HomeMy WebLinkAboutNCG500200_Inspection_20210720ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
S. DANIEL SMITH
Director
Rudy Ballance
National Spinning Company Inc
PO Box 547
Whiteville, NC 28472-0547
NORTH CAROLINA
Environmental Quality
July 20, 2021
SUBJECT: Compliance Inspection Report
Washington Mill
NPDES WW Permit No. NCG500200
Beaufort County
Dear Mr. Ballance:
The North Carolina Division of Water Resources conducted an inspection of the Washington Mill on
7/20/2021. This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in NPDES WW Permit No. NCG500200. The findings and comments
noted during this inspection are provided in the enclosed copy of the inspection report entitled
"Compliance Inspection Report".
If you should have any questions, please do not hesitate to contact me with the Water
Quality Regional Operations Section in the Washington Regional Office at 252-948-3843 or via email at
robert.e.bullock@ncdenr.gov.
Cc: Laserfiche
Sincerely,
/26.M4.2.3li�ecl
Robbie Bullock, Environmental Specialist II
Water Quality Regional Operations Section
Washington Regional Office
Division of Water Resources, NCDEQ
DE
North Carolina Department of Envlronmental Quality I Dlvlslon of Waler Resources
Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
252.946.6481
United States Environmental Protection Agency
E PA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection
1 IN I 2 LI 3 I NCG500200 111 121 21/07/20 117
Type
18 H
IIIIIIIIIII
Inspector Fac Type
19 I S I 2011
1
21IIIIII IIIIIIIIIIIIIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
671 I 7° I3 I 711 1 72 I N I 731 I 74 71
I I 1
I I I I I I 180
l
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Washington Mill
1481 W 2nd St
Washington NC 27889
Entry Time/Date
08:40AM 21/07/20
Permit Effective Date
20/12/15
Exit Time/Date
09:OOAM 21/07/20
Permit Expiration Date
25/11/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Rudy Ballance,PO Box 547 Whiteville NC 284720547/Director of
Engineering/910-642-9474/ No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
RooJb-�ertt E[[Bullock /J/J // DWR/WARO WQ/252-948-3843/ 7/20/2021
/C�664,•Z 5G C1P�
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
31
NPDES yr/mo/day
N CG500200 111 121 21/07/20
I17
Inspection Type
18 [j
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
The facility has not discharged any wastewater that is covered under this permit since the last
inspection. The boiler has not operated in the last two years while the air compressor is only ran as
needed.
Currently, if there is a discharge from the air compressor or boiler the wastewater is disposed of in
the City of Washington's sewer system.
The facility was reminded that sampling will be required as stated in General Permit NCG500000 if
there is a discharge to the receiving stream in the future.
Page# 2
Permit: NCG500200
Inspection Date: 07/20/2021
Owner - Facility: Washington Mill
Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new El El ❑
application?
Is the facility as described in the permit? • El El El
# Are there any special conditions for the permit? El El • El
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • El El El
Comment:
Page# 3