Loading...
HomeMy WebLinkAboutWQ0036207_Sewer Extension Permit Status Update_20210715 Request for Engineering Certification Date of Letter: June 15,2021 Sewer Extension Permit Status Update Please complete the applicable portion of this form for each permit and return this form and supporting documents by July 14,2021 to the attention of Collin Geersen at the Division's Municipal Permitting Unit by the delivery method below: NCDEQ/DWR WQPS—Municipal Permitting Unit By U.S.Postal Service: By Courier/Special Delivery: By Email: 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Collin Geersen Raleigh, NC 27699-1617 Raleigh, NC 27604 Collin.Geersen@ncdenr.gov *v,-e^rcr i.fl&" 44.4 M[+ ..., ••..$aSr v4c R2,Aar',F:Mite?J35YTb:: ,.3,..m,.k.:flY,Ai4.R.3M Aw.'A.r.w.,'.' riMMEZEMBEESUM Project Status (Complete Signature 81 Date section below. Check appropriate box['to indicate Permittee's response.) Name&Title(print): DC(V 1 C t /"l• l VI r 1 ec E On Dee v'c&t 1 ons o-cC‘'Gr Signature: d3—d7-4, `( _Date: 07/i3/z4oz4 Comments: U&) a 0 C3-5(0 a O 17 (u OCr-6,r-c f e s+- ,✓ SEWER NOT YET CONSTRUCTED ❑ The Permittee certifies that the permitted project has not been constructed but shall be constructed in the future in conformity with the approved Permit, project plans,specifications,and supporting documents.The Permittee understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject permit shall be maintained in Active status. NOTE: If sewer will never be built,please complete Permit Rescission Request section below. SEW AS BEEN CONSTRUCTED Engineer's Certification: The Permitted project has been constructed and the required Certification page and supporting documents are being submitted to the Division with this form. OWNERSHIP/NAME CHANGE ❑ The Permittee requests information to apply for ownership or name change. Please provide email and phone number below for follow-up. S,...x.::.x.sca wfl -.. ,"k&,:,.Ba;S:�aR cssc,.rs.xf] rns'a'r,x, "..+v'•�z:Sir'..€»,:s,:trw y, ...a.:..:eC. .w:...au 2;inc.^-.:�r,s'�ei;'3 rfrnxa iA.x:ux s" 4s...a:,.w.., wk..:�'.+w ,..zx._...,fx .;.:•...w:w.F Sa..x..:.eeSefm-a.•.y Permit Rescission Request The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall not be constructed nor made operational. By signing below,we acknowledge that should we wish to operate a non-discharge sewer system in the future,we shall apply for and receive a new Wastewater Collection System Permit. Name&Title(Print): Signature: Date: Comments: Contact Information Updates for Permittee Updated Contact Person&Title(Print): Updated Mailing Address: Updated Email: Updated Phone: RECEIVED JUL 15 2021 NCDEQ/DWR/NPDES PARKER & ASSO! 9a AS, INC. sloping g Ho o Consulting Engineers - Land nd Planners 306 New Bridge Street•P.O.Box 976 Jacksonville,NC 28541-0976 (910)455-2414•Fax: (910)455-3441 www.parkerengineeringandsurveying.com Firm License Number F-0108 VIA STANDARD MAIL Vrnq q'zte' September 20,2016 l g a6 Mr.Dean Hunkele,Senior Environmental Specialist {K NCDENR—Division of Water Quality 127 Cardinal Drive Extension Wilmington,NC 28405-3845 RE: Certification of Construction(Final) Sewer System.Extensions Watercrest Landing Permit No.WQ0036207 Onslow County,NC Dear Mr.Hunkele: We are providing herein a Sewer System Construction Certification for the above referenced project as shown below. I,Jason A.Houston,as a duly registered Professional Engineer in the State of North Carolina,having been authorized to observe the construction of the project,Watercrest Landing.Permit No.WQ0036207,herby state that,to the best of my abilities,due care and diligence was used in the observation of the project construction such that the construction was observed to have been built within the substantial compliance and intent of approved plans and specification. Please take note that this is a Final Certification. The original partial certification for Section 1 of Watercrest Landing included 12 Manholes,the Sewage Pumping station,and Force Main.The revised portion included Manhole#12 and#3A.The final portion of this project is now complete and includes Lots 9-26.The purpose of stating lot numbers is for ONWASA's use only. Please find enclosed one Fast Track Sewer Engineering Certification Form and one copy of the Record Drawings. If you have any questions or need any additional information,please call If you have any questions,please give me a call. '+‘‘1. Ni�111�// ``� ,AV! CARpei/�Sincerely, ?.6bi SS%.:d19�.. •�. ..PA tKER&i Q SSOCIATEE), INC. SEAL r; _ • / 34978 •ay'1d+'•`r01N tie'c�' �on A.Houston,PE Enclosures �///® A. HOVS��o\ xc: Ms.Wynne Ray-ONWASA(w/paper copy��'ttUdbliThrawings) Mr.Elijah Morton-M Three Partnership,LLC(Letter Only) CF(P),LAM,DAB,KRP(Letter Only) JAH/krp Secretary.0 1.JAH.Letter.Hunkele.watercrestLanding.SewerCeaFina1.9.20.16 EMAIL ADDRESS:TEXT MESSAGES TO:paitext@bizec.rrcom MAPS and PLANS TO:paidratitt@bizec.rr.com +ENVIRONMENTAL ENGINEERING+STORMWATER,WATER AND WASTEWATER SYSTEMS +FEASIBILITY AND DEVELOPMENT CONSULTING+GLOBAL POSITIONING SURVEYS+SUBDIVISION AND CONSTRUCTION PLANS FAST TRP,'K SEWER ENGINEERING CERTIFICATION PERMITTEE: ONWASA PERMIT#: WQ0036207 PROJECT: Watercrest Landing Subdivision ISSUE DATE: September 8,2014 COUNTY: Onslow This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. Consequently, it should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Wilmington Regional Supervisor, Water Quality Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I,the undersigned agent for the Permittee,hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee,and the Permittee is prepared to operate&maintain the wastewater collection system permi rein or portions ther of. �.a✓ic' ,-s. -' out, • cr /b Zol Printed Name,Title Signature D to co I.-,ala,rz....x-71 Dtr2aseX7Dre, ENGINEER'S CERTIFICATION Jason A. Houston ,as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe a periodically, ❑ weekly, ❑ full time) the construction of the project name and location as referenced above for the above Permittee hereby state that,to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed.to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supPQflglIrntF,)a Is. North Carolina Professional Engineer's Seal w/signature&date A . •*SS S/4j,.'f i� E •d• SEAL. • 34013 `74 Final ❑Partial G .1%,ti,, t:Vi GO"- - i l Certification Comments/Qualifiers: NC Division of Water Resources—Water Quality Section 127 Cardinal Drive Extension Wilmington,NC 28405 Wilmington Regional Office Phone: 910-796-7215 FAX:910-350-2004