Loading...
HomeMy WebLinkAbout20110089 Ver 6_SMP Mod Approval_20210719 July 19, 2021 DWR # 2011-0089v6 Lincoln County Mr. Mark Klindera - President UNOX Inc. 987 Airlie Parkway Denver, North Carolina 28037 Subject: APPROVAL OF STORMWATER MANAGEMENT PLAN MODIFICATION Airlie Industrial Park Phase 1 – UNOX Expansion Dear Mr. Klindera: The Division of Water Resources (Division) recently received a request from CES Group Engineers LLP (via Sean Coldren, PE) on your behalf to modify the existing stormwater management plan (SMP) as previously approved by the Division under the 401 certification #2011-0089v4 dated July 26, 2017. The Division hereby approves the design change of two (2) Sand Filters to only one (1) Sand Filter with its revised maximum allowable drainage area of 244,096 square feet and built-upon area within that drainage area of 160,644 square feet, including all associated stormwater conveyances, inlet and outlet structures, and grading and drainage patterns depicted on revised plan sheets submitted with this modification request. All other aspects of the stormwater management plan shall continue as previously approved by the Division, including the following conditions [15A NCAC 02H .0506(b)(5)]: a) Any changes to the allowable maximum drainage and built-upon areas shall require the applicant to submit and receive approval from the Division prior to any construction or modification of the current site. b) The footprint of all stormwater management device(s) as well as an additional 10-foot wide area on all sides of the device(s) shall be located in either public rights-of-way, dedicated common areas or recorded easement areas. The final plats for the project showing such rights-of-way, common areas and easement areas, shall be in accordance with the approved plans. c) The approved SMP shall be constructed and operational before any expanded permanent building or other structure is occupied at the site. d) The SMP may not be modified without prior written authorization from the Division. DocuSign Envelope ID: ECA09952-4C75-457E-8F77-BF5BDDC4B17E e) Maintenance activities for stormwater management device(s) shall be performed in accordance with the updated O&M agreements signed by Mark Klindera – UNOX Inc. on May 24, 2021. The O&M agreement shall transfer with the sale of the land or transfer of ownership/responsibility for the approved SMP. The Division shall be notified promptly of every transfer. f) Upon completion of construction and prior to operation of the approved st ormwater control device(s), a certification from an appropriate designer for the device certifying that it has been installed in accordance with the approved plans, specifications, and other supporting documentation (including construction photos, if available), shall be submitted to the Division (C/O Chonticha McDaniel; 1617 Mail Service Center, Raleigh, NC 27699-1617 or via email). g) Additional SMP(s) for future phases must receive written authorization from the Division before any land disturbance, construction, or expansion of the new phase(s) may occur. Please contact Chonticha McDaniel at (919) 707-3634 or chonticha.mcdaniel@ncdenr.gov if you have any questions or concerns regarding this matter. Sincerely, Paul Wojoski, Supervisor 401 & Buffer Permitting Branch cc: Sean Coldren, PE – CES Group Engineers LLP (via email) DWR, Mooresville Regional Office DWR 401 & Buffer Permitting Branch File DocuSign Envelope ID: ECA09952-4C75-457E-8F77-BF5BDDC4B17E