Loading...
HomeMy WebLinkAboutNCS000402_29_2014-10-13 Compass Pointe Surety Estimate-RevisedBy: Aden R. Stoltzfus, PE SURETY ESTIMATE Stoltzfus Engineering, Inc. COMPASS POINTE CENTER Date: 10/13/2014 (Revised) REMAINING INFRASTRUCTURE COMPASS POINTE CENTER SURETY ESTIMATE ITEM NUMBER DESCRIPTION QUAN. UNITSI I Estimated Prices COST/UNIT Totals 1 Striping for Compass Drive, Lowes Blvd. & NC 119, Thermoplastic Pavement Markings 1 L.S. $7,000.00 $7,000.00 2 Remove & Replace Handicap Ramp, Northeast Quadrant Lowes Blvd. & NCI 19 Intersection 1 L.S. $1,000.00 $1,000.00 3 Permanent Seeding, Road Shoulders 0.4 A.C. $1,950.00 $780.00 4 Convert Skimmer Basin to Wet Detention Pond, Muck Pond Out and Re -Establish to Design Dimensions 1 L.S. $14,000.00 $14,000.00 5 Pond As -Built Surveys and Engineer's Certification 1 L.S. $2,000.00 $2,000.00 6 Pond Landscaping 1 L.S. $7,000.00 $7,000.00 7 Pond Fencing 457 LF $13.50 $6,169.50 SUB -TOTAL OF ESTIMATED SURETY $37,949.50 25% CONTINGENCY $9,487.38 TOTAL ESTIMATED SURETY $47,436.88 �����c��®1�8�69o9APe9®3ny� °S CAS �i 'sT� ®� � dd&'gf$4t#ttt�� 1 OF 1