HomeMy WebLinkAboutNCG020897_Site Map_20210716CONSTRUCTION SEQUENCE MINING ACTIVITY I PHASE 1 1. PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES CONTACT NCDEQ LAND QUALITY SECTION (919) 7914200. 2. INSTALL CONSTRUCTION ENTRANCE ON ELMER MOORE ROAD PER PLAN SEE SHEETCS. 3. INSTALL SILT FENCE ALONG ACCESS ROAD PER PLAN WITH SILT FENCE OUTLETS. INSTALL CULVERT#1 8 #2. 4. INSTALL PERMANENT DIVERSIONS #12-19. STABILIZE AND SEED ALL SLOPES IMMEDIATELY. ONLY CLEAR AS NECESSARY TO INSTALL DIVERSIONS. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL TEMPORARY/PERMANENT LINING, AND GOOD GROUND COVER ON FILL SLOPES IS ESTABLISHED 5. INSTALL SILT FENCE PER PLAN BELOW ALL PERMANENT/TEMPORARY DIVERSIONS AND BASINITRAPS W/ SILT FENCE OUTLETS IN LOW AREAS PER PLAN. 6. INSTALL SILT FENCE BELOW HAUL ROAD W/ SILT FENCE OUTLETS IN LOW AREAS PER PLAN. 7. INSTALL SKIMMER BASIN #1, 2, 3. STABILIZE AND SEED ALL SLOPES IMMEDIATELY. ONLY CLEAR AS NECESSARY TO INSTALL BASINS. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL GOOD GROUND COVET IS ESTABLISHED 8. INSTALL TEMPORARY DIVERSIONS # 1,2,5,6,8,9 PER PLAN. STABILIZE AND SEED ALL SLOPES IMMEDIATELY. ONLY CLEAR AS NECESSARY TO INSTALL DIVERSIONS. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL TEMPORARY/PERMANENT LINING, AND GOOD GROUND COVER ON FILL SLOPES IS ESTABLISHED. 9. INSTALL HAUL ROAD PER SHEET C-6 Wl PERMANENT DIVERSIONS # 20-23 WTH OUTLET PROT[:CTION. INSTALL CULVERT 93 AND CULVERT #4 (TEMPORARY STREAM CROSSING) 10, BEGIN CLEARING NECESSARY AREAS TO INSTALL PLANT SITE AND BEGIN REMOVAL OF OVERBURDEN FROM PIT FOR FILL MATERIAL. ONCE GRADE IS MET ON THE PLANT SITE REMOVE TO # 8,9 ALONG WITH SKIMMERN BASIN #3 ND INSTALL PDA 7 W/ CULVERT#5. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL TEMPORARY/PERMANENT LINING, AND GOOD GROUND COVER ON FILL SLOPES IS ESTABLISHED. 11. MAINTAIN ALL EROSION CONTROL MEASURES WEEKLY AND AFTER ANY STORM EVENTS. 12. ONCE PLANT SITE, SITE ACCESS ROAD (PERMANENT DIVERSIONS CONSTRUCTED), PIT HAUL ROAD AND SCALE HOUSE SITE GRADES ARE MET AND ALL SLOPES STABILIZED AND SEEDED. BEGIN CONSTRUCTING BERMS PER PLAN. MAINTAIN ALL DOWNSTREAM DIVERSIONS AND SILT FENCE UNTIL GOOD GROUND COVER IS ESTABLISHED. 13. ONCE BERMS ARE COMPLETE AROUND PLANT SITE AND 10-YR PIT AND ARE STABILIZED AND SEEDED. MAINTAIN SILT FENCE UNTIL THIS ACHIEVED. REMOVE TEMPORARY DIVERSIONS # 1, 2 AND TEMPORARY SKIMMER BASIN #1. MAINTAIN ALL DOWNSTREAM DIVERSIONS AND SILT FENCE UNTIL GOOD GROUND COVER IS ESTABLISHED. 14. INSTALL TEMPORARY DIVERSIONS # 3, 4. STABILIZE AND SEED ALL SLOPES IMMEDIATELY. ONLY CLEAR AS NECESSARY TO INSTALL DIVERSIONS. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UNTIL TEMPORARY/PERMANENT LINING, AND GOOD GROUND COVER ON FILL SLOPES IS ESTABLISHED. 15. INSTALL TEMPORARY SKIMMER BASIN 94, 5. STABILIZE AND SEED ALL SLOPES IMMEDIATELY. ONLY CLEAR AS NECESSARY TO INSTALL BASINS. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWN STREAM UN71L GOOD GROUND COVER IS ESTABLISHED 16. INSTALL TEMPORARY DIVERSIONS # 10, 11. STABILIZE AND SEED ALL SLOPES IMMEDIATELY. ONLY CLEAR AS NECESSARY TO INSTALL DIVERSIONS. MAINTAIN SILT FENCE AND SILT FENCE OUTLETS DOWNSTREAM UNTIL TEMPORARY/PERMANENT LINING, AND GOOD GROUND COVER ON FILL SLOPES IS ESTABLISHED. 17. ONCE PLANT SITE AND BERMS ARE CONSTRUCTED BEGIN PLACING OVERBURDEN IN THE OVERBURDEN AREA. MAINTAIN ALL EROSION CONTROL MEASURES WEEKLY AND AFTER ANY STORM EVENTS UNTIL FINAL MAX FILL IS MET. STABILIZE AND SEED ALL SLOPES AND DENUDED AREAS. 14. ONCE GOOD GROUND COVER IS ESTABLISHED AND NO RUTTING OF SLOPES IS OCCURRING REMOVE ALL EROSION CONTROL MEASURES WHILE MAINTAINING SILT FENCE ON DOWNSTREAM SIDE. 15. DEWATER ALL SKIMMER BASINS AND SEDIMENT TRAPS MATH SILT BAG PER DETAIL. 16, MAINTAIN SILT FENCE AFTER MAJOR RAIN EVENTS. 17. STABILIZE AND SEED ALL DENUDED AREAS IN WHICH WORK HALL NOT RECOMMENCE WITHIN 7 WORKING DAYS OR 14 CALENDAR DAYS, 18. CALL NCDEQ LAND QUALITY SECTION FOR INSPECTION (919) 7914200. PHASE 2 1. BEGIN MINING ACTIVITIES. 2. TEMPORARY SEED OVERBURDEN AREAS THAT WALL BE DENUDED FOR 30 DAYS OR MORE. 3. MAINTAIN ALL EROSION CONTROL DEVICES WEEKLY AND AFTER MAJOR STORM EVENTS. 4. CALL NCDEQ LAND QUALITY SECT ION FOR INSPECTION (919) 7914200. 1< ALL DENUDED AREAS LEFT INACTIVE BETWEEN PERIODS OF GRADING ACTIVITY SHALL BE TEMPORARILY SEEDED VATH IN 15 MARx NGS DAYS OR 30 CALENDAR DAYS, SHICHEVER IS SHORTER. SEE SEEDING SCHEDULE IN DETAILS. �. OVERBURDEN PILE TO BE CONSTRUCTED AND STABILIZED FROM BOTTOM PER ABOVE DETAIL AS FILLED. ONCE FINAL LIFT IS REACHED - THELOWER SLOPES AN D BENCH ES SHALL BE COMPLETED MEETING THE RECLAMATION PUN). j. FOR FINAL STABILIZATION OF FILL SLOPES, GRADE TO 2I SLOPE, COVER wTH TOPSOIL. SEED AND MULCH. - WASTE PILE RECLAMATION (TYP) NTS EROSION CONTROL LEGEND SEDIMENT BASIN WIER BAFFLES ROCK CHECK DAMS SILT FENCE SF TEMPORARY DIVERSION DITCH D OUTLET PROTECTION J-HOOK W/ SILT FENCE OUTLET SILT FENCE OUTLET DISTURBED AREAS TAILINGS/SEDIMENT PONDS 1.4 AC STOCKPILES 3.0 AC OVERBURDEN STOCKPILE 6.0 AC PROCESSING AREA/HAUL ROADS 4.3 AC MINE EXCAVATION 10.0 AC OTHER MISC EXCAVATION 16.1 AC (BERMS, DIVERSIONS, ETC.) TOTAL AFFECTED AREA 40.8 AC LEGEND ACTIVE PERMIT BOUNDARY EXISTING CONTOUR - - - EXISTING BUFFER AFFECTED AREA CREEK BERM .. POND C� SKIMMER BASIN #4 TOP DIM= 30 x 60 1 BOTTOM DIM= 12 x 42 POOL DEPTH 3.0' / TOP EL= 485.0 BOTTOM EL= 480.0 / WEIR EL= 483.0 VOL PROPOSED= 3456 CF�_i \ \\\ VOL REQUIRED- 2880 CF WEIR D=2.0' WEIR LINING=CLASS A RIP RAP J WEIR STONE D=9" EMERGENCY SPILLWAY TO BE CONSTRUCTED IN CUT TEMPORARY SKIMMER SIZE=4" SKIMMER BASIN 05'T�1< SKIMMER ORFICE=1.0" TOP DIM= 41 x 82 BAFFLES= 3 BOTTOM DIM= 23 x 64 \ DIVERSION INLET PROTECTION POOL DEPTH=3.0' La=12.0' TOP EL= 480.0 EXTEND TO BOTTOM BOTTOM EL= 475.0 C W=9.0' WEIR EL=478.0 STONE O-CLASS A RIP RAP VOL PROPOSED= 7248 CF J D=1.0' VOL REQUIRED= 6650 OF CHANNEL ID CHANNELSLOPE SIDI SLOPE PROPOSED DIVERSION TABLE S CHANNEL DEPTH TEMPORARY LINING PERMANENT LINING LINING DEPTH TOO 4.4 % 3:1 2.0 FT CLASS A RIP RAP CLASS A RIP RAP 1,0 FT TD42 0.5 % 3:1 2.5 FT STRAW Wf NETTING BERMUDAGRASS - PD#3 CLEAN WATER 10.0 % 3:1 2.0 FT CLASS A RIP RAP CLASS A RIP RAP 1.0 FT PD#4 CLEAN WATER 12.0 % 3:1 2.0 FT CLASS B RIP RAP CLASS B RIP RAP 1.5 FT TD95 CLEAN WATER 6.8 % 3:1 2.0 FT CLASS A RIP RAP CLASS A RIP RAP 1.0 FT TD96 CLEAN WATER 0.5 % 3:1 2.5 FT STRAW W(NETTING BERMUDAGRASS - PD#7 2.0 % 3:1 2.0 FT CLASS A RIP RAP CLASS A RIP RAP 1.0 FT TONS 4.1 % 3:1 2.0 FT CLASS A RIP RAP CLASS A RIP RAP 1.0 FT TD#9 2.9 % 3:1 2.0 FT STRAW W/ NETTING BERMUDAGRASS - TD#10 0.5 % 3:1 1 2.0 FT STRAW W/ NETTING BERMUDAGRASS - TD911 1.0 % 3:1 2.0 FT STRAW W/ NETTING BERMUDAGRASS - MPORARY 1 � �-- R BASIN #3 'I �I' ACCESS ROAD M= 53 x 106 ! 1 I SEE SHEET C-5 / ! -- AFFECTED AREA TYP IM= 35 x 88 PLAN/PROFILE (TYP) ❑EPTH=3.0'� 40.8 AC+I• _ P EL- 495.0' MEL- 490.0 R EL= 493.0 )= 13047 CF I - 510 + + --- `\ EI R L= 15 OF 'i 1\ + ++ + + ++ 1 �\ VEIR D= 2.0 ! + i A RIP RAP TD #9 TED IN ER S2E=U4" I CHECK DAM (TYP � ! + \ )RFICE=1.6' \ + TD #8 I \ \ 3AFR ES= 3 ' 1 \ + 500 ) 20TECTION i I ,\ + LaT1O f0 BOTTOM � + o ' + i W=9.0'J� LANT SITE ++ CULVERT#5 _ 3 A RIP RAP1.0' q .� 1..3 AC + 50 LF 15" RCP @ 1.0% UTLET PROTECTION #9 \�_ SILT FENCE OUTLET (TYP) + 500 W=�5' 1 / PD #4 (CLEAN WATER1.n,�,L-v„%;; ?D #7 + STONE 0= CLASS 1 RIP RAP t� STONE D= 1.5 � ERMANENT \ SKIMMER BASIN #2 WR RISER 1 TOP DIM= 92 x 184 I m BOTTOM DIM= 74 x 166 VBBARRELLOUTLET PROTECTION POOL DEPTH=3.0' TOPEL= 494.5 BOTTOM EL=485.0 STONE O=CLASS B RIP RAP PRINCIPAL SPILLWAY EL= 491.0 j 13=1.5' WEIR EL=492.5 BASIN TO BE LINED WITH CLASS A RIP RAP \ - '_ANWATER) �;� \W \510/ VOL PROPOSED=156288 CF 11 \ \ m OVERSIZED FOR PLANT OPERATIONS -- - )AM TYP �/ VOL REQUIRED=42840 CF (TYP), m -WEIR L=24.0 W / WEIRD=2.0' _EANWATER) + _ - i' WEIR LINING=CLASS A RIP RAP WEIR STONE D=9" _ EMERGENCY SPILLWAY TO BE CONSTRUCTED IN CUT �\ )IN \ '� J / SKIMMER SIZE= 8" \\ SKIMMER ORFICE=6.6' RE -� / RISER LSIZE=.36"C - `"�.�"'tp•L\A f CMP BARREL 512E=.36" CMP R / ; CONCRETE BASE= 5.5E x 5.5E x 1.0' BAFFLES=3 DIVERSION INLET PROTECTION \ ' � Le=12.0' ' EXTEND TO BOTTOM 'ET \F, 1 / W=9.0 ;DEOF ICELE / STONE O=CLASS A RIP RAP OUT (TYP) "ARREL OUTLET PROTECTION \ La=12.0' W=6.0' \_ \ \_ I STONE O=CLASS B RIP RAP D-LS' 1 470 RAFTING AND DESIGN If/' SERVICES, INC. 346 WOOLARD ROAD Sanford, North Carolina 27330 (919)499-8759 phone d rafti nganddesigniPymai 1. co m 6 Vel Al c*` 4 I i RACip cot' P PATTERSON EXPLORATION SERVICES P.O. BOX 3008 SANFORD, NC 273313008 Z J 0 Q Q Q Y/ Z .� W �' a 0 Z On MINE 20 Z _ C9 g V Wa 2_ W a W J 0 m REVISIONS AGENCY REVIEW ONLY NOT FOR CONSTRUCTION Scale: Drawn by: DRAFTING AND DESIGN 1"=200' SERVICES, INC. Sheet. Designed by: DRAFTING AND DESIGN SERVICES, INC. Reviewed by: C4 �S p Of 1 v PATTERSON EXPLORATION SERVICES Project Number: Date: DDS JOB M 2016-18 PXS JOB M FEB 2016 .10