Loading...
HomeMy WebLinkAboutNCC201838_NOT Closeout Documents_20210719 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington, NC 27889 (252) 946-6481 County: Wayne Project: Scarborough Mitigation Project River basin: Neuse Person financially responsible:Water&Land Solutions-Kayne Van Stell,Vice Project#: WAYNE-2020-015 President Address: 7721 Six Forks Road, Suite 130,Raleigh,NC 27615 1. Project Location: Casey Mill Rd,Goldsboro Pictures: No 2. Weather and soil conditions: Sunny,warm,wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No one onsite Title: Inspection report: Sent Report Date given/sent: July 15,2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self- 10. Comments: monitoring or self-inspections are required. Project is released.Termination of coverage under NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Reported by: Bradley West Others present: Date of inspection: July 13,2021 Time arriving on site: 11:20 AM Time leaving site: 12:00 PM cc:1: