. 4.f�. `� '„..„ r, 7 I, • 2,, , .414 Iiimmiiraw,,,,,_;_ikaa_ , ::-_. g i. =, ar 4, .� � - Y x d" r : R -..E ii4 v ' t J�i i .'y 4115-. k Photo Point 2 Downstream: MY1 (7/2/2021) Tryon International Equestrian Center page 5 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 .-,,,_.1 VIN/T.':411...-,;,...-P.v,,..: • , '14 74e ,, . 71`'lit,piff,r • f: My • _ mro- _ 3::- _ ` ik , _ ._. , , „,..,„,t, _. ,_•,.. de -ir Photo Point 3 Upstream: As-Built(11/22/2019) l • ,-� �-t , `y�eY ` ••--.`.�_ 1 i 7, -- C. � $ R 4�o w4 kily ..r,�-.'4 - er� - - ,ram. -4 t -, .ems �-.I'._- - .- "S i'' +s`—s• . a'Sf' fo s ' _ r.:a r, `t'Gs•: 3� . - ,, 7 -_ Jd l Photo Point 3 Upstream: MY1 (7/2/2021) Tryon International Equestrian Center page 6 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 1 ' it�r.� is — '',t'... .•.Yai a. ', -.--_- ",':1 liZ:Y, am,.. S'•4 -gip �� `-gyp-._J. �� * . *��. � �_ -y--� t•Vf . Photo Point 3 Downstream: As-Built(11/22/2019) M �`W. 6 ,,,,, ."ys` . $6' -fir' ';'k - a'��!'' -'+.a,. ......A.- c 7,0 0- ,--' ', -...;-,-), ;‘,. .Attr- •-..,., ''.01 : :A ,.. ., ,, r ., ,_,„ 1.,,, r, .....so..,..„,_ _ _ " , „, t......, _.-il. v, r''''' * " '• - '1.?,:ri gip f • f 0 t 0 .> .G c ( Tom►" s l 4 � ipPlir Y • tmot Photo Point 3 Downstream: MY1 (7/2/2021) Tryon International Equestrian Center page 7 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 _ "---"•", air I . - .;i.' 'i f� 911E .. 4 F➢.0 , �r Yfb - 'Ir. f. r2lxe i -; ;` - . ` t:, 1-.�' 'E,:, ; _, ,-- ' „', - i-- �I. eta:•d ::yy''�.'`rcy^4. K. .•,. e''. f� W�: . „Ilre sit_ -' Y isle .L 4,.....„..... _ ,How,..;.„,..,,o., 4. ", _. : ; . � : 7Y.t:: • • 11 .•1412;041.912 ` I a_ ,; is. 'K. Photo Point 4 Upstream: As-Built(11/22/2019) r R d I *r r Ye --4 .. _7" ., rj s• 'G "i. -1 'I Alrf >4 -� ,o-[r. t , ' ai } ,ate - --a - '`-` .. z, ., - - — • , , 074//02/2;021- 09`1 E, Photo Point 4 Upstream: MY1 (7/2/2021) Tryon International Equestrian Center page 8 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 X ',,, -:.'-'1. '' •rr *` >;r$q` •-•••x4.:_" ydrw rrie•— ';+"-— 7y! } � i+a# `- ,, - ,. S- m 11 i,G.fdF+'l.,.yo,. Y,»Ql' h'"yam-r l c'i�-' `A 1r, s i# 4 / ' "�c . 9 ^,'ice .. . .fi ar,. $ _j',' 6 b- :a5�1. ,r ' ' any s+,-a 'VW -s.. �'V 1 .^•yti!' .yf t.11r! . , ' s'-f. 5 �'�; _ 'Or, _ ,. w=.. ir is y u A. �'i - ,' 9 ;•f; /�- t _ 4'.-"' l l r`2-?,,2 U 1 Y 12 :14 Photo Point 4 Downstream(11/22/2019) r of n 1 - A . „..s ' Ys _ • fin•i.- ,,,,r, , . ,,,,. _.,„ , , ..., ._. ..,., .. 2" 47i, -/ .e.. '.'"' ' 4 . ...r..._.,. ,..,,.. ,......„ .....?......,..,, ,.....„., .. _,, ft..I__.....wc... f. ,j. �F _.r.4• ,x al- �� i �r . ,ram• i �' " Photo Point 4 Downstream: MY1 (7/2/2021) Tryon International Equestrian Center page 9 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 yam.•. }... . ' 4 - -2rc -, Cur u: 4. . ' i' ,,.- . . 4�ti.A ' ,•1 ,,E . _ y a'. + y . r • ,/ ;r .P = sue::-Yj - . iAti. - -, . - • •4•:- r :, ,, ,... Photo Point 5 Upstream: As-Built(11/22/2019) ‘. ' \\ _,..', .t,'. t ..:44.. , ...:-,. '.. ...., • .0 =47=rf ` T yi `. 4• ,yam '�'�,... � t.'yt TF 1 7w. r i .di 4• ....14104 • • " ii �a 4 �� .0,7/02/202,1 09 15 '- a - r �r Photo Point 5 Upstream: As-Built(7/2/2021) Tryon International Equestrian Center page 10 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 iiii Cr--. a�� i-d.. .. ;[S-` '.t,. - - j:....:.i' vjj.o- •s -.- .-?, .7? - ''' ..;-%It- J--......-..,: -.,i,. -,.., # 1-- ix*:›xir . ',V--L-__1,-;;;4_ .r ..' - ' • Fyn^ -• _ `f •i_:i`.f -. `,. ' 1k.'. x - - s�. Lae .i +r F. .' _ " -€.aSL N t..PT4 s% R;•_ .-. i ce?".. .-E:' .-F�. j,,f�a,,-,-+�]Ey_:- _l�r..... � C1. .--} G.r Photo Point 5 Downstream: As-Built(11/22/2019) a �' d k i4 t • la" -sic ° ' T � � Sty e; � V;-� � �` i �� u- �`.. -tie, " .. ' ----Zr. • .. • ' �@6� b k � Y yw .. . .,..•. . , .,,,...t_....„ .;,_ .,..,,, Irr" i . T'e_ -'�'L _ Ti 'r .� a - - - .-. z fi: O�1j0"'20.2-1 `09 17 '— 1. ., '' - Ste *-,; in,:' 'iE� Photo Point 5 Downstream: MY1 (7/2/2021) Tryon International Equestrian Center page 11 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 4; ti• a v' - —.rat- .�r. ff77 . 4 :+ ti'''' '7;7.11 11- 1 .01;,,,..L.--)---gpvr, 4.._ ,, _ _ 1 /22 . ,47. —, 4 Photo Point 6 Facing Stormwater Outlet Pipe: As-Built(11/22/2019) 'i'" ,,.....„..0,,,,,,,,-,„ fK, „ z, ...-„,, ,,,. ----,,,,- , 1-.,- vi-ct... t, 4", 4.;),...4.--=''' _Li4t,,,...... 5"�, � 4Rfmic6F.,f 'G Ai �. - Syr S �:1 y° iy",� , AI D ! , •i,-'- 1 �- -4. `ka i' '_'' t ��,!a'' ` p < -f�� r „- ` . nl le,"., S�eh;'"1t` 1 d i'il ,4 , -, '� 0741 2,12,02e1 n .1 Photo Point 6 Facing Stormwater Outlet Pipe: MY1 (7/2/2021) Tryon International Equestrian Center page 12 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 _ - _ .: 'P• .y';? 4r"ya _ x' " �, r. .. <r. '. , _7 } \ '- •.rim . �..`-� �_ '/. .i k �.,b • - .. ._ ft, i_- lc , . 'ram _ , V*v.V. ` 4 r... + Lam. ', �, r..�.0 r � � �'..fir T ogi . _.. Photo Point 6 Facing Stormwater confluence with UT to White Oak Creek: As-Built(11/22/2019) :- -., ra. pp III 7- ,4 _l i r r el S r ' _ ;erg, �, x `:*XI2, _'4 L''.-'-- a ''1'; Jr,'•...„7,,— -.-. f.- , .;,--;,..,A :P..'VellAW 4—A-ie.ktri.le''-'. , ,.- -:4'E.:,,,f_4_,,,::'...k,,,1;,,,,,, ,,,.,;,9e _ h II�L-. '•-• Il �e1°Lr-ll ,,,," ''' -i '-;'- i'f r',...',4;II • '-, 7 i,24.1 ' ,'.k-''': .'' . ��• ww 1 :�r' w ,1}r ,}'�a:.r. 'Sd -�r''iaiad; w�.i,_ A�. � Iati��lFa._•A.. --- Photo Point 6 Facing Stormwater confluence with UT to White Oak Creek: MY1 (7/2/2021) Tryon International Equestrian Center page 13 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 Additional streambank stabilization below the stormwater outlet and on the inside mend bend were installed in January 2021. Photographic documentation of the installed measures is presented below: V if,',',1,°i:;',;, 4i,i.;\A =,:', ". ,-fil ci 6,,,,,'—,,,,4,'' ‘" a it , ' r o . ' '''''''..''''':.,''.41:''.'"-:',':,,i',,,-t-':i: .:::.„1,1t.e., .*'H''';--li,a:'4,4-:-'1,!--'.-,' '7. 4,-;,0,..'"'-:: .,_ , „.1, ,,,, :_:' ' _ . ._:. _., ,,,„„,,, �' ate .d" ,ktft ; - . .O/2O2l II 53 w, 01/20/2021 11.54 �, . ue �. .ia�� k�.-u.. --. Overview of additional stabilization measures Inner meander bend seed and matting(1/20/2021) (1/20/2021) �mm� iR� �es ' ti 'ypp' j0 1_ 4 as a r` v_y '` ..-1,,. „ 'fir P '�17 `_ ,..:,:•,...". - i,',...... .---i- Rock toe on inner bend, opposite of stormwater Concrete block step structure installed below 60" outlet(1/20/2021) RCP stormwater outlet(1/20/2021) Live stakes planted April 2020 on the outside meander bend have had a poor rate of establishment.Roughly half of the live stakes observed did not sprout as of the MY1 site visit.Approximately eight live stakes are established. Installation of additional live stakes is recommended. Photos of the outside meander bend live stakes are below: Tryon International Equestrian Center page 14 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 m«-- 'gig � . 1'.4/2.012 2FE Live stake installation on outside meander bend(4/30/2020) l f '< A p, t i w r� �„�� �A�� ray. I �( e;R�6 , � ;l '� s xr 07/A0242021 09 22 i MY1 live stake establishment is poor and should be supplemented(7/2/2021) Tryon International Equestrian Center page 15 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 Geomorphic Monitoring Cross section surveys were performed during the November 2019 As-Built Assessment and again on July 2,2021 for MY1.MY1 data is compared to geomorphic data collected during the As-Built assessment.Due to the additional stabilization measures that were installed along both banks since the As-Built survey, and the results of MY1 geomorphic assessment, there is no significant evidence of widening or incision at monitoring cross sections,at this time. Cross section comparison graphs and the longitudinal profile are included in Attachment A. Cross Section 1 (XS 1)showed slight downcutting(a few inches)at the thalweg. The right bank of XS 1 was re-stabilized in early 2021 and has a sediment wattle in the cross section.XS2 shows the re-graded left bank with a new rock toe,and sediment wattle,abutting the stream bed.The right bank at XS2 also had additional stabilization work completed since the As-Built survey. No significant changed was noted to the stream bed at XS2. XS3 shows very little change across the entire cross section. The left bank of XS3 was re- seeded and matted in early 2021. XS4 shows some very minor downcutting along the thalweg and will be an area of interest during annual year 2 monitoring(MY2).The left bank at XS4 had additional stabilization work conducted in early 2021. The table below summarizes Geomorphic Data for the monitoring record: XS1 XS2 XS3 XS4 Bankfull Dimensions Riffle Run Pool Riffle Nov-19 Jul-21 Nov-19 Jul-21 Nov-19 Jul-21 Nov-19 Jul-21 x-section area (ft.sq.) 12.6 14.4 20.0 26.5 26.3 30.5 27.5 31.9 width (ft) 7.8 8.5 14.3 19.8 18.5 18.8 17.5 26.4 mean depth (ft) 1.6 1.7 1.4 1.3 1.4 1.6 1.6 1.2 max depth (ft) 2.3 2.6 2.3 2.5 3.3 3.5 2.8 3.0 wetted parimeter(ft) 10.2 11.3 16.2 22.9 20.6 21.7 18.7 27.8 hyd radi (ft) 1.2 1.3 1.2 1.2 1.3 1.4 1.5 1.1 width-depth ratio 4.8 5.0 10.2 14.8 12.9 11.6 11.2 21.8 In addition,photographic documentation of geomorphic cross sections are included below: Cross Section Photographs f :.4 �w - .. _ ,k, ,, 44f .yl`. Si.V +�a Y i � ri 420 0: o Os 114� r ''I:I,net , .. Cross Section 1 Facing Downstream(7/2/2021) Cross Section 1 Facing Upstream(7/2/2021) Tryon International Equestrian Center page 16 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 r .a ii, .. ., . i ,,,_ ,:,,,,r,,d,_ ,., ,..„,_, ,, ,Ist:„. ;1:: of ''''Ir.-7":4" , '�'✓ - 4... ,,IL,;i,.:1,3...,:ii.71,,,,isi4.‘,„1:4,:,,,,...,-,:...--, :. -.40. . , -,.sue ,, _e i , - Y - yR 1 w? 'ter,1. Cross Section 2 Facing Downstream(7/2/2021) Cross Section 2 Facing Upstream(7/2/2021) a ' 4 ./ Cross Section 3 Facing Downstream(7/2/2021) Cross Section 3 Facing Upstream(7/2/2021) Y � • s r r xr` ,- w- - a Y r xf � g `s_r , m� ea '�- � # , ° 7 . � .�a : h �.Us9 1z:o12 0D° Y�<o7Qo� �0�1 r Cross Section 4 Facing Downstream(7/2/2021) Cross Section 4 Facing Upstream(7/2/2021) Tryon International Equestrian Center page 17 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 Conclusions The overall geomorphic condition of UT to White Oak Creek appears to be stable within most of the project area.The recent stabilization work appears to be effective at stabilizing the stream during heavy stormwater flows. Minor amounts of cobble and boulder mobilization was observed below the stormwater outlet structure. This area will continue to be an area of interest over the next two monitoring years. Additional live stake planting is recommending along the outside meander bend below the stormwater outlet. As riparian vegetation continues to become established around the recently installed measures,it is expected that the stream will reach a new equilibrium and geomorphic conditions will move toward increased stability. Comparing MY1 to the As-Built survey is a poor reference due to the additional stabilization work and resetting of cross section monuments; therefore,MY1 will serve as a new baseline moving forward. MY1 indicates that the site generally meets performance standards. CEC will conduct the MY2 during the summer of 2021 and send the report to DWR for review. Tryon International Equestrian Center page 18 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 References Harrelson,Cheryl C;C.L Rawlins;J.P.Potyondy. 1994.Stream channel reference sites:an illustrated guide to field technique. Gen. Tech. Rep. RM-245. Fort Collins, CO: U.S. Department of Agriculture, Forest Service,Rocky Mountain Forest and Range Experiment Station. 61 p. Dan Mecklenburg & Ohio Department of Natural Resources. Copyright 2006. "The Reference Reach Spreadsheet"version 4.3 L Tryon International Equestrian Center page 19 of 10 Monitoring Year 1 for repairs to UT to White Oak Creek July 2021 TIEC As-Built Documentation Report a A 0 0 t C 4 ae, 4° old A P qt. o9v,, a d ---- - — En 46a ypct`a °o _� Monitoring Reach ��--_-_---___ °. C JO° S — — --- _ r R d a �F.586e e I I 3. ~q. C I Q4 8 d�,9 I cr o e o o q I a Larsen Ln a r d c N Lek g au$ r 4 t Mod1°rd Rd 7. L a CO '1m n a a $ 3' f r 4 dl 6 OV es Hi11 Dr ^S. Luz N i:___ Y Ln MUscadmet Legend •, > Monitoring Reach TIEC Boundary 0 0.5 1_ Miles Drawn by:AKT Date;5.18.2020 CEC Project#747 r y q.� `p. o- . [LearWater Polk County, Vicinity North Carolina 32 Clayton St Figure 1 Asheville,North Carolina 28801 TIEC As-Built Documentation Report 7 ''. N) '--.---•,) - ...0.-:,..--sj ( - \I • . - '''' 7 —'''') .-7- 22 . P-. ; ..- --!. „- ,_____It .7k ,..„,-,, .., , . _ ,........ _„,..., •_ .... „ ,___:.___ _....,,.. .,I f-:::-'. ,- ( ... 4 --.. ,..cl#11 °..%:' - 41.11 .i . ./ , r_____ -) •----.. . c,...:> '-' ( ,,C:williblifil, .--._. _7I a .. /c,._........\.. ,1 4,.,,,,,,, _ . , . .-.)7, !; /: ,..-L--- J 899 `1,. . ./Nevi' ii1 t ''-.-4-., •333k �!- 1 `. -. � } r Z___,..%\.. .. .,/•ina ry.---�. t , K'k l actik !/F r J _I. V , N\ Monitoring Reach __ _J— r - " 8M - ••'.•',�� 1 -- � �_``� I I� ` V it `F-�^ /_ 4 Ll �`l r I % .,e.------- ., . ,. -,„_ t--.‘_.,-...A j _ j _ `, 1 * a rr -' q e l ti ./ .� i• t _ : . -j . '" - ' ',. • r i, 1 • .SIIScl l( -- -- )...,. ',N,_/.--- ,., �Zjra�� - nNE �. x,.•a / -� --,... ,i .. - . ._ . . .,..d _.7 - ....-t ,---„N - :%, -. e ,_ -_,_ .„ L) - i ' - . .- „ ~ 7 _____Ai---- ,1 '-.-----.._ \ , --_ * ( 4.____: ,:,,,j . a• 1 ♦. /r ' i• / l i,., . ...._ .__.,/ _ ........ ..„ I, .„„.. ___,, , \ ,- _.. - , , . .... ,. . ‘.:, ____,.. , , . ____, N Legend � ` - 0 C .tip I�,-_ J > Monitoring Reach - � r. •� ti �' �_ TIEC Boundary 0 0.5' 1 •Y Miles_ . ;i :AKT Date;5.18.2020 CEC Project#747 -- - .. © - i ` o [LearWater USGS Topographic Map Polk County, Pea Ridge Quad North Carolina 32 Clayton St Figure 2 Asheville,North Carolina 28801 TIEC As-Built Documentation Report a Stormwater Longitudinal Outlet Profile Reach 1 ri 'Photo Point 1 4 +s • r. Photo Point 2 Photo Point 6 - •- xs, - - . - - - _Photo Point 3 i 0 _ . Photo Point11141 , - • L Photo Point 5 Legend N Monitoring Reach171 I 4 -Stormwater Infrastructure I_CZ. TIEC Boundary i • 1 + Photo Points .1 -Cross-sections 0 25 50 Feet Drawn by:AKT Date;5.18.2020 CEC Project#747 NC OneMap, NC Center for Geographic Information and Analysis, NC 911 Board [LearWater Polk County, Monitoring Features Map North Carolina 32 Clayton St Figure 3 Asheville,North Carolina 28801 Attachment A TIEC -Repairs to UT to White Oak Creek Cross Section Comparison Plots MY1 -July 2021 XS1 - Riffle -0+65 842.5 Q $42 841.5 - ` - -1 841 - 840.5 • a 840 839.5 • m 839 V 838.5 a 838 m 837.5 , 1 w 0 5 10 15 20 25 30 35 Width (feet) Cross Section Nov-19(As-built) —Cross Section Jul-21 —Bankfull Jul-21 Bankfull Dimensions Nov-19 Jul-21 x-section area (ft.sq.) 12.6 14.4 width (ft) 7.8 8.5 mean depth (ft) 1.6 1.7 max depth (ft) 2.3 2.6 wetted parimeter(ft) 10.2 11.3 hyd radi (ft) 1.2 1.3 width-depth ratio 4.8 5.0 * Elevations are all correct relative to each cross section but may not be the exact elevation above MSL. Elevations were calculated based on a singular benchmark that is approximately 840 feet above MSL. Attachment A TIEC -Repairs to UT to White Oak Creek Cross Section Comparison Plots MY1 -July 2021 XS2 -Run- 1+04 844 - x 0 a 843 0_ 842 841 0 ¢ 840 I 839 838 - m 837 0 5 10 15 20 25 30 35 Width (Feet) Cross Section Nov-19(As-built) —Cross Section Jul-21 —Bankfull Jul-21 Bankfull Dimensions Nov-19 Jul-21 x-section area (ft.sq.) 20 26.5 width (ft) 14.3 19.8 mean depth (ft) 1.4 1.3 max depth (ft) 2.3 2.5 wetted parimeter(ft) 16.2 22.9 hyd radi (ft) 1.2 1.2 width-depth ratio 10.2 14.8 * Elevations are all correct relative to each cross section but may not be the exact elevation above MSL. Elevations were calculated based on a singular benchmark that is approximately 840 feet above MSL. Attachment A TIEC -Repairs to UT to White Oak Creek Cross Section Comparison Plots MY1 -July 2021 XS3 -Pool -1+15 848 0 a 846 — o_ Q 844 co m 842 0 .....geterso00000000. Q 840 - ii 638 -- - — 2 836 -- - -- - - - La w 834 0 5 10 15 20 25 30 35 40 Width(Feet) •Cross Section Nov-19(As-Built) —Cross Section Jul-21 —Bankfull Jul-21 Bankfull Dimensions Nov-19 Jul-21 x-section area (ft.sq.) 26.3 30.5 width (ft) _ 18.5 18.8 mean depth (ft) 1.4 1.6 max depth (ft) 3.3 3.5 wetted parimeter(ft) 20.6 21.7 hyd radi (ft) 1.3 1.4 width-depth ratio 12.9 11.6 * Elevations are all correct relative to each cross section but may not be the exact elevation above MSL. Elevations were calculated based on a singular benchmark that is approximately 840 feet above MSL. Attachment A TIEC -Repairs to UT to White Oak Creek Cross Section Comparison Plots MY1 -July 2021 XS4 - Riffle-1+43 841 - X 2 840.5 - — a 840 - J u) 839.5 839 Q 838.5 0 838 u_ O 837.5 1i 837 N w 836.5 I 0 5 10 15 20 25 30 35 Width (Feet) Cross Section Nov-19(As-Built) —Cross Section Jul-21 —Bankfull Jul-21 Bankfull Dimensions Nov-19 Jul-21 x-section area (ft.sq.) 27.5 31.9 width (ft) _ 17.5 26.4 mean depth (ft) 1.6 1.2 max depth (ft) 2.8 3.0 wetted parimeter(ft) 18.7 27.8 hyd radi (ft) 1.5 1.1 width-depth ratio 11.2 21.8 * Elevations are all correct relative to each cross section but may not be the exact elevation above MSL. Elevations were calculated based on a singular benchmark that is approximately 840 feet above MSL. Attachment A TIEC -Repairs to UT to White Oak Creek Cross Section Comparison Plots MYI -July 2021 Longitudinal Profile-UTto White Oak Creek tbed —•—water srf —•—bankfull n x-section a riffle crest o pool • run glide 842 a 841 Q 840 +:',..< co a)• 839 838 - a) u- 837 C o 836 a) a) w 835 0 50 100 150 200 Channel Distance(Feet) slope(%) slope ratio length(ft) length ratio pool-pool spacing(ft) p-p ratio reach 1.9 --- 200.0 (15.4 channel widths --- --- --- riffle 3 1.6 6.8 (0- 13.5) 2.2 (----1) --- --- pool 1.8 0.9 15.0 (0- 12) 1.2 (----0.9) 42.0 (15-42) 3.2 (1.2-3 run 2.1 1.1 10.0 0.8 --- --- glide 1.3 0.7 3.3 0.3 --- --- * Elevations are all correct relative to the longitudinal profile but may not be the exact elevation above MSL. Elevations were calculated based on a singular benchmark that is approximately 840 feet above MSL.