Loading...
HomeMy WebLinkAboutNCS000314_DOD Cherry Point Draft MS4 Permit Transmittal_20210716From:Powell, Jeanette To:Arnett CIV Nathan W Cc:Annette Lucas (annette.lucas@ncdenr.gov); Dumpor, Samir; Mitchell, Mike; Kuo, Mary; Dromgoole, Ahmad Subject:NCS000314: DOD Cherry Point Draft MS4 Permit Date:Friday, July 16, 2021 12:28:00 PM Attachments:NCS000314_DOD Cherry Point 2021 DRAFT PERMIT_20210716.pdf All, Attached is the proposed draft MS4 permit for USMCAS Cherry Point, currently scheduled for public notice on July 28, 2021. Comments will be accepted through August 30, 2021. The primary differences between the existing permit and this one are: 1. The draft permit is in the new DEQ permit format, but is essentially the same as the existing permit. 2. There is a significant wording change in Section H: Industrial Activities, but the intent is the same as the current permit. This wording change incorporates general permit requirements by reference rather than including specific NCG text. This is to ensure that current, consistent and applicable requirements are in effect for the industrial activities on base since the NCG permit updates/reissuance do not correspond to the MS4 permit renewal cycle. 3. The permit incorporates the DOD post-construction program deadlines previously established in DEQ’s February 18, 2021 Memorandum. 4. The permit incorporates the approved Stormwater Management Corrective Action Plan (SWMCAP) as an enforceable component of the permit. The Draft SWMCAP is currently under review and comments are pending. Please let me know if you have any comments. Regards, J Jeanette Powell MS4 Program Coordinator 919-707-3620 Jeanette.Powell@ncdenr.gov North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. https://deq.nc.gov/sw