Loading...
HomeMy WebLinkAbout20120202 Ver 2_Site Plan_20130531 (2)b v IIv ERN�l S64B SI o� �f THE p c.c \ C) O ❑ fl / � 11 _� D1 S 91W x ' Isla �µ ff O LE l� VICINITY MAP EQUATION: -Y2- PC Sta.27 +07.80 BK = - Y2REV4- PC Sta.27 +07.80 AH EQUATION: - Y2REV3- POT Sta 56 +31.53 BK = -Y2- POT Sta 56 +20.00 AH EQUATION: - Y2REV4- PT Sta . 34+ 19.60 BK= -Y2- PT Sta.34 +20.69 AH -Y2- STA. 33 +19.42 END BOARDWALK 2 BEGN 10' APP SLAB TEMP STREAM CROSSING -Y2- STA. 32 + 79.42 END 10' APP SLAB BEGIN BOARDWALK 2 -Y2- 20 +60.00 END BOARDWALK 1 BEGIN 10' APP SLAB TEMP CONSTRUCTION ENTRANCE #2 ON -Y2- 17+00.00 END 10' APP SLAB BEGIN BOARDWALK 1 BEGIN PROJECT BEGIN CONSTRUCTION -Y2- STA. 10 +60.00 Urn rn C z Z< rn rn U) . CITY OF RALEIGH NORTH CAROLINA CRABTREE CREEK GREENWAY TRAIL LOCATION: FROM END OF EXISTING GREENWAY ON MILBURNIE ROAD TO ANDERSON POINT PARK TYPE OF WORK: GRADING, PAVING, STRUCTURE, DRAINAGE, EROSION CONTROL, LANDSCAPING INDEX OF SHEETS 1 TITLE 1A SYMBOLOGY SHEET 1B THRU 1C NOTES 1D THRU lE CONSTRUCTION ACCESS IF I HKU lG BUILDING CODE SUMMARY 1u TunV 11 STATEMENT OF CI']Cr`TAI TAICDCr`TTr1NC 13 „�� �� NPDES STABILIZATION DRAWING 2 THR"F TYPICAL SECTIONS & DETAILS --3- DRAINAGE SCHEDULL4 SIGN SCHEDULE /A THRU 7V SIGN DETAILS 4 THRU 19 PLAN & PROFILE SHEETS X -1 THRU X -74 CROSS SECTIONS Y" END BOARDWALK 9 BEGIN 10' APP SLAB 2 -Y2 REVI- 198+66.59 - Y2REV5- POT Sta.190 +28.97 BK= - Y2REV1- POT Sta. 185+95.00 AH EQUATION: -Y2- POT Sta.130 +20.00 BK = -Y2- PC Sta 96 +24.81 BK = - Y2REV1- POT Sta.130 +20.71 A -Y2- PC Sta 96 +25.62 AH END 10' APP SLAB END BOARDWALK 7 BEGIN BRIDGE Sl BEGIN 10' APP SLAB -Y2- STA 57+41.46 TEMP STREAM END BOARDWALK 5 -Y2 REVI- 185+10.00 CROSSING BEGIN BRIDGE S3 END BRIDGE Sl END 10'APP SLAB 116 +22.30 - Y2REV1- POT Sta.180 +00.00 BK= BEGIN 10' APP SLAB BEGIN BOARDWALK 4 -Y2- STA 58 +81.46 -Y2- STA 113 +04.83 - Y2REV5- POT Sta.180 +00.00 AH TEMP CONSTRUCTION ENTRANCE #3 �y 6 u -- 0 w Q 0 EQUATION: -Y2- PC Sta 42 +26.95 BK = - Y2REV3- PC Sta 42 +26.95 AH END 10' APP SLAB BEGIN BOARDWALK 3 Y2- STA. 100 + 35.00 TEMP CONSTRUCTION ENTRANCE #1 GRAPHIC SCALES 50 25 0 50 100 50 25 0 50 100 10 5 0 10 20 V I- w PLANS PROFILE (HORIZONTAL) PROFILE USEOCA (VERTICAL) LAKE w z woz UP) o g IL _ f w o kD b v IIv ERN�l S64B SI o� �f THE p c.c \ C) O ❑ fl / � 11 _� D1 S 91W x ' Isla �µ ff O LE l� VICINITY MAP EQUATION: -Y2- PC Sta.27 +07.80 BK = - Y2REV4- PC Sta.27 +07.80 AH EQUATION: - Y2REV3- POT Sta 56 +31.53 BK = -Y2- POT Sta 56 +20.00 AH EQUATION: - Y2REV4- PT Sta . 34+ 19.60 BK= -Y2- PT Sta.34 +20.69 AH -Y2- STA. 33 +19.42 END BOARDWALK 2 BEGN 10' APP SLAB TEMP STREAM CROSSING -Y2- STA. 32 + 79.42 END 10' APP SLAB BEGIN BOARDWALK 2 -Y2- 20 +60.00 END BOARDWALK 1 BEGIN 10' APP SLAB TEMP CONSTRUCTION ENTRANCE #2 ON -Y2- 17+00.00 END 10' APP SLAB BEGIN BOARDWALK 1 BEGIN PROJECT BEGIN CONSTRUCTION -Y2- STA. 10 +60.00 Urn rn C z Z< rn rn U) . CITY OF RALEIGH NORTH CAROLINA CRABTREE CREEK GREENWAY TRAIL LOCATION: FROM END OF EXISTING GREENWAY ON MILBURNIE ROAD TO ANDERSON POINT PARK TYPE OF WORK: GRADING, PAVING, STRUCTURE, DRAINAGE, EROSION CONTROL, LANDSCAPING INDEX OF SHEETS 1 TITLE 1A SYMBOLOGY SHEET 1B THRU 1C NOTES 1D THRU lE CONSTRUCTION ACCESS IF I HKU lG BUILDING CODE SUMMARY 1u TunV 11 STATEMENT OF CI']Cr`TAI TAICDCr`TTr1NC 13 „�� �� NPDES STABILIZATION DRAWING 2 THR"F TYPICAL SECTIONS & DETAILS --3- DRAINAGE SCHEDULL4 SIGN SCHEDULE /A THRU 7V SIGN DETAILS 4 THRU 19 PLAN & PROFILE SHEETS X -1 THRU X -74 CROSS SECTIONS Y" END BOARDWALK 9 BEGIN 10' APP SLAB 2 -Y2 REVI- 198+66.59 - Y2REV5- POT Sta.190 +28.97 BK= - Y2REV1- POT Sta. 185+95.00 AH EQUATION: -Y2- POT Sta.130 +20.00 BK = -Y2- PC Sta 96 +24.81 BK = - Y2REV1- POT Sta.130 +20.71 A -Y2- PC Sta 96 +25.62 AH END 10' APP SLAB END BOARDWALK 7 BEGIN BRIDGE Sl BEGIN 10' APP SLAB -Y2- STA 57+41.46 TEMP STREAM END BOARDWALK 5 -Y2 REVI- 185+10.00 CROSSING BEGIN BRIDGE S3 END BRIDGE Sl END 10'APP SLAB 116 +22.30 - Y2REV1- POT Sta.180 +00.00 BK= BEGIN 10' APP SLAB BEGIN BOARDWALK 4 -Y2- STA 58 +81.46 -Y2- STA 113 +04.83 - Y2REV5- POT Sta.180 +00.00 AH TEMP CONSTRUCTION ENTRANCE #3 �y 6 u -- 0 w Q 0 EQUATION: -Y2- PC Sta 42 +26.95 BK = - Y2REV3- PC Sta 42 +26.95 AH END 10' APP SLAB BEGIN BOARDWALK 3 Y2- STA. 100 + 35.00 TEMP CONSTRUCTION ENTRANCE #1 GRAPHIC SCALES 50 25 0 50 100 50 25 0 50 100 10 5 0 10 20 V I- w PLANS PROFILE (HORIZONTAL) PROFILE (VERTICAL) z END 10' APP SLAB J BEGIN BOARDWALK 7 END BRIDGE S3 TEMP CONSTRUCTION Y2REV5- 182 +25.00 I` BEGIN 10' APP SLAB ENTRANCE #4 O -Y2- STA 117+62.30 0 END 10' APP SLAB END BOARDWALK 6 END BRIDGE S2 BEGIN BOARDWALK 6 BEGIN 10' APP SLAB BEGIN BOARDWALK 5 - Y2REV1- STA. 152 +05.00 - Y2REV1- STA. 153 +55.00 114 +24.83 CONSTRUCTION TEMP C TEMP STREAM END BOARDWALK 4 CROSSING ENTRANCE #5 BEGIN BRIDGE S2 113 +84.83 END 10' APP SLAB BEGIN BOARDWALK 8 LEND BOARDWALK 3 -Y2 REVI- 191+31.47 BEGIN 10' APP SLAB -Y2- STA. 101 +45.00 END BOARDWALK 8 TEMP STREAM BEGIN BOARDWALK PLATFORM CROSSING - Y2REV- STA 193 +11.47 DESIGN DA TA DESIGN SPEED = 20 MPH LEAN ANGLE = 15 DEGRESS FUNC. CLASSIFICATION = GREENWAY Ell Y2REV1- POT Sta.198 +78.20 BK - Y2REV2- POT Sta.198 +78.20 AH m 0 w oC Q a w oC a z g a o Q .Y ;r TEMP CONSTRUCTION ENTRANCE #6 END PROJECT END CONSTRUCTION - Y2REV2- STA. 209 +46.15 END BOARDWALK PLATFORM BEGIN BOARDWALK 9 - Y2REV1- STA 196 +86.59 END BRIDGE S4 BEGIN BOARDWALK PLATFORM Y2REV1- 196 +69.18 END BOARDWALK PLATFORM BEGIN BRIDGE S4 - Y2REV1- 193 +29.18 PROJECT LENGTH LENGTH OF GREENWAY = 3.334 MILES LENGTH OF BOARDWALK = 0.309 MILES LENGTH OF BRIDGE = 0.125 MILES LENGTH OF PROJECT = 3.768 MILES Y J Lu W U ~ w Lu a � z m w Q w o� 0� U C7 PRELIMINARY PLANS II ®O NOT USE FOR CONSTIRUCTION UKAWN BY: MLI CHECKED BY: BRC REVISIONS: NO. DATE 1 4/8/2013 2 5/16/2013 PROJECT NO.: H9001.00 i V I- w Lu w z woz UP) g w o kD cl > Q N u w U ^ oo LL O z Ln w Lu M =^ Lu 0 Y LL w w co M D J rn a < d O M (n 01 z H w U `) Y U ° En U w H z U - Y2REV2- POT Sta.198 +78.20 AH m 0 w oC Q a w oC a z g a o Q .Y ;r TEMP CONSTRUCTION ENTRANCE #6 END PROJECT END CONSTRUCTION - Y2REV2- STA. 209 +46.15 END BOARDWALK PLATFORM BEGIN BOARDWALK 9 - Y2REV1- STA 196 +86.59 END BRIDGE S4 BEGIN BOARDWALK PLATFORM Y2REV1- 196 +69.18 END BOARDWALK PLATFORM BEGIN BRIDGE S4 - Y2REV1- 193 +29.18 PROJECT LENGTH LENGTH OF GREENWAY = 3.334 MILES LENGTH OF BOARDWALK = 0.309 MILES LENGTH OF BRIDGE = 0.125 MILES LENGTH OF PROJECT = 3.768 MILES Y J Lu W U ~ w Lu a � z m w Q w o� 0� U C7 PRELIMINARY PLANS II ®O NOT USE FOR CONSTIRUCTION UKAWN BY: MLI CHECKED BY: BRC REVISIONS: NO. DATE 1 4/8/2013 2 5/16/2013 PROJECT NO.: H9001.00 i BOUNDARIES AND PROPERTY State Line - - - -- County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument Parcel /Sequence Number Existing Fence Line EIP ECM 123 CONVENTIONAL Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence Existing Wetland Boundary - - - —WLB— - - - Proposed Wetland Boundary WLB Existing Endangered Animal Boundary EAB Existing Endangered Plant Boundary EPB BUILDINGS AND OTHER CULTURE: Gas Pump Vent or U/G Tank Cap ❑ PEGETATION: S Sign W Well Small Mine CSX TRANSPORTAT /ON Foundation 0 Area Outline Cemetery fi Building MILEPOOST 35 W School ❑❑ Church ❑� J J Dam J HYDROLOGY.• Stream or Body of Water Hydro, Pool or Reservoir Jurisdictional Stream Buffer Zone 1 Buffer Zone 2 100 Year Flood Plain 500 Year Flood Plain Floodway Flow Arrow Disappearing Stream Crrirn vrw....7a Wetland Proposed Lateral, Tail, Head Ditch False Sump is BZ 1 BZ 2 100 - 500 FW - PLAN SHEET SYMBOLS RAILROADS: PEGETATION: Standard Gauge Single Tree ~ w CSX TRANSPORTAT /ON RR Signal Milepost Single Shrub MILEPOOST 35 W z ° Switch ❑ Hedge J J SWITCH J RR Abandoned Woods Line Q w RR Dismantled Orchard RIGHT OF WAY.- � Vineyard F Vineyard Baseline Control Point 0000 LL iU a Existing Right of Way Marker ❑ EXISTING STRUCTURES: � Existing Right of Way Line MAJOR: Proposed Right of Way Line R Bridge, Tunnel or Box Culvert GONG Proposed Right of Way Line with R Bridge Wing Wall, Head Wall and End Wall - GONG WW Iron Pin and Cap Marker d MINOR: Proposed Right of Way Line with R Head and End Wall GONG HW Concrete or Granite Marker (n M H Pipe Culvert Existing Control of Access U Footbridge �-- - - - - - - � Proposed Control of Access Drainage Box: Catch Basin, DI or JB ❑ CB Existing Easement Line E Paved Ditch Gutter Existing Greenway Easement Line -- -- -- Storm Sewer Manhole O Proposed Temporary Construction Easement - E Storm Sewer S Proposed Permanent Greenway Easement PGE Proposed Permanent Drainage Easement PDE UTILITIES: Proposed Permanent Drainage /Utility Easement DUE POWER: Proposed Permanent Utility Easement PUE i Existing Power Pole Proposed Temporary Utility Easement TUE Proposed Power Pole b Proposed Permanent Easement with Iron Pin and Cap Marker Existing Joint Use Pole ROADS AND RELATED FEATURES: Proposed Joint Use Pole Existing Edge of Pavement Power Manhole Existing Curb — Power Line Tower Limits of Disturbance LD Power Transformer Proposed Slope Stakes Cut - - - C - - - U/G Power Cable Hand Hole "H Proposed Slope Stakes Fill - - - F - - - H -Frame Pole �• Temporary Silt Fence Recorded UVG Power Line P Temporary Tree Protection Fence TPF Designated U/G Power Line (S.U.E. *) - - - -P- - - - Temporary Combination Tree —x x x- ProtectiorvSilt Fence TELEPHONE: Proposed Wheel Chair Ramp cR Existing Telephone Pole AV Existing Metal Guardrail T T T Proposed Telephone Pole -0- Proposed Guardrail T T T T Telephone Manhole ❑ Existing Cable Guiderail n n n Telephone Booth 0 Proposed Cable Guiderail n n n n Telephone Pedestal ❑D Equality Symbol Telephone Cell Tower Pavement Removal U/G Telephone Cable Hand Hole HH Culvert Inlet Protection Recorded U/G Telephone Cable T Designated UAG Telephone Cable (S.U.E. *) - - - -T- - - - Drop Inlet Protection Recorded U/G Telephone Conduit TG Silt Fence Outlet With J Hook Designated UAG Telephone Conduit (S.U.E. *) - - - -TG- - - - Check Dam ) Recorded U/G Fiber Optics Cable T FO Special Stilling Basin Designated UAG Fiber Optics Cable (S.U.E.*)- - - - -T FO— - - - WATER: Water Manhole Water Meter CD Water Valve Water Hydrant ❑ Recorded UAG Water Line W Designated U/G Water Line (S.U.E.* ) - - - —W____ Above Ground Water Line A/G Water TV: TV Satellite Dish TV Pedestal ❑ TV Tower ❑ U/G TV Cable Hand Hole Iq Recorded LPG TV Cable TV Designated U/G TV Cable (S.U.E. *) - - - —TV— - - - Recorded LPG Fiber Optic Cable TV FO Designated U/G Fiber Optic Cable (S.U.E. *)-- - - - —TV FO— - - GAS: Gas Valve Gas Meter Recorded LPG Gas Line Designated U/G Gas Line (S.U.E. *) Above Ground Gas Line SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Above Ground Sanitary Sewer Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E. *) MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line U/G Tank Water, Gas, Oil AEG Tank Water, Gas, Oil U/G Test Hole (S.U.E. *) Abandoned According to Utility Records End of Information 0 -G- - —G— — — - A/G Gas O O Ss- A/G Sanitary Sewer FSS — — — —FSS— — — - • 0 0 0 m AATU R E.0.1. = (D ~ w I--I w W z ° un J J Q w � 0 � w N U 0000 LL iU a 0 z � 0 v,Qw�?� LU d M (n M H U m 0 w a W a z g "I q1111 Y J LU W U ~ w a LU � z m w Q w o� Q� U (7 a w z z g a z w w a C� O z w U) Y U O Ln U co LU z J U O > PRELIMINARY PLANS I ®O NOT USE FOR CONSTIRUCTION UKAWN BY: Mtl CHECKED BY: BRC REVISIONS: NO. DATE PROJECT NO.: H9001.00 NTS GENERAL NOTES 25. THE AMOUNT OF DISTURBED AREA REQUIRED TO BE TEMPORARILY SEEDED IS LIMITED TO 2,000 LF OF (D w w NOTES _ Z TRAIL OR THE TIME FRAME GUIDELINES AS SPECIFIED BY NCG 010000 GENERAL CONSTRUCITON PERMIT Z g 1. THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH THE EFFECTIVE AUGUST 3, 2011 ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND J ° W 8 APPLICABLE REQUIREMENTS OF THE 2012 NCDOT STANDARD SPECIFICATIONS FOR ROADS AND NATURAL RESOURCES DIVISION OF WATER QUALITY. TEMPROARY GROUND COVER STABILIZATION SHALL W STRUCTURES. OCCUR WITHIN 7 CALENDAR DAYS FROM THE LAST LANDDISTURBING ACTIVITY, WITH THE FOLLOWING w w v EXCEPTIONS IN WHICH TEMPORARY GROUND COVER SHALL BE PROVIDED IN 14 CALENDAR DAYS FROM THE LL z T Z 2. ALL DEMOLITION SHALL BE APPROVED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT. LAST LAND - DISTURBING ACTIVITY. SEE STABALIZATION TIMEFRAME TABLE ON SHEET 1C. O Q w ? L9 Op � ce M � J 01 D 3. ALL DEMOLITION AND SUBSEQUENT CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND 26. PER NEW NPDES GUIDELINES, NO STOCK OR WASTE PILES ARE ALLOWED WITHIN 50' OF STREAMS OR r a M z DRAINAGE STRUCTURES. ~ Ln APPLICABLE STATE, COUNTY, AND LOCAL CODES. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL u INSPECTIONS, CERTIFICATIONS, PERMITS, EQUIPMENT, ETC. THAT MAY BE REQUIRED. 1 u En 4. WHERE ASPHALT OR CONCRETE SECTIONS ARE REMOVED, CONTRACTOR SHALL USE A SAW CUT AT THE I w SEQUENCE OF CONSTRUCTION ACTIVITIES U LIMITS OF DEMOLITION TO OBTAIN A CLEAN EDGE. II �� o u U> 5. ALL TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO LAND DISTURBANCE OPERATIONS 1. A PRECONSTRUCTION CONFERENCE MUST BE HELD PRIOR TO THE START OF ANY CONSTRUCTION INCLUDING TREE REMOVAL, IN SUCH A MANNER AS TO CLEARLY AND ADEQUATELY SEPARATE ALL TREES ACTIVITIES. A MANDATORY PRE - CONSTRUCTION MEETING WILL ALSO BE REQUIRED WITH THE LAND TO BE REMOVED FROM REMAINING VEGETATION. QUALITY SECTION OF NCDENR BEFORE LAND DISTURBING ACTIVITIES BEGIN. CALL 919 - 791 -4200 TO SCHEDULE A MEETING. J 6• NO GRADING IS TO OCCUR IN THE TREE PROTECTION AREAS OR TREE CRITICAL ROOT ZONES. w � 2. INSTALL CONSTRUCTION ENTRANCES WITH CONCRETE TRUCK WASHOUT PITS PER DETAIL ON SHEET 2B AS w 7. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT, NEEDED AT LOCATIONS SHOWN ON SHEETS 1 D AND 1 E. OTHER STAGING AREAS WILL NEED TO BE ETC. THAT MAY BE REQUIRED. DISCUSSED WITH CITY OF RALEIGH PRIOR TO THE START OF CONSTRUCTION. CONTACT THE CITY OF RALEIGH AT (919)516 -2837. U 8. THE CONTRACTOR MUST, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES, OR HIS WORK. ALL DEBRIS SHALL BE 3. DETERMINE AND MARK LIMITS OF DISTURBANCE. LJ,J REMOVED FROM THE SITE ON A DAILY BASIS. w 4. INSTALL TREE PROTECTION FENCING, SILT FENCE, COMBINATION FENCE AND, SILT FENCE OUTLETS. 9. RELOCATION OF EXISTING UTILITIES TO BE COORDINATED WITH THE LOCAL UTILITY PROVIDER(S). SILT FENCE OUTLETS SHALL BE INSTALLED PER FIELD LOCATED LOW POINTS AND AS SHOWN ON APPROVED PLANS. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. z 10. EXISTING UTILITIES AND STRUCTURES SHOWN BOTH UNDERGROUND AND ABOVE ARE BASED ON THE BEST m w AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO 5. CALL FOR ON SITE INSPECTION BY ENVIRONMENTAL INSPECTOR AND OBTAIN CERTIFICATE OF lij BEGINNING RELATED CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S COMPLIANCE. CALL FOR TREE PROTECTION FENCE INSPECTION BY CHRIS CRUM OF THE CITY OF REPRESENTATIVE IMMEDIATELY. RALEIGH. 919 - 516 -2561 U (D 11. CONTRACTOR SHALL LOCATE ALL UTILITIES AND UTILITY ELEVATIONS PRIOR TO CONSTRUCTION. ALL 6. TOPSOIL REMOVAL AND /OR STORAGE AREAS SHALL BE CONTAINED WITHIN THE PROPOSED LIMITS OF UTILITIES TO REMAIN SHALL BE PROTECTED BY THE CONTRACTOR. ANY UTILITIES DAMAGED DURING DISTURBANCE. CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR. 12. CONTRACTOR SHALL RESTORE ALL LAY DOWN AND STAGING AREAS TO ORIGINAL CONDITIONS AND TO THE SATISFACTION OF THE OWNER, PRIOR TO DEMOBILIZATION AT THE CONCLUSION OF THE PROJECT. 13. ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, AND EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA. 14. CONSTRUCTION /SAFETY FENCING REMOVED TO FACILITATE ACCESS BY THE CONTRACTOR FOR CONSTRUCTION MUST BE REPLACED AT THE END OF EACH WORK PERIOD TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM HAZARDOUS AREAS. 15. DEMOLITION, AND SUBSEQUENT CONSTRUCTION OF STORM DRAINAGE FACILITIES SHALL BE PERFORMED IN SUCH A MANNER THAT THE OLD PIPE AND STRUCTURES ARE REMOVED AND NEW STRUCTURES AND PIPING ARE IMMEDIATELY PUT INTO SERVICE. CONTRACTOR SHALL ENSURE THAT STORM DRAINAGE DOES NOT REMAIN OUT OF SERVICE FOR LONGER THAN 12 HOURS AT A TIME. PROVISIONS SHALL BE MADE TO MAINTAIN STORM WATER DRAINAGE DURING CONSTRUCTION. 16. CONTRACTOR SHALL STAKE CENTERLINE OF TRAIL ACCORDING TO PLANS AND OBTAIN APPROVAL FROM OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE RESOLVED PRIOR TO CONSTRUCTION. 17. STATIONING IS APPROXIMATE. CONTRACTOR SHALL VERIFY ALL STATIONING FOR APPLICABILITY TO EXISTING CONDITIONS PRIOR TO CONSTRUCTION. DEVIATION FROM ALIGNMENT DUE TO LARGE TREES OR OTHER OBSTACLES ETC SHALL BE APPROVED BY CITY OF RALEIGH. 18. CONTRACTOR SHALL MAINTAIN ALL ABOVE AND BELOW GROUND STORM WATER DRAINAGE AND PATTERNS AND PIPING AS THEY CURRENTLY EXIST UNLESS NOTED OTHERWISE. ANY DISTURBANCE OF THE PATTERNS OR STRUCTURES BY THE CONTRACTOR SHALL BE CORRECTED BY THE CONTRACTOR TO CONDITION PRIOR TO DISTURBANCE. CLEAN OUT STORM WATER PIPE ONLY IF NOTED ON PLAN AND ACCORDING TO DETAIL. 19. CONTRACTOR ACCESS FOR TRAIL CONSTRUCTION SHALL BE CONFIRMED BY CONTRACTOR WITH OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. 20. CONTRACTOR SHALL REVIEW TREE REMOVAL WITH OWNER'S REPRESENTATIVE AND OBTAIN APPROVAL PRIOR TO TREE REMOVAL. CONTRACTOR SHALL REMOVE ALL VEGETATION TO 3' BEYOND ASPHALT EDGE OF TRAIL OR WITH IN REQUIRED DRAINAGE DITCHES. TRIM UP BRANCHES OF TREES TO PROVIDE 8' VERTICAL CLEARANCE. 21. ALL CONSTRUCTION SHALL COMPLY WITH CITY OF RALEIGH STANDARDS. 22. CONTRACTOR SHALL PROVIDE SILT FENCING IN ALL AREAS AND EROSION CONTROL MEASURES AS NEEDED OR DIRECTED BY THE EROSION CONTROL INSPECTOR. IF ADDITIONAL MEASURES ARE REQUIRED IN ADDITION TO THE PLANS, COMPENSATION WILL BE PROVIDED PER THE CONTRACT PROVISIONS. 23. VEGETATION ON BANKS AND WETLANDS SHOULD BE HAND CUT WITH ROOT MATS UNDISTURBED. 24. THE ENGINEER AND OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH PROJECT AS SET FORTH IN THESE PLANS. IF DEPARTURES FROM THE SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE OWNER IN WRITING FOR REVIEW. NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF THE OWNER. 7. BEGIN GRADING, CLEARING AND GRUBBING. MAINTAIN DEVICES AS NEEDED. ROUGH GRADE SITE. INSURE THAT SEDIMENT LADEN WATER IS DIRECTED TO SEDIMENT CONTROL DEVICES. 8. INSPECT AND MAINTAIN ALL EROSION CONTROL MEASURES EVERY 7 DAYS AND AFTER EACH SIGNIFICANT RAINFALL (0.5 INCHES OR GREATER) AND DOCUMENT WITH INSPECTION REPORTS. 9. THE AMOUNT OF DISTURBED AREA REQUIRED TO BE TEMPORARILY SEEDED IS LIMITED TO 2,000 LF OF 3 TRAIL OR THE TIME FRAME GUIDELINES AS SPECIFIED BY NCG- 010000 GENERAL CONSTRUCITON PERMIT U EFFECTIVE AUGUST 3, 2011 ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY. TEMPROARY GROUND COVER STABILIZATION SHALL OCCUR WITHIN 7 CALENDAR DAYS FROM THE LAST LANDDISTURBING ACTIVITY, WITH THE FOLLOWING m Q EXCEPTIONS IN WHICH TEMPORARY GROUND COVER SHALL BE PROVIDED IN 14 CALENDAR DAYS FROM THE w LAST LAND - DISTURBING ACTIVITY. SEE STABALIZATION TIMEFRAME TABLE ON SHEE 1J. a 1 w 10. INSTALL CULVERTS AND PROTECT INLETS WITH INLET PROTECTION. INSTALL CULVERTS IN W JURISDICTIONAL AREAS ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND g MAINTENANCE ACTIVITIES MANUAL. CULVERT INSTALLATIONS IN STREAMS WILL REQUIRE DEWATERING BY USE OF COFFER DAMS /IMPERVIOUS DIKES AND PUMPS TO MAINTAIN WATER QUALITY STANDARDS, PER DETAIL ON SHEET 2C. CULVERT TO BE CONSTRUCTED IN THE DRY. CONTRACTOR TO COORDINATE WITH EROSION CONTROL INSPECTOR. ANY TEMPORARY COFFER DAM SHALL BE CONSTRUCTED OF MATERIALS SUCH AS SHEET PILING, SANDBAGS OR CLEAN CLASS 1 RIP RAP OR LARGER STONE THAT WILL NOT CONTRIBUTE TO TURBIDITY OR SILTATION OF THE WATER BODY. A TEMPORARY SEDIMENTATION BAG SHALL BE USED PER NCDOT STANDARD DRAWING NUMBER 1630.06. SANDBAGS SHALL BE OF THE FILTER FABRIC TYPE, DOUBLE BAGGED AND INDIVIDUALLY TIED TO PREVENT SAND LEAKAGE. THEY SHALL BE PLACED AND REMOVED MANUALLY TO PREVENT SPILLAGE. ONLY CLEAN SAND, FREE OF DEBRIS, SILT, FINE PARTICLES OR OTHER FOREIGN SUBSTANCES, SHALL BE USED TO FILL THE BAGS. THE COFFERDAM SHALL BE ENTIRELY REMOVED IMMEDIATELY UPON COMPLETION OF WORK. DURING PERIODS OF WORK ACTIVITY, FLOW IMMEDIATELY DOWNSTREAM OF THE WORKSITE SHALL EQUAL FLOW IMMEDIATELY UPSTREAM OF THE WORKSITE. ALL OTHER OPTIONS WILL NEED PRIOR APPROVAL. SEE SHEET 2D FOR DETAIL. NO DIRECT PAYMENT SHALL BE MADE FOR THE WORK OF INSTALLATION, MAINTENANCE, AND REMOVAL OF IMPERVIOUS DIKE(S) AS DESCRIBED IN THIS PROVISION. PAYMENT FOR SUCH WORK SHALL BE DISTRIBUTED AMONG THE VARIOUS PAY ITEMS. PRELIMINARY DNT �� 11. ALL BANK AND CHANNEL STABILIZATION SHALL BE MAINTAINED DAILY UNTIL PERMANENT STABILIZATION HAS BEEN ACCOMPLISHED. TEMPORARY ACCESS ROADS SHALL BE PERMANENTLY STABILIZED AFTER CONSTRUCTION AND DECOMMISIONED AT THE DIRECTION OF THE LAND OWNER. ALL STAGING AND LAY DOWN AREAS SHALL BE PERMANENTLY STABILIZED ONCE MATERIAL AND EQUIPMENT IS REMOVED. 12. AS AREAS ARE BROUGHT UP TO FINISH GRADE, SPREAD TOPSOIL OVER ALL AREAS TO RECEIVE TURF OR LANDSCAPING. SEED ALL AREAS WITHIN NPDES SPECIFIED TIMEFRAME OF COMPLETING ACTIVITY. PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON. FERTILIZE, WATER AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN A VIGOROUS STAND OF GRASS. 13. AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STABILIZED, REMOVE ALL ACCUMULATED SEDIMENT FROM SEDIMENT TRAPPING MEASURES AND SPREAD EVENLY ACROSS THE SITE. THEN REMOVE TEMPORARY EROSION CONTROL MEASURES, SMOOTH AREA AND APPLY APPROPRIATE GRASS. 14. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR FINAL SITE INSPECTION BY ENVIRONMENTAL OFFICER. OBTAIN CERTIFICATE OF COMPLIANCE. 15. CONTRACTOR IS REQUIRED TO MAINTAIN A WEEKLY WRITTEN REPORT OF SEDIMENT AND EROSION CONTROL DEVICES. UKAWN BY: Mtl CHECKED BY: BRC REVISIONS: NO. DATE IPROJECT NO.: H9001.00 t EROSION CONTROL NOTES 1 TOTAL ACREAGE OF DISTURBED AREA IS 24.7 ACRES, TOTAL PROJECT AREA IS 582.75 ACRES. ACREAGE OF PERMANENT AND SEEDING IS 8.81 ACRES. ACREAGE OF TEMPORARY SEEDING IS 18.6 ACRES. SEE CONTRACT DOCUMENTS AND SHEETS 1C, 1J, AND 2P FOR SEEDING REQUIREMENTS AND SPECIFICATIONS. 2 ON -SITE BURIAL PITS ARE NOT ACCEPTABLE. 3 ANY GRADING BEYOND THE LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE STATE /COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO FINE. 4 STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL IN LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. 5 ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 15 CALENDAR DAYS OF COMPLETION OF GRADING. 6 DURING UNSUITABLE GROWING SEASONS, MULCH WILL BE USED AS A TEMPORARY COVER ON SLOPES THAT ARE 4:1 OR STEEPER, MULCH WILL BE ANCHORED. 7 ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A LOCAL REPRESENTATIVE OF THE STATE /COUNTY STORM WATER MANAGEMENT SECTION AND THE LOCAL INSPECTIONS DEPARTMENT. 8 CONSTRUCTION, MAINTENANCE, REMOVAL OF ALL EROSION CONTROL DEVICES, ALL FINES, LEGAL FEES AND RESTORATION COSTS ARE THE RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE NOTED. 9 A COPY OF THE APPROVED PLANS MUST BE ON FILE AT THE JOB SITE. 10 CONTRACTOR SHALL OBTAIN A COPY OF EACH SUBSURFACE INVESTIGATION REPORT AND FOLLOW THE RECOMMENDATIONS OR AS DIRECTED FOR GRADING, COMPLETION AND PAVEMENT DESIGN, ETC. 11 THE AMOUNT OF DISTURBED AREA REQUIRED TO BE SEEDED IS LIMITED TO 2,000 LF OF TRAIL OR THE TIME FRAME GUIDELINES AS SPECIFIED BY NCG- 010000 GENERAL CONSTRUCITON PERMIT EFFECTIVE AUGUST 3, 2011 ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY. GROUND COVER STABILIZATION SHALL OCCUR WITHIN 7 CALENDAR DAYS FROM THE LAST LAND - DISTURBING ACTIVITY, WITH THE FOLLOWING EXCEPTIONS IN WHICH TEMPORARY GROUND COVER SHALL BE PROVIDED IN 14 CALENDAR DAYS FROM THE LAST LAND - DISTURBING ACTIVITY . SEE SHEET 1J FOR NPDES STABILIZATION TIMEFRAME GUIDELINES EROSION PROVISION 12 THE CONTRACTOR SHALL BE REQUIRED TO TAKE EVERY REASONABLE PRECAUTION THROUGHOUT THE CONTRACT TO PREVENT THE EROSION OF SOIL AND THE SEDIMENTATION OF STREAMS, LAKES, RESERVOIRS, OTHER WATER IMPOUNDMENTS, GROUND SURFACES, OR OTHER PROPERTY AS REQUIRED BY THE SEDIMENT POLLUTION CONTROL ACT OF 1973 AND THE 1974 AMENDMENTS TO THE ACT. 13 FAILURE ON THE PART OF THE CONTRACTOR TO COMPLY WITH THE PROVISIONS OF THE EROSION CONTROL PLAN OR TO PERFORM EROSION CONTROL WORK AS DIRECTED WILL RESULT IN THE ENGINEER, INSPECTOR OR NCDENR NOTIFYING THE CONTRACTOR TO COMPLY WITH THESE PROVISIONS. IN THE EVENT THAT THE CONTRACTOR FAILS TO BEGIN SUCH REMEDIAL ACTION OR FAILS TO BEGIN EROSION CONTROL WORK WITHIN 24 HOURS AFTER RECEIPT OF SUCH NOTICE WITH ADEQUATE FORCES AND EQUIPMENT, THE ENGINEER MAY PROCEED TO HAVE THE WORK PERFORMED WITH OTHER FORCES. NO PAYMENT WILL BE MADE TO THE CONTRACTOR FOR WORK PERFORMED BY OTHERS. ANY COSTS INCURRED BY THE CITY DUE TO THE FAILURE OF THE CONTRACTOR TO COMPLY WITH THESE PROVISIONS WILL BE BORNE BY THE CONTRACTOR. SUCH COSTS WILL INCLUDE CIVIL PENALTIES ASSESSED FOR SOIL EROSION AND SEDIMENTATION CONTROL VIOLATIONS. 14 ANY COSTS INCURRED BY THE CITY FOR WORK PERFORMED BY OTHERS AS PROVIDED ABOVE IN THE EXCESS OF THE COSTS THAT WOULD HAVE BEEN INCURRED HAD THE WORK BEEN PERFORMED BY THE CONTRACTOR WILL BE DEDUCTED FROM RETAINAGE OR OTHER MONIES DUE THE CONTRACTOR OR HIS CONTRACT. MISC - WETLANDS. TREES. STORM PIPING 15 CONTRACTOR TO VERIFY ACTUAL WETLAND BOUNDARY IN THE FIELD PRIOR TO CONSTRUCTION OF BOARDWALK. WETLAND LOCATION WILL DETERMINE BOARDWALKS STARTING /STOPPING LOCATION. 16 NO EQUIPMENT IS ALLOWED IN THE WETLANDS. EQUIPMENT MUST BE ON TIMBER MATS. TIMBER MATS SHALL BE CAROLINA MAT INCORPORATED BRIDGE /TIMBER MAT (6" MIN. THICKNESS) OR APPROVED ALTERNATE. TEMPORARY WETLAND CROSSINGS SHALL REQUIRE TIMBER MATS. 17 ALL DISTURBED AREAS TO BE OVERSEEDED WITH APPROVED MIX. CONTRACTOR SHALL MAINTAIN A WETLAND SEEDING MIX ON SITE TO BE APPLIED TO TEMPORARILY DISTURBED WETLAND AREAS AS DIRECTED BY ENGINEER IN THE FIELD. WETLAND SEED MIX IS PROVIDED IN THE SPECIFICATIONS IN SECTION 02910. 18 WETLAND LOCATION /DELINEATION BY ESI DATED 12/2012 19 LOCATION OF PIPING FOR DITCHES IS APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY LOCATION AND MATCH PIPING TO DITCH CENTERLINE. 20 SAVE ALL PROMINENT EXISTING TREES PLUS EXISTING TREES AS FLAGGED. IF JUDGMENT IS REQUIRED, CONTACT DESIGNER FOR FIELD ADJUSTMENT. IF EGREGIOUS VIOLATIONS OCCUR AS DETERMINED BY THE OWNER, REPLANTING MAY BE ORDERED AT A COMPENSATORY RATE AT THE CONTRACTORS EXPENSE. 21 ALL STORM PIPING SHALL BE HDPE DBL WALL- SMOOTH INTERIOR EXCEPT WERE OTHERWISE NOTED. SEE DRAINAGE SUMMARY SHEET. 22 ON ALL STORM PIPING, BURY INVERTS ONLY AS NEEDED. NOTES COMPACTION NOTES STRUCTURAL FILL BENEATH THE PAVED AREAS SHOULD BE PLACED IN UNIFORM LIFTS OF 8 INCHES OR LESS (LOOSE MEASURE), AND COMPACTED TO AT LEAST 95 PERCENT OF MAXIMUM DRY DENSITY AND WITHIN 2 PERCENT OF THE OPTIMUM MOISTURE AS DEFINED BY THE STANDARD PROCTOR COMPACTION TEST. HOWEVER, THE UPPER 12 INCHES OF THE FILL PLACED SHOULD BE COMPACTED TO 98 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. TO CONFIRM THAT THE SPECIFIED DEGREE OF COMPACTION IS OBTAINED, FIELD DENSITY TESTING SHOULD BE PERFORMED IN EACH LIFT BY A SOILS TECHNICIAN. 2012 NCDOT ROADWAY ENGLISH STD. DRAWINGS THE FOLLOWING ROADWAY STANDARDS AS APPEAR IN "ROADWAY STANDARD DRAWINGS" HIGHWAY DESIGN BRANCH - N.C. DEPARTMENT OR TRANSPORTATION - RALEIGH, N.C. ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS: STD.NO. DIVISION 2 - EARTHWORK 200.02 DIVISION 3 - PIPE CULVERTS 300.01 DIVISION 8 - INCIDENTALS 838.01 838.80 876.01 876.02 876.04 TITLE Method of Clearing - Method II Method of Pipe Installation - Method 'A' Concrete Endwall for Single and Double Pipe Culverts - 15" thru 48" Pipe 90° Skew Precast Concrete Endwall - For Single 12" thru 72" Pipe 90° Skew Rip Rap in Channels Guide for Rip Rap at Pipe Outlets Drainage Ditches with Class 'B' Rip Rap ADDITIONAL NCDOT STANDARDS NOT ON THE LIST ABOVE MAY BE REQUIRED AS PER PLAN DETAILS AND SPECIFICATIONS. SEEDING A. ACCOMPLISH SEEDING BY MEANS OF AN APPROVED POWER -DRAWN SEED DRILL, COMBINATION CORRUGATED ROLLER - SEEDER, APPROVED HAND OPERATED MECHANICAL SEEDER, OR OTHER APPROVED METHODS TO PROVIDE EVEN DISTRIBUTION OF SEED. B. DO NOT SEED WHEN GROUND IS EXCESSIVELY WET OR EXCESSIVELY DRY. AFTER SEEDING, ROLL AREA WITH A ROLLER, NOT LESS THAN 18 INCHES IN DIAMETER AND WEIGHING NOT MORE THAN 210 POUNDS PER FOOT OF WIDTH. UPON COMPLETION OF ROLLING, WATER AREA WITH A FINE SPRAY. C. IMMEDIATELY FOLLOWING SEEDING APPLY MULCH OR MATTING. DO NOT SEED AREAS IN EXCESS OF THAT WHICH CAN BE MULCHED ON SAME DAY. D. APPLY WATER WITH A FINE SPRAY IMMEDIATELY AFTER EACH AREA HAS BEEN MULCHED. SATURATE TO 4 INCHES OF SOIL DEPTH. (D J LL O r U m E. THE AMOUNT OF DISTURBED AREA REQUIRED TO BE SEEDED IS LIMITED TO 2,000 LF OF o TRAIL OR THE TIME FRAME GUIDELINES AS SPECIFIED BY NCG- 010000 GENERAL CONSTRUCITON a PERMIT EFFECTIVE AUGUST 3, 2011 ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT w Ce AND NATURAL RESOURCES DIVISION OF WATER QUALITY. GROUND COVER STABILIZATION SHALL OCCUR WITHIN 7 CALENDAR DAYS FROM THE LAST LAND - DISTURBING ACTIVITY, WITH THE g FOLLOWING EXCEPTIONS IN WHICH TEMPORARY GROUND COVER SHALL BE PROVIDED IN 14 CALENDAR DAYS FROM THE LAST LAND - DISTURBING ACTIVITY. SEE SHEET 1J FOR NPDES STABILIZATION TIMEFRAME GUIDELINES MULCHING AND MATTING A. APPLY MULCH OR MATTING AS REQUIRED TO RETAIN SOIL AND GRAS BUT NO LESS THEN THE FOLLOWING: 1 1. SLOPES FROM 5:1 OR FLATTER BY SPREADING A RATE OF NOT LESS THAN 92 LBS. PER 1000 SQ.FT 2. SLOPES GREATER THAN 5:1 MULCH WITH MATTIN AT 5 FOOT INTERVALS, IMMEDIATELY AFTER SEE[ 3. 7GAL/ACRE.TCT VP'i. B. C. OVER SEEDED AREA AT THE 2 TONS PER ACRE). G: f'TN'IGUXTT1TVGTO THE GROUND WITH WIRE STAPLES TACK SHALL BE APPLIED AT APPROXIMATLEY 400 , FOR TACK USE AN ASPHALT TIE -DOWN OF EMULSIFIED ASPHALT GRADE AE -E OR CUT -BACK ASPHALT GRADE RC -2 OR OTHER APPROVED EQUAL. AN APPROVED JUTE MESH OR NET MAY BE USED IN LIEU OF TACKING STRAW MULCH. OTHER TYPES OF MULCH AND ANCHORING METHODS MAY BE USED UPON APPROVAL BY THE ENGINEER. EXCELSIOR MATTING SHALL MEET NCDOT STANDARD SPECIFICATIONS AND SHALL BE INSTALLED PER APPROVED PLANS. PROTECTION PROTECT SEEDED AREAS FROM DAMAGE BY BARRICADES, SIGNS, AND OTHER APPROPRIATE MEANS. MAINTAIN AND PROTECT SLOPES FROM WEATHER- DAMAGE. w w ZI 2 Ul Q J W �O J N iU w U 00 C 0 z U) Qw"co � M � _j p1 LU a m U a m Il, Y J Ljj W U ~ w Ljj a � z CIO w 9 w 113� U (7 Ce W Z Z g a Z w w ice c� 0 z w U) Y U Ln 0 aw Z J U o> PRELIMINARY PLANS ®O NOT USE FOR CONSTIRUCTION UKAWN BY: Mtl CHECKED BY: BRC REVISIONS: NO. DATE 1 04/08/2013 (PROJECT NO.: H9001.00 1C NTS 4 _ i a 2i � - - s . � V1�A AKE USEOCA fl �� L \ S64B SI THE �4N �r \" (is f I D\ S N .� . K ,. �,.. O LE 11 - � 4 VICINITY MAP EQUATION: - Y2REV3- POT Sta 56 +31.53 BK = -Y2- POT Sta 56 +20.00 AH = -Y2- STA. 33 + 20.50 END BOARDWALK 2 BEGN 10' APP SLAB TEMP STREAM CROSSING -Y2- STA. 32 + 80.50 END 10' APP SLAB BEGIN BOARDWALK 2 END 10' APP SLAB BEGIN BRIDGE S1 -Y2- STA 57 +41.46 END BRIDGE S1 BEGIN 10' APP SLAB -Y2- STA 58+81.46 _ TEMP CONSTRUCTION ENTRANCE #3 NPDES STABILIZATION PLAN NPDES Star ater Discharge Permit for Construction Activities xN - 1) N IDENIPJDivision of Aster Qualo NEW STABILtZATION TIMEFRAMES (Effective Aug. 3, 011) -Y2- 20+60.00 END BOARDWALK 1 ,I V SITE AREA DESCRIPTION STABILIZATION TiMEFRA: E E CEPTION Perimeter dikes, swales, ditches, slopes 7 days None Mk High Quality Water (HQ W) Zones 7 days None Slopes steeper than 3:1 7 days If slopes are 101 or less in length and are not steeper than 2:1,14 days are allowed. LU Z 1rw Slopes 3;1 or flatter 14 days, 7 days for slopes greater than 50' in length. C z All other areas +nr`ith slopes flatter than 4:1 14 _ da s None, except for perimeters and H W Zones. PROJECT SEEDING REQUIREMENTS VARY PER TRAIL SLOPES. SEE SLOPES ON CROSS SECTION PLANS FOR STABILIZATION TIME FRAME DETERMINATION. Notification of Land Resources Sediment and Erosion Control Self- Insaection Proeram: STANDARD LANGUAGE FOR NPDES- SPECIFIC PLAN SHEETS (FOR COMPLIANCE WITH NCGO10000) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH NPDES GENERAL STORMWATER PERMIT NCGO10000; 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000 ONLY; 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000; 4. THE CITY IS NOT AUTHORIZED TO ENFORCE THIS PAGE OF THE PLANS AND IT IS NOT A PART OF THE APPROVED PLANS FOR PURPOSES OF ENFORCEMENT ACTION UNDER THE CITY CODE. NOTE: ALL ACCESS TO PROJECT MUST BE LOCATED WITHIN THE LIMITS OF DISTURBANCE. The Sedimentation Pollution Control Act was amended in 2006 to require that persons responsible for land- disturbing activities inspect a project after each phase of the project to make sure that the approved erosion and sedimentation control plan is being followed. Rules detailing the documentation of these inspections took effect October 1, 2010. The self- inspection program is separate from the weekly self- monitoring program of the NPDES Stormwater Permit for Construction Activities. The focus of the self- inspection report is the installation and maintenance of erosion and sedimentation control measures according to the approved plan. The inspections should be conducted after each phase of the project, and continued until permanent ground cover is established in accordance with NCGS 113 -54.1 and 15A NCAC 413.0131. The Self - Inspection Report form is avialabe as and Excel spreadsheet from http: / /www.dlr.enr. state. nc. us /pages /sedimentation_new.html. If you have questins or cannot access the form, please contact this office at (919) 791 -4200 EQUATION: -Y2- PC Sta 96 +24.81 BK = -Y2- PC Sta 96 +25.62 AH END BOARDWALK 5 END 10' APP SLAB BEGIN BRIDGE S3 BEGIN BOARDWALK 4 116 +22.30 -Y2- STA 113+04.83 -Y2- POT Sta.130 +20.00 BK = - Y2REV1- POT Sta.130 +20.71 AH -Y2- STA. 10 +60.00 TEMP CONSTRUCTION ENTRANCE #1 TEMP STREAM CROSSING END BOARDWALK 7 BEGIN 10' APP SLAB Y2 REVI- 185+80.00 �0 �C END BOARDWALK 9 BEGIN 10' APP SLAB -Y2 REVI- 198+66.59 END 10' APP SLAB J BEGIN BOARDWALK 7 -Y2 REVI - 182+80.00 j 00 END BOARDWALK 6 BEGIN 10' APP SLAB -Y2 REVI- STA. 153 + 55.00 END 10' APP SLAB - BEGIN BOARDWALK 8 -Y2 REVI- 191+31.47 END BOARDWALK 8 J BEGIN BOARDWALK PLATFORM Y2 REV- STA 193+11.47 TEMP CONSTRUCTION ENTRANCE #5 Y2REV1- POT Sta.198 +78.20 BK f � -Y2- 20+60.00 END BOARDWALK 1 ,I V °! O Lu w BEGIN 10' APP SLAB �, K w LU Z 1rw LU z C z ° U) 0 g L_UJ TEMP CONSTRUCTION 0) ENTRANCE #2 -P rn N W w U N oo C z LL iU Ci O z (f1 w END BRIDGE S3 TEMP CONSTRUCTION z C ^ Q BEGIN 10' APP SLAB ENTRANCE #4 -Y2- 17+00.00 rn rn w w -Y2- STA 117 + 62.30 END 10 APP SLAB (J) M END 10' APP SLAB BEGIN BOARDWALK 1 � a END BRIDGE S2 BEGIN BOARDWALK 6 BEGIN BOARDWALK 5 - Y2REV1- STA. 152 +05.00 M (n 114 +24.83 z EQUATION: TEMP STREAM -Y2- PC Sta 42 +26.95 BK = END BOARD 4 CROSSING BEGIN BRIDWALK - Y2REV3- PC Sta 42 +26.95 AH = 113 +84.83 Y END 10' APP SLAB END BOARDWALK 3 BEGIN PROJECT BEGIN BOARDWALK 3 BEGIN 10' APP SLAB BEGIN CONSTRUCTION Y2- STA. 100 + 35.00 -Y2- STA. 101 + 45.00 -Y2- STA. 10 +60.00 TEMP CONSTRUCTION ENTRANCE #1 TEMP STREAM CROSSING END BOARDWALK 7 BEGIN 10' APP SLAB Y2 REVI- 185+80.00 �0 �C END BOARDWALK 9 BEGIN 10' APP SLAB -Y2 REVI- 198+66.59 END 10' APP SLAB J BEGIN BOARDWALK 7 -Y2 REVI - 182+80.00 j 00 END BOARDWALK 6 BEGIN 10' APP SLAB -Y2 REVI- STA. 153 + 55.00 END 10' APP SLAB - BEGIN BOARDWALK 8 -Y2 REVI- 191+31.47 END BOARDWALK 8 J BEGIN BOARDWALK PLATFORM Y2 REV- STA 193+11.47 TEMP CONSTRUCTION ENTRANCE #5 Y2REV1- POT Sta.198 +78.20 BK - Y2REV2- POT Sta.198 +78.20 AH m 0 W Q a W oC a z g o TEMP CONSTRUCTION ENTRANCE #6 END PROJECT END CONSTRUCTION - Y2REV2- STA. 209 +46.15 END BOARDWALK PLATFORM BEGIN BOARDWALK 9 - Y2REV1- STA 196 +86.59 END BRIDGE S4 BEGIN BOARDWALK PLATFORM Y2REV1- 196 +69.18 END BOARDWALK PLATFORM BEGIN BRIDGE S4 - Y2REV1- 193 +29.18 Y J LU W U ~ w a LU � z m w Q w o� 0� U C7 PRELIMINARY PLANS II ®O NOT USE FOR CONSTIRUCTION UKAWN BY: MLI CHECKED BY: BRC REVISIONS: NO. DATE PROJECT NO.: H9001.00 13 ,I V Lu w w LU Z 1rw z J ° U) g L_UJ ID O N Q w U N oo LL iU Ci O z Ln w = ^ Lu lY OM Y w w w oo U M J a d O M (n ON z w U `) Y U � 0 � go W Z o U > - Y2REV2- POT Sta.198 +78.20 AH m 0 W Q a W oC a z g o TEMP CONSTRUCTION ENTRANCE #6 END PROJECT END CONSTRUCTION - Y2REV2- STA. 209 +46.15 END BOARDWALK PLATFORM BEGIN BOARDWALK 9 - Y2REV1- STA 196 +86.59 END BRIDGE S4 BEGIN BOARDWALK PLATFORM Y2REV1- 196 +69.18 END BOARDWALK PLATFORM BEGIN BRIDGE S4 - Y2REV1- 193 +29.18 Y J LU W U ~ w a LU � z m w Q w o� 0� U C7 PRELIMINARY PLANS II ®O NOT USE FOR CONSTIRUCTION UKAWN BY: MLI CHECKED BY: BRC REVISIONS: NO. DATE PROJECT NO.: H9001.00 13 ti J a N� L.L a O 00 0 z a z W z J a 0 III U/ ryo W I M T_ N co LID O Z O 0 W ry INSET 1 PAVEMENT SCHEDULE Cl PROPOSED APPROX. 2" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.513, AT AN AVERAGE RATE OF 224 LBS. PER SQ. YD. J1 PROPOSED 6" AGGREGATE BASE COURSE. T EARTH MATERIAL. V1 GEOTEXTILE SEPERATOR FABRIC 7 CHAIN 5' 0.02 �) V1 5' i i GRADE POINT Cl i 0.02 6' SHLD. 4'W/ SAFETY RAIL 31 SAFETY RAIL* SEE SHEET 2B =MAX. GRADE TO THIS LINE ( T ASPHALT TRAIL TYPICAL SECTION BEGIN STATION -Y2- (BEGIN CONSTRUCTION) 10 +60.00 17 +00.00 -Y2- (END BOARDWALK 1) 20 +60.00 27 +07.80 ** - Y2REV4- (STATION EQUATION AH) 27 +07.80 32 +79.42 - Y2REV4- (END BOARDWALK 2) 33 +19.42 34 +19.60 -Y2- (STATION EQUATION AH) 34 +20.69 42 +26.95 - Y2REV3- (STATION EQUATION AH) 42 +26.95 56 +31.53 -Y2- (STATION EQUATION AH) 56 +20.00 57 +41.46 -Y2- (END BRIDGE S1) 58 +81.46 96 +24.81 -Y2- (STATION EQUATION AH) 96 +25.62 100 +35.00 -Y2- (END BOARDWALK 3) 101 +45.00 113 +04.83 -Y2- (END BRIDGE S3) 117 +62.30 130 +20.00 -Y2RE V 196 +86.59 Al Y2REV1- (END BOARDWALK 6) 153 +55.00 180 +00.00 �c - Y2REV5- (STATION EQUATION AH) 180 +00.00 184 +25.00 - Y2REV5- (END BOARDWALK 7) 185 +10.00 190 +28.97 -Y2R 1- (STATION EQUAT ON ) 185 +9 .00 1 1 +31 4 - Y2REV1- (END B ARDWALK 9) 198 +66.59 198 +78.20 - Y2REV2- (STATION EQUATION AH) 198 +78.20 209 +46.15 BOARDWALK TYPICAL SECTION ** NOTE: PROVIDE 2' LEFT SHOULDER FROM - Y2REV4- STA 30 +00 TO 32 +25 PROVIDE 8" X 18" CURB ON RT FROM - Y2REV4- STA 30 +40 TO 32 +60 SEE X- SECTIONS FOR ADDITIONAL INFORMATION BOARDWALK NO. CHAIN BEGIN STATION END STATION 1 Y2 17 +00.00 20 +60.00 2 Y2REV4 32 +79.42 33 +19.42 3 Y2 100 +35.00 101+45.00 4 Y2 113 +04.83 113 +84.83 5 Y2 114 +24.83 116 +22.30 END STATION (BEGIN BOARDWALK 1) (STATION EQUATION BK) (BEGIN BOARDWALK 2) (STATION EQUATION BK) (STATION EQUATION BK) (STATION EQUATION BK) (BEGIN BRIDGE S1) (STATION EQUATION BK) (BEGIN BOARDWALK 3) (BEGIN BOARDWALK 4) (STATION EQUATION BK) (STATION EQUATION BK) (BEGIN BOARDWALK 7) (STATION EQUATION BK) (STATION EQUATION BK) (END CONSTRUCTION) NOTES: -USE 6' SHOULDER IN FILL SECTIONS AND 3' SHOULDER IN CUT SECTIONS. - TRANSITION SUPERELEVATION AS SHOWN ON PLANS. TRANSITION DISTANCE SHALL BE 101 . ORIGINAL GROUND *PROVIDE A SAFETY RAIL FOR THE FOLLOWING CIRCUMSTANCES: SLOPE >_ 3:1 AND DROP OF 6' SLOPE >_ 2:1 AND DROP OF 4' SLOPE >_ 1:1 AND DROP OF 1' { -Y2- OR - Y2REV1- go z J i V1 Y2REV5 1 184 +25.00 IU " -U " MIN. (:LtAK WIUII-I CHAIN BEGIN STATION 51 -011 51 -O„ J TIMBER DECK (DOUGLAS FIR) GRADE POINT Y2 57 +41.46 58 +81.46 9 Y2REV1 ----------------------------------------------- ----------------------------------------------- 198 +66.59 S2 Y2 113 +84.83 BRIDGE TYPICAL SECTION PREMANUFACTURED TRUSS 7 V1 Y2REV5 1 184 +25.00 +5 . 185 +10.00 BRIDGE NO. (CLEAR WIDTH) 193 1.47 S 1 CHAIN BEGIN STATION END STATION Y2 57 +41.46 58 +81.46 9 Y2REV1 196 +86.59 198 +66.59 S2 Y2 113 +84.83 114 +24.83 w S3 Y2 116 +22.30 117 +62.30 Y2REV1 193 +11.47 BOARDWALK PLATFORM 1 193 +29.18 S4 Y2REV1 193 +29.18 196 +69.18 2 Y2REV1 196 +69.18 196 +86.59 m 0 w a w a z g a Y J W U ~ w a Lu � z m w Q w o� 0� U C7 PRELIMINARY PLANS I ®O NOT USE FOR CONSTIRUCTION UKAWN BY: Mtl CHECKED BY: BRC REVISIONS: NO. DATE 1 05/16/2013 (PROJECT NO.: H9001.00 I I 2 NTS CD Lu w � w w z j z � J U) g � W Lu i N Q w U ^ oo IL iU ��ozrL., w C-6 L M = O Y w w oo < M D J rn a d O M (n m Z H W U `) Y U ° w 99 0 H ® I O z > m 0 w a w a z g a Y J W U ~ w a Lu � z m w Q w o� 0� U C7 PRELIMINARY PLANS I ®O NOT USE FOR CONSTIRUCTION UKAWN BY: Mtl CHECKED BY: BRC REVISIONS: NO. DATE 1 05/16/2013 (PROJECT NO.: H9001.00 I I 2 NTS 8' MAX. VARIABLE AS DIRECTED BY THE ENGINEER STEEL FENCE POST WIRE FENCE HARDWARE CLOTH MIN. 12 -1/2 GA. NCDOT SEDIMENT CONTROL STONE MIN. 10 GA. SILT FENCE FABRIC INTERMEDIATE LINE WIRES INSTALLED TO SECOND WIRES WIRE FROM TOP GRADE FRONT VIEW NOTES: - END OF SILT FENCE SHOULD BE TURNED UPHILL STEEL POST TOP OF SILT FENCE - SEE N.C. STATE DENR PRACTICE STANDARDS & SPECIFICATIONS WOVEN WIRE FABRIC MUST BEAT LEAST 1' IS ALWAYS REQUIRED ABOVE THE TOP OF SEDIMENT FENCE SET FOR CONDITIONS WHERE PRACTICE APPLIES THE WASHED STONE PLANNING CONSIDERATIONS & DESIGN CRITERIA. (HOWEVER FLOW _ SILT FENCE GEOTEXTILE FABRIC SHALL NOT RUN PARALLEL WITH THE TOE OF THE FENCE). _ z= FILL SLOPE N 0 ` * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE GRADE FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. IN EACH CASE THE SILT FENCE IS TO BE PROPERLY ENTRENCHED & THE o 6" MIN. COVER STONE SHALL BE AT A MINIMUM OF 16" ABOVE GRADE AT THE N OVER SKIRT DIRECTION OF FLOW & BETWEEN 60 - 45 DEGREES. ANCOR SKIRT AS DIRECTED BY ENGINEER. SIDE VIEW ,� STANDARD TEMPORARY SILT FENCE C.O.R. STD # 40.01 TYPE A TYPE B PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL PIPE OUTLET TO WELL- DEFINED CHANNEL x p CHANNEL BOTTOM Y PLAN VIEW 4 x DIAMETER FILTER FABRIC SEE PLANS FOR QUANTITIES SECTION A -A 40" 4 x DIAMETER FILTER FABRIC J SEE PLANS FOR QUANTITIES SECTION B -B PIPE OUTLET PROTECTION NCDOT STD. 876.02 c� TREE PROTECTION AREA 18" c� DO NOT ENTER WARNING SIGN DETAIL NOTES: 3' FILTER FABRIC ON GROUND BURY WIRE FENCE AND HARDWARE CLOTH BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH SECTION VIEW Al RAIA1 nn r'KICE STEEL FENCE POST SET MAX 2' APART - I�- MIN. 18" INTO SOLID GROUND FRONT VIEW SILT FENCE OUTLET L l NOTES: FOOTING SIZE PIPE SIZE 1' x 15 " - 24" 8" 12" w 12" 24" >3611- 54" 18" 36" ll�- w 114 +00 48" DOUBLE - Y2REV1 152 +80 w TRIPLE A o o Q B B x p CHANNEL BOTTOM Y PLAN VIEW 4 x DIAMETER FILTER FABRIC SEE PLANS FOR QUANTITIES SECTION A -A 40" 4 x DIAMETER FILTER FABRIC J SEE PLANS FOR QUANTITIES SECTION B -B PIPE OUTLET PROTECTION NCDOT STD. 876.02 c� TREE PROTECTION AREA 18" c� DO NOT ENTER WARNING SIGN DETAIL NOTES: 3' FILTER FABRIC ON GROUND BURY WIRE FENCE AND HARDWARE CLOTH BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH SECTION VIEW Al RAIA1 nn r'KICE STEEL FENCE POST SET MAX 2' APART - I�- MIN. 18" INTO SOLID GROUND FRONT VIEW SILT FENCE OUTLET L l NOTES: FOOTING SIZE PIPE SIZE WIDTH DEPTH 15 " - 24" 8" 12" >24" - 36" 12" 24" >3611- 54" 18" 36" till T FILTER FABRIC H = RIP RAP TO TOP OF PIPE (MAX. H = D +T) T = 15" CLASS 'I' RIPRAP T = 12" CLASS 'B' RIP RAP 1/2 DIAMETER OF PIPE OR 12" WHICHEVER IS GREATER FILTER FABRIC CAPACITY OF PIPE CULVERTS - TOGETHER = BANK FULL FLOW TEMPORARY STREAM CROSSING SUMMARY CHAIN STATION DIAMETER NOTES - Y2REV4 33 +00 48" SINGLE -Y2- 100 +80 48" DOUBLE -Y2- 114 +00 48" DOUBLE - Y2REV1 152 +80 48" TRIPLE 1. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. 2. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 3. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. 4. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 5. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 6. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 7. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. 8. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. 9. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 10. FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATIONS ( HOWEVER FLOW SHALL NOT RUN PARALLEL WITH THE FENCE) AND DESIGN CRITERIA. 11. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 12. SEE N.C. STATE DENR PRACTICE & SPECIFICATION SEDIMENTS FENCE SECTION. FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATIONS. 13. SEE N.C. STATE DENR PRACTICE & SPECIFICATION SEDIMENTS FENCE SECTION. (HOWEVER FLOW SHALL NOT RUN PARALLEL WITH THE FENCE) STEEL POST -WOVEN WIRE FABRIC — WARNING SIGN SILT FENCE GEOTEXTILE FABRIC MIN. 10 GA. LINE WIRES o 1 04 FILL SLOPE co z M GRADE -VIII 6" MIN. COVER o ir OVER SKIRT N IIII�I EXTEND WIRE 6" MIN. INTO TRENCH AND ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE. FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. 8' MAX. VARIARI F AR nIRFCTFn RY THE FNrINFFR TM WARNING SIGN TM TREE PROTECTION AREA DO NOT ENTER TREE PROTECTION AREA DO NOT ENTER SILT FENCE FABRIC IN TO SECOND WIRE FROM TO xxx \/x xxx X ><X><m a-/ ul III III it IIIIIIIIII IIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII FRONT VIEW VIII VIII VIII VIII VIII VIII III VIII III III III MIN. 12 -1/2 GA. INTERMEDIATE WIRES GRADE I III 6 COMBINATION SILT/ TREE PROTECTION FENCE C.O.R. STD # 40.03 MIN. 10 GA. LINE WIRES DESIGN CRITERIA NOTES THE DRAINAGE AREA IS LIMITED TO ONE HALF ACRE. 1. PLACE STONE TO THE LINE AND DIMENSION SHOWN IN THE PLAN CD w w KEEP A MAXIMUM HEIGHT OF 2 FEET AT THE CENTER OF ON A FILTER FABRIC FOUNDATION. III Lu z THE DAM. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW W z0 U z KEEP THE CENTER OF THE CHECK DAM AT LEAST 9 INCHES NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL J w o 0- LOWER THAN THE OUTER EDGES AT NATURAL GROUND BANKS. w J N a ELEVATION. 3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO > KEEP THE SIDE SLOPES OF THE DAM AT 2:1 OR FLATTER KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK w w U oo ENSURE THAT THE MAXIMUM SPACING BETWEEN DAMS DAM. LL O z Ln w PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION O o-6 L>u c°� o Lu ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE Y w w ao STABILIZE OUTFLOW AREAS ALONG THE CHANNEL TO ELEVATION OF THE UPPER DAM. � w o� RESIST EROSION. 5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM a M � m USE NCDOT CLASS B RIP RAP AND LINE THE UPSTREAM HEAVY FLOW THAT COULD CAUSE EROSION. III w SIDE OF THE DAM WITH NCDOT SEDIMENT CONTROL STONE. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST In KEY THE STONE INTO THE DITCH BANKS AND EXTEND IT UPSTREAM IS STABLE. U Y BEYOND THE ABUTMENTS A MINIMUM OF 1.5 FEET TO 7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT U AVOID WASHOUT FROM OVERFLOW AROUND THE DAM. ENTRANCES BELOW THE CHECK DAMS, ARE NOT SUBJECT TO ® ®�� d�o� v O DAMAGE OR BLOCKAGE FROM DISPLACED STONES. I °� w 99 9 12" OF NCDOT SEDIMENT ® II O U 9 MIN. 1.5' MIN CONTROL STONE 1.5 `�'� U > ( #5 OR #57) ; CLASS BRIP -RAP 2' MAX AT CENTER NCDOT TYPE 2. NCDOT TYPE 2 � FILTER FABRIC s , FILTER FABRIC` 4' TO 6' PLAN VIEW - CROSS - SECTION VIEW PURPOSE: TO REDUCE EROSION IN A CHANNEL BY REDUCING THE FENCE, VELOCITY OF FLOW. L = THE DISTANCE SUCH THAT POINTS 3RIC, A AND B ARE OF EQUAL ELEVATION .WARE DO NOT USE CHECK DAM IN INTERMITTENT OR PERENNIAL STREAMS. CLOTH IN TRENCH A g SEE DENR STANDARDS & SPECS. FOR COMPLETE DESIGN CRITERIA &>' L - MAINTENANCE CHECK DAM SIDE VIEW 6" DEEP COARSE AGGREGATE ELEVATION v FOR USE IN PROPOSED DITCHES '-' w w U ~ w ui a � z m w W EARTH FILL COVERED BY r / n LARGE ANGULAR ROCK FLOW v v EARTH FILL COVERED BY LARGE ANGULAR ROCK COARSE AGGREGATE N TOP OF BANK -I I I f` TOP OF BANK PLAN STANDARD TEMPORARY STREAM CROSSING 5 40" M TREE PROTECTION AREA 18" ih DO NOT ENTER WARNING SIGN DETAIL 8' MAX. VARIABLE AS DIRECTED BY THE ENGINEER NOTES: WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. TM WARNING SIGN TM TREE PROTECTION AREA DO NOT ENTER III III it IIIIIIIIII VIII VIII (IIII (IIII VIII VIII VIII (IIII —VIII VIII — (IIII —VIII (IIII — (IIII ORANGE, UV RESISTANT HIGH - TENSILE STRENGTH POLY BARRICADE FABRIC (TYPICAL) — (IIII — (IIII —VIII VIII VIII IIII FRONT VIEW 7 MIN. 12 -1/2 GA. INTERMEDIATE WIRES GRADE VIII III TREE PROTECTION FENCE C.O.R. STD # 40.04 c Or. c N "'I POST 1VEN WIRE FABRIC ARNING SIGN )RANGE, UV RESISTANT iIGH - TENSILE STRENGTH 3OLY BARRICADE FABRIC (TYPICAL) SIDE VIEW NOTE: FOR TREE PROTECTION ONLY m w QC Q a w oC a ul z g UKAWN BY: Mtl CHECKED BY: BRC REVISIONS: NO. DATE PROJECT NO.: H9001.00 NTS 2A w w V a NOTES: 1"4 Lou� z LV U z 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO O g J EXISTING ENSURE CONSTRUCTION ENTRANCE IS USED. Q � C, ROADWAY BOLLARD OR c^v ^ a 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD TRAIL OBSTRUCTION � z N w c IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE o 06 _ Q M 0, C7 ° C� STONE, THEN THE TIRES OF THE VEHICLE MUST BE my STOP SIGN GREENWAY TRAIL HINGED BOLLARD � w -4 00 C9 m WASHED BEFORE ENTERING THE PUBLIC ROAD. cn SEE DETAIL BOULDER TYP. M � o� a Q M r f' �' ccoo m n o BOULDER TO BE SUPPLIED PAINT STRIPE -SOLID YELLOW LINE 2" w m > " z — °- c X ­11 z K 3. IF A PROJECT CONTINUES TO PULL MUD AND DEBRIS ON BY CITY OF RALEIGH TRANSPORT AND PLACEMENT BY CONTRACTOR 1­4 m � z -1 z TO THE PUBLIC ROAD, THE GOVERNING AUTHORITY WILL v O CLEAN THE AREA AND INVOICE THE FINANCIALLY 2" YELLOW PAVEMENT ®�� duo H O m m RESPONSIBLE PERSON AS INDICATED ON THE FINANCIAL MARKING e I ��� Q w m RESPONSIBILITY FORM. , . (SEE DETAIL 3, THIS SHEET) 1/2" EXPANSION JOINT �' z J ® II O U . WHEN TIEING TO o TIE TO EXISTING `�d ®� ®�qa`� U > CONCRETE SURFACE N CONCRETE /ASHPALT PLAN 5FT RADIUS UNLESS OTHERWISE NOTED 16' OR FULL WIDTH OF PROPOSED STREET NEW CONSTRUCTION OR ENTRANCE, EXISTING ROADWAY T ----------- - - - - -- WHICHEVER IS 75' MIN. 25' MIN. 10 FT. GREATER. > r---------------- ----------------------------------------------------- - - - - -1 ~� w ui PLAN VIEW 12" MIN. 6" 6" MIN. FABRIC UNDER STONE � W Q CONSTRUCTION ENTRANCE 1 GREENWAY ENTRANCE 2 TRAIL OBSTRUCTION WITHIN PAVEMENT MARKING w W 3 NOTE: SEE 2009 MUTCD z M� W W � 61v 3" W 1" BEVEL @ 45° (TYP) 1/4" 6 11X3" X %" - STEEL BOLLARD ' ` , ^ v v 6 "x 6" POST, bo � 3"X13 "X "%2' 5' -0" 5' -0" S.Y.P. PRESSURE 7%" STEL PLATE TREATED FOR HOLE FOR TACK WELD PIN CAP, LOCK 1/2 " DIA. GROUND CONTACT Np (SEE SPECS) /s' 1" X 10" STEEL /a" o `0 E �ooin TOP OF `' CONCRETE LOCK PIN O ° w '> FOOTING TO FINISH GRADE M �� 1" X 10" STEEL /$ /8 U U °w E DRAIN AWAY FROM BOLLARD STEEL PLATE HINGE PIN BOLLARD 6 }, � z f"� w > t °1 W HINGED BOLLARD /2' /2' U' w p1O' +' SEE DETAIL AT RIGHT LOCK PIN co FINISHED GRADE HOLE FOR D D LOCK 1/2 DIA. L TYP. STEEL PLATE /a u N ra H 3 °C 3 _� HINGE PIN B HINGE PIN 3" X 6 �4" X 1�" E N N CONCRETE STEEL PLATE FL - III =1 I I =1 I I =1 I I =1 I I =1 I I =1 I I =1 I I =1 I I =1 I I =1 I I =1 I I= I I =1 I I =1 I I =1 I I =1 I I =1 -1 I I -1 I I -1 I I -1 I I -1 I I -1 I L =I I L =I I L =III_ " -` `- - - -- "- - '- I I -1 I I -1 I I -1 I I -1 I I I I =1 I I =1 I I =1 I I =1 I I- m 1 I I =[ CONCRETE A -1 I I -1 I I -1 I I -1 I I -1 I I -1 I I:. FOOTING A � 2 -6 "X2- 6'x2' — -1 — — — — — — — — — — — — — — — — — ° — — FOOTING p I I1 0 0 000 ll l N o D 1 I ° _ya" B 4" GRAVEL BASE TYP. 1/4 LOCK PIN <« 2" X 1 �" X 1�" .. } s 4" GRAVEL BASE COMPACTED L owc III — — — — =I I _ = SUBGRADE PLAN w w uj SQUARE FOOTING SECTION A -A SECTION B -B g HINGED BOLLARD PERMANENT BARRIER WOOD BOLLARD HINGED BOLLLARD a V) NOTE: BOULDERS PROVIDED BY THE CITY OF RALEIGH BOLLARDS 4 1 TIMBER MAT 8' -0" CTR TO CTR 7' -7" FACE TO FACE W/ NO SLOTS PYRAMID POST CAP 2" MIN.WIDTH AS NECESSARY SIDEBOARD FOR EQUIPMENT 10' X 10' SQUARE WASHOUT BASIN TIMBER MAT W/ NO SLOTS 5" SQ POST 10%2" THRU BOLT THRU BOLT MIN EXISTING GROUND ��ONT�s�OCONSTRUCTION L COMPACTED ABC El—_ :III - IIII -III -IIII- :III -IIII 00�tslo DODD STONE APPROACH 1 I -IIf1 11- 11 1-1111_ I I_f I -III -f N � — — — — — in H o 0 1'2" X 51/2" RAIL 54" W 1 11-1111 _ _ _ - III IIII - I--ii fIII.____.III_IIII O CROSS SECTION PLAN VIEW NOTES 1. INSTALL CONCRETE WASHOUT PIT AT ALL CONSTRUCTION ENTRANCES USED BY CONCRETE RI 'CL G G BIN HA , ND TO RA PE S, TRUCKS. CONTRACTOR SHALL PROVIDE TIMBER MATS WITH OUT SLOTS WHEN CROSSING 2. LINE PIT WITH IMPERVIOUS FABRIC OR POLYETHYLENE SHEET. ANCHOR FABRIC INTO JURISDICTIONAL AREAS. 14YZ DRAWN BY: MET GROUND OUTSIDE PIT AS SHOWN. ". CHECKED BY: BRC 3. MAXIMUM WATER AND SEDIMENT DEPTH IS 12 PIT MUST BE EXCAVATED AND RE -LINED REVISIONS: WHEN DEPTH OF SEDIMENT REACHES 12" OR COMBINED WATER/SEDIMENT DEPTH EXCEEDS IF TOPOGRAPHY DOES NOT PERMIT THE USE OF TIMBER MATS, OR THE TIMBER 1 1 1 1 30" No. DATE 12" FOLLOWING WASHOUT OF CONCRETE TRUCK. MATS CAN NOT SUPPORT THE EQUIPMENT LOAD, CONTRACTOR SHALL INSTALL THE 1 02 -26 -2012 4. ALLOW WATER TO EVAPORATE COMPLETELY PRIOR TO EXCAVATING PIT. PERMITTED TEMPORARY PIPE CROSSING OF THE SIZE SHOWN, AND AT THE LOCATION NOTES: 5. WASHOUT PIT MAY BE LOCATED NO CLOSER THAN 50' TO DRAINS, INLETS, OR SURFACE SHOWN ON SHEET 2A, DETAIL 5. 1. FENCE TO BE MASTER HALLO THREE -RAIL RANCH STYLE ____'' 6. WATERS. AT COMPLETION OF PROJECT, WASHOUT AREA TO BE BACKFILLED AND GRADED TO BE FENCE WITH NOMINAL 8' SECTION LENGTH _J LEVEL WITH EXISTING GRADE. MATS WITHOUT SLOTS ARE UTILIZED TO MINIMIZE SEDIMENT DEPOSITS INTO PROJECT NO.: 7. DIMENSIONS MAY BE MODIFIED TO FIT TOPOGRAPYH. PROVIDE MINIMUM 100 SF OF SURFACE AREA ENVIRONMENTALLY SENSITIVE AREAS. USE CAROLINA TIMBER CRANE MAT OR FOOTING WIDTH TO BE (2X) POST WIDTH. MINIMUM 8. LOCATIONS SHOWN ON PLANS ARE FOR ILLUSTRATIVE PURPOSES ONLY. CONTRACTOR SHALL DEPTH 30 ". 9. DETERMINE FINAL PLACEMENT. THERE IS NO DIRECT PAYMENT FOR CONCRETE WASHOUT PITS. THEY ARE CONSIDERED ENGINEER APPROVED ALTERNATE. un00 i .00 fl 7 1 INCIDENTAL TO THE CONCRETE WORK. THERE IS NO DIRECT PAYMENT FOR CRANE MATS. THE ARE CONSIDERED INCIDENTAL NTS TO THE CLEARING AND GRUBBING WORK. 2 B CONCRETE WASHOUT PIT 5 TIMBER MAT W /NO SLOTS DETAIL 6 DETAIL FOR SAFETY RAIL 7 I" I I I I I� PERVIOUS DIKE - EXISTING TERRAIN a TEMPORARY SEDIMENTATION BAG i 15 X 10 TEMPORARY SEDIMENTATION BAG`. L PUMP TO SEDIMENTATION BAG SLOPE DRAIN INLET G­1­171177ARA InAAII/ [0!•_,t ]Ml MAN 191 ­1\0 _M1_.w0 ..x_. 011►11 ._.w1�`Wl M`. im .l NOTE: PROVIDE STABILIZED OUTLET TO STREAMBANK JP11 V l.J uP117a7 )RAIN DRAW DETAIL FOR CULVERT CONSTRUCTION AT WET STREAMS AND DITCHES TEMPORARY SEDIMENTATION BAG(S): LJ,J THE WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING, PLACING, AND Lij REMOVING A TEMPORARY SEDIMENTATION BAG(S) AS DIRECTED BY THE ENGINEER. 0� 3: THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE USED TO FILTER PUMPED WATER � z DURING THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR m W PIPE CONSTRUCTION. LJ,J THE FILTER FABRIC SHALL MEET THE REQUIREMENTS OF SECTION 1056 FOR TYPE 2 FABRIC. U CD SEDIMENT CONTROL STONE SHALL MEET THE REQUIREMENTS OF SECTION 1005 AND SHALL BE CLEAN OF DIRT AND DEBRIS. INSTALL STONE ACCORDING TO THE DETAIL SHOWN ON THE PLANS. � 00 8 O E in�Oin O t0 I� U THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE A WATER PERMEABLE FABRIC BAG >v� THAT TRAPS SAND, SILT, AND FINES AS SEDIMENT LADEN WATER IS PUMPED INTO Z � � z � IT. THIS DEVICE SHALL BE CONSTRUCTED SUCH THAT IT IS PORTABLE AND CAN BE °''� m ra .a) - +� w USED ADJACENT TO THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR uN a 3 ce CULVERT OR PIPE CONSTRUCTION. 3 THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE A BAG CONSTRUCTED TO A MINIMUM SIZE OF 10'X 15' MADE FROM A NONWOVEN FABRIC. IT SHALL HAVE A SEWN -IN 8 IN. (MAXIMUM) SPOUT FOR RECEIVING PUMP DISCHARGE. THE BAG SEAMS SHALL BE m Q SEWN WITH A DOUBLE NEEDLE MACHINE USING A HIGH STRENGTH THREAD. THE SEAMS 0 w SHALL HAVE A MINIMUM WIDE WIDTH STRENGTH AS FOLLOWS: a a w TEST METHOD MINIMUM SPECIFICATIONS LLJ ASTM D -4884 60 LB/IN g a THE FABRIC USED TO CONSTRUCT THE BAG SHALL BE STABILIZED TO PROVIDE C) RESISTANCE TO ULTRA- VIOLET DEGRADATION AND MEET THE FOLLOWING SPECIFICATIONS FOR FLOW RATES, STRENGTH, AND PERMEABILITY: PROPERTY TEST METHOD UNITS MIN. SPECIFICATIONS SPECIFICATIONS WEIGHT ASTM D -3776 OZ/YD 8.0 GRAB TENSILE ASTM D -4632 LB 200.0 PUNCTURE ASTM D -4833 LB 130.0 FLOW RATE ASTM D -4491 GAL /MIN /SF 80.0 IMPERVIOUS DIKE: PERMITTIVITY ASTM D -4991 1 /SEC 1.2 w UV RESISTANCE ASTM D -4355 % 70.0 Lu WITH THE DETAILS IN THE PLANS AND AT LOCATIONS AS DIRECTED BY THE ENGINEER. THE WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING, INSTALLING, W J Lu ° ; FLOWS INTO AND THROUGH THE BAG WITHOUT CAUSING EROSION. THE NECK OR SPOUT OF THE BAG SHALL BE TIED OFF TIGHTLY TO STOP THE WATER FROM FLOWING OUT OF w z Z g "�. MAINTAINING, AND REMOVING AN IMPERVIOUS DIKE FOR THE PURPOSE OF DIVERTING DRAWN BY: MET Q� w REVISIONS: k DATE ENGINEER MUST BE RECEIVED BEFORE REMOVAL AND REPLACEMENT. NORMAL STREAM FLOW AROUND THE CONSTRUCTION SITE. THE CONTRACTOR SHALL Lu u 0 CONSTRUCT AN IMPERVIOUS DIKE IN SUCH A MANNER APPROVED BY THE ENGINEER. PROJECT NO.: - Lu } M = ^ TEMPORARY SEDIMENTATION BAG (S) WILL BE MEASURED AND PAID FOR PER EACH. THIS PAYMENT WILL BE FULL COMPENSATION FOR ALL WORK COVERED BY THIS Lu ' THE IMPERVIOUS DIKE SHALL NOT PERMIT SEEPAGE OF WATER INTO THE CONSTRUCTION O 06 Y Q w (? °o c� SITE OR CONTRIBUTE TO SILTATION OF THE STREAM. THE IMPERVIOUS DIKE SHALL LL Q M D J ° BE CONSTRUCTED OF AN ACCEPTABLE MATERIAL IN THE LOCATIONS NOTED ON THE a "' `� °' w ' \ PLANS OR AS DIRECTED BY THE ENGINEER . r (> �' IOUS,DIKE ' G ACCEPTABLE MATERIALS SHALL INCLUDE BUT NOT BE LIMITED TO SHEET PILES ® ®�� ��� L Y ° �� SANDBAGS, AND /OR THE PLACEMENT OF AN ACCEPTABLE SIZE STONE LINED WITH m Z w - - -_ SAND SAGS / ; - -- \ m POLYPROPYLENE OR OTHER IMPERVIOUS FABRIC. I� �� 0 I , EARTH MATERIAL SHALL NOT BE USED TO CONSTRUCT AN IMPERVIOUS DIKE WHEN IT IS STREAM _ �: IN DIRECT CONTACT WITH THE STREAM. � NO DIRECT PAYMENT SHALL BE MADE FOR THE WORK OF INSTALLATION MAINTENANCE AND REMOVAL OF IMPERVIOUS DIKE(S) AND RELATED WORK AS DESCRIBED IN THIS Lu PROVISION. PAYMENT FOR SUCH WORK SHALL BEDISTRIBUTED AMONG THE VARIOUS PAY Lu ITEMS. SLOPE DRAIN . 15 X 10 TEMPORARY SEDIMENTATION BAG`. L PUMP TO SEDIMENTATION BAG SLOPE DRAIN INLET G­1­171177ARA InAAII/ [0!•_,t ]Ml MAN 191 ­1\0 _M1_.w0 ..x_. 011►11 ._.w1�`Wl M`. im .l NOTE: PROVIDE STABILIZED OUTLET TO STREAMBANK JP11 V l.J uP117a7 )RAIN DRAW DETAIL FOR CULVERT CONSTRUCTION AT WET STREAMS AND DITCHES TEMPORARY SEDIMENTATION BAG(S): LJ,J THE WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING, PLACING, AND Lij REMOVING A TEMPORARY SEDIMENTATION BAG(S) AS DIRECTED BY THE ENGINEER. 0� 3: THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE USED TO FILTER PUMPED WATER � z DURING THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR m W PIPE CONSTRUCTION. LJ,J THE FILTER FABRIC SHALL MEET THE REQUIREMENTS OF SECTION 1056 FOR TYPE 2 FABRIC. U CD SEDIMENT CONTROL STONE SHALL MEET THE REQUIREMENTS OF SECTION 1005 AND SHALL BE CLEAN OF DIRT AND DEBRIS. INSTALL STONE ACCORDING TO THE DETAIL SHOWN ON THE PLANS. � 00 8 O E in�Oin O t0 I� U THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE A WATER PERMEABLE FABRIC BAG >v� THAT TRAPS SAND, SILT, AND FINES AS SEDIMENT LADEN WATER IS PUMPED INTO Z � � z � IT. THIS DEVICE SHALL BE CONSTRUCTED SUCH THAT IT IS PORTABLE AND CAN BE °''� m ra .a) - +� w USED ADJACENT TO THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR uN a 3 ce CULVERT OR PIPE CONSTRUCTION. 3 THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE A BAG CONSTRUCTED TO A MINIMUM SIZE OF 10'X 15' MADE FROM A NONWOVEN FABRIC. IT SHALL HAVE A SEWN -IN 8 IN. (MAXIMUM) SPOUT FOR RECEIVING PUMP DISCHARGE. THE BAG SEAMS SHALL BE m Q SEWN WITH A DOUBLE NEEDLE MACHINE USING A HIGH STRENGTH THREAD. THE SEAMS 0 w SHALL HAVE A MINIMUM WIDE WIDTH STRENGTH AS FOLLOWS: a a w TEST METHOD MINIMUM SPECIFICATIONS LLJ ASTM D -4884 60 LB/IN g a THE FABRIC USED TO CONSTRUCT THE BAG SHALL BE STABILIZED TO PROVIDE C) RESISTANCE TO ULTRA- VIOLET DEGRADATION AND MEET THE FOLLOWING SPECIFICATIONS FOR FLOW RATES, STRENGTH, AND PERMEABILITY: PROPERTY TEST METHOD UNITS MIN. SPECIFICATIONS SPECIFICATIONS WEIGHT ASTM D -3776 OZ/YD 8.0 GRAB TENSILE ASTM D -4632 LB 200.0 PUNCTURE ASTM D -4833 LB 130.0 FLOW RATE ASTM D -4491 GAL /MIN /SF 80.0 PERMITTIVITY ASTM D -4991 1 /SEC 1.2 UV RESISTANCE ASTM D -4355 % 70.0 THE CONTRACTOR SHALL INSTALL THE TEMPORARY SEDIMENTATION BAG IN ACCORDANCE WITH THE DETAILS IN THE PLANS AND AT LOCATIONS AS DIRECTED BY THE ENGINEER. PRELIMINARY PL��� ®O NOT USE FOR CONSTRUCTION THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE PLACED SO THE INCOMING WATER FLOWS INTO AND THROUGH THE BAG WITHOUT CAUSING EROSION. THE NECK OR SPOUT OF THE BAG SHALL BE TIED OFF TIGHTLY TO STOP THE WATER FROM FLOWING OUT OF THE BAG WITHOUT GOING THROUGH THE WALLS. THE TEMPORARY SEDIMENTATION BAGS SHALL BE REPLACED AND DISPOSED OF WHEN BAG(S) IT IS 3/4 FULL OF SEDIMENT OR WHEN IT IS IMPRACTICAL FOR THE BAG TO FILTER THE SEDIMENT OUT AT A REASONABLE FLOW RATE. PRIOR APPROVAL FROM THE DRAWN BY: MET CHECKED BY: BRC REVISIONS: NO. DATE ENGINEER MUST BE RECEIVED BEFORE REMOVAL AND REPLACEMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A SUFFICIENT QUANTITY OF BAGS TO CONTAIN SILT FROM PUMPED EFFLUENT DURING THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR PIPE PROJECT NO.: CONSTRUCTION. H9001.00 TEMPORARY SEDIMENTATION BAG (S) WILL BE MEASURED AND PAID FOR PER EACH. THIS PAYMENT WILL BE FULL COMPENSATION FOR ALL WORK COVERED BY THIS NTs PROVISION, INCLUDING BUT NOT LIMITED TO, FURNISHING ALL MATERIALS, PLACING AND MAINTAINING THE TEMPORARY SEDIMENTATION BAG(S), AND REMOVAL AND DISPOSAL OF SILT ACCUMULATIONS AND BAG. ® Practice Standards and Specifications e ( V Practice Standards and Specifications 1­4 Table 6.10a Seeding mixture Table 6.10b Seeding mixture Table 6A0c Seeding mixture _ — Table 6,11k Seeding mixture Temporary Seeding Species Rate (Iblacre) J Ternpomry Seeding Species Rate (Iblacre) Temporary Seeding Species Rate (Iblacre) Seeding No. I P for: Steep Species' Rate (lb /acne) Recommendations for Late Rye (grain) 120 Recommendations for German millet 40 Recommendations for Fall Rye (grain) 120 Slopes or Poor Soils; Low Tall fescue 100 IU Winter and early Spring Annual lespedeza (Kobe €n ; z Summer O Maintenance Sericea lespedeza 30 Piedmont and Coastal plain, In the Piedmont and Mountains, a small- sternmed Sudangrass may be Seeding Mates d Kobe lespedeza 10 J Korean in Mountains) 50 substituted at a rate of 50 €b /acre. to Mountains —Aug. 15 - Dec. 15 ON H U Coastal Plain and Piedmont —Aug. 15 - Dec. 30 Seeding notes Omit annual lespedeza when duration of temporary cover is not to Seeding dates Mountains ---May 15 -Aug. 15 Soil amendments 1. In Eastern Piedmont, add 25 lb /acre Pensacola Bahiagrass or 10 lb/ acre common Bermudagrass. Use common Bermudagrass only where extend beyond June. Medmont —(+nay i -Aug. 15 Follow soil tests or apply 2,000 lb /acre ground agricultural limestone it is unlikely to become a pest. Seeding dates Coastal Plain —Apr. 15 -Aug. 15 and 1,000 lb /acre 10 -10 -10 fertilizer. 2. After Aug. 15, use unscarified Sericea seed. Mountains—Above 2500 feet: Feb. 15 _ May 15 Soil amendments Mulch 3. Where a neat appearance is desired, omit sericea and substitute 40 Below 2500 feet: Feb. 1- May 1 Piedmont —Jan. 1 - May '1 Follow recommendations of soil tests or apply 2,000 lb/acre round pp Y g Apply 4,000 ib /acre straw. Anchor straw b tacking with asphalt, netting, pp d Y g P g' lb/acre Bahia grass or 15 lb/acre Bermuda rass. g g 4. To extend spring seeding dates into June, add 15 lb/acre hulled p g g Coastal Plain —Dec. 1 - Apr. 15 agricultural limestone and 750 lb/acre 10 -10 -10 fertilizer. or a mulch anchoring tool. A disk with blades set nearly straight can be Bermudagrass. However, it is referable to seed temporary Dover and p Mulch used as a mulch anchoring tool. seed fescue in Sept. Soil amendments Follow recommendations of soil tests or apply 2,000 lb /acre ground Apply 4,000 Iblacre straw. Anchor straw by tacking with asphalt, netting, Maintenance Nurse plants agriculture{ limestone and 7501blacre 10 -10 -10 fertilizer. or a mulch anchoring tool. A disk with blades set nearly straight can be Repair and refertilize damaged areas immediately. Topdress with 50 Between May 1 and Aug. 5, add 10 lb/acre German millet or 15 lb/ Y g used as a mulch anchoring tool. lb/acre of nitrogen in March. If it is necessary to extent temporary acre Sudangrass. Prior to May 1 or after Aug. 15, add 40 lb /acre rye Mulch cover beyond June 15, overseed with 50 lb /acre Robe (Piedmont and (grain). Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. or a mulch anchoring tool. A disk with blades set nearly straight can be immediately following erosion or other damage. Seeding dates used as a mulch anchoring tool. Maintenance Best Possible Refertilize if growth is not fully adequate. Reseed, refertilize and mulch Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 immediately following erosion or other damage. Late Winter: Feb. 15 - Mar. 21 Feb. 1 -Apr. 15 Fall is best for tail fescue, and lespedezas in late winter. Overseeding of Kobe lespedeza over fall- seeded tall fescue is very effective. Use unhLlied Bermudagrass seed in fall. Soil amendments Apply lime and fertilizer according to soil tests or apply 4,000 lb/acre ground agricultural limestone and 1,000 Iblacre 10 -10 -10 fertilizer. Mulch Apply 4,000 -5,000 Iblacre grain straw or equivalent cover of another suitable mulching material. Anchor mulch by tacking with asphalt, roving, or netting. Netting is the preferred anchoring method on steep Slopes. Maintenance Refertilize in the second year unless growth is fully adequate. May be mowed once or twice a year, but mowing is not necessary. Reseed, fertilize, and mulch damaged areas immediately. b, 'Refer to Appendix 8.02 for botanical names. 6.10.4 6.10.5 6.10.6 6.11.19 ® Practice Standards and .Specifications � Practice Standards and .Specificaation.y Table 6.11m Seeding mixture Table 6.11n Seeding mixture Table 6.110 Seeding mixture Table 6.111 Seeding mixture Seeding No. 2P for: Gentle Species' Rate (Iblacre) Seeding No. 3f' fore Gentle Species' Rate (lb /acre) Seeding Flo. 4P for: Gentle Species' Rate (lb/acre) Seeding Igo, 5P for: Species' Rate (Iblacre) Slopes, Average Soil; Low Tall fescue 80 Slopes, Soils with Average Blend of two turf -type tall Slopes, Soils Somewhat Blend of 50% KY -31 tall fescue Grass -limed Channels Tall fescue 200 (4 -5 Ib /1,000 ft2) Maintenance Sericea lespedeza 20 or Better Moisture fescues (90 %) and two or Warmer or Drier than 3P, or and 50% mixture of two or Kobe lespedeza 10 Retention, more improved Kentucky ° with Physical Limitations; more turf -type tall fescues 200 -250 Nurse plants Cooler Sites, High bluegrass varieties (10 %) 200 -250 High Maintenance or Between May 1 and Aug. 15, add 15 Iblacre Sudangrass or 15 lb /acro Seeding notes Maintenance A turf-type Blend of three or more turf -t e German millet. Prior to May 1 or after Aug. 15, add 40 lb /acre rye I. After Aug. 15, use unscarified sericea seed. I Seeding date tali fescues 200 -250 (grain). 2. Where mowing or a neat a p g is planned appearance 1s desired, I omit sericea and 'increase Kobe lespedeza eza to 40 lb/acre. Best Possible ! Seeding dates eeding dates Best: Aug. 25 - Oct. 3. To extend spring seeding dates into June, add 15 Iblacre hulled 1 1 Bermudagrass. However, after mid-Apr. it i5 referable to seed g p p Fall Aug. 25 - Sept. '15 Aug. 20 - Oct. 25 Best Possible Possible: Feb. -Apr. '15 temporary cover. Winter: — Feb. °l - Mar. 31 i i I Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Avoid seeding from Nov. to Jan. If seeding must be done at this time, Nurse {plants For quality turf, avoid spring seeding. Where grading is completed Winter: — Feb. 1 - Mar. 31 add 40 Iblacre rye grain and use a channel lining that offers maximum Between May 1 and Aug. 15, add 10 lb /acre German millet or 15 lb/ during late winter or spring, an alternative is to seed 30 lb/acre Kobe protection. acre Sudangrass. Prior to May 1 or after Aug. 15, add 40 Iblacre rye lespedeza, keep mowed, prepare seedbed, and seed a permanent For quality turf, avoid spring seeding. Where grading is completed (grain). mixture in early fail. during late winter or spring, an alternative is to seed 30 lb /acre Kobe Soil amendments lespedeza, keep mowed, prepare seedbed, and seed permanent Apply lime and fertilizer according to soil tests, or apply 4,000 lb /acre Seeding dates Soil amendments I mixtLre between Aug. 25 and Sept. 15. ground agricultural limestone and 1,000 lb/acre 10 -10 -10 fertilizer. Apply time and fertilizer according to soil tests, or apply 4,000 Iblacre Operate tillage equipment across the waterway. Best possible ground agricultural limestone and 1,000 lb/acre 10 -10 -10 fertilizer. Soil amendments Apply lime and fertilizer according to soil tests or apply 4,000 lb /acre Mulch Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Mulch ground agricultural limestone and 1,000 Ib /acre 10 -10 -10 fertilizer. Use a rolled erosion control product to cover the bottom of channels Late Winter. Feb. 15 - Mar. 21 Feb. 1 -Apr. 15 Apply 4.000 lb/acre small grain straw or equivalent cover of another and ditches, and staple securely. The lining should extend above the suitable mulch. Anchor straw by tacking with asphalt, netting, roving, or Mulch highest calculated depth of flow. On channel side slopes above this Fall is best for tall fescue and late winter for lespedezas. Overseeding by crimping with a mulch anchoring tool. A disk with blades set nearly Apply 4,000 Iblacre grain straw or equivalent cover of another suitable height, and in drainages not requiring temporary linings, apply 4,000 of Kobe lespedeza over fall- seeded tall fescue is very effective. straight can be used as a mulch anchoring tool. mulch. Anchor straw by tacking with asphalt, roving, netting, or by lb/acre grain straw, and anchor straw by stapling netting over the top. Soil amendments Maintenance crimping with a mu €ch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Mulch and anchoring materials must not be allowed to wash down Apply lime and fertilizer according to soil tests, or apply 4,000 lb/acre Fertilize according to soil tests or apply 40 lb/acre nitrogen in Jan. or slopes where they can clog drainage devices. ground agricultural limestone and 1,000 Iblacre 10 -10 -10 fertilizer. Feb., 40 lb in Sept., and 40 lb in Nov., from a 12 -4 -8, 16 -4 -8, or similar Maintenance tarf fertilizer. Avoid fertilizer applications during warm weather, as this Fertilze according to soil tests or apply 40 1b /acre nitrogen in Jan. or Maintenance Mulch increases stand losses to disease. Mow to a height of 2.5 -3.5 inches Feb., 40 lb in Sept., and 40 lb in Nov., from a 12 -4 -8, 16 -4 -8, or similar Inspect and repair mulch frequently. Refertilize in late winter of the Apply 4,000 lb /acre grain straw or equivalent cover of another suitable as needed. Reseed, fertilize, and mulch damaged areas immediately. turf fertilizer. Avoid fertilizer applications during warm weather, as following year; use soil tests or apply 150 lblacre 10- 10 -10. Mow mulch. Anchor straw by tacking with asphalt, netting, or roving or by this increases stand losses to disease. Reseed, fertilize, and mulch regu arly to a height of 2 -4 inches. crimping with a mulch anchoring tool. A disk with blades set nearly damaged areas immediately. Mow to a height of 2.5 -3.5 inches as straight can be used as a mulch anchoring tool. 'Refer to Appendix 8.02 for botanical names. needed. 'Refer to Appendix 5.02 for botanical names. Maintenance Refertilize in the second year unless growth is fully adequate. May be 'Refer to Appendix 8.02 for botanical names. mowed once or twice a year, but mowing is not necessary. Reseed, fertilize, and mulch damaged areas immediately. 'Refer to Appendix 8.02 for botanical names. 6.11.20 a 6.11.21 6.11.22 I 6.11.23 TEMPORARY AND PERMANENT SEEDING CHARTS CHARTS FROM NCDENR PRACTICE STANDARDS AND SPECIFICATIONS (REV 6/06) = ( V ~ w 1­4 w � W Z ° U) J J Q W _j 0 0� w 00 N U LL IU o z Lnn O U,Qwop LU d M J 01 M to ON H U m W oC Q a W QC a Z g Y J LU W U ~ w a LU � z m w Q w o� Q� U C7 a w Z Z g a Z w w a C� _O Z W U) Y U O Q CO Z J U O > PRELIMINARY PLANS ®O NOT USE FOR CONSTIRUCTION UKAWN BY: Mtl CHECKED BY: BRC REVISIONS: NO. DATE (PROJECT NO.: H9001.00 2D REPLACE CONCRETE �- ENTRANCE NCDOT Z STD. 848.02 Y ' BEGIN PROJECT Ia BEGIN CONSTRUCTION CO STRUCTION -Y2- STA 10 + 60.00 ENT - E -Y2- POT Sta.10 +02.85 O P320 CGr DB LD -- - ---- ------ I-MILB--POT Sta. fbwl BUFFER ZONE 1 IMPACT BUFFER ZONE 2IMPACT + + + + ++ + + ++ LD l5' 07.611 E 10' PROPOSED � LT TRAI L SILT FENCE PROPOSED CURB RAMP -Y2- P/ STA. 14 +44.1 / P/ STA. 17 +60.87 PI STA. 21+23.09 0 = 8° 141 37.9" (RT) 0 = 33° 09' 07.1" (LT) 0 = l8° 50' 45.4" (LT) D = 5° 43' 46.5" D = 8° 40' 52.2" D = 7° 09' 43.1" L = 143.88' L = 381.88' L = 263.14' T = 72.07' T = 196.45' T = 132.77' R = 19000.00' R = 660.00' R = 800.00' REPLACE CONCRETE �- ENTRANCE NCDOT Z STD. 848.02 Y ' BEGIN PROJECT Ia BEGIN CONSTRUCTION CO STRUCTION -Y2- STA 10 + 60.00 ENT - E -Y2- POT Sta.10 +02.85 O P320 CGr DB LD -- - ---- ------ I-MILB--POT Sta. fbwl BUFFER ZONE 1 IMPACT BUFFER ZONE 2IMPACT + + + + ++ + + ++ LD l5' 07.611 E 10' PROPOSED � LT TRAI L SILT FENCE PROPOSED CURB RAMP SILT FENCE �K RELOCATE EXISTING LIGHT -END.-WHITE 3 RAIL FENCE LD I L 7113' .� , FER APA MH 25A 1-Y2- PC Sta.15 +64.42 PROPOSED CROSS WALK LMILB- PRC Sta.15 +45.82 --Y2- PT Sta.15 +15.93 5 25 m N N m P301 N/F TRIG (ANGLE GREENWAYS COUNCIL DB 9830, PG 265 BY 1999, PG 1761 IPIN 1724059340 N AN CO ATION/ CONSTRUCT N TO ENTRAN #2 r E RD ` MILB - PT Sta.18 *977 COMBINA,ION FENCE (TYP; \BUFFER IMPACT B2 SEE PCN APP. -Y2 - PT Sta.19 +46.30 \ - -Y2- 17 + 00.00 REMOVE EXISTING -Y2- PC Sta.19 +90.32 END 10' APP SLAB GUARDRAIL BEGIN BOARDWALK 1 INSTALL 325' OF GUARDRAIL END CAT -1 AT FACE OF CURB -Y2- 16 + 54.40 BEGIN EY APP SLAB BEGIN GRAU 350 TL -2 -Y2- 20 +01.65 -MILB - PT Sta.21 +47.25 w� FEMA PANEL 1724 MAP # 3 72 0172400J EFFECTIVE DATE MAY 02, 2006 10 +00 11 +00 12 +00 13 +00 14 +00 15 +00 16 +00 17 +00 18 +00 19 +00 20 +00 21 +00 I 2 -MILB - P/ STA. 14 +59.26 P/ STA. 17 +23.72 P/ STA. 20 +56.28 A = /0° 12' 14.7" (RT) 0 = 29° 30' 47.3" (LT) 0 = 50° 13' 43.5" (RT) D = 5° 52' 42.8" D = 8° 29' 00.3" D = 25'411 32.4" L = 173.58' L = 347.89' L = 195.50' T = 87.02' T = 177.90' T = 104.53' R = 974.66' R = 675.39' R = 223.01' SILT FENCE �K RELOCATE EXISTING LIGHT -END.-WHITE 3 RAIL FENCE LD I L 7113' .� , FER APA MH 25A 1-Y2- PC Sta.15 +64.42 PROPOSED CROSS WALK LMILB- PRC Sta.15 +45.82 --Y2- PT Sta.15 +15.93 5 25 m N N m P301 N/F TRIG (ANGLE GREENWAYS COUNCIL DB 9830, PG 265 BY 1999, PG 1761 IPIN 1724059340 N AN CO ATION/ CONSTRUCT N TO ENTRAN #2 r E RD ` MILB - PT Sta.18 *977 COMBINA,ION FENCE (TYP; \BUFFER IMPACT B2 SEE PCN APP. -Y2 - PT Sta.19 +46.30 \ - -Y2- 17 + 00.00 REMOVE EXISTING -Y2- PC Sta.19 +90.32 END 10' APP SLAB GUARDRAIL BEGIN BOARDWALK 1 INSTALL 325' OF GUARDRAIL END CAT -1 AT FACE OF CURB -Y2- 16 + 54.40 BEGIN EY APP SLAB BEGIN GRAU 350 TL -2 -Y2- 20 +01.65 -MILB - PT Sta.21 +47.25 w� FEMA PANEL 1724 MAP # 3 72 0172400J EFFECTIVE DATE MAY 02, 2006 10 +00 11 +00 12 +00 13 +00 14 +00 15 +00 16 +00 17 +00 18 +00 19 +00 20 +00 21 +00 I 2 H W C� W W w Z Z J O r- W D kD a > N Q w U ^ 00 iU o z Ln w o6 LU M = ^ Lu O Y w w w 00 M D a O < a m u QJ a m Z I--I w U `) Y U Ln Ln U w ® I o z > m w �c a w �c a z g a Y J Lu W U ~ w Lu a � z m w Q w o� Q� U C7 PRELIMINARY PLANS II DO NOT USE FOR CONBTRUCITON UKAWN BY: Mtl CHECKED BY: BRC REVISIONS: NO. DATE PROJECT NO.: H9001.00 m 0 w Q a w oC a z Y J ui W U ~ w LU a � z m w Q w o� Q� U C7 V t w a w w z w Z� J ° U) g p w o N Q i w U ^ oo iU o z Ln w M = O Y w w w op < M J a d O M (n ON Z H w U `) Y U En En U CO 99 CD H ® I O z > m 0 w Q a w oC a z Y J ui W U ~ w LU a � z m w Q w o� Q� U C7 t a BUFFER ZONE 1 IMPACT w w I--I � z Lu Z � Z .N J o UP) g H w o a BUFFER ZONE 2 IMPACT + + + + + + U w U + + + + + LL 0 � w Lu O 06 > M = ^ Lu Y w w w 00 U < M D J rn a d M (n ON O Z HI w U `) Y U U Ln Ln w O �a w r w �A w � w Q �A co W 1 200 1 190 1 170 1 160 150 34 +00 ca B M .. .._ Md '��_ Md md _ P324 ?3 N /F F BEEASCO LIMITED LIMITED PARTNERSHIP RSHIP DB 5966, PG 376 PG 376 BM 1985, PG 270 PG 270 PIN 1724320761 229676 Cc3�iI� •'=1110� Y2RE1/3 PRC Sta °46 +44 °73 -Y2- PC Sto °38 +51.17 ' GnL- V Vu -" °mac TG ° °�� H" - -Y2REV 3 - PRC Sta °42 +96 °02 \ Cd:lffiIol 01116=11111 P325 N F POAA II EEC QiIIlIll DB 14713, PG 0970 PIN 1724327369 wAffilel P325 NF POAA II EEC DB 14713, PG 0970 PIN 1724327369 m 0 w �c a a w oC a Z g a FEMA PANEL 1724 MAP # 3 72 0172400J EFFECTIVE DATE MAY 0212006 200 Q w o� Q� U C7 190 I PRELIMINARY PLANS I DO NOT UN POR CONWRUMON UKAWN BY: Mtl CHECKED BY: BRC REVISIONS: 170 NO. DATE 160 PROJECT NO.: H9001.00 43 +00 44 +00 45 +00 46 +00 47 +00 6 g a v�vuna '•I D V% .—I .. —I— v LV JlJ JL. / d L = 142.38' L = 206,56' L = 139.69' L = 62.54' m BUFFER ZONE 2 IMPACT + + + + + + Min. D =1 Ft. T = 71,95' T = 112.50' T = 72.83' T = 36.11' + + + + Type of Liner= PSPM Max d =1 Ft. R = 400.00' R = 210.00' R = 200.00' R = 50.00' FROM STA. 54 + 75 -Y2 REV3- '. FEMA PANEL 1724 TO STA. 56 + 75, -Y2 REV3- MAP # 3 72 0172 400J I m EFFECTIVE DATE MAY 02, 2006 LEFT DITCH -- --- - - - - -- 47 +00 48 +00 49 +00 50 +00 51 +00 52 +00 53 +00 54 +00 55 +00 i. 07ci- i - le allot 57 +00 -4:1miIll 418=11111 PRELIMINARY PLANS II DO NOT USE FOR CONBTRUCITON KAWN BY: MLI NECKED BY: BRC EVISIONS: NO. DATE PROJECT NO.: H9001.00 7 $00 • OOL Fw 500 -' . 00L - O - t y oo dol –Y2 – P1 STA. 66+38.60 P1 STA. 67 +02 °8/ Pl STA. 67+62.90 0 = 19° 53' 16 °8" (RT) 0 = 33'14'37.3' (LT) 0 = 9° 50' 46 °0" (RT) ) D = 28° 38' 52 °4" D = 57° 17' 44 °8" D = 57° 17' 44 °8" L = 69.42' L = 58.02' L = 17.18' ` - T = 35 °06' T = 29.85' T = 8 °61' =' R = 200 °00' R = 100 °00' R = 100.00' Pl STA. 69+76.65 Pl STA. 72 +59 °65 0 = 4° 55' 38.6" (RT) 0 = 12° 52' 36 °8" (LT) FW FW D = 7° 09' 43.1" D = 7° 09' 43 °1" L = 68 °80 L = 179.80' T = 34 °42' T = 90.28' R = 800 °00' R = 800 °00' Ln _ - Nip , P 3 CITY GF RALEIGH Df 5443, PG 39 �M 1992,PG 1472 G7 PERMANENT WETL,�N /D' PIN 17245222200 V Y LIMITS OF DISTURBANCE IMPACT ::::,,0.' AC - TREE PROTECTION = -Y2 – PT' (nn H � V w w w Lu z z J O U) i w -J N Q ULu 0 000 — _ LL LU c0°�i� w 06 Y �� o ` - � M 01 op Q M Ln ON ac�cn rn w Fw - U FW FW LFW 0 CUD P304 I w ® II o u �> u > I� FENCE (TYP) / / SEE III APP i / WET ND WG7 `TPF PF. LD 7 LD TPF LLJ 0 LD LD LD / �D NG 401,01TY'OF VF TPF TPF LD LD LD % LD TPF - EXfSTI TPF TPF TPF TPF LD' . R�- p - TPF - - RALEIGH S : PF MENT 0 F _ 9 PG2 7, F M /9 - s �8 + FLD "\ r C F C C' M H 12 -f F F F MH C // M F f _55 and w \ C F F — F f F F F f / F F F F d W _ —_- F _ F ss F F F 3n 3? _ �, _ _ -- ss , ss s= =s , ,r., / °_. 5l 0 a Y Lu I--I 7 Q 7 C. � 3 k � F x x and 3nd �.,nd 3nd 3nd 3n 3nd r 3nd .. _v , and, 3n 3nd and . 3 d -an I I 10' PROPOSED EX /STING 40' CITY OF U ASPHALT TRAIL RALEIGH SANITARY SEWER EASEMENT __ � SILT FENCE (TYP) _ — - ., � (BY /979, PG 204J Y2 PC Stdo66 +03 °53 �32LF - 36 H PE Z 4 SILT FENCE OUTLET - -gZ 2 10' PROPOSED W/J HOOK (TYP) -Y2- PRC Sto °66 +72 °95 BZ 2 BZ 2 NS B RIP RAP BZ 2, ASPHALT TRAIL EST 42 SY FILTER FABRIC = BZ BZ, 2 -12`t X 12`W 7 —Y— PT 77 1 200 190 3 1 N y 1 -3 (n N rn U-) rn x + o = rn orn vo PUE PUE PUE PUE PU M4 M4 M4 Md BUFFER ZONE 2IMPACT + + + + ++ Md Md m w oC Q a w oC a z g FEMA PANEL 17 Md--- MAP # 3720172400J EFFECTIVE DATE MAY 021 2006 200 Y J Lu W U ~ w Lu a � z m w Q w o� Q� U C7 190 I PRELIMINARY PLANS I DO NOT UN POR CONWRUMON , .... { .... { A .... { { 18 0 . . . . . . . . . . . l/ nn, tt �}t tt 180 170 160 150 60 +00 I-- ualft o:iI11 1*1miIl] molol C '�iIll C:l:lffiIll mealmoill UKAWN BY: MLI CHECKED BY: BRC 170 REVISIONS: NO. DATE 160 PROJECT NO.: H9001.00 70 +00 71 +00 72 +00 73 +00 8 Lu Lu U w � z co Lu LU o� � U (D FRC StG.79 +33.90,, Wt ul —F� I SILT FENCE (TYP) -kl 1 200 1 190 1 170 1 160 CL az Luuj el W iL f- 4& '7� L, Qj Lu CL L 150 I I � � � � I � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .. 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 200 ELIMINARY PLANS 190 11 PRW NOT UN IVR CONWRUMON I UKAWN BY: mtl CHECKED BY: BRC 170 REVISIONS: —] NO. DATE -y2- F/ ST A° 74+10.33 F1 ST A. 75 +60.94 F/ ST A. 76+82.04 ce Lu BUFFER ZONE 1 IMPACT A = 8* 44" 40.6" (RT) A = 61* 44" 43.1" (LT) A = 27* 361 13.0" (RT) z D = 7* 091 43.1" D = 38* 49.9" D = 28* 38-52.4" ul) L = 122.101 L = 161.65 L = 96.35 kD T = 61.171 T = 89.681 T = 49.13 U Lcu� w ruj R = 800.00 R = /50.00 R 200.00 . . . . . LL CITY OF RALEIGH o c:l Lzu 0 [19, 544),PG 37 > m Lu N op iL:Ue L9 BY `1�92, FG, 1472 ce < F1 ST A. 78 +89.73 F1 STA. 79 +74.20 F1 ST A. 84 +87.90 o'j a 0 PIN V4505 47 A = 55*22123.2"(RT) A = 43-53"43.8"(LT) A = 68* 161 37.9" (LT) ON z D 57* 171 44.8" D 57* 171 44.8" D 9* 321 57.5" Fw Lu U) = L 96.641 L 76.611 L 715.00 N T 52.471 T 40.301 T 406.82' CITY OF RALEIGH IT O UOn co R 100.00/ R 100.00/ R 600.001 BB 5443Poo, 37 BY 1992, 472 Lu FIN 1724505547 z 0 u . Lu Lu U w � z co Lu LU o� � U (D FRC StG.79 +33.90,, Wt ul —F� I SILT FENCE (TYP) -kl 1 200 1 190 1 170 1 160 CL az Luuj el W iL f- 4& '7� L, Qj Lu CL L 150 I I � � � � I � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .. 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 200 ELIMINARY PLANS 190 11 PRW NOT UN IVR CONWRUMON I UKAWN BY: mtl CHECKED BY: BRC 170 REVISIONS: —] NO. DATE Lu ce Lu BUFFER ZONE 1 IMPACT Lu 0� z J Z 0 ul) z kD BUFFER ZONE 2 IMPACT . . . . . . U Lcu� w ruj 00 rL., . . . . . LL L U o c:l Lzu 0 -6 C-6 U) > m Lu N op iL:Ue L9 ce < m m D w -J o'j a 0 a- fy) Ln ON z Lu U) Y U UOn co Lu z 0 u . u > Lu Lu U w � z co Lu LU o� � U (D FRC StG.79 +33.90,, Wt ul —F� I SILT FENCE (TYP) -kl 1 200 1 190 1 170 1 160 CL az Luuj el W iL f- 4& '7� L, Qj Lu CL L 150 I I � � � � I � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I � � � � � � � � � I .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .. 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 200 ELIMINARY PLANS 190 11 PRW NOT UN IVR CONWRUMON I UKAWN BY: mtl CHECKED BY: BRC 170 REVISIONS: —] NO. DATE \ oL 5 v DETAIL 2 -Y2- \ NOTE: (D w w STANDARD 'V 'DITCH NO CONSTRUCTION VEHICLES, EQUIPMENT OR, 1--4 � z ( " ° "° 5ca1e) P/ STA. 91+41.75 P/ STA. 93 +0/.58 P/ STA. 94 +05.3/ / z L g o SUPPLIES SHALL BE STORED IN NCDOT W D = 6° 31' 26.0" (RT) 0 = 4° 52' 19.1" (RT) 0 = 19° 46' 46.1" (LT) RIGHT -OF -WAY. J ° `� Natural Natural � w � d Ground 31 �D';N Ground D = l4° l9' 26.2" D = 7° 09' 43.1" D = l4° l9' 26.2" w � � oo� d EOUAT IONe o! > N ,� a L= 45.55 L= 68.03 L= 138.09 o U w U oo T = 22.80' T = 34.03' T = 69.74' PC StG 9 2�.8/ BK = LL � o z w DITCH 2 Min. d= ' Ft. } M ce Max. d = 0.5 Ft. R = 400.00' R = 800.00' R = 400.00' PC StG + .62 AH 06 _ " 0 �awC7o 00, Type of Liner= PSRM Y w � w � � DISCHARGES INTO EXISTING WETLANDS FROM STA. 89 + 55 TO STA. 90 + 40 RT < M D J °' RATIONAL COEFFICIENT C = 0.401 Pl STA. 96 +87.89 Pl STA. 97+90.97 P/ STA. 99 +07.95 1-440 i S -64 I a M � m z RAINFALL INTENSITY 1 = 7.22 IN /HR A = IT 4/' 45.2" (RT) 0 = //* 56' 01.7" (LT) A = 2/° 22' 12.7" (RT) INTER HANGS o -Y2- PRC StG.97 +49.16 '"' U) CATCHMENT AREA A = 0..235 AC `roo NEUSE IVER TRAIL o CONSTRUCTION Ln D = l4° I9 26.2 D = l4° 19 26.2 D = 14 19 26.2 I I ENTRANCE #3 U Y FLOW 0 = 85 CTS o L = 123.54' L = 83.3/' L = 149.19' HOU wN TO OPERATION N I d a �� U LENGTH = 85 LF �� _ Cam` ®� �o _ MAX SLOPE = .0087 T = 62.27' T = 4/.8/' T - 75.47 co MIN SLOPE = 1.407 R = 400.00' R = 400.00' R = 400.00' TYPE BOTH L CAT ONS TYPICAL I I ® I z U LU OUTLET VELOCITY = 2.25 FPS I I ��® II ��� O > \ -Y2 - PT StG.91 +64.50 -Y2 - PC StG.92 +67.55 -V /D - OT C' n -L o <] � sn _. 170 160 150 86 +00 �:lmmift E:I:�iI11 160116=1181 1'I1IIiI11 O o- �r m I L cn 1'iI11 0 0 O 0 0 00, FW P306 NF CITY OF RALEIGH DB 2050, PG 155 BY 2007, PG 72 PIN 1724816908 ce FEMA PANEL 1724 z MAP # 3720172400J W oz J g EFFECTIVE DATE MAY 02, 2006 o uj cl N ^ Q U w U 00 w z N z BUFFER ZONE 1 IMPACT >- ° '�' w o O U) M E QJ ,1 a m u a m O z BUFFER ZONE 2 IMPACT + ++ ++ ++ ++ ++ U L' Y U 0 LA —Y2— PRC StG.111 +94,47 I � °� U co z o > -Y2- PRC Sta.111 +03.28 REAM PlN 1724816908 -Y2S 10 'APP 35.00 TEMP T G SEE —Y2 — PRC St0.108 +87.56 - W BEGIN BOARDWALK 3 CROS IW Lu A SHEET 2A END BOAR WALK 3 BEGI 10' PP SLAB . ^ PROPC)SFD H i %�, %� -Y.2 STA_ 1 1 +45.00 -Y %— P( Stn_�n_3 +F)7_R7 - 1 200 1 190 1 170 1 160 150 99 +00 _. _. 1 W/J H ��� �P�`�"�.- 1111111ifflill Effirrill mroI►rtill, I���iI�� 1 111 +00 w oC - Q a w oC a z g 200 Y J ui W U ~ w Lu a � z m w Q w o� ol� U C7 190 I PRELIMINARY PLANS I DO NOT UN POR CONWRUMON UKAWN BY: Mtl CHECKED BY: BRC 170 REVISIONS: NO. DATE o! STREAM IMPACTS -Y2- Pl ST A, 99 +07.95 P1 ST A. /00 +32.77 Pl STA. 104 +51.66 STREAM S G 5 D - 21* 22' 12,7" (RT) A = 14° 33' 42.5" (LT) A = //* 57' 30,6" (RT ) PERMANENT IMPACTS = 0 LF D = 14 °19'26.2" D = 14 °19'26,2" D = 7 °09'43.1" TEMPORARY IMPACTS = 40 LF L = 149,19' L = 101.66' L = 166.97' T = 75.47' T = 5 /./// T = 83,79' R = 400,00' R = 400.00' R = 800.00' \ P1 STA. 107 +23.59 Pl STA. 109 +98.11 P1 STA. 111 +49.68 0 = 50° 31' 2/.4" (LT) 0 = 30° 53' 57.8" (RT) 0 = 26° 07' 32.5" (LT) D = 14° 19' 26.2" D = 14° 19' 26.2" D = 28° 38' 52.4" L = 352.71' L = 215.72' L = 91.20 ' T = 188.75' T = 110.55' T = 46.40' R = 400,00' R = 400.00' R = 200.00' � I WETLAND WG5 O ` � — — —was_ � FW — FW � FW FW FW FW " W 0 ]DW "� Fw - —Y2 — PT Sta.100 +83.33 P306 W 10' PROPOSED N/F o � � t ASPHALT TRAM_ r' � "- �` ,. _ S REAM SG5 CITY DB OF RALEIGH 2050, PG l55 BM 2007, PG 72 0 0 O 0 0 00, FW P306 NF CITY OF RALEIGH DB 2050, PG 155 BY 2007, PG 72 PIN 1724816908 ce FEMA PANEL 1724 z MAP # 3720172400J W oz J g EFFECTIVE DATE MAY 02, 2006 o uj cl N ^ Q U w U 00 w z N z BUFFER ZONE 1 IMPACT >- ° '�' w o O U) M E QJ ,1 a m u a m O z BUFFER ZONE 2 IMPACT + ++ ++ ++ ++ ++ U L' Y U 0 LA —Y2— PRC StG.111 +94,47 I � °� U co z o > -Y2- PRC Sta.111 +03.28 REAM PlN 1724816908 -Y2S 10 'APP 35.00 TEMP T G SEE —Y2 — PRC St0.108 +87.56 - W BEGIN BOARDWALK 3 CROS IW Lu A SHEET 2A END BOAR WALK 3 BEGI 10' PP SLAB . ^ PROPC)SFD H i %�, %� -Y.2 STA_ 1 1 +45.00 -Y %— P( Stn_�n_3 +F)7_R7 - 1 200 1 190 1 170 1 160 150 99 +00 _. _. 1 W/J H ��� �P�`�"�.- 1111111ifflill Effirrill mroI►rtill, I���iI�� 1 111 +00 w oC - Q a w oC a z g 200 Y J ui W U ~ w Lu a � z m w Q w o� ol� U C7 190 I PRELIMINARY PLANS I DO NOT UN POR CONWRUMON UKAWN BY: Mtl CHECKED BY: BRC 170 REVISIONS: NO. DATE P306 NF CITY OF RALEIGH DB 2050, PG 155 BM 2007, PG 72 PIN 1724816908 -Y2 - PT Sta.112 +90.09 TEMP REAM CROS G SEE SHEET BUFFER IMPACT B15 SEE PCN APP. N .� -Y2 - PRC Sta.115 +25.86 7�\: -Y2 - PT Sta.116 +18.45 ,011 P306 NiF CITY OF RALEIGH DB 2050, PG l55 Fw BM 2007 PG 72 - - - PIN 17248/6908 rw" r - O - i - LIMITS - �'' RBANCE C _ _ N �- - LD CflMBIN N -Y2— PT StO. //8 +66.5/ CRABTREE CREEK PROPOSED m ' BOLLARD . X X T YP -Y2- PC Sta.117 +94.19 -Y2= ° 8.83 -Y2- PT Sta.123 +42.73 -Y2- PC Sta.124 +66.27 t�F R , IMPACT 1317 ,.0 C S I810RI � �' ��. �' �-� _ ti- SEE /PCN APP. 0' PROPOSED '" _ x�. ASPHALT TRAIL BUFFER ZONE 1 IMPACT r BUFFER ZONE 2IMPACT + + + + ++ + + ++ 1 200 1 190 1 170 1 160 150 ii2 +oo 113 +00 114 +00 115 +00 / P307C ti P31 - o NiF N/F V EW HOPE a�EV E H ENE PUBLIC E,VICE CO DE NC -INC P VP npn� 116 +00 117 +00 118 +00 119 +00 120 +00 121+00 122 +00 E olmoll( MAP # 3720172400J EFFECTIVE DATE MAY 0212006 200 m w oC Q a w oC a z g a Y J Lu W U ~ w Lu a � z m w Q w o� Q� U C7 190 I PRELIMINARY PLANS I DO NOT UN POR CONWRUMON UKAWN BY: Mtl CHECKED BY: BRC 170 REVISIONS: NO. DATE 160 PROJECT NO.: H9001.00 150 125 +00 12 ry n H w a 1--1 � w z LV z P z g w o LU > N Q w U ^ o0 LL iU a' 0 z Ln w o6 >- M Lu O Y w w w 00 U M D J a < O M 1n m z I--I w U `) Y U ° En U w z U BUFFER ZONE 1 IMPACT r BUFFER ZONE 2IMPACT + + + + ++ + + ++ 1 200 1 190 1 170 1 160 150 ii2 +oo 113 +00 114 +00 115 +00 / P307C ti P31 - o NiF N/F V EW HOPE a�EV E H ENE PUBLIC E,VICE CO DE NC -INC P VP npn� 116 +00 117 +00 118 +00 119 +00 120 +00 121+00 122 +00 E olmoll( MAP # 3720172400J EFFECTIVE DATE MAY 0212006 200 m w oC Q a w oC a z g a Y J Lu W U ~ w Lu a � z m w Q w o� Q� U C7 190 I PRELIMINARY PLANS I DO NOT UN POR CONWRUMON UKAWN BY: Mtl CHECKED BY: BRC 170 REVISIONS: NO. DATE 160 PROJECT NO.: H9001.00 150 125 +00 12 END —Y2— POT Sta,130 +20.00 NSF P309 BEGIN —Y2REV I — POT Sto.130 +20.71 CITY 5 RALEIGH STREAM IMPACTS e p,�p BY 2004, PG 2332 STREAM S G 2 BUFOf- &*l� BZPC Sto.I30 +87.45 PIN 1734111169 �SE PERMANENT IMPACTS (USACE) = 12 LF - Y2REV l - PRC Sta.131 +53.09 - � � �- PERMANENT IMPACTS (NCDENR) = 20 LF TEMPORARY IMPACTS = 0 LF — Y2REV /— PT St0 ^132 +70.81 EST 3 TONS CLASS B RIP RAP - EST 10 SY FILTER FABRIC CR�13T1�'EE ._, �, 6'L X 3'W GREEK LIMITS OF � —Y2REV I — . —Y2 — P/ STA. 1,32 +12.38 0 = 9° 24' 07.9" (RT) P/ STA. 125 +12.74 P/ STA. 127-f,37.9,3 P/ STA. 128 +96.12 PI STA. 129 +90.69 0 = l3° l5' 05.9" (LT) 0 = 61* 411 08.1" (RT) 0 = I6° 19' 44.3" (LT) 0 = 14° 33' 02.8" (RT ) D = I4° 19' 26.2" D = 19° 05' 54,9" D = 57° 17' 44.8" D = 28° 38' 52.4" L = 92.51' L = 322.98' L = 28.50' L = 50.79' T = 46.46' T = 179.14' T = 14.35' T = 25.53' R = 400.00' R = 300.00' R = 100.00' R = 200.00' END —Y2— POT Sta,130 +20.00 NSF P309 BEGIN —Y2REV I — POT Sto.130 +20.71 CITY 5 RALEIGH STREAM IMPACTS e p,�p BY 2004, PG 2332 STREAM S G 2 BUFOf- &*l� BZPC Sto.I30 +87.45 PIN 1734111169 �SE PERMANENT IMPACTS (USACE) = 12 LF - Y2REV l - PRC Sta.131 +53.09 - � � �- PERMANENT IMPACTS (NCDENR) = 20 LF TEMPORARY IMPACTS = 0 LF — Y2REV /— PT St0 ^132 +70.81 EST 3 TONS CLASS B RIP RAP - EST 10 SY FILTER FABRIC CR�13T1�'EE ._, �, 6'L X 3'W GREEK LIMITS OF � —Y2REV I — . P/ ST A. l3/ +20.35 P/ STA. 1,32 +12.38 0 = 9° 24' 07.9" (RT) 0 = I6° 5I' 43.9" (LT ) D = I4° 19' 26.2" D = I4° I9' 26.2" L = 65.64' L = 117.72' T = 32.89' T = 59.29' R = 400.00' R = 400.00' END —Y2— POT Sta,130 +20.00 NSF P309 BEGIN —Y2REV I — POT Sto.130 +20.71 CITY 5 RALEIGH STREAM IMPACTS e p,�p BY 2004, PG 2332 STREAM S G 2 BUFOf- &*l� BZPC Sto.I30 +87.45 PIN 1734111169 �SE PERMANENT IMPACTS (USACE) = 12 LF - Y2REV l - PRC Sta.131 +53.09 - � � �- PERMANENT IMPACTS (NCDENR) = 20 LF TEMPORARY IMPACTS = 0 LF — Y2REV /— PT St0 ^132 +70.81 EST 3 TONS CLASS B RIP RAP - EST 10 SY FILTER FABRIC CR�13T1�'EE ._, �, 6'L X 3'W GREEK LIMITS OF � v 1, T IP C C6 F T FABRIC cy -� _. `. it 1R' T FN o - W I , f-'tJL3LlC, `>�,h'VIC,C LU Ur /VC, / /VC,', ITRnG 005 1�G40brPERMANENT WETLAND AGO ADO DB 14367, FG",,/273 FIN 1723996632 MPA 02 AC '° all 1 °_ �� �J O 10 owC GGS o o w c� z BUFFER ZONE 1 IMPACT oos _ \ FEMA PANEL 1724 MAP # 3720172400J y� � \ tiP � EFFECTIVE DATE MAY 0212006 BUFFER ZONE 2 IMPACT + + + + + F G o o so FEMA PANEL 1733 MAP # 3720173300J EFFECTIVE DATE MAY 02, 2006 200 . . QU,4 ION: V .... .. Lu w STA 130+ 0.00 . .... .... .. . .... .... .. Y2R a 190 . w .... .... .... .... .... .... .... .... .... .... .... .... .... .... Pf 129 65;0 w z Lu z� ... .... 1 = 30+ 000. .. ... .... .... .. .... Pl 127 +650 0 ::: . 180 .... .... .... .... .... .... .... ... .... .... .... .... :::: VC: :40" .... .... .... .... .... .... .... L. . 172.E .. . .. . .... .... .... .... .... .... .... ... ... _.. ..,.. .... .... .... .... .... .... .... .... ... .... ... ( )Oe 500 f .... . VC _::/o . 2 55 0/ . ... g .... ...... �W . . .... .... .. o J0. 00% 36LF -1 " HDPE . . . . . . . . . . . -! 17 :7..60 .... .... _ o Lu i N . .. ... ... P/, — t 28: 90°0 . . . . . . . . . Q . 160 .... .... .... .... .... . Vca' w U ^ oo . LL iU � 130 +00 ozrL., w C-6 L M = O Y w w op < M D J a d O M u') ON z w U `n Y U o z O U > v 1, T IP C C6 F T FABRIC cy -� _. `. it 1R' T FN o - W I , f-'tJL3LlC, `>�,h'VIC,C LU Ur /VC, / /VC,', ITRnG 005 1�G40brPERMANENT WETLAND AGO ADO DB 14367, FG",,/273 FIN 1723996632 MPA 02 AC '° all 1 °_ �� �J O 10 owC GGS o o w c� z BUFFER ZONE 1 IMPACT oos _ \ FEMA PANEL 1724 MAP # 3720172400J y� � \ tiP � EFFECTIVE DATE MAY 0212006 BUFFER ZONE 2 IMPACT + + + + + F G o o so FEMA PANEL 1733 MAP # 3720173300J EFFECTIVE DATE MAY 02, 2006 200 . . QU,4 ION: .... ... ... ... .... .. .... Y2— STA 130+ 0.00 . .... .... .. . .... .... .. Y2R — V 1 30 0.7/ 190 . .... .... .... .... .... .... .... .... .... .... .... .... .... .... Pf 129 65;0 .. .... .... .... .... .... .... .... .... .... .... EL 172 43' . ... .... 1 = 30+ 000. .. ... .... .... .. .... Pl 127 +650 0 ::: . 180 .... .... .... .... .... .... .... ... .... .... .... .... :::: VC: :40" .... .... .... .... .... .... .... L. . 172.E .. . .. . .... .... .... .... .... .... .... ... ... _.. ..,.. .... .... .... .... .... .... .... .... ... .... ... ( )Oe 500 f .... . VC _::/o . 2 55 0/ . ... .... .... .... .... .... ...... . . .... .... .. o o .... .... .... J0. 00% 36LF -1 " HDPE . . . . . . . . . . . -! 17 :7..60 .... .... _ o .�, . )i;�o .. . ... .. .... .... .... E 6.22 . . . . . . : . . . . . E. . 1 . RCP . .. ... ... P/, — t 28: 90°0 . . . . . . . . . . . 160 .... .... .... .... .... . Vca' 150 . 125 +00 126 +00 127 +00 128 +00 129 +00 130 +00 131 +00 c w� w. =o U� W W U� W U Z � J r> UW H� Q� m , � •1 170 150 FW FW FW FW —Y2REV l P1 STA. 1,39 +35.94 Pl STA. 143 +35.42 P1 STA. 147 +34.03 P1 STA. 149 +75.04 0 = 4° 12' 45.0" (LT) 0 = 8° 39' 39.0" (LT) A = 38° 25' 01.4" (RT) A = 48° l3' 53.8" (LT) n = ,)° c� i/ L� � o° D = 9° .3 ,9' 57_5" D = 47° 44' 47.3" D = 57° 17' 44.8" 00, FW FW \ FW 140 138 +00 )O6 190 m 0 w Q a w oC a z g a Y J LU W U ~ w LU a � z m w Q w o� Q� U (7 a w Z Z g a Z w w a C� _O Z W U) Y U O Ln Q w Z J O U > 1(7 0 I PRELIMINARY PLANS I DO NOT UN POR CONWRUMON 170 UKAWN BY: Mtl CHECKED BY: BRC 160 REVISIONS: NO. DATE 150 PROJECT NO.: H9001.00 I I I I I I I I I I I I I I I I I I I I I I I I I I 140 139 +00 140 +00 141 +00 142 +00 143 +00 144 +00 145 +00 146 +00 147 +00 148 +00 149 +00 150 +00 151 +00 14 (D ~ w 1--I w W Z1 J Q W > ID � w N U o^o iU o z 0 Lu U) 0 d M J 01 M (n ON H U m 0 w Q a w oC a z g a Y J LU W U ~ w LU a � z m w Q w o� Q� U (7 a w Z Z g a Z w w a C� _O Z W U) Y U O Ln Q w Z J O U > 1(7 0 I PRELIMINARY PLANS I DO NOT UN POR CONWRUMON 170 UKAWN BY: Mtl CHECKED BY: BRC 160 REVISIONS: NO. DATE 150 PROJECT NO.: H9001.00 I I I I I I I I I I I I I I I I I I I I I I I I I I 140 139 +00 140 +00 141 +00 142 +00 143 +00 144 +00 145 +00 146 +00 147 +00 148 +00 149 +00 150 +00 151 +00 14 )Q —Y2REV l — F/ STA. 151 +70.44 0 = l3° 35' 59.3" (RT ) D = 14° 19' 26.2" L = 94.94' T = 47.70' R = 400.00' F1 STA. 157 +83.93 A = 61* 48' 41.6" (LT) D = 57° 17' 44.8" L = 107.88' T = 59.86' R = inn nnl O �o � o W � Z� S� Tr , 10' PROP 200 I •1 .1 170 I •1 150 F/ STA. 153 +31.85 F/ STA. 156 +87.59 0 = 36° 21' 56.7" (LT) 0 = 44° 06' 35.7" (RT ) D = 57° 17' 44.8" D = 57° 17' 44.8" L = 63.47' L = 76.99' T = 32.85' T = 40.51' R = 100.00' R = 100.00' F/ ST A. /58 +52.92 F/ STA. 161 +27.32 0 = 23° 4/' 35.2" (RT) 0 = 26° 40' 10.1" (RT ) D = 57° 17' 44.8" D = 28° 38' 52.4" L = 41.35' L = 93.09' T = 20.98' T = 47.41' R = Inn nn' Q - qnn nnl C7~ w I--I w BUFFER ZONE 1 IMPACT W ° H w o Y2REV l — PT Sta.163 +88.00 w Q A w N � N iU w U o^o BUFFER ZONE 2 IMPACT O 06 }M Z � N o —Y2REV l — PRC Sto.l63 +50,50 Y � w < M QJ Lu a m u a m U 151 +00 152 +00 153 +00 154 +00 155 +00 156 +00 157 +00 158 +00 159 +00 160 +00 —Y2REV l — FCC Sta.162 +43.14 00 s �e J W � EXIST FEMA PANEL 1733 MAP # 3720173300J EFFECTIVE DATE MAY 02, 2006 200 190 .1 170 160 150 m w oC Q a w oC a z g a w Z Z g a Z w w c� O z w U) Y U O Ln Q w Z J O U > PRELIMINARY PLANS W NOT UN FOR CONWRUMON UKAWN BY. Mtl CHECKED BY: BRC REVISIONS: NO. DATE 1 02/26/2013 PROJECT NO.: H9001.00 161 +00 162 +00 163 +00 164 +00 I 15 1 200 1 190 1 170 1 160 150 164+00 C-01 11 al 1111 all all X N 4ty Y RXR RIG OF WAY REV I- FRC Sta.174*14.91 0 W Lu LIMITS F DISTURB X EX 0 ,6 COMBINATION LU TY 40 FENCE P) > Lu A SILT FENCE OUTLET 0' PROPOSED XAA NOOK'TYP D SPHALT TRAIL NIF DANIEL, 5 EWART MAH LOWEE, ANDREW R'R1,50N I'EA-TROSS -I// — PT wo FIG 2703 Stud f 1733450,228 � z co w w o� � U (D 0 slg NE sEE NE ccv i_ S-T 0 BUFFER ZONE 1 IMPACT ul z BUFFER ZONE 2 IMPACT + + + + + + FEMA PANEL 1733 MAP # 3720173300J EFFECTIVE DATE MAY 021 2006 200 ELIMINARY PLANS 190 11 PRW NOT UN IVR CONWRUMON I KAWN BY: MLI --i-( --Hp --:!�o 0p; /. - - V C3 L)CHECKED BY: BRC .. .. .... .. .... .. +- ()1.,30 07 . .. .... . REVISIONS: 7--) nn * .... 170 NO. DATE -Y2REV5- FT StG.186+51,191," EE 4� 0) CO C) 0 6 BZ X x x7— x Uj =,=x 0 c)) Z: OL AP 100 10"PRO LT TRAIL - --j Ln 100 J, LLJ Natural Natural 0 'p, K Ground t Ground ��2REVI- FT StG.179+49.051 ��P)El L�— P/ 1 190 Effelole 1 170 1 160 1 150 140 177+00 ,W60=81111 Mails 1 1"41:0111 1 Q� 0 11 --- I I m I (D tu a/ w w LU Z � z 0 U) p U LU —j r,� cl� U 5: w r1i U 00 LL LU 0� 0 z N Ln z LU 0-6 L>u cm , LU C, 0 U) �e < LL LU CN :) 00 L9 13� M �-4 LU —J (� c� 0 < m D r-1 o- fy) Ln m U Ln Y U 0 LA U co w 99 CD 9 -1 z 0 U . U > 0 w BUFFER ZONE 1 IMPACT w Ul z BUFFER ZONE 2 IMPACT + + + + + + :5 FEMA PANEL 1733 1 MAP # 37201733001 EFFECTIVE DATE MAY 0212006 m Y J LU LU U LU < � z LU co LU LU o� � U (D PRELIMINARY PLANS 180 11 W NOT UN IVR CONWRUMON I 70 I-- z <W z a 0 W N W OL a z, �B T D BRIDGE P�4CT BE N BOA ALK PLATFORM PC Y2 R - 69.18 ��p� `ST . T ION EOUAT ION -Y REV I - POT StqJ98 +78020 BK - W :.� - Y RE >V 2 - POT Sta I98 +78.20 AH PROPOSED BOt RD ')p , -Y2REV 2 - PT StG.199 +45.64 LU < r -. - - PC Sto.I99 +95.59 LU END BOARDWALK � � � - BEGIN 10' APP SLAB --; Y2REV1 + 64.59 au co w O fIyNTS OF DDS RBAN LU F �ODc F C P) CE O ol LET -X U (D 1 200 1 19 1 170 1 16 15 ELT 0 0 0 m 0 0 0 m V t w a w w z w Z� J ° U) g p w o N Q i w U ^ oo iU o z Ln w M = O Y w w w op U M J a < d O M (n ON Z HI w U `) Y U O En U w 99 ® I Z O U > z, �B T D BRIDGE P�4CT BE N BOA ALK PLATFORM PC Y2 R - 69.18 ��p� `ST . T ION EOUAT ION -Y REV I - POT StqJ98 +78020 BK - W :.� - Y RE >V 2 - POT Sta I98 +78.20 AH PROPOSED BOt RD ')p , -Y2REV 2 - PT StG.199 +45.64 LU < r -. - - PC Sto.I99 +95.59 LU END BOARDWALK � � � - BEGIN 10' APP SLAB --; Y2REV1 + 64.59 au co w O fIyNTS OF DDS RBAN LU F �ODc F C P) CE O ol LET -X U (D 1 200 1 19 1 170 1 16 15 ELT 0 0 0 m 0 0 0 m 191 +00 192 +00 193 +00 194 +00 195 +00 196 +00 197 +00 200 190 I PRELIMINARY PLANS I DO NOT UN POR CONWRUMON UKAWN BY: Mtl CHECKED BY: BRC 170 REVISIONS: NO. DATE 160 PROJECT NO.: H9001.00 198 +00 199 +00 200 +00 201 +00 202 +00 + 1 M O N 00 5� 0 w w oC z p LU LU U LU < � z LU co LU LU o� � U 0 1 200 1 190 1 170 1 160 150 203+00 NISM81111 11 11 lj�� pill 11�11111211�iilj all 11111102,11� ll� D 1111 1111, N: N 210 ELIMINARY PLANS 200 11 PRW NOT UN IVR CONWRUMON I 190 LU w a LU z Z LU OZ UP) < w —J 0 0- LU _j U Lu u 00 LL LU 0 z N Ln z LU 06 LU 0 m LU O U, Lu w OP C, M .-J O'j C! 0 < o- fy) Ln ON LU U) U 0 Ln u co z 0 u u > 5� 0 w w oC z p LU LU U LU < � z LU co LU LU o� � U 0 1 200 1 190 1 170 1 160 150 203+00 NISM81111 11 11 lj�� pill 11�11111211�iilj all 11111102,11� ll� D 1111 1111, N: N 210 ELIMINARY PLANS 200 11 PRW NOT UN IVR CONWRUMON I 190