Loading...
HomeMy WebLinkAboutWQ0038342_Sewer Extension Permit Status Update_20210715 ONWASA LETTER OF TRANSMITTAL onwasa.com 228 Georgetown Rd Jacksonville, NC 285d0 TO: Collin Geersen Municipal Permitting Unit Division of Water Resources\Department of Environmental Quali ECE,V ED 1617 Mail Service Center Raleigh, NC 27699-1617 JUL 1 5 2021 NcD1 Q/D 1/VR NPDES FROM: Wynne M. Ray, Development Services Supervisor DATE July 13, 2021 RE: Engineering Certification Request CONTENT: 1— Completed Project Status Update form and asbuilt for WQ0033507, Maidstone Park 1 — Final Certification and asbuilt for WQ0036207, Watercrest Landing 1 — Final Certification and asbuilt for WQ0033132, Shadow Creek Estates 1— Final Certification and asbuilt for WQ0038590, New Beginnings Liberty Christian Academy Expansion (Main) 1 — Request for permit extension for WQ0038342, Grants Creek Farms 1— Request for permit extension for WQ0038452, 4228 Richlands Highway COMMENTS: METHOD OF TRANSMITTAL: NUS MAIL ❑FEDEX ❑UPS ❑FAX ❑EMAIL ❑PICKUP Wynne M. Ray Development Services Supervisor Request for Engineering Certification Date of Letter: June 15,2021 Sewer Extension Permit Status Update Please complete the applicable portion of this form for each permit and return this form and supporting documents by July 14,2021 to the attention of Collin Geersen at the Division's Municipal Permitting Unit by the delivery method below: NCDEQ/DWR WQPS—Municipal Permitting Unit By U.S.Postal Service: By Courier/Special Delivery: By Email: 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Collin Geersen Raleigh, NC 27699-1617 Raleigh, NC 27604 Collin.Geersen@ncdenr.gov ..- r<.:r;;�,..•.4%tfl•a� s-r. ,.;....: a @-'rt..:,:aLn.' -«. . r:-:. ..-:U L,.,r..,t._. ..:awn , r-V,sx YVI W�sr r:s�-�s....vs.a.�a--..w.attt.v... ,a-..:.,�.;aL c.vL Project Status (Complete Signature&Date section below. Check appropriate box 'to indicate Permittee's response.) Name&Title(print : ���i rJ M. )-k r PE. c h Gc CA 2j o,- Signature: reg Date: 0 7//.3/Za"Z! Comments:1 _003 6 n-#5 v-y-h SEWER NOT YET CONSTRUCTED ©"The Permittee certifies that the permitted project has not been constructed but shall be constructed in the future in conformity with the approved Permit,project plans,specifications,and supporting documents.The Permittee understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject permit shall be maintained in Active status. NOTE: If sewer will never be built,please complete Permit Rescission Request section below. SEWER HAS BEEN CONSTRUCTED ❑ Engineer's Certification: The Permitted project has been constructed and the required Certification page and supporting documents are being submitted to the Division with this form. OWNERSHIP/NAME CHANGE ❑ The Permittee requests information to apply for ownership or name change. Please provide email and phone number below for follow-up. +aasia Permit Rescission Request The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall not be constructed nor made operational. By signing below,we acknowledge that should we wish to operate a non-discharge sewer system in the future,we shall apply for and receive a new Wastewater Collection System Permit. Name&Title(Print):_ Signature: _ Date: Comments: a.+s'.P: ,..iw..c 1_M•....».:LTrHIA.i:e3.3' :::_^Hr^,5..1..!...'.u^&�'flC-t:,..;.`.fi'.,Rin tt,......-e.r.."Y , a•__. .,r_'.'W':.. ;..,. r=8.a. .u�....�:*. F..S.O-a:a.•,: _"ai..�.k ...:tc Contact Information Updates for Permittee Updated Contact Person&Title(Print): Updated Mailing Address: Updated Email: Updated Phone: