HomeMy WebLinkAboutNCC201838_NOT Closeout Documents_20210719 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall,Washington, NC 27889 (252) 946-6481
County: Wayne Project: Scarborough Mitigation Project River basin: Neuse
Person financially responsible:Water&Land Solutions-Kayne Van Stell,Vice Project#: WAYNE-2020-015
President
Address: 7721 Six Forks Road, Suite 130,Raleigh,NC 27615
1. Project Location: Casey Mill Rd,Goldsboro
Pictures: No
2. Weather and soil conditions: Sunny,warm,wet Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No one onsite Title:
Inspection report: Sent Report Date given/sent: July 15,2021
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No additional self-
10. Comments: monitoring or self-inspections are required. Project is released.Termination of coverage under NPDES
General Stormwater Permit for Construction Activities should be requested by the permittee via a
Notice of Termination.
Reported by: Bradley West Others present:
Date of inspection: July 13,2021 Time arriving on site: 11:20 AM Time leaving site: 12:00 PM
cc:1: