Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0042663_Application_20210709
DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION RF.. 'VED/NOOCO/DWR Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Roadra, LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation El General Partnership Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name: Rodney Howard per 15A NCAC 02T .0106(2) RECEIVED/NCD Q�9 Title: Owner ' JUL - 9 2021 4. Applicant's mailing address: 137 Cross Center Road, Suite 325 ' City: Denver State: NC Zip: 28037- litOORESVILLE12EGLIK.4 5. Applicant's contact information: Phone number: (704) 361-9119 Email Address: N/A UL -- .2021 II. PROJECT INFORMATION: 1. Project name: Cowans Ford Storage Facility 2. Application/Project status: Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Lincoln 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.4367' Longitude:-81.9708' 5. Parcel ID (if applicable): 02101, 34492 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Patrick Murphy License Number: 036836 Firm: R. Joe Harris & Associates, Inc. Mailing address: 1186 Stonecrest Blvd City: Fort Mill State: SC Zip: 29708- Phone number: (803) 802-1799 Email Address: pmurphy@rjoeharris.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Killian Creek WWTP Permit Number: NC0088722 Owner Name: Lincoln County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ€-S-iittfirt9 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS nCIINq Owner Name(s): East Lincoln Sewer System WQROS MOORE 1ILL. REGIONAL OFFII FORM: FTA 04-1 6 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ® Yes ❑No ❑N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Residential Leased ❑ School / preschool / day care ❑ Food and drink facilities ® Businesses / offices / factories ❑ Retail (stores, centers, malls) ❑ Retail with food preparation/service ❑ Medical / dental / veterinary facilities ❑ Church ❑ Nursing Home ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(20)) �Is there a Pretreatment Program in effect'? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .01 14(f)? ❑ Yes ® No > If yes, provide a cony of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow''b No. of Units Flow Commercial Storage Facility 25 gal/employee/shift 1,250 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 1,250 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 1,250 GPD (per 15A NCAC 02T .0114) > Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) 8 Length (feet) 940 Material PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: . Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(1)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 ®Yes ❑No 4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes ❑ No ➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per I5A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ®No ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. ProfessionalfeEngineer's Certification: I, 1 c i;fVkv%ti) (Profeslsional Engineer's name from Application Item III.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violat0l$$eeh1rtteo .443. a �• T<: 0 . SEAL • N • • North Carolina Professional Engineer's seal, signature, and date: • g'� � 9° QINO �,,/'C tik 3. Applicant's Certificationgobmed per 15A NCAC 02T .0106(b): I, 1 QdP7(4 - o 1✓14e,,- (Signature Authority's name & title from Application Item I.3.) attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: RECEIVED/NCDEQ/DWR FORM: FTA 04-16 JUL 7 9 2021 WQROS Page 5 of 5 MOORESVILLE REGIONAL OFFICE X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: P4L ►\Av./0, (Professional Engineer's name from Application Item III.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per mas violation. assaesaes get 14vA CARD 0a® North Carolina Professional Engineer's seal, signature, and date: •••°•••••• 4Fe. ,,� PP ° SEAL Y1%.1ll e ao t. s l"es s L. 3. Applicant's Certification per 15A NCAC 02T .0106(b): 1, Rodney Howard, Owner (Signature Authority's name & title from Application Item I.3.) attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: 02/22/21 FORM: FTA 04-16 Page 5 of 5 LINCOLN COUNTY PUBLIC WORKS DONALD V. CHAMBLEE PUBLIC WORKS DIRECTOR April 12, 2021 Roadra, LLC Attn: Rodney Howard 137 Cross Center Rd, Suite 235 Denver, NC 28037 RE: Cowans Ford Storage Facility — Sewer Availability Letter Mr.Howard: This letter is provided in response to your request, dated February 11, 2021, for flow acceptance of the wastewater treatment infrastructure (the "System") for the Cowans Ford Storage Facility Development (the "Project"). Lincoln County (the "County") has the actual average daily flow capacity at its Killian Creek Wastewater Treatment Plant to treat the domestic wastewater as requested, and does conditionally grant approval for the Project, subject, however, to the terms and conditions below: 1. . The amount of flow requested for the Project is for 1 lot with a total flow of 1,250 gallons per day of additional flow at the NCDEQ approved reduced flow rate of 240 gallons per day per home into LS- 20; and 2. For the NCDEQ Permits, the receiving sewer treatment facility is the Killian Creek WWTP, Permit #NC 0088722. The sewer collections facility is the Lincoln County Sewer System, Permit #WQCS 00149; and 3. The County shall not be named as the Permittee on NCDEQ system applications. You must make the application to NCDEQ in your own name for the System; and 4. Acceptance of the System and transferal of the System to the County is subject to the following: a. A complete final inspection and approval of the System by the County, and receipt of other applicable documentation requested by the County; and b. Approval of the System by NCDEQ, and proof provided to the County of a valid permit issued by NCDEQ with an Authorization to Construct (ATC); and c. Initiating construction of the Project within two years of the date of this conditional approval. You must notify the Lincoln County Public Works Department in writing when construction of the Project is initiated; and d. The County continuing to have actual average daily flow capacity to treat the domestic wastewater as requested at the time all other conditions precedent have been satisfied. This acceptance and allocation of flow shall only be effective upon your compliance with all of the above terms and conditions and the County providing an acknowledgment that you have complied with all of the above terms and conditions. 0. (704) 736-8495 0 dchambleea©incolncounty.org 4 115 W. MAIN ST I LINCOLNTON, NC 28092 LINCOLN COUNTY PUBLIC WORKS DONALD V. CHAMBLEE PUBLIC WORKS DIRECTOR Included in this mailing is the Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE — 10/18) with the County's portion completed. If you have any questions, please do not hesitate to call me at 704-736-8497. Sincerely, Chuck King Engineering Associate Cc: File 0 o. (704) 736-8495 dchambleegincolncounty.org 0 115 W. MAIN ST I LINCOLNTON, NC 28092 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Roadra, LLC Project Name for which flow is being requested: Cowans Ford Storage Facility More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Killian Creek WWTP b. WWTP Facility Permit #: NC0088722 All flows are in MGD c. WWTP facility's permitted flow 3.35 d. Estimated obligated flow not yet tributary to the WWTP 1,493,716 e. WWTP facility's actual avg. flow 1,407,000 f. Total flow for this specific request 1,250 g. Total actual and obligated flows to the facility 2,901,966 h. Percent of permitted flow used 86.62% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Approx. Average Current Obligated, Total Pump Pump Daily Avg. Not Yet Current Station Station Firm Flow** Daily Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Flow, Daily Flow, Obligated Available Number) No. MGD MGD MGD MGD Flow Capacity*** 20 WQ0020424 259,200 103,680 33,263 3,840 37,103 66,577 10 WQ0010918 468,000 187,200 61,561 78,720 140,281 46,919 15B WQ0032852M 1,856,160 742,464 20,466 366,360 386,826 355,638 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Lincoln County Sewer System Downstream Permit Number: WQCS00149 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Donald V. Chamblee certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. 11/(3 (ze..- Signing Official Signature Date Title of Signing Official Page 2 of 6 FTSE 10-18 North Carolina Secretary of State Search Results Page 1 of 1 • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings • Print a Pre -Populated Annual Report form • Print an Amended a Annual Report form Limited Liability Company Legal Name ROADRA, LLC Information Sosld: 1479049 Status: Current -Active 0 Date Formed: 11/3/2015 Citizenship: Domestic Annual Report Due Date: April 15th CurrentAnnual Report Status: Registered Agent: Howard, April D Addresses Mailing Principal Office Reg Office Reg Mailing 8261 NC 73 Suite D 8261 NC 73 Suite D 8261 NC 73 Suite D 8261 NC 73 Suite D Stanley, NC 28164 Stanley, NC 28164 Stanley, NC 28164 Stanley, NC 28164 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Member Rodney Howard 8261 NC 73 Suite D Stanley NC 28164 file:///C:/Users/DELUCK-1/AppData/Local/Temp/Low/WESWO9DJ.htm 7/7/2021