Loading...
HomeMy WebLinkAbout710006_Application_20210708Animal Waste Management Plan Certification (Please type or print all information that does not require a signature) xistin, or New or Expanded . (please circle one) General Information: Name of Farm: Greenwood Finishing #3 Owners) Name: Greenwood Livestock, LLC Permit No: AWS71006 Facility No: 71-6 Phone No:910-874-9001 Mailing Address: PO Box 2107. Elizabethtown, NC 28337 Farm Location: County Farm is located in: Fender Latitude and Longitude: 34.659526 / 78.068283 Integrator: Smithfield Please attach a copy of a county road map with location identified and describe below (Be specific: road names, directions, milepost, etc.): Take NC 11 west from Penderlea .3 miles to Raccoon. Turn right. travel .5 miles to farm on left. Operation Description: Type ofSwine No. ofAnimals o Wean to Feeder o Wean to Finish 9297 o Farrow to Wean o Farrow to Feeder o Farrow to Finish o Gilts o Boars 7) pe of Pordoy No. of Animals Type of Daily No. ofAnimats o Layer o Milking o Non -Layer o Dry Type of Beef No. of Animals o Heifers o Brood o Calves o Feeders o Stockers Other Type of Livestock: Number ofAnlatals: Expanding operation Only Previous Design CgJaeira : Additional Design Capacity: _ Total Design Capacity: Acreage Available for Application. 113.29 Required Acreage:l 1 3.29 Number of waste structures: _ 3 Total Capacity: 2.47 1,451 Cubic Feet (&) Are subsurface drains present on the farm: YES or (please circle one) If YES: are subsurface drains present in the area of the waste structures (please circle one or both as applicable) ************************************************************************************ Owner / Manager Agreement I (we) verify that all the above information is correct and will be updated upon changing. 1 (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. 1 (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a permit application and a new certification to be submitted to the Division of Water Quality (DWQ) and permit approval received before the new animals are stocked. 1 (we) understand that there must be no discharge of animal waste from the storage system to surface waters of the state unless specifically allowed under a permit from DWQ and there must not be run-off from the application of animal waste. I (we) understand that run-off of pollutants from lounging and heavy use areas must be minimized using technical standards developed by the USDA - Natural Resources Conservation Service (NRCS). The approved plan will be filed at the farm and at the DWQ Regional Office and the office of the local Soil and Water Conservation District (SWCD). I (we) know that any modification must be approved by a technical specialist and submitted to the DWQ Regional Office and focal SWCD and required approvals received from DWQ prior to implementation. A change in farm ownership requires apermit application to be sent to DWQ along with a new certification (if the approved plan is changed). Name of Land od Livestock LLC by Dean Hilton Signature: Date: 6/3/21 Name of Manager (if different from owner): Signature: Date: AWC - September 18, 2006 1 Technical Specialist Certification I. As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6H .0104, I certify that the animal waste management system for the farm named above has an animal waste management plan that meets or exceeds standards and specifications of the Division of Water Quality as specified in 15A NCAC 2T .1300 (formerly 2H .0217) and the USDA -Natural Resources Conservation Service and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2T .1300 (formerly 2H .0217) and 15A NCAC 6F .0101-.0105. The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, SI, WUP, RC, I), the technical specialist should only certify parts for which they are technically competent. IL Certification of Design A) Collection, Storage, Treatment System Check the appropriate box X Existing facility without retrofit (SD or WUP) Storage volume is adequate for operation capacity; storage capability consistent with waste utilization requirements. o New, expanded or retrofitted facility (SD) Animal waste storage and treatment structures, such as but not limited to collection systems, lagoons and ponds, have been designed to meet or exceed the minimum standards and specifications. Name of Technical Specialist (Please Print):Curtis Barwick Affiliation Barwick Aa Services, LLC Date Work Completed: 6/3/21 Address (Agency):103 Country Club Circle. Clinton. NC 28328 Phone No.: 910-385-1000 Signature: Date: 6/3/21 B) Land Application Site (WUP) The plan provides for minimum separations (buffers); adequate amount of land for waste utilization; chosen crop is suitable for waste management; and the hydraulic and nutrient loading rates are appropriate for the site and receiving crop. Name of Technical Specialist (Please Print): Curtis Barwick Affiliation: Barwick Ag Services, LLC Date Work Completed: 6/3/21 Address (Agency):103 Country Club Circle, Clinton. NC 28328 Phone No.:910-385-1000 Signature: 6 Date: 6/3/21 C) Runoff Controls from Exterior Lots Check the appropriate box X Facility without exterior lots (SD or WUP or RC) This facility does not contain any exterior lots. o Facility with exterior lots (RC) Methods to minimize the run off of pollutants from lounging and heavy use areas have been designed in accordance with technical standards developed by NRCS. Name of Technical Specialist (Please Print):Curtis Barwick Affiliation Barwick Ag Services, LLC Date Work Completed: 6/3/21 Address (Agency): 103 Country ub Circle Clinto . NC 28328 Phone No.:910-385-1000 Signature: � 4' Date:6/3/21 AWC - September 18, 2006 2 D). Application and Handling Equipment Check the appropriate box X Existing or expanding facility with existing waste application equipment (WUP or I) Animal waste application equipment specified in the plan has been either field calibrated or evaluated in accordance with existing design charts and tables and is able to apply waste as necessary to accommodate the waste management plan: (existing application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates, a schedule for timing of applications has been established; required buffers can be maintained and calibration and adjustment guidance are contained as part of the plan). O Newe'.randeel or existing facility without existing waste application equipment for spray irrigation. (I) Animal waste application equipment specified in the plan has been designed to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance are contained as part of the plan). o New. expanded. or existing facility without existing+ waste application equipment for land spreading not using spray irrigation. (WUP or I) Animal waste application equipment specified in the plan has been selected to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance are contained as part of the plan). Name of Technical Specialist (Please Print): Affiliation Address Phone No.: Signature: Curtis Barwick Barwick Ag Services, LLC Date Work Completed: 6/3/21 (Agency):103 Country Club Circle, Clinton. NC 28328 910-385-1000 &15—Si Date:6/3/21 E) Odor Control, Insect Control, Mortality Management and Emergency Action Plan (SD, SL WUP, RC or 1 The waste management plan for this facility includes a Waste Management Odor Control Checklist, an Insect Control Checklist, a Mortality Management Checklist and an Emergency Action Plan. Sources of both odors and insects have been evaluated with respect to this site and Best Management Practices to Minimize Odors and Best Management Practices to Control Insects have been selected and included in the waste management plan. Both the Mortality Management Plan and the Emergency Action Plan are complete and can be implemented by this facility. Name of Technical Specialist (Please Print): Curtis Barwick Affiliation Barwick Ag Services, LLC Date Work Completed: 6/3/21 Address (Agency): _ 103 Country Club Circle. Clinton. NC 28328 Phone No.:910-385-1000 Signature: Date:6/3/21 F) Written Notice of New or Expanding Swine Farm The following signature block is only to be used for new or expanding swine farms that begin construction after June 21, 1996. If the facility was built before June 21, 1996, when was it constructed or last expanded I (we) certify that I (we) have attempted to contact by certified mail all adjoining property owners and all property owners who own property located across a public road, street, or highway from this new or expanding swine farm. The notice was in compliance with the requirements of NCGS 106-805. A copy of the notice and a list of the property owners notified are attached. Name of Land Owner: Signature: Date: Name of Manager (if different from owner): AWC - September 18, 2006 3 Signature: Date: III. Certification of Installation A) Collection. Storaze, Treatment Installation New, expanded or retrofitted facilii v (SI) Animal waste storage and treatment structures, such as but not limited to lagoons and ponds, have been installed in accordance with the approved plan to meet or exceed the minimum standards and specifications. For existing facilities without retrofits, no certification is necessary. Name of Technical Specialist (Please Print): Affiliation Date Work Completed: Address (Agency): Phone No.: Signature: Date: B) Land Application Site (WUP) The cropping system is in place on all land as specified in the animal waste management plan. Name of Technical Specialist (Please Print): Affiliation: Barwick Ag Services, LLC Date Work Completed: Address (Agency):103 Country Club Circle. Clinton. NC 28328Phone No.: Signature: Date: Curtis Barwick 6/3/2021 910-385-1000 6/3/2021 C) Runoff Controls from Exterior Lots (RC) Facility with exterior lots Methods to minimize the run off of pollutants from lounging and heavy use areas have been installed as specified in the plan. For facilities without exterior lots, no certification is necessary. Name of Technical Specialist (Please Print): _ Affiliation Date Work Completed: Address (Agency): Phone No.: Signature: Date: D) Application and Handlintz Equipment Installation (WUP or I) X Animal waste application and handling equipment specified in the plan is on site and ready for use; calibration and adjustment materials have been provided to the owners and are contained as part of the plan. o Animal waste application and handling equipment specified in the plan has not been installed but the owner has proposed leasing or third party application and has provided a signed contract; equipment specified in the contract agrees with the requirements of the plan; required buffers can be maintained; calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. Name of Technical Specialist (Please Print): Curtis Barwick Affiliation: Barwick As Services. LLC Date Work Completed: 6/3/21 Address (Agency): 103 Count Club Circle, Clinto NC 28328 Phone No.:910-385-1000 Signature: Date: 6/3/21 AWC - September 18, 2006 4 E) Odor Control, Insect Control and Mortality Management (SD, SI, WUP, RC or I) Methods to control odors and insects as specified in the Plan have been installed and are operational. The mortality management system as specified in the Plan has also been installed and is operational. Name of Technical Specialist (Please Print): Curtis Barwick Affiliation Barwick Ag, Services. LLC Date Work Completed: 6/3/21 Address (Agency): 103 Country Club Circle. Clinton, NC 28328 Phone No.: 910-385-1000 Signature: ) 4- Date:6/3/21 Please return the completed form to the Division of Water Quality at the following address: Department of Environment and Natural Resources Division of Water Quality Animal Feeding Operations Unit 1636 Mail Service Center Raleigh, NC 27699-1636 Please also remember to submit a copy of this form along with the complete Animal Waste Management Plan to the DWQ Regional Office and the local Soil and Water Conservation District Office and to keep a copy in your files with your Animal Waste Management Plan. AWC - September 18, 2006 5 6/7/2021 Pender County GIS ou https://gis.pendercountync.gov/maps/ 1/1 WASTE UTILIZATION PLAN Tuesday, March 21, 2017 Gip JL/ /17 i)6711 Producer : Greenwood Livestock, LLC Farm Name : Greenwood Finishing #3 71-6 PO Box 535 Elizabethtown,NC 28337 Telephone # : (910) 876-1627 Type of Operation : {/✓ra. Finish Swine Number of Animals : 9297 hogs design capacity Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient contents of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and avaialable water holding capacities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special pre -cautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on waste application through irrigation for this is the manner in which you have chosen to apply your waste. If you choose to inject the waste in the future, you need to revise this plan. Nutrient levels for injecting waste and irrigating waste are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for ananlysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. Page 1 AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 7920 hogs X 1.9 tons waste/hogs/year = 15048 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 7920 hogs X 1.7 Ibs PAN/hogs/year = 13464 PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and suface application. TABLE 1 : ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE &CLASS - DETERMINING PHASE CROP YIELD LBS AW COMM ACRES LBS AW APPLIC. CODE NACRE NACRE USED TIME t 261 WOODINGTON DRAINED C 132 104.281 01 34.68 261 WOODINGTON DRAINED W k 501 971 01 34.68 261 * 1 WOODINGTON DRAINED SB 29 112.231 or-34.68 261 * 1AW WOODINGTON DRAINED C 1321 104 281 _ 0 12.52 50 97; 0 12.52 29 112 23 0 12.52 * 1 * 1 261 °* 1AW IWOODINGTON DRAINED _ W 261 ,* 1AW 1WOODINGTON DRAINED 1- SB 261 2 ;TORHUNTA DRAINED C 261 * 2 TORHUNTA DRAINED -1- W TORHUNTA DRAINED I SB TORHUNTA DRAINED C TORHUNTA DRAINED j W -4 3616.431 FEB15-JUN 3363.96 SEP-APR 3892.141APR-SEP 15 1305.591 FEB15-JUN 1214 44 SEP-APR 1405 12;APR-SEP 15 1501 123 0 48.87 6011.01 FEB15-JUN 55I 111.1- 0 48.87 5429.46' SEP-APR 35T-136.15 0 48.87 6653.65tAPR-SEP 15 1501 123 0 10.32 1269.361 FEB15-JUN 551 111.1. 0 10.32 1146.55i SEP-APR * 2AW TORHUNTA DRAINED SB i 35' 136.15 0-10.32 261 T 3 RAINS 261 261 * 3 * 3 261 * 3AW 261 261 RAINS RAINS RAINS * 3AW RAINS * 3AW RAINS C 150 120 0 3.88 W 55 106.15 0 3.88 SB 1 37, 143.19 0 3.88 C 150 120 0 3.02 1405.07APR-SEP 15 465.61 FEB15-JUN 411.862 SEP-APR 555.577APR-SEP 15 362.41 FEB15-JUN W 55 106.15 0 3.02 320.5731 SEP-APR SB 1 371 143.191 0 3.02 432.434!APR-SEP 15 TOTALS: 19630.6 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirments. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of NC to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. Page 2 TABLE 2 : ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specifications 2.) There are no Acres Leased Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation * Acreage figures may exceed total acreage in field due to overseeding. **Lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in TABLES 1 and 2 above: CROP CODE IC LCORN ISB ISOYBEANS IW [ WHEAT CROP UNITS LBS NIUNIT BUSHELS 1.25 BUSHELS 4 Page 3 TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED TABLE 1 r 113.29 TOTALS: 113.291 19,631 AMOUNT OF N PRODUCED: 13,016 *** BALANCE -6,615 *** This number must be Tess than or equal to 0 in order to fully utilize the animal waste N produced. Acres show in each of the preceeding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nurturient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 3439.89 pounds of plant available nitrogen (PAN) per year in the sludge that will need to be removed on a periodic basis. This figure is PAN when broadcasting the sludge. Please be aware that additional acres of land, as well special equipment, may be needed when you remove this sludge. See the attached map showing the fields to be used for the utilization of waste water. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. Your facility is designed for 0 days of temporary storage and the temporary storage must be removed on the average of once every 0 months. In no instance should the volume of waste being stored in your structure be within 0 feet of the top of the dike. If surface irrigation is the method of land application for this plan, it is the responsiblity of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of Nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. APPLICATION APPLICATION CROP RATE (in/hr) AMT (inches) TRACT FIELD SOIL TYPE 261 *1, *1AW WOODINGTON DRAINED W *1 261 *1,'IAW WOODINGTON DRAINED SB 0.40 *1 261 *i,'1AW WOODINGTON DRAINED C 0.40 *1 261 *2, *2AW TORHUNTA DRAINED W 0.40 *1 261 *2,'2AW TORHUNTA DRAINED SB 0.45 *1 261 '2, '2AW TORHUNTA DRAINED C 0.45 *1 261 *3,'3AW RAINS W 0.45 *1 261 *3, *3AW RAINS SB 0.40 *1 261 *3, *3AW RAINS C 0.40 *1 Page 4 . * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Page 5 NARRATIVE OF OPERATION This farm is changing from feeder -finish to wean-finish.This WUP is written using both the latest nirtogen co -efficient and the latest RYE. Producer has the option to plant a small grain overseed after soybeans and apply no more than 30 Ibs/N/acre and harvest and use the full nitrogen rate for the following corn crop. On Woodington soils this would be 119 Ibs/N/acre; Torhunta 138 Ibs/N/acre; Rains 135 Ibs/N/acre. If cotton is planted, fertilize at these rates: Woodington 53 Ibs/N/acre, Torhunta 65 Ibs/N/acre, Rains 58 Ibs/N/acre. For grain sorghum, fertilize at these rates: Woodington 84 Ibs/N/acre, Torhunta 103 Ibs/N./acre, Rains 100 Ibs/N/acre. Field acreages for 1AW, 2AW and 3AW are added to regular field acreages when an aerway is used. If a sorghum sudan/rye rotation is used, see the accompanying nitrogen rate table. Page 6 PLANS & SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to assessment of civil penalties of $10,000 per day by the Division of Water Quality for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land to properly dispose of waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System (ACS). If an ACS is used the soil Toss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field. These filter strips will be in addition to "Buffers" required by DEM. (See FOTG Stantard 393 - Filter Strips and Standard 390 Interim Riparian Forest Buffers). 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" in the NRCS Technical Reference - Environment file for guidance.) *7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and to provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop on bare soil. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: the outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from anv perennial stream or river (other that an irriaation ditch or canal. Animal waste Page 7 .other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal Waste shall not be applied closer than 200 feet of dwellings other than those owned by the Iandownwer. 14. Waste shall be applied in a manner not to reach other property and public right - of ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted croplands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses, except when applied at agronomic rates and the application causes no runoff or drift from the site. *16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. *17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. *18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. *19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied as a preemergence with no other applications of animal waste during the crop season. *21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume fpr waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production amd maintained. Soil and waste analysis records shall be kept for five (5) years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina Department of Agriculture regulations. * Liquid Systems Page 8 NAME OF FARM: Greenwood Finishing #3 71-6 OWNER / MANAGER AGREEMENT I (we) understand and will follow and implement the specifications and the operation and maintenance precedures estalished in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and/or storage system or construction of new facilities will require a new utilization plan and a new certification to be submitted to DEM before the new animals are stocked. I (we) understand that I must own or have acces to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-• . • r - - 'so certify that the waste will be applied on the land according to t is plan at the appropria - •4 -s and at rates that no runoff occurs. NAME OF FA .' `OWN enwood Li ock, LLC NAME OF MANAGER (if different from owner): please print SIGNATURE: DATE: NAME OF TECHNICAL SPECIALIST: Curtis Barwick AFFILIATION: Barwick Ag Services ADDRESS (AGENCY): 103 Country Club Circle Clinton, NC 28328 (910) 3, 5-1000 SIGNATURE: DATE: J / -. Page 9 o. tract # TABLE Finishing #3 71-6 FIELD & CROP SUMMARY p_ field # q. crop /soil type / RYE 4B 5B-12 14,15 13 1-4A,5A,13 4B, 5B-12, 14, 15 sorhum sudan ha /Wo/4.3 tn sor• hum sudan ha /To/4.8 tn so . hum sudan ha /Ra/4.3 tn small grain hav 4.3 tn x48 lb/ton = 204 N 4.8 to x 491b/ton = 233 N r. acres 113.29 s. IRR-2 PAN t TOTAL PAN w. application balance BALANCE FOR window (lb/acre) FIELD (Ibs.) column r x s 9628.8 13791.3 1407.6 11329.0 36156.7 Mar 15-Au Mar 15 Au Sep -Mar Operator: Greenwood 3 #1 County: Ponder Date: 06/01/21 Distance to nearest residence (other than owner): 2600.0 feet 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish) x 1417 lbs. = 0 Ibs 0 sows (farrow to feeder) x 522 lbs. = 0 Ibs 3099 head (finishing only) x 115 Ibs. = 356385 Ibs 0 sows (farrow to wean) x 433 Ibs. = 0 Ibs 0 head (wean to feeder) x 30 lbs. = 0 lbs Describe other : 0 Total Average Live Weight = 356385 Ibs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 356385 lbs. ALW x Treatment Volume(CF)/Ib. ALW Treatment Volume(CF)/lb. ALW = 1 CF/Ib. ALW Volume = 356385 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet 4. TOTAL DESIGNED VOLUME Inside top length (feet)----- ---- Inside top width (feet) ------------------ Top of dike elevation (feet) -------------- Bottom of lagoon elevation (feet) ---------- Freeboard (feet) ------------------ Side slopes (inside lagoon) ------------- Total design volume using prismoidal formula 319.5 305.5 46.0 34.0 1.0 3.0 : 1 SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 313.5 299.5 11.0 AREA OF TOP LENGTH *WIDTH = 313.5 299.5 AREA OF BOTTOM LENGTH * WIDTH = 247.5 233.5 AREA OF MIDSECTION LENGTH * WIDTH *4 280.5 266.5 93893 (AREA OF TOP) 57791 (AREA OF BOTTOM) 299013 (AREA OF MIDSECTION * 4) CU. FT. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 93893.3 299013.0 57791.3 1.8 Total Designed Volume Available = 826279 CU. FT. 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length *Width = 319.5 305.5 97607.3 square feet Buildings (roof and lot water) 0.0 square feet TOTAL DA 97607.3 square feet Design temporary storage period to riod to b e 5A. Volume of waste produced Feces & urine production in gal./day per 135 Ib. ALW Describe this area. 180 days. 1.37 Volume = 356385 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days Volume = 650997 gals. or 87031.6 cubic feet 5B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall Volume = 7.0 in * DA / 12 inches per foot Volume = 56937.6 cubic feet 5D. Volume of 25 year - 24 hour storm 7.0 inches 0.0 gallons/day * 180 days storage/7.48 gallons per CF Volume = 7.5 inches / 12 inches per foot * DA Volume = 61004.5 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 87032 cubic feet 5B. 0 cubic feet 5C. 56938 cubic feet 5D. 61005 cubic feet TOTAL 204974 cubic feet 6. SUMMARY Temporary storage period > 180 days Rainfall in excess of evaporation > 7.0 inches 25 year - 24 hour rainfall > 7.5 inches Freeboard > 1.0 feet Side slopes > 3.0 : 1 Inside top length > 319.5 feet inside top width > 305.5 feet Top of dike elevation > 46.0 feet Bottom of lagoon elevation > 34.0 feet Total required volume > 561359 cu. ft. Actual design volume > 826279 cu. ft. Seasonal high watertable elevation (SHWT)===> feet Stop pumping elev. > 42.0 feet Must be > or = to the SHWT elev. > feet Must be > or = to min. req. treatment el.=> 40.0 feet Required minimum treatment volume- > 356385 cu. ft. Volume at stop pumping elevation > 560826 cu. ft. Start pumping elev. > 44.3 feet Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.- 24 hr. rainfall==> 765274 cu. ft. Volume at start pumping elevation > 761450 cu. ft. Required volume to be pumped > 143969 cu. ft. Actual volume planned to be pumped > 200624 cu. ft. Min. thickness of soil liner when required==> 1.8 feet 7. DESIGNED BY: APPROVED BY: g_ DATE: DATE: < 6-/".2% NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: JirJ�I 'I' JGlPCP.r Operator: Greenwood 3 #2 County: Pender Date: 06/01/21 Distance to nearest residence (other than owner): 2600.0 feet 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish) x 1417 Ibs. = 0 Ibs 0 sows (farrow to feeder) x 522 lbs. = 0 Ibs 3099 head (finishing only) x 115 lbs. = 356385 Ibs 0 sows (farrow to wean) x 433 Ibs. = 0 Ibs 0 head (wean to feeder) x 30 lbs. = 0 Ibs Describe other : 0 Total Average Live Weight = 356385 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 356385 Ibs. ALW x Treatment Volume(CF)llb. ALW Treatment Volume(CF)/lb. ALW = 1 CF/lb. ALW Volume = 356385 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet 4. TOTAL DESIGNED VOLUME Inside top length (feet) ------- Inside top width (feet) Top of dike elevation (feet) Bottom of lagoon elevation (feet) ---- Freeboard (feet) Side slopes (inside lagoon) -------------- Total design volume using prismoidal formula 318.0 305.5 46.0 34.0 1.0 3.0 : 1 SS/END1 SS/END2 SS/SIDE1 SSISIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 312.0 299.5 11.0 AREA OF TOP LENGTH *WIDTH = 312.0 299.5 AREA OF BOTTOM LENGTH *WIDTH = 246.0 233.5 AREA OF MIDSECTION LENGTH *WIDTH *4 279.0 266.5 93444 (AREA OF TOP) 57441 (AREA OF BOTTOM) 297414 (AREA OF MIDSECTION * 4) CU. FT. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 93444.0 297414.0 57441.0 1.8 Total Designed Volume Available = 821882 CU. FT 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 318.0 305.5 97149.0 square feet Buildings (roof and lot water) 0.0 square feet TOTAL DA 97149.0 square feet Design temporary storage period to riod to b e 5A. Volume of waste produced Feces & urine production in gal./day per 135 Ib. ALW Volume = Volume = 5B. Volume of wash water Describe this area. 180 days. 1.37 356385 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days 650997 gals. or 87031.6 cubic feet This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall Volume = 7.0 in * DA / 12 inches per foot Volume = 56670.3 cubic feet 5D. Volume of 25 year - 24 hour storm 7.0 inches 0.0 gallons/day * 180 days storage/7.48 gallons per CF Volume = 7.5 inches 112 inches per foot * DA Volume = 60718.1 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 87032 cubic feet 5B. 0 cubic feet 5C. 56670 cubic feet 5D. 60718 cubic feet TOTAL 204420 cubic feet 6. SUMMARY Temporary storage period > 180 days Rainfall in excess of evaporation > 7.0 inches 25 year - 24 hour rainfall > 7.5 inches Freeboard > 1.0 feet Side slopes > 3.0 : 1 Inside top length > 318.0 feet Inside top width > 305.5 feet Top of dike elevation > 46.0 feet Bottom of lagoon elevation > 34.0 feet Total required volume > 560805 cu. ft. Actual design volume > 821882 cu. ft. Seasonal high watertable elevation (SHWT)===> feet Stop pumping elev. > 42.0 feet Must be > or = to the SHIM elev. > feet Must be > or = to min. req. treatment el.=> 40.0 feet Required minimum treatment volume > 356385 cu. ft. Volume at stop pumping elevation > 557736 cu. ft. Start pumping elev. > 44.3 feet Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.- 24 hr. rainfall==> 761163 cu. ft. Volume at start pumping elevation > 757365 cu. ft. Required volume to be pumped > 143702 cu. ft. Actual volume planned to be pumped > 199629 cu. ft. Min. thickness of soil liner when required==> 1.8 feet 7. DESIGNED BY: APPROVED BY: C. I c(41i16). : 6,41 DATE: DATE: e 'l-z4 NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: Operator: Greenwood 3 #3 County: Pender Date: 06/01/21 Distance to nearest residence (other than owner): 2600.0 feet 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish) x 1417 lbs. = 0 Ibs 0 sows (farrow to feeder) x 522 Ibs. = 0 Ibs 3099 head (finishing only) x 115 lbs. = 356385 lbs 0 sows (farrow to wean) x 433 lbs. = 0 Ibs 0 head (wean to feeder) x 30 lbs. = 0 Ibs Describe other : 0 Total Average Live Weight = 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON • Volume = 356385 Ibs. ALW x Treatment Volume(CF)/lb. ALW Treatment Volume(CF)/Ib. ALW = 1 CF/Ib. ALW Volume = 356385 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet 4. TOTAL DESIGNED VOLUME 356385 Ibs Inside top length (feet)---------------- 320.0 Inside top width (feet) — 306.0 Top of dike elevation (feet) 46.0 Bottom of lagoon elevation (feet)— 34.0 Freeboard (feet)-------- --- 1.0 Side slopes (inside lagoon)3.0 1 Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 314.0 300.0 11.0 AREA OF TOP LENGTH *WIDTH = 314.0 300.0 AREA OF BOTTOM LENGTH * WIDTH = 248.0 234.0 AREA OF MIDSECTION LENGTH *WIDTH *4 281.0 267.0 94200 (AREA OF TOP) 58032 (AREA OF BOTTOM) 300108 (AREA OF MIDSECTION * 4) CU. FT. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 94200.0 300108.0 58032.0 1.8 Total Designed Volume Available = 829290 CU. FT. 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 320.0 306.0 97920.0 square feet Buildings (roof and lot water) 0.0 square feet TOTAL DA 97920.0 square feet Design temporary storage period to riod to b e 5A. Volume of waste produced Feces & urine production in gal./day per 135 Ib. ALW Volume = Volume = 5B. Volume of wash water Describe this area. 180 days. 1.37 356385 lbs. ALW/135 lbs. ALW* 1.37 gal/day 180 days 650997 gals. or 87031.6 cubic feet This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall Volume = 7.0 in * DA / 12 inches per foot Volume = 57120.0 cubic feet 5D. Volume of 25 year - 24 hour storm 7.0 inches 0.0 gallons/day * 180 days storage/7 48 gallons per CF Volume = 7.5 inches / 12 inches per foot * DA Volume = 61200.0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 87032 cubic feet 5B. 0 cubic feet 5C. 57120 cubic feet 5D. 61200 cubic feet TOTAL 205352 cubic feet 6. SUMMARY Temporary storage period > 180 days Rainfall in excess of evaporation > 7.0 inches 25 year - 24 hour rainfall > 7.5 inches Freeboard > 1.0 feet Side slopes > 3.0 : 1 Inside top length > 320.0 feet Inside top width > 306.0 feet Top of dike elevation > 46.0 feet Bottom of lagoon elevation > 34.0 feet Total required volume > 561737 cu. ft. Actual design volume > 829290 cu. ft. Seasonal high watertable elevation (SHWT)===> feet Stop pumping elev. > 42.0 feet Must be > or = to the SHWT elev. > feet Must be > or = to min. req. treatment el.=> 40.0 feet Required minimum treatment volume > 356385 cu. ft. Volume at stop pumping elevation > 562944 cu. ft. Start pumping elev. > 44.3 feet Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.- 24 hr. rainfall==> 768090 cu. ft. Volume at start pumping elevation > 764248 cu. ft. Required volume to be pumped > 144152 cu. ft. Actual volume planned to be pumped > 201304 cu. ft. Min. thickness of soil liner when required==> 1.8 feet 7 DESIGNED BY: APPROVED BY: 64-1-NS (41ley I'GM.� y: (.1 DATE: DATE: ‘ j') / 6" /1-I NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: 11u1 -.d:_ L.T )i / y Afl f x r4 5