Loading...
HomeMy WebLinkAbout20211126 Ver 1_ePCN Application_20210715 DWR Division of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1,2021 Ver4.1 Initial Review Has this project met the requirements for acceptance in to the review process?* 6' Yes ✓ No Is this project a public transportation project?* R Yes r No Change only if needed. BIMS#Assigned* Version#* 20211126 1 Is a payment required for this project?* (7 No payment required ✓ Fee received Reviewing Office* ✓ Fee needed-send electronic notification Washington Regional Office-(252)946-6481 Select Project Reviewer* Garcy Ward:eads\gpward Information for Initial Review la.Name of project: Bridge No.7 on US 64 over the Alligator River 1a.Who is the Primary Contact?* Gordon Cashin lb.Primary Contact Email:* 1c.Primary Contact Phone:* gcashin@ncdot.gov (919)749-0442 Date Submitted 7/15/2021 Nearest Body of Water Alligator River Basin Pasquotank Water Classification SC,Sw,ORW Site Coordinates Latitude: Longitude: 35.900732 -76.008779 A. Processing Information L) County(or Counties)where the project is located: Tyrrell Dare Is this a NCDMS Project ✓ Yes f• No Is this project a public transportation project?* 6' Yes r No Is this a NCDOT Project?* <7 Yes r No (NCDOT only)T.I.P.or state project number: HB-0001 WBS#(2) 49475.1.1 Pre-Filing Meeting Information Is this a courtesy copy notification?* ✓ Yes r No ID# Version Pre-fling Meeting or Request Date Attach documentation of Pre-Filing Meeting Request here: Click the upload button or drag and drop ties here to attach docurrent Re type trot be FCF 1a.Type(s)of approval sought from the Corps: 17 Section 404 Permit(wetlands,streams and waters,Clean Water Act) 17 Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes r No lb.What type(s)of permit(s)do you wish to seek authorization? 17 Nationwide Permit(NWP) r Regional General Permit(RGP) I—Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? ✓ Yes r No Nationwide Permit(NWP)Number: 6-Survey Activities NWP Numbers(for multiple NWPS): 1d.Type(s)of approval sought from the DWR: I7 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes r No For the record only for Corps Permit: r Yes r No If.Is this an after-the-fact permit application?* ✓ Yes rNo 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes ( No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo 1h.Is the project located in any of NC's twenty coastal counties? ✓ Yes r No 11.Is the project located within a NC DCM Area of Environmental Concern(AEC)? ✓ Yes r No r Unknown 1j.Is the project located in a designated trout watershed? ✓ Yes r No B. Applicant Information Id.Who is applying for the permit? I7 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* r Yes r No 2.Owner Information 2a.Name(s)on recorded deed: Multiple properties 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address 1000 Birch Ridge Road Address Line 2 (Sty State/Bovine/Region Raleigh NC Fbstal/Zip Code Country 27610 USA 2e.Telephone Number: 2f.Fax Number: (919)749-0442 2g.Email Address:* pharris@ncdot.gov C. Project Information and Prior Project History e). 1. Project Information 1b.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Columbia 2. Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 IDLY State/Province/Region Fbstal/Zip(ode Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Alligator River 3b.Water Resources Classification of nearest receiving water:* SC,Sw,ORW 3c. What river basin(s)is your project located in?* Pasquotank 3d.Please provide the 12-digit HUC in which the project is located. 03010205 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Existing land use in the vicinity is rural,with one gas station/marina located at the western end of the existing bridge. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* r Yes r No r Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 88.08 4g.List the total estimated linear feet of all existing streams on the property: 1,091 4h.Explain the purpose of the proposed project:* Replace the existing bridge over Alligator River.Geotechnical borings are required to facilitate design of the new bridge's foundations. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* Please see the attached detailed narrative of the proposed work. 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* 6 Yes r No O Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* 6 Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Rob Crowther Agency/Consultant Company: Carolina Ecosystems Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR The USACE,Division of Water Resources and Division of Coastal Management visited the project on March 31,2021. 6. Future Project Plans 6a.Is this a phased project?* C Yes a No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? This proposed work is for geotechnical investigations to faciltate bridge design.A detailed permit application for the actual bridge replacement will be submitted in the future. D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): 17 Wetlands r Streams-tributaries ❑Buffers 17 Open Waters r Pond Construction 2.Wetland Impacts 2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name* 2e.Forested* 2f.Type of 2g.Impact Jurisdicition*(?) area* 1 Borings T Salt/Brackish Marsh marsh No Both 0.021 (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.021 0.000 2g.Total Wetland Impact 0.021 2i.Comments: Assuming a 2 foot radius of impact around each boring. 4.Open Water Impacts 4a. Site# 4a1.Impact Reason 4b.Impact type 4c.Name of waterbody 4d.Activity type 4e.Waterbodytype 4f.Impact area 1 borings T Alligator River Excavation Tributary 0.04 4g.Total temporary open water Impacts: 4g.Total permanent open water impacts: 0.04 0.00 4g.Total open water impacts: 0.04 4h.Comments: E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Please see the attached detailed narrative. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The drilling and sampling of the borings will be completed within the steel casing utilizing mud-rotary drilling methods.Drill fluids consisting of a water- bentonite slurry will be circulated from a mud tub on the barge platform through the drill tools and drilling bit and recirculated to the mud tub on the barge platform through the outer steel casing.Drilling cuttings(spoils)will be captured in the mud tub,removed as necessary to facilitate drilling and sampling operations,and temporarily stored in metal drums on the barge platform until boring termination is achieved.Please see the attached narrative for additional information. 2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ✓ Yes (zNo 2b.If this project DOES NOT require Compensatory Mitigation,explain why: The request is for geotechnical borings only. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes (zNo If no,explain why: The Pasquotank Basin does not have riparian buffer rules. 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* ✓ Yes ( No 2b.Does this project meet the requirements for low density projects as defined in 15A NCAC 02H.1003(2)? ✓ Yes a No 2c.Does this project have a stormwater management plan(SMP)reviewed and approved under a state stormwater program or state-approved local government stormwater program? ✓ Yes r No ( N/A-project disturbs<1 acre Comments: G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ( Yes r No lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* (z Yes r No 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* ✓ Yes (7 No Comments:* A Categorical Exclusion document is in preparation for the bridge replacement. 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* C Yes ( No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes 6- No 3b.If you answered"no,"provide a short narrative description. The borings are needed to assist with the design for the future bridge replacement. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes F No r N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ( Yes r No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ( Yes r No 5c.If yes,indicate the USFWS Field Office you have contacted. Raleigh 5d.Is another Federal agency involved?* ( Yes r No r Unknown What Federal Agency is involved? NOAA Fisheries 5e.Is this a DOT project located within Division's 1-8? ✓ Yes r No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage databases and field surveys 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ Yes ( No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA Essential fish habitat mapping tool. 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* 6 Yes r No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* Coordination with SHPO 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* ( Yes r No 8b.If yes,explain how project meets FEMA requirements: The proposed activity is for temporary impacts. 8c.What source(s)did you use to make the floodplain determination?* FRIS Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document HB-0001_Alligator River Boring Plan.pdf 2.87MB Fie mist be FDF or lOsE Comments Signature R By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Mack Christopher Rivenbark,Ill Signature /04 C. X(.47A404 III Date 7/15/2021