HomeMy WebLinkAboutNCS000314_DOD Cherry Point Draft MS4 Permit Transmittal_20210716From:Powell, Jeanette
To:Arnett CIV Nathan W
Cc:Annette Lucas (annette.lucas@ncdenr.gov); Dumpor, Samir; Mitchell, Mike; Kuo, Mary; Dromgoole, Ahmad
Subject:NCS000314: DOD Cherry Point Draft MS4 Permit
Date:Friday, July 16, 2021 12:28:00 PM
Attachments:NCS000314_DOD Cherry Point 2021 DRAFT PERMIT_20210716.pdf
All,
Attached is the proposed draft MS4 permit for USMCAS Cherry Point, currently scheduled for public
notice on July 28, 2021. Comments will be accepted through August 30, 2021.
The primary differences between the existing permit and this one are:
1. The draft permit is in the new DEQ permit format, but is essentially the same as the existing
permit.
2. There is a significant wording change in Section H: Industrial Activities, but the intent is the
same as the current permit. This wording change incorporates general permit requirements
by reference rather than including specific NCG text. This is to ensure that current, consistent
and applicable requirements are in effect for the industrial activities on base since the NCG
permit updates/reissuance do not correspond to the MS4 permit renewal cycle.
3. The permit incorporates the DOD post-construction program deadlines previously established
in DEQ’s February 18, 2021 Memorandum.
4. The permit incorporates the approved Stormwater Management Corrective Action Plan
(SWMCAP) as an enforceable component of the permit. The Draft SWMCAP is currently
under review and comments are pending.
Please let me know if you have any comments.
Regards,
J
Jeanette Powell
MS4 Program Coordinator
919-707-3620
Jeanette.Powell@ncdenr.gov
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street, 6th Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be
disclosed to third parties.
https://deq.nc.gov/sw