Loading...
HomeMy WebLinkAboutSW1191201_Letter of Transmittal_202107195410 Tnnity Road P 919.866.4951 5663 T I M M O N S GROUP Suite 102 F w.tim ons.c Raleigh, NC 27607 www.timmons.com July 15, 2021 Jim Farkas NCDEQ Stormwater Section 512 N. Salisbury St, Archdale Bldg. 91h Floor Raleigh, NC 27604 Dear Jim, This letter is written to inform you that Phase II of the NCNG Morganton Regional Readiness Center is submitting a major modification for the Stormwater Permit No. SW1191201. The project is currently under construction. This Major Modifications is for the expansion of the proposed military owned vehicle (MOV) lot in lieu of the originally permitted future helipad. This change has increased the amount of impervious on site and will be treated with an additional wet pond SCM. The re -aligned rear access road is not being treated using some of the previous impervious credit established as part of the original permit. As seen on sheet C4.7 & C4.8 analysis point B increased in size due to a change in discharge location for the new wet pond SCM. Closing, q1V1 I'v Frank Slinsky, P.E. Sr. Project Manager ENGINEERING I DESIGN I TECHNOLOGY