Loading...
HomeMy WebLinkAboutNCS000402_29_Compass Pointe Center 1-15-14U M alle cK Williams, carmen, and kingi, ine Engineering • Architecture • Land Surveying Stormwater Review for Compass Pointe Center Engineer: Aden Stoltzfus, P.E. Reviewer: Joshua S. Johnson, P.E. Date: January 15, 2014 Stormwater Review Notes: 1. The Submittal needs the following: a. Stormwater Narrative. b. City of Mebane O&M Agreement (Attached). c. Landscape/Planting Plan (with approved plants from BMP Manual). 2. What is downstream of the proposed WQB? It is not clear if any structures are downstream or what the existing off site drainage patterns are. This can be shown with an exhibit or with County Topo/GIS information. 3. Use Rational Method for Peak Flows. 4. Fence type needs to meet City standards (attached). 5. Water Quality Orifice needs anti -clogging detail (downturned elbow?). 6. Is adequate access to the forebay available? 7. All future upstream development completed after the proposed improvements (that is tributary to pond) will need onsite erosion control to prevent sedimentation of pond. Pond will need to be completed within 6 months of CO of proposed building. 8. Show maintenance easement on WQB. 9. Provide a copy of Erosion Control approval from NC Land Quality. 10. Complete the attached Jordan -Falls Lake Nutrient Loading Calculator for the project. The Tool can be found at http://portal.ncdenr.or_ web/jordanlake/implementation-guidance-archive. Please note that compliance with the Tool is not required but submitting a copy of the Tool is required. 740 Chapel Hill Road (27215) - P.O. Box 1179 - Burlington, North Carolina 27216 Tel. - (336)226-5534 - Fax — (336)226-3034 - awck.com ESTABLISHED - 1960